ISS_15R0001_USAYPG_-_Technical_Exhibit_2_-_Workload_History_-_20170511.pdf
PDF 76 KB Posted
- Attached to
- Installation Support Services for Yuma Proving Ground, AZ Federal contract opportunity
- Solicitation number
- W9124R-15-R-0001
About this file
Revised TE 2
View the file
Other files for this federal contract opportunity
Show all 50
Installation Support Services for Yuma Proving Ground, AZ has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 2
WORKLOAD HISTORY
The DPW Workload Data is known to vary significantly with an increase or decrease in the mission, changing security and environmental requirements, or variations in funding level.
However, based upon FY12 through FY15 averages, the following is an estimated workload per year.
Number of Services:
Shop SO SJO PM TOTAL
HVAC (H) 711 430 2,857 3,998
PLUMBING (J) 723 388 1,709 2,820
ELECTRICAL (K) 1,091 267 1,881 3,239
CARPENTRY (M) 1,089 521 904 2,513
PEST CONTROL (P) 149 258 0 407
GROUNDS
MAINTENANCE (R)
142 1,237 0 1,378
HEAVY EQUIPMENT (V) 424 235 0 660
HIGH VOLTAGE (X) 82 54 44 180
TOTAL 4,410 3,390 7,394 15,190
Number of Labor Hours
Shop SO SJO PM TOTAL
HVAC (H) 2,723 7,124 3,729 13,576
PLUMBING (J) 3,148 3,403 1,919 8,470
ELECTRICAL (K) 4,748 2,784 3,317 10,849
CARPENTRY (M) 5,185 6,227 723 12,135
PEST CONTROL (P) 240 1,913 0 2,153
GROUNDS
MAINTENANCE (R)
1,672 17043 0 18,715
HEAVY EQUIPMENT (V) 6,984 13,649 0 20,633
HIGH VOLTAGE (X) 960 558 669 2,186
TOTAL 25,660 52,861 10,357 88,719
Cost of Materials
Shop SO SJO PM TOTAL
HVAC (H) $145,193 $11,782 $2,866 $159,842
PLUMBING (J) $44,577 $5,153 $5,676 $55,407
ELECTRICAL (K) $78,684 $383 $5,319 $84,387
CARPENTRY (M) $73,683 $9,070 $64 $82,817
PEST CONTROL (P) $487 $1,979 $0 $2,467
GROUNDS
MAINTENANCE (R)
$4,081 $24,248 $0 $28,328
HEAVY EQUIPMENT (V) $116 $1,555 $0 $1,671
HIGH VOLTAGE (X) $8,427 $4 $802 $9,233
TOTAL $355,249 $54,175 $14,728 $424,152
Additional Workload Information
• There is no workload history for recycling. It is estimated that this function will take 2.0 man-years of labor.
• The workload history from the POL Facility Maintenance is 1.0 man-years of labor and $2,500 materials.
• The workload history from the Cathodic Protection System Maintenance is 1.0 man-years labor and $5,000 materials.
• The average workload for Sanitary Landfill Operations is 3,750 man-hours per year.
• The average workload for Food Service Equipment Maintenance and Repair is 410 man-hours per year.
• The average SO workload for Roofing Systems is 380 man-hours per year.
• The average SO workload for painting is 414 man-hours per year.
• The average workload for Locksmith Services is 890 man-hours per year.
• The average workload for Mission Test Support is 9,496 man-hours per year.
o Heavy Equipment Support – 2,596 man-hours per year.
o Test Site Setup – 4,000 man-hours per year.
o Crane Support – 2,900 man-hours per year.
• The average workload for Small Engine Mechanic is 1,500 man-hours per year.
• Historical data indicates an average of 71 Emergency Service Orders, 780 man-hours labor, and approximately $5,000.00 annually.
• The average workload for Water Supply Distribution Systems is 2,965 man-hours per year.
• The average workload for Sanitary Sewage collection Systems is 287 man-hours per year.
• UPH Furniture Movement averages 76 man-hours per year. Non-UPH Furniture Movement averages 468 man-hours per year
• The average workload history for priority 1 service orders is 853 service orders and 3,365 man-hours per year.
• The average workload history for priority 2 service orders is 1,895 service orders and 7,961 man-hours per year.
• The average workload history for Priority 3 Service Orders is 1,662 service orders and 14,334 man-hours per year.
• The average workload history for Meter Reading is 519 man-hours per year.
• The average workload history for Planning & Estimating is 246 estimates per year.
Table 3–8: HCA Potable and Non-Potable Pipe Inventory
Diameter of Pipe (Inches)
PVC Asbestos Concrete Cast Iron
1” 54 2” 1,401 0 65 4” 3,646 716 1,471 6” 1,600 5,361 2,179 8” 20,424 13,434 9,417 10” 3,730 12” 970 3,543 14” 91
Unknown 185 35,735
TOTAL 23,310 22,249 56,231
Table 3–11: Walker Pipe Inventory
1” 2” 4” 990 6” 646 1,627 8” 1,327 9,662 1,632 10” 94 12” 14”
Unknown 396 4,585
TOTAL 1,327 11,694 7,938
Table 3–14: Laguna Pipe Inventory
2” 2,225 4” 10,294 1,221 6” 2,347 8” 7,902 790 4,168 10” 582 237 12” 14” 91
Unknown 2,580
TOTAL 18,196 1,372 12,869
Table 3–16: Kofa Pipe Inventory
2” 2,944 81 4” 20,925 6” 1,047 2,736 8” 13,119 6,382 4,264 10” 42,850 3,099 185 12” 45,612 14”
Unknown 77 15,487
TOTAL 57,093 55,093 43,597
Table 3–20: CDH Pipe Inventory
2” 4” 6” 8” 10” 12” 14”
Unknown 7,440
TOTAL
Table 3–22: CDA Pipe Inventory
2” 4” 6” 881 416 3,377 8” 10” 12” 14”
Unknown 6,783
TOTAL 881 416 10,160
Sanitary Sewer Systems
The sanitary sewer system serving the Col. George W. Howard cantonment area (HCA), consists of approximately 27,550 linear feet of gravity sanitary sewer and approximately 4,500 linear feet of force main. The sanitary sewer lines are mostly composed of vitrified clay pipe (VCP) with some sections that have been repaired with PVC. While the age of the existing PVC pipe is unknown, the installation date for most of the existing VCP dates back to the 1950’s.
The sanitary sewer system serving the General Walton H. Walker Cantonment Area (WCA) consists of approximately 12,163 linear feet of gravity sanitary sewer. The sanitary sewer lines are mostly composed of vitrified clay pipe (VCP) with some sections that have been repaired with PVC. While the age of the existing PVC pipe is unknown, the installation date for most of the existing VCP dates back to the 1950’s.
The sanitary sewer system serving the Laguna Army Airfield (LAAF) Cantonment Area consists of approximately 3,517 linear feet of gravity sanitary sewer. The sanitary sewer lines are mostly composed of vitrified clay pipe (VCP) with some sections of PVC. Additional buildings have been constructed on the north side of LAAF that are connected by approximately 1,800 linear feet of PVC gravity sewer. While the age of the existing PVC pipe is unknown, the installation date for most of the existing VCP dates back to the 1950’s.
The sanitary sewer system serving the Kofa Cantonment Area consists of approximately 10,350 linear feet of gravity sanitary. The sanitary sewer lines are composed of either vitrified clay pipe (VCP) or polyvinyl chloride pipe (PVC). While the age of the existing PVC pipe is unknown, the installation date for most of the existing VCP dates back to the 1950’s.
The sanitary sewer system serving the CDH cantonment area consists of approximately 881 linear feet of gravity sanitary sewer. The sanitary sewer lines are composed of vitrified clay pipe (VCP) installed in the 1950’s.
The sanitary sewer system serving the Castle Dome Annex (CDA) cantonment area consists of 4 septic tanks with leach fields and one septic tank connected to a lined evapotranspiration bed.
The gravity sanitary sewer consists of 4” and 6” laterals that connect the septic systems to the leach fields.