TECHNICAL EXHIBIT 10
BOILER TUNE-UP FORM
RECORD OF GENERAL BOILER INFORMATION
Date:
Reporting Period:
Boiler Operator:
Boiler Emission Unit IDa:
Tune-Up Conducted By:
Please Print
RECORD OF TUNE-UP PROCEDURES (§63.11225(c)(2) and (§63.11223(b)(6)(i) and (ii))
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirement |
| Description |
| Inspector Comments/ Corrective Actions Taken |
| Inspect the burnerb |
| Clean or replace any components of the burner, as necessary |
| Inspect the flame pattern |
| Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. |
| Inspect air-to-fuel ratio control system |
| Ensure system is calibrated and control system functioning properly, if such a system is installed on the boiler. |
| Optimize emissions of carbon monoxide (CO) |
| Optimize emissions consistent with the carbon monoxide (CO) manufacturer's specifications, if available. |
| Measure CO and O2 levels in exhaust, before and after tune-upc |
| Parameter |
| Before |
| After |
Basis (wet or dry)
CO (ppmv)
O2 (%by volume) a Use the boiler emission unit ID consistent with the ID provided in the Initial Notification Report.
b You may delay the burner inspection until the next scheduled unit shut down, but you must inspect each burner at least once every 60 months.
c Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as per cent by volume.