W9128A-18-B-0002_Am-0003_Specifications.pdf

PDF 9 MB Posted

Attached to
FY16 MCAF KNMD043004, Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii
Solicitation number
W9128A-18-B-0002
Issued by

About this file

Am-0003 - Specifications

View the file

Other files

File Type Posted
W9128A-18-B-0002_Abstract_of_Bids.pdf PDF
W9128A-18-B-0002_Am-0013.pdf PDF
W9128A-18-B-0002_Am-0013_Specifications.pdf PDF
W9128A-18-B-0002_Am-0013_Drawings.pdf PDF
W9128A-18-B-0002_Am-0012.pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Specifications.pdf PDF
W9128A-18-B-0002_Am-0011.pdf PDF
W9128A-18-B-0002_Am-0010_Specifications.pdf PDF
W9128A-18-B-0002_Am-0010.pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0009.pdf PDF
W9128A-18-B-0002_Am-0008.pdf PDF
W9128A-18-B-0002_Am-0008_Specifications.pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(2_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(5_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(6_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(3_of_6).pdf PDF
W9128A-18-B-0002_Am-0007.pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(4_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(1_of_6).pdf PDF
W9128A-18-B-0002_Am-0006.pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0005_Specifications.pdf PDF
W9128A-18-B-0002_Am-0005.pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0004.pdf PDF
W9128A-18-B-0002_Am-0003_Drawings_(1_of_2).pdf PDF
W9128A-18-B-0002_Am-0003.pdf PDF
W9128A-18-B-0002_Am-0003_Drawings_(2_of_2).pdf PDF
W9128A-18-B-0002_Am-0002.pdf PDF
W9128A-18-B-0002_Am-0001.pdf PDF
W9128A-18-B-0002_Specifications.pdf PDF
W9128A-18-B-0002_Drawings_(2_of_2).pdf PDF
W9128A-18-B-0002_IFB.pdf PDF
W9128A-18-B-0002_Drawings_(1_of_2).pdf PDF
SECNAV_5512-1.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCAF FIGHTER ALERT FACILITY, JBPHH, OAHU, HAWAII KNMD 043004

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 00 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 20 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 90 00 MISCELLANEOUS PROVISIONS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

(DELETED) (DELETED)

(Am-0003)

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Project Team Survey 61 - 90% Design Submittals ASHRAE 189.1-2014 ASHRAE 90.1-2013

Guiding Principle Requirement Select Your Answer i.a i.a.1 i.a.1.1

Not Applicable i.a.1.2

Not Applicable i.a.1.3

Not Applicable

Link 1:

Link 2:

1.a 1.a.1

1.a.1.1 Yes

No LCCA was performend because there's no HVAC in the base bid package.

1.a.2 1.a.2.1

Partially

1 EMPLOY INTEGRATED DESIGN PRINCIPLES

Sustainable Locations UFC 1-200-02, Paragraph 2-2.1.2 Evaluation for Design Strategies Evaluate site and building components for determination on passive &/or natural design strategies.

The building is designed with both long sides open for natural ventilation.

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Meet requirements of UFC 2-100-01 Installation Master Planning.

UFC 1-200-02, Paragraph 2-2.1.3 Evaluation of the Site

Prepare the LCCA in accordance with CFR Title 10 Part 436, Subpart A and NIST Handbook 135 "Life-Cycle Costing Manual for the Federal Energy Management Program ."

In the base bid configuration, the building is open on both long sides with no HVAC. The only HVAC would be an 11,000 Btu DX split system for the Foam Room if the hangar door option is exercised

Prepare the LCCA using the Building Life-Cycle Costing (BLCC) program from NIST.

Use the implied long-term inflation rate and discount rates identified in the Annual supplement to NIST Handbook 135.

http://energy.gov/eere/femp/building-life-cycle-cost-programs https://www.ecfr.gov/cgi-bin/text-idx?SID=1772217352e2b3956b37b48739ebd676&mc=true&node=pt10.3.436&rgn=div5

UFC 1-200-02, Paragraph 1-7: Life-Cycle Cost Analysis (LCCA)

LCCAs comparing individual component or system alternatives comply with UFC 1-200-02, Paragraph 1-7.3 (LCCA Individual Component or System Alternatives Analysis).

Item # Enter Required Documentation & Comments

i. LIFE-CYCLE COST ANALYSIS (LCCA) LCCA Format

1(Am-0003)

SECTION 01 33 29 ATTACHMENT 2

TPC CHECKLIST

1.a.3

1.a.3.1 Partially

1.a.3.2 Yes

1.a.3.3 Partially

1.a.3.4 Partially

1.a.3.5 Not Applicable

1.b 1.b.1

1.b.1.1

Partially

1.b.2 1.b.2.1

Yes

UFC 1-200-02, Paragraph 2-2.1.1 Integrated Planning Submit meeting notes, project goals, and design charrette matrix and decisions Showing established goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals.

Meetings were held to discuss and select the site layout.

Follow the steps of design optimization for the Integrated Design Charrette Process in ASHRAE 189.1 Section F1.1.1 (Charrette Process).

Submit list of stakeholders.

Four possible building orientation/configuration options were considered but many of the functional considerations had to take precendence over the sustainability id ti

This is a secured area. Only aircraft operators and maintenance personnel should be approaching the building.

UFC 1-200-02, Paragraph 2-2.1.4 Site Integration and Design of the Building Meet the following requirements during the planning and design process.

Site design elements ensure safe and convenient pedestrian access.

Incorporate results of site analysis into design, with focus on orientation, configuration, and massing.

Integrated Design UFC 1-200-02, Paragraph 2-2.1: Integrated Design

Orient building to maximize energy efficiency, passive solar, and daylighting potential.

Incorporate high performance and sustainable systems into design.

The nature of the function of the building isn't one that's conducive to voluntary physical activity due to aircraft and other vehicular traffic in

Design promotes opportunities for occupants to voluntarily increase physical activity.

Four different building orientations/configurations were considered however, the site was very constrained Some of the constraintsAll lighting is high-efficiency LED lighting. Building is naturally ventilated.

2(Am-0003)

1.c

1.c.1

1.c.1.1

Yes

1.c.1.2

Yes

1.c.1.3 Yes

1.c.1.4

Yes

1.c.1.5

Yes

1.c.1.6 Yes

1.c.1.7 Yes

1.c.1.8 Yes

1.c.1.9 Not Applicable

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.6 Documentation.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.2 Activities Prior to Building Occupancy.

Submit an electronic O&M Manual (hard copy optional).

Commissioning

UFC 1-200-02, Paragraph 2-2.2: Commissioning Complete all nine (9) requirements (as applicable).

Exception: For medical treatment facilities, refer to UFC 4-510-01 Military Medical Facilities for commissioning requirements.

Air Force projects only: The Project Delivery team must determine the level of commissioning activities required.

Submit the design documentation requirements of ASHRAE 189.1 Section 10.3.1.2.1 Activities Prior to Building Permit.

The CxA has conducted a focused OPR review of the contract documents at or near 50% design completion.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.4 Systems.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.5 Building Envelope Airtightness.

The CxA has conducted a second, focused OPR review of the final contract documents.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.3 Post-Occupancy Activities.

3(Am-0003)

ASSESSOR USE ONLY Assessor Comments

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

1.a Sustainable Locations i.a LCCA Format

I. LIFE-CYCLE COST ANALYSIS (LCCA)

1 EMPLOY INTEGRATED DESIGN PRINCIPLES

4(Am-0003)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

1.b Integrated Design

5(Am-0003)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

1.c Commissioning

6(Am-0003)

Guiding Principle Requirement Select Your Answer

2.a

2.a.1 Commercial & Multi-Family

2.a.1.A 2.a.1.A.1

Not Applicable

2.a.1.A.2

Not Applicable

2.a.1.A.3 Not Applicable

2.a.1.B 2.a.1.B.1

Not Applicable

2.a.1.B.2

Not Applicable

2.a.1.C

(pick from drop down list)

2.a.1.C.1 (pick from drop down list)

2.a.1.C.2

2.a.1.C.2.i

( mark with X to select)

2.a.1.C.2.ii

( mark with X to select)

2.a.1.C.2.iii

( mark with X to select)

2.a.1.C.2.iv

( mark with X to select)

iv) If none of the above reductions are LCCE, design to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.

Not applicable. New Construction.

ii) Reduce measured building energy use by at least 20% below FY 2015 energy use baseline.

Not applicable. New Construction.

iii) Reduce modeled energy use (from all sources including renewable energy) by 20% compared to the ASHRAE 90.1 baseline building design.

Not applicable. New Construction.

Submit energy model showing the proposed building alternatives to achieve at least 30% - less if LCCE -energy consumption reduction from IECC baseline (Section 405, Simulated Performance Alternative).

UFC 1-200-02, Paragraph 2-3.1.3 Renovations - OPTION C Renovation Type - Will this renovation replace everything above the foundation?

Not applicable. New Construction.

If replacing everything above the foundation:

Apply either UFC 2-3.1.1 or 2-3.1.2 as applicable.

Not applicable. New Construction.

Determine energy consumption levels for ASHRAE Baseline Building and proposed building alternatives.

UFC 1-200-02, Paragraph 2-3.1.2 Low-Rise Residential Buildings - OPTION B Meet the requirements of International Energy Conservation Code (IECC).

Meet the requirements of ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings.

The building wasn't modeled because there are no HVAC systems in the base bid.

For all other renovations, choose from one of the following four (4) options by marking an X in the pink cell:

i) Reduce measured building energy use by at least 30%, below FY 2003 energy use baseline.

Not applicable. New Construction.

UFC 1-200-02, Paragraph 2-3.1.1 Commercial and Multi-Family High-Rise Residential Buildings - OPTION A

Building Type - Select the building type most applicable to your project. Then complete only the appropriate requirement (Option) below.

Item # Enter Required Documentation & Comments

2 OPTIMIZE ENERGY PERFORMANCE

Energy Efficiency

Submit energy model showing the proposed building model to achieve at least 30% - less if LCCE - energy consumption reduction from ASHRAE 90.1 baseline.

7(Am-0003)

LCCA was not performed since no HVAC in the base bid.

Not applicable

Not applicable

2.a.2

2.a.2.1 Not Applicable

Link 1:

Link 2:

2.a.3

2.a.3.1 Not Applicable

2.b

2.b.1

2.b.1.1

Not Applicable

2.b.1.2 Not Applicable

No LCCA performed because first-cost budget constraints precluded PV and/or solar hot ater0%

Not applicable http://www.energystar.gov https://energy.gov/eere/femp/federal�energy�management�program

UFC 1-200-02, Paragraph 2-3.1.5 Standby Powered Devices

UFC 1-200-02, Paragraph 2-3.2: On-Site Renewable Energy Complete LCCA, both specific requirements, and tracking fields 1 - 4 (as applicable).

NAVFAC only: In addition to above, complete tracking field 5.

Submit Life Cycle Cost Analysis for on-site renewable energy (minimum quantity per ASHRAE 189.1 Section 7.4.1.1).

Rooftop PV and/or hot water systems were not feasible due to first-cost budget constraints and the fact that a glare study had not been done to

Submit documentation for on-site renewable energy system(s).

Tracking 5 Navy only: What is the Installation-level solution to renewable energy systems for this project?

Tracking 3 What is the system's total capacity for renewable thermal energy?

Tracking 4 List renewable energy technology

Tracking 1 What percentage of energy will come from the renewable energy system(s)?

Tracking 2 What is the system's total capacity for renewable electric energy?

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Renewable and Clean Energy

Provide commercially available, off-the-shelf products that use no more than 1 watt in standby mode.

There are no appliance or equipment beign provided under this project.

COMPLETE EACH REQUIREMENT BELOW.

UFC 1-200-02, Paragraph 2-3.1.4 Energy Efficient Products Select energy consuming products and equipment with Energy Star or FEMP designation.

No energyconsuming

Tracking 1 What is the current energy consumption reduction percentage?

Tracking 2 Energy Use Intensity (EUI) (kBTU/Sq. Ft./Year per building)

Enter LCCA and tracking data below, regardless of OPTION selected above.

Life-Cycle

Cost Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

8(Am-0003)

2.b.2

2.b.2.1 Not Applicable

Not applicable

Not applicable

2.c

2.c.1

2.c.1.1 Partially

2.c.1.2 Not Applicable

2.c.1.3 Not Applicable

2.c.1.4 Partially

2.c.1.5 Partially

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Is steam metered at the building level?

Submit documentation of electric meter at each building connected to base-wide monitoring system.

Sheet M-802

Submit documentation of utility meters for all other sources at each building, connected to the base-wide monitoring system.

The Alert Shelter is fed from the Crew Quarters Building, which has its own meter. The Crew Quarters building's meter is connected to the base wide

Metering

UFC 1-200-02, Paragraph 2-3.4 Metering Requirements 2.c.1.1 - 3: Choose "Yes" for each utility available at the project site, and "Not applicable" for utilities not available.

Requirements 2.c.1.4 - 5: Select "Not applicable if there is no centralized system.

Is electricity metered at the building level? The Alert Shelter is fed from the Crew Quarters Building, which has its own

Is natural gas metered at the building level?

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Tracking 1 What percentage of the hot water demand is being met through the installation of solar hot water heaters?

UFC 1-200-02, Paragraph 2-3.2.1 Solar Domestic Hot Water (SDHW) Purchase and install solar domestic hot water system where life cycle cost effective.

Solar hot water heating was not provided due to first-cost budget constraints.

9(Am-0003)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

2 OPTIMIZE ENERGY PERFORMANCE

2.a Energy Efficiency

10(Am-0003)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

2.b Renewable and Clean Energy

11(Am-0003)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

2.c Metering

12(Am-0003)

Guiding Principle Requirement Select Your Answer

3.a 3.a.1

3.a.1.1

Not Applicable

3.a.1.2 Not Applicable

3.a.1.3 Not Applicable

Not applicable

Not applicable

3.a.2 3.a.2.1

Not Applicable

3.b

3.b.1

3.b.1.1 Not Applicable

3.b.1.2

Not Applicable

3.b.1.3

Not Applicable

Not applicable.

3.b.2

UFC 1-200-02, Paragraph 2-4.1: Indoor Water Submit documentation of compliance with ASHRAE 189.1 Section 6.3.2 (Building Water Use Reduction), which incorporates USEPA WaterSense-labeled products.

The only plumbing in the building consists of two emergency eyewash/showers. Because this is a health and safety feature, adequae water flow is critical.

Submit documentation of compliance with ASHRAE 189.1 Section 6.4.2 (Building Water Use Reduction).

Submit documentation of compliance with ASHRAE 189.1 Section 6.4.3 (Special Water Features).

No Special Water Features in this project

Submit documentation showing no potable water is used for new landscaping.

No landcaping.

UFC 1-200-02, Paragraph 2-4.1.1 Indoor Water Metering Submit documentation for water meter(s) at each building, connected to base-wide monitoring system.

Item # Enter Required Documentation & Comments

3 PROTECT AND CONSERVE WATER

Indoor Water Use

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Tracking 1 NAVFAC ONLY: Water Use Intensity (GAL/Sq. Ft./Year/building)

There are only two emergency eyewash/shower stations in the building's plumbing system. Regular

Outdoor Water Use

UFC 1-200-02, Paragraph 2-4.2.1 Water for Landscaping Complete LCCA and all three (3) requirements (as applicable).

For existing systems, if a building has a single water meter: Submit documentation of 20% indoor and outdoor potable water use reduction. Calculate water savings results to baseline building using EPA's WaterSense landscape water budget tool version 1.01 or later.

New Building

Require irrigation contractors to be certified through a WaterSense labeled program, or by another industry-recognized, credentialing program.

No landscaping

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

No landscaping

UFC 1-200-02, Paragraph 2-4.2.2 Outdoor Water Metering For existing irrigation systems using potable water and serving more than 25,000 sq. ft. of landscape.

13(Am-0003)

3.b.2.1 Not Applicable

3.c 3.c.1

3.c.1.1

Not Applicable

3.d

3.d.1

3.d.1.1 Not Applicable

3.d.1.2

Not Applicable

3.d.1.3 Not Applicable

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

UFC 3-210-10 Low Impact Development Complete requirements 3.d.1.1 and 3.d.1.2 (as applicable).

NAVFAC only: In addition to above, complete 3.d.1.3

Alternative Water UFC 1-200-02, Paragraph 2-4.3 Alternative Water Submit documentation of water efficient landscape and irrigation strategies, such as water reuse and the use of harvested rainwater.

No landscaping

Stormwater Management

Submit documentation for separate water meters for outdoor water use.

No landcaping.

Are the requirements of UFC 3-210-10 Low Impact Development applicable to this project?

Although the site meets the criteria in paragraph 1-4 of UFC 3-10-10, application of full LID principles is technically infeasible per Paragraph 2Submit documentation (see ToolTip, all documentation is required) to validate the as-built LID-integrated management practices meet the design requirements, per UFC 3-210-10 paragraph 2-2.4.

For NAVFAC only, does the project require NAVY LID policy?

14(Am-0003)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

3 PROTECT AND CONSERVE WATER

3.a Indoor Water Use

3.b Outdoor Water Use

15(Am-0003)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

3.d Stormwater Management

3.c Alternative Water

16(Am-0003)

Guiding Principle Requirement Select Your Answer

4.a 4.a.1

4.a.1.1 Not Applicable

4.a.1.2

Not Applicable

4.a.1.3

Yes

4.b 4.b.1

4.b.1.1 Not Applicable

4.b.1.2 Not Applicable

4.b.1.3

Not Applicable

4.b.2 4.b.2.1

Partially

4.b.2.2

Not Applicable

4.c 4.c.1 4.c.1

Yes

4.c.1.2 Not Applicable

If Medical Treatment Facility: Meet the requirements of UFC 4-510-01 Medical Military Facilities.

Not a medical facility

UFC 1-200-02, Paragraph 2-5.3.1: Moisture Control Meet the requirements of ASHRAE 189.1 Section

10.3.1.5. Include and implement these requirements in

the IAQ construction management plan.

Material handling/storage requirements are in the specficiations.

Meet the requirements of UFC 3-410-01, Chapter 3, Sections 3-2 and 3-3 (Ventilation Air).

Building is not conditioned.

All regularly occupied spaces located on the exterior wall have vision fenestration.

No regularly occupied spaces in the building.

UFC 3-530-01 Interior & Exterior Lighting Systems and Controls Provide automated lighting controls in accordance with UFC 3-530-01 Interior and Exterior Lighting Systems and Controls, Sections 2-2 Lighting Controls (Interior) and 4-3 Lighting Controls (Exterior).

The Civil Engineering Squadron, who will be maintaining the facilities, was against daylight responsive dimmers due to long-term maintenance concerns. A timeclock is being

Indoor Air Quality

All classrooms and offices have daylighting. No classrooms or offices in the building.

Meet the requirements of ASHRAE 189.1 Section 8.4.1.2 (Minimum Sidelighting effective Aperture for Office Spaces and Classrooms) OR Section 8.5.1.2 (Usable Daylight Illuminance in Office Spaces and Classrooms).

No classrroms or office in the building.

UFC 1-200-02, Paragraph 2-5.2: Daylighting and Lighting Controls

Meet the requirements of UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems.

No HVAC in the base bid of this building. The only AC will be a 11 000 Btu unit to cool the equipment

If Medical Treatment Facility: Meet the requirements of UFC 4-510-01 Medical Military Facilities.

This is not a medical treatment facility.

Show proof that passive ventilation and thermal comfort methods are allowed and encouraged.

The long side of both buildings are open for ventilation. There is no HVAC in the base bid of this building.

Daylighting and Lighting Controls

UFC 1-200-02, Paragraph 2-5.1: Ventilation and Thermal Comfort

Item # Enter Required Documentation & Comments

4 ENHANCE INDOOR ENVIRONMENTAL QUALITY

Ventilation and Thermal Comfort

17(Am-0003)

4.c.1.3

4.c.2 4.c.2.1

Yes

4.c.3 4.c.3.1

Not Applicable

4.c.3.2

Not Applicable

4.c.4 4.c.4.1

Yes

4.d 4.d.1

4.d.1.1 Yes

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Occupant Health and Wellness UFC 1-200-02, Paragraph 2-5.4 Occupant Health and Wellness During Integrated Design Process, identify efforts to promote opportunities for occupant physical activity.

An exercise room and locker rooms are provided in the Crew Quarters building where the "Alert" personnel

For new construction and for renovation of unoccupied existing buildings, meet the requirements of ASHRAE 189.1 Section 10.3.1.4 Indoor Air Quality (IAQ) Construction Management.

There are no HVAC systems in the base bid and the building sides are mostly open. There's no need for a flushout or indoor air monitoring.

For renovation of occupied existing buildings, meet the requirements of SMACNA IAQ Guidelines for Occupied Buildings Under Construction , 2nd edition

ANSI/SMACNA 008-2008.

UFC 1-200-02, Paragraph 2-5.3.4 Environmental Tobacco Smoke Control Meet the requirements of ASHRAE 189.1 Section 8.3.1 Manage environmental tobacco smoke.

Meet the requirements of UFC 3-101-01 Architecture, Chapter 3, Building Envelope Requirements. Submit design details complying with moisture control requirements.

The two long sides of the building are mostly open. The building envelope isn't designed to be air-tight.

UFC 1-200-02, Paragraph 2-5.3.2 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials) Meet the requirements of ASHRAE 189.1 Section 8.4.2 Materials (Prescriptive Option).

VOC limitation requirements have been inserted to all of the pertinent sections in the Specifications.

UFC 1-200-02, Paragraph 2-5.3.3 Protect Indoor Air Quality during Construction

18(Am-0003)

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

4 ENHANCE INDOOR ENVIRONMENTAL QUALITY

4.a Ventilation and Thermal Comfort

4.b Daylighting and Lighting Controls

4.c Indoor Air Quality

19(Am-0003)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

4.d Occupant Health and Wellness

20(Am-0003)

Guiding Principle Requirement Select Your Answer

5.a 5.a.1

5.a.1.1 Yes

5.a.1.2 Yes

5.a.2 5.a.2.1

Yes

5.a.2.2

Yes

5.a.3 5.a.3.1

Not Applicable

5.a.3.2

Not Applicable

5.a.3.3

Yes

5.b 5.b.1

5.b.1.1

Not Applicable

5.b.2 5.b.2.1

Yes

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

UFC 1-200-02, Paragraph 2-6.2.2 Waste Diversion Divert a minimum of 60% (DoD requirement) of non-hazardous construction and demolition waste from landfills.

Comply with UFC 3-600-01 Fire Protection Engineering for Facilities for allowable chemicals in fire suppression systems.

UFC 3-600-01 refers to UFC 4-211-01 for Aircraft Maintenance Hangars.

UFC 4-211-01 allows foam fire suppression systems, which is what's

Waste Diversion and Materials Management UFC 1-200-02, Paragraph 2-6.2.1 Storage of Recyclables Meet the requirements of ASHRAE 189.1 Section 9.3.4.1:

Provide an area that serves the entire building and is dedicated to the collection and storage of materials for recycling.

The maintenance hangar is not a normally occupied space. When not actively maintaining an aircraft, the maintenance personnel will be in the Ready Alert Building.

Provide written narrative detailing research, analysis, and final determination of exclusion or inclusion of considered bio-based products in project.

Research of EPA website

UFC 1-200-02, Paragraph 2-6.1.3 Ozone Depleting Compounds Provide written narrative detailing research, analysis, and final determination of exclusion or inclusion of considered environmentally preferable products in project.

Base contract does not include any air conditoning

Meet the requirements of ASHRAE 189.1 Section 9.3.3:

Do not use CFC-based refrigerants in HVAC&R Systems.

Base contract does not include any air conditoning

Comply with RCRA Section 6002, per EPA's Comprehensive Procurement Guideline website.

Requirements were included in each pertinent section of the Specifications.

For EPA-designated products, specify products meeting or exceeding EPA's recycled content recommendations.

Requirements were included in each pertinent section of the Specifications.

UFC 1-200-02, Paragraph 2-6.1.2 Biologically-Based Products Specify products composed of the highest percentage of biobased content consistent with the USDA BioPreferred Program if products meet performance and are available at a reasonable cost.

Requirements were included in each pertinent section of the Specifications.

UFC 1-200-02, Paragraph 2-6.1.1 Recycled Content

Item # Enter Required Documentation & Comments

5 REDUCE ENVIRONMENTAL IMPACT OF MATERIALS

Material Content and Performance

21(Am-0003)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

(pick from drop down list)

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

Has the requirement been met?

(pick from drop down list)

5 REDUCE ENVIRONMENTAL IMPACT OF MATERIALS

5.a Material Content and Performance

5.b Waste Diversion and Materials Management

22(Am-0003)

Guiding Principle Requirement Select Your Answer

6.a 6.a.1

6.a.1.1 Not Applicable

6.a.1.2 Not Applicable

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Is or will there be a climate change projection and/or determination of acceptable risk for this project?

If located in a floodplain of concern: Provide design solutions which mitigate floodplain impact and impact on building function and occupants.

Project is near a floodplain but the building was purposely cited to avoid encroachment into the floodplain.

UFC 1-200-02, Paragraph 2-7 Address Climate Change Risk

Item # Enter Required Documentation & Comments

6 ASSESS AND CONSIDER CLIMATE CHANGE RISKS

Address Climate Change Risks

23(Am-0003)

(pick from drop down list)

(pick from drop down list)

6 ASSESS AND CONSIDER CLIMATE CHANGE RISKS

6.a Address Climate Change Risks

24(Am-0003)

DOD�GPC�NC�Survey�V1.2 ©�2015�2017�GREEN�BUILDING�INITIATIVE,�INC.�ALL�RIGHTS�RESERVED.

Survey�Assessment�Area Criteria Project�Team�Response Assessor�Response i.a.1.1 Not�Applicable No�Answer i.a.1.2 Not�Applicable No�Answer i.a.1.3 Not�Applicable No�Answer

1.a.1.1 Yes No�Answer Life�Cycle�Cost�Analysis No�LCCA�was�performend�because�there's�no�HVNo�Answer

1.a.2.1 Partially No�Answer

1.a.3.1 Partially No�Answer 1.a.3.2 Yes No�Answer 1.a.3.3 Partially No�Answer 1.a.3.4 Partially No�Answer 1.a.3.5 Not�Applicable No�Answer

1.b.1.1 Partially No�Answer

1.b.2.1 Yes No�Answer

1.c.1.1 Yes No�Answer 1.c.1.2 Yes No�Answer 1.c.1.3 Yes No�Answer 1.c.1.4 Yes No�Answer 1.c.1.5 Yes No�Answer 1.c.1.6 Yes No�Answer 1.c.1.7 Yes No�Answer 1.c.1.8 Yes No�Answer 1.c.1.9 Not�Applicable No�Answer

1.c.1�UFC�1�200�02,�Paragraph�2�2.2:��Commissioning i.a�LCCA�Format i.a.1�UFC�1�200�02,�Paragraph�1�7:�Life�Cycle�Cost�Analysis�(LCCA)

EM

PL

O Y�

IN

TE

G

RA

TE

D�

DE

SI

G N �P

RI

N

CI

PL

ES

1.a�Sustainable�Locations 1.a.1�UFC�1�200�02,�Paragraph�2�2.1.2�Evaluation�for�Design�Strategies

1.a.2�UFC�1�200�02,�Paragraph�2�2.1.3�Evaluation�of�the�Site

1.a.3�UFC�1�200�02,�Paragraph�2�2.1.4�Site�Integration�and�Design�of�the�Building

1.b�Integrated�Design 1.b.1�UFC�1�200�02,�Paragraph�2�2.1:��Integrated�Design

1.b.2�UFC�1�200�02,�Paragraph�2�2.1.1�Integrated�Planning

1.c�Commissioning

LC

CA

25(Am-0003)

2.a.1�Building�Type Commercial�&�Multi�Family No�Answer

2.a.1.A.1 Not�Applicable No�Answer 2.a.1.A.2 Not�Applicable No�Answer 2.a.1.A.3 Not�Applicable No�Answer

2.a.1.B.1 Not�Applicable No�Answer 2.a.1.B.2 Not�Applicable No�Answer Renovation�Type No�Answer No�Answer

2.a.1.C.1 No�Answer No�Answer

2.a.1.C.2.i (mark�with�X�to�select) No�Answer 2.a.1.C.2.ii (mark�with�X�to�select) No�Answer 2.a.1.C.2.iii (mark�with�X�to�select) No�Answer 2.a.1.C.2.iv (mark�with�X�to�select) No�Answer Life�Cycle�Cost�Analysis LCCA�was�not�performed�since�no�HVAC�in�the�bNo�Answer Tracking�1 Not�applicable No�Answer Tracking�2 Not�applicable No�Answer

2.a.2.1 Not�Applicable No�Answer

2.a.3.1 Not�Applicable No�Answer

2.b.1.1 Not�Applicable No�Answer 2.b.1.2 Not�Applicable No�Answer Life�Cycle�Cost�Analysis No�LCCA�performed�because�first�cost�budget�coNo�Answer Tracking�1 0% No�Answer Tracking�2 No�Answer No�Answer Tracking�3 No�Answer No�Answer Tracking�4 Not�applicable No�Answer Tracking�5 No�Answer No�Answer

2.b.2.1 Not�Applicable No�Answer Life�Cycle�Cost�Analysis Not�applicable No�Answer Tracking�1 Not�applicable No�Answer

O

PT

IM

IZ

E�

EN

ER

G Y�

PE

RF

O

RM

AN

CE

2.a�Energy�Efficiency

2.a.1.A�UFC�1�200�02,�Paragraph�2�3.1.1�Commercial�and�Multi�Family�High�Rise�Residential�Buildings���OPTION�A

2.a.1.B�UFC�1�200�02,�Paragraph�2�3.1.2�Low�Rise�Residential�Buildings���OPTION�B

2.a.1.C�UFC�1�200�02,�Paragraph�2�3.1.3�Renovations���OPTION�C

2.a.1.C.2�For�all�other�renovations,�choose�from�one�of�the�following�four�(4)�options�by�marking�an�X�in�the�pink�cell:

2.a.2�UFC�1�200�02,�Paragraph�2�3.1.4�Energy�Efficient�Products

2.a.3�UFC�1�200�02,�Paragraph�2�3.1.5�Standby�Powered�Devices

2.b�Renewable�and�Clean�Energy 2.b.1�UFC�1�200�02,�Paragraph�2�3.2:��On�Site�Renewable�Energy

2.b.2�UFC�1�200�02,�Paragraph�2�3.2.1�Solar�Domestic�Hot�Water�(SDHW)

26(Am-0003)

2.c.1.1 Partially No�Answer 2.c.1.2 Not�Applicable No�Answer 2.c.1.3 Not�Applicable No�Answer 2.c.1.4 Partially No�Answer 2.c.1.5 Partially No�Answer

3.a.1.1 Not�Applicable No�Answer 3.a.1.2 Not�Applicable No�Answer 3.a.1.3 Not�Applicable No�Answer Life�Cycle�Cost�Analysis Not�applicable No�Answer Tracking�1 Not�applicable No�Answer

3.a.2.1 Not�Applicable No�Answer

3.b.1.1 Not�Applicable No�Answer 3.b.1.2 Not�Applicable No�Answer 3.b.1.3 Not�Applicable No�Answer Life�Cycle�Cost�Analysis Not�applicable.�� No�Answer

3.b.2.1 Not�Applicable No�Answer

3.c.1.1 Not�Applicable No�Answer

3.d.1.1 Not�Applicable No�Answer 3.d.1.2 Not�Applicable No�Answer 3.d.1.3 Not�Applicable No�Answer

4.a.1.1 Not�Applicable No�Answer 4.a.1.2 Not�Applicable No�Answer 4.a.1.3 Yes No�Answer

4.b.1.1 Not�Applicable No�Answer 4.b.1.2 Not�Applicable No�Answer 4.b.1.3 Not�Applicable No�Answer

4.b.2.1 Partially No�Answer 4.b.2.2 Not�Applicable No�AnswerRO

N M

EN

TA

L� Q U

AL

IT

Y

4.a�Ventilation�and�Thermal�Comfort

3.b.1�UFC�1�200�02,�Paragraph�2�4.2.1�Water�for�Landscaping

3.b.2�UFC�1�200�02,�Paragraph�2�4.2.2�Outdoor�Water�Metering

3.c�Alternative�Water 3.c.1�UFC�1�200�02,�Paragraph�2�4.3�Alternative�Water

3.d�Stormwater�Management 3.d.1�UFC�3�210�10�Low�Impact�Development

4.a.1�UFC�1�200�02,�Paragraph�2�5.1:�Ventilation�and�Thermal�Comfort

4.b�Daylighting�and�Lighting�Controls 4.b.1�UFC�1�200�02,�Paragraph�2�5.2:�Daylighting�and�Lighting�Controls

4.b.2�UFC�3�530�01�Interior�&�Exterior�Lighting�Systems�and�Controls

PR

O

TE

CT

�A N D�

CO

N

SE

RV

E� W

AT

ER

3.a�Indoor�Water�Use 3.a.1�UFC�1�200�02,�Paragraph�2�4.1:�Indoor�Water

3.a.2�UFC�1�200�02,�Paragraph�2�4.1.1�Indoor�Water�Metering

3.b�Outdoor�Water�Use

2.c�Metering 2.c.1�UFC�1�200�02,�Paragraph�2�3.4�Metering

27(Am-0003)

4.c.1 Yes No�Answer 4.c.1.2 Not�Applicable No�Answer 4.c.1.3 Not�Applicable No�Answer

4.c.2.1 Yes No�Answer

4.c.3.1 Not�Applicable No�Answer 4.c.3.2 Not�Applicable No�Answer

4.c.4.1 Yes No�Answer

4.d.1.1 Yes No�Answer

5.a.1.1 Yes No�Answer 5.a.1.2 Yes No�Answer

5.a.2.1 Yes No�Answer 5.a.2.2 Yes No�Answer

5.a.3.1 Not�Applicable No�Answer 5.a.3.2 Not�Applicable No�Answer 5.a.3.3 Yes No�Answer

5.b.1.1 Not�Applicable No�Answer

5.b.2.1 Yes No�Answer

6.a.1.1 Not�Applicable No�Answer

6.a.1.2 Not�Applicable No�Answer

DOD�GPC�NC�Survey�V1.2 ©�2015�2017�GREEN�BUILDING�INITIATIVE,�INC.�ALL�RIGHTS�RESERVED.

5.b.2�UFC�1�200�02,�Paragraph�2�6.2.2�Waste�Diversion

AS

SE

SS

�A N D�

CO

N

SI

DE

R�

CL

IM

AT

E�

CH

AN

G E�

RI

SK

S 6.a�Address�Climate�Change�Risks

6.a.1�UFC�1�200�02,�Paragraph�2�7�Address�Climate�Change�Risk

4.c.4�UFC�1�200�02,�Paragraph�2�5.3.4�Environmental�Tobacco�Smoke�Control

4.d�Occupant�Health�and�Wellness 4.d.1�UFC�1�200�02,�Paragraph�2�5.4�Occupant�Health�and�Wellness

RE

DU

CE

�E N

VI

RO

N M

EN

TA

L�

IM

PA

CT

�O F� M

AT

ER

IA

LS

5.a�Material�Content�and�Performance 5.a.1�UFC�1�200�02,�Paragraph�2�6.1.1�Recycled�Content

5.a.2�UFC�1�200�02,�Paragraph�2�6.1.2�Biologically�Based�Products

5.a.3�UFC�1�200�02,�Paragraph�2�6.1.3�Ozone�Depleting�Compounds

5.b�Waste�Diversion�and�Materials�Management 5.b.1�UFC�1�200�02,�Paragraph�2�6.2.1�Storage�of�Recyclables

EN

HA

N

CE

�IN

DO

O R�

EN

VI

R

4.c.1�UFC�1�200�02,�Paragraph�2�5.3.1:�Moisture�Control

4.c.2�UFC�1�200�02,�Paragraph�2�5.3.2�Reduce�Volatile�Organic�Compounds�(VOC)�(Low�Emitting�Materials)

4.c.3�UFC�1�200�02,�Paragraph�2�5.3.3�Protect�Indoor�Air�Quality�during�Construction

4.c�Indoor�Air�Quality

28(Am-0003)

Guiding Principle Requirement Select Your Answer ASSESSOR USE ONLY Assessor Comments i.a i.a.1 Has the requirement been met?

i.a.1.1

Not Applicable (pick from drop down list) i.a.1.2

Not Applicable (pick from drop down list) i.a.1.3

Yes (pick from drop down list)

Link 1:

Link 2:

1.a 1.a.1 Has the requirement been met?

1.a.1.1 Partially (pick from drop down list)

The most LCC effective air conditioning system for this application is a system incorporating a high efficiency air cooled chiller.

1.a.2 Has the requirement been met?

1.a.2.1

Partially (pick from drop down list)

UFC 1-200-02, Paragraph 1-7: Life-Cycle Cost Analysis (LCCA)

LCCAs comparing individual component or system alternatives comply with UFC 1-200-02, Paragraph 1-7.3 (LCCA Individual Component or System Alternatives Analysis).

AC LCCA attached in Sustainability Notebook

Item # Enter Required Documentation & Comments

i. LIFE-CYCLE COST ANALYSIS (LCCA) LCCA Format

Meet requirements of UFC 2-100-01 Installation Master Planning.

The project involves replacing existing buildings with new facilities in the same general vicinity. The entire area

UFC 1-200-02, Paragraph 2-2.1.3 Evaluation of the Site

Prepare the LCCA in accordance with CFR Title 10 Part 436, Subpart A and NIST Handbook 135 "Life-Cycle Costing Manual for the Federal Energy Management Program ."

Prepare the LCCA using the Building Life-Cycle Costing (BLCC) program from NIST.

Use the implied long-term inflation rate and discount rates identified in the Annual supplement to NIST Handbook 135.

http://energy.gov/eere/femp/building-life-cycle-cost-programs https://www.ecfr.gov/cgi-bin/text-idx?SID=1772217352e2b3956b37b48739ebd676&mc=true&node=pt10.3.436&rgn=div5

1 EMPLOY INTEGRATED DESIGN PRINCIPLES

Sustainable Locations UFC 1-200-02, Paragraph 2-2.1.2 Evaluation for Design Strategies Evaluate site and building components for determination on passive &/or natural design strategies.

There were numerous functional and safety issues that precluded flexibility in the siting of the buildings.

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

1.a Sustainable Locations i.a LCCA Format

I. LIFE-CYCLE COST ANALYSIS (LCCA)

1 EMPLOY INTEGRATED DESIGN PRINCIPLES

29(Am-0003)

1.a.3 Has the requirement been met?

Yes (pick from drop down list)

1.a.3.2 Yes (pick from drop down list)

1.a.3.3 Not Applicable (pick from drop down list)

1.a.3.4 Yes (pick from drop down list)

1.a.3.5 Partially (pick from drop down list)

1.b 1.b.1 Has the requirement been met?

1.b.1.1

Yes (pick from drop down list)

1.b.2 Has the requirement been met?

1.b.2.1

Yes (pick from drop down list)

Follow the steps of design optimization for the Integrated Design Charrette Process in ASHRAE 189.1 Section F1.1.1 (Charrette Process).

Submit list of stakeholders.

The charrette report (331 pages) and the Design Analysis (925 pages) are incorporated by reference but not attachment due to their length.

There were numeorus functional and safety considerations in the siting of the building. See charrette minutes in the Sustainability Notebook thatReference is made to the charrette meeting minutes cited in Item 1.a.3.1.

There were numerous mission-critical site constraints that dictated the

UFC 1-200-02, Paragraph 2-2.1.4 Site Integration and Design of the Building Meet the following requirements during the planning and design process.

Site design elements ensure safe and convenient pedestrian access.

Incorporate results of site analysis into design, with focus on orientation, configuration, and massing.

Integrated Design UFC 1-200-02, Paragraph 2-2.1: Integrated Design

Orient building to maximize energy efficiency, passive solar, and daylighting potential.

Incorporate high performance and sustainable systems into design.

The nature of the functions at the site are not conducive to people walking around the building. One of the reasons the Crew Quarters is located

Design promotes opportunities for occupants to voluntarily increase physical activity.

Daylighting via windows was provided to the extent feasible. However, the wall assemblies facing the hangar were subject to minimum blast Refer to charrette minutes in this section of the Sustainability Notebook.

Subsequent to the charrette, it was determined that low impact design

UFC 1-200-02, Paragraph 2-2.1.1 Integrated Planning Submit meeting notes, project goals, and design charrette matrix and decisions Showing established goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals.

Refer to Charrette Report and Design Analysis.

1.b Integrated Design

30(Am-0003)

1.c.1 Has the requirement been met?

1.c.1.1

Yes (pick from drop down list)

1.c.1.2

Yes (pick from drop down list)

1.c.1.3 Yes (pick from drop down list)

1.c.1.4

Yes (pick from drop down list)

1.c.1.5

Yes (pick from drop down list)

1.c.1.6 Yes (pick from drop down list)

1.c.1.7 Yes (pick from drop down list)

1.c.1.8 Yes (pick from drop down list)

1.c.1.9 Not Applicable (pick from drop down list)

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Submit an electronic O&M Manual (hard copy optional). To be provided by the Contractor during the construction phase

Refer to attached Design Phase Commissioning Plan.

Commissioning

UFC 1-200-02, Paragraph 2-2.2: Commissioning Complete all nine (9) requirements (as applicable).

Exception: For medical treatment facilities, refer to UFC 4-510-01 Military Medical Facilities for commissioning requirements.

Air Force projects only: The Project Delivery team must determine the level of commissioning activities required.

Submit the design documentation requirements of ASHRAE 189.1 Section 10.3.1.2.1 Activities Prior to Building Permit.

Refer to attached Design Phase Commissioning Plan.

The CxA has conducted a focused OPR review of the contract documents at or near 50% design completion.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.4 Systems.

Refer to attached Design Phase Commissioning Plan.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.5 Building Envelope Airtightness.

Refer to attached Design Phase Commissioning Plan.

The CxA has conducted a second, focused OPR review of the final contract documents.

Refer to attached Design Phase Commissioning Plan.

Refer to attached Design Phase Commissioning Plan.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.3 Post-Occupancy Activities.

Refer to attached Design Phase Commissioning Plan.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.6 Documentation.

Submit the contract documentation requirements of ASHRAE 189.1 Section 10.3.1.2.2 Activities Prior to Building Occupancy.

Refer to attached Design Phase Commissioning Plan.

1.c Commissioning

31(Am-0003)

Guiding Principle Requirement Select Your Answer ASSESSOR USE ONLY Assessor Comments

2.a

2.a.1 Commercial & Multi-Family (pick from drop down list)

2.a.1.A Has the requirement been met?

2.a.1.A.1

Partially (pick from drop down list)

2.a.1.A.2

Not Applicable (pick from drop down list)

2.a.1.A.3 Yes (pick from drop down list)

2.a.1.B Has the requirement been met?

2.a.1.B.1

Not Applicable (pick from drop down list)

2.a.1.B.2

Not Applicable (pick from drop down list)

2.a.1.C Has the requirement been met?

(pick from drop down list) (pick from drop down list)

2.a.1.C.1 (pick from drop down list) (pick from drop down list)

2.a.1.C.2 Has the requirement been met?

2.a.1.C.2.i

( mark with X to select) (pick from drop down list)

2.a.1.C.2.ii

( mark with X to select) (pick from drop down list)

2.a.1.C.2.iii

( mark with X to select) (pick from drop down list)

2.a.1.C.2.iv

( mark with X to select) (pick from drop down list)

Has the requirement been met?

LCCA was performed for the air conditoning system. The most LCC efficient system is a system using a high efficiency4.87%

74.291

2.a.2 Has the requirement been met?

2.a.2.1 Yes (pick from drop down list)

Link 1:

Link 2:

2.a.3 Has the requirement been met?

2.a.3.1 Not Applicable (pick from drop down list)

2.b

2.b.1 Has the requirement been met?

2.b.1.1

Not Applicable (pick from drop down list)

UFC 1-200-02, Paragraph 2-3.1.1 Commercial and Multi-Family High-Rise Residential Buildings - OPTION A

Building Type - Select the building type most applicable to your project. Then complete only the appropriate requirement (Option) below.

Item # Enter Required Documentation & Comments

2 OPTIMIZE ENERGY PERFORMANCE

Energy Efficiency

Submit energy model showing the proposed building model to achieve at least 30% - less if LCCE - energy consumption reduction from ASHRAE 90.1 baseline.

Base energy consumptions was 163,164 kWh. Proposed consumption is 155,218 kWh for a 4.87% reduction. Without PV, it's not

Determine energy consumption levels for ASHRAE Baseline Building and proposed building alternatives.

Base energy consumptions was 163,164 kWh. Proposed consumption is 155,218 kWh for a 4.87%

UFC 1-200-02, Paragraph 2-3.1.2 Low-Rise Residential Buildings - OPTION B Meet the requirements of International Energy Conservation Code (IECC).

Meet the requirements of ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings.

Base energy consumptions was 163,164 kWh. Proposed consumption is 155,218 kWh for a 4.87% red ction Witho t PV it's not

For all other renovations, choose from one of the following four (4) options by marking an X in the pink cell:

i) Reduce measured building energy use by at least 30%, below FY 2003 energy use baseline.

Not applicable. New Construction.

Tracking 1 What is the current energy consumption reduction percentage?

Tracking 2 Energy Use Intensity (EUI) (kBTU/Sq. Ft./Year per building)

Enter LCCA and tracking data below, regardless of OPTION selected above.

Life-Cycle

Cost Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Renewable and Clean Energy

Provide commercially available, off-the-shelf products that use no more than 1 watt in standby mode.

Appliances are not being furnished under this project.

COMPLETE EACH REQUIREMENT BELOW.

UFC 1-200-02, Paragraph 2-3.1.4 Energy Efficient Products Select energy consuming products and equipment with Energy Star or FEMP designation.

Water heaters are required to be Energy Star compliant (refer to Spec Section 22 00 00, Section 2.11.1).

Appliances are not in contract.

UFC 1-200-02, Paragraph 2-3.2: On-Site Renewable Energy Complete LCCA, both specific requirements, and tracking fields 1 - 4 (as applicable).

NAVFAC only: In addition to above, complete tracking field 5.

Submit Life Cycle Cost Analysis for on-site renewable energy (minimum quantity per ASHRAE 189.1 Section 7.4.1.1).

Rooftop PV and/or hot water systems were not feasible due to first-cost budget constraints.

iv) If none of the above reductions are LCCE, design to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.

Not applicable. New Construction.

2 OPTIMIZE ENERGY PERFORMANCE

2.a Energy Efficiency

2.b Renewable and Clean Energy http://www.energystar.gov https://energy.gov/eere/femp/federal�energy�management�program

UFC 1-200-02, Paragraph 2-3.1.5 Standby Powered Devices

ii) Reduce measured building energy use by at least 20% below FY 2015 energy use baseline.

Not applicable. New Construction.

iii) Reduce modeled energy use (from all sources including renewable energy) by 20% compared to the ASHRAE 90.1 baseline building design.

Not applicable. New Construction.

Submit energy model showing the proposed building alternatives to achieve at least 30% - less if LCCE -energy consumption reduction from IECC baseline (Section 405, Simulated Performance Alternative).

UFC 1-200-02, Paragraph 2-3.1.3 Renovations - OPTION C Renovation Type - Will this renovation replace everything above the foundation?

Not applicable. New Construction.

If replacing everything above the foundation:

Apply either UFC 2-3.1.1 or 2-3.1.2 as applicable.

Not applicable. New Construction.

32(Am-0003)

2.b.1.2 Not Applicable (pick from drop down list)

No LCCA performed because first-cost budget constraints precluded PV and/or solar hot water0%

Not applicable

2.b.2 Has the requirement been met?

2.b.2.1 Not Applicable (pick from drop down list)

Not applicable

Not applicable

2.c

2.c.1 Has the requirement been met?

2.c.1.1 Yes (pick from drop down list)

2.c.1.2 Not Applicable (pick from drop down list)

2.c.1.3 Not Applicable (pick from drop down list)

2.c.1.4 Yes (pick from drop down list)

2.c.1.5 Yes (pick from drop down list)

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Tracking 3 What is the system's total capacity for renewable thermal energy?

Tracking 4 List renewable energy technology

Tracking 1 What percentage of energy will come from the renewable energy system(s)?

Tracking 2 What is the system's total capacity for renewable electric energy?

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost Analysis

(LCCA)?

Tracking 1 What percentage of the hot water demand is being met through the installation of solar hot water heaters?

Tracking 5 Navy only: What is the Installation-level solution to renewable energy systems for this project?

UFC 1-200-02, Paragraph 2-3.2.1 Solar Domestic Hot Water (SDHW) Purchase and install solar domestic hot water system where life cycle cost effective.

Solar hot water heating was not provided due to first-cost budget constraints.

Submit documentation of utility meters for all other sources at each building, connected to the base-wide monitoring system.

Sheet M-802

Metering

UFC 1-200-02, Paragraph 2-3.4 Metering Requirements 2.c.1.1 - 3: Choose "Yes" for each utility available at the project site, and "Not applicable" for utilities not available.

Requirements 2.c.1.4 - 5: Select "Not applicable if there is no centralized system.

Is electricity metered at the building level? Sheet M-802

Is natural gas metered at the building level?

Submit documentation for on-site renewable energy system(s).

2.c Metering

Is steam metered at the building level?

Submit documentation of electric meter at each building connected to base-wide monitoring system.

Sheet M-802

33(Am-0003)

Guiding Principle Requirement Select Your Answer ASSESSOR USE ONLY Assessor Comments

3.a 3.a.1 Has the requirement been met?

3.a.1.1

Yes (pick from drop down list)

3.a.1.2 Yes (pick from drop down list)

3.a.1.3 Not Applicable (pick from drop down list)

Not applicable

Not applicable

3.a.2 Has the requirement been met?

3.a.2.1

Yes (pick from drop down list)

3.b

3.b.1 Has the requirement been met?

3.b.1.1 Yes (pick from drop down list)

3.b.1.2

Not Applicable (pick from drop down list)

3.b.1.3

Not Applicable (pick from drop down list)

Not applicable.

3.b.2

3.b.2.1 Not Applicable (pick from drop down list)

3.c 3.c.1 Has the requirement been met?

3.c.1.1

Yes (pick from drop down list)

3.d

3.d.1 Has the requirement been met?

3.d.1.1 Not Applicable (pick from drop down list)

3.d.1.2

Not Applicable (pick from drop down list)

3.d.1.3 Not Applicable (pick from drop down list)

DOD GPC NC Survey V1.2 © 2015-2017 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

Are the requirements of UFC 3-210-10 Low Impact Development applicable to this project?

Although the site meets the criteria in paragraph 1-4 of UFC 3-10-10, application of full LID principles is technically infeasible per Paragraph 2Submit documentation (see ToolTip, all documentation is required) to validate the as-built LID-integrated management practices meet the design requirements, per UFC 3-210-10 paragraph 2-2.4.

This is a design submission.

Construction team will coordinate the post construction documentation.

For NAVFAC only, does the project require NAVY LID policy?

Life-Cycle Cost

Analysis

What was the finding of the Life-Cycle Cost…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.