ISS 15R0001 USAYPG - Technical Exhibit 8 - ICE PM Checklist.docx

DOCX document 36 KB Posted

Attached to
Installation Support Services for Yuma Proving Ground, AZ Federal contract opportunity
Solicitation number
W9124R-15-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

About this file

TE 8

View the file

Other files for this federal contract opportunity

Other files attached to Installation Support Services for Yuma Proving Ground, AZ, newest first.
File Type Posted
W9124R-15-R-0001-0005.pdf PDF
Attachment_1_PWS_15R0001_YPG-ISS_-_5-19-17_v7L.pdf PDF
Attachment_1_PWS_15R0001_YPG-ISS_-_5-9-17_v6L.pdf PDF
revised_Technical_Exhibit_3_-_Performance_Requirements_Summary_-_20170504.pdf PDF
W9124R-15-R-0001-0003.pdf PDF
Response_to_Vendor_Questions_-_Final.pdf PDF
Response_to_Vendor_Questions__7_5-4-17_.pdf PDF
ISS_15R0001_USAYPG_-_Technical_Exhibit_24_-_Boiler_Size.docx DOCX document
Attachment_5_NEW__5-2-17.xlsx XLSX spreadsheet
W9124R-15-R-0001-0002.pdf PDF
ISS_15R0001_USAYPG_-_Technical_Exhibit_21_-_Labor_Categories_Rev_4-26-17.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_5_-_Equipment_In_Place_-_20170426.docx DOCX document
Response_to_Vendor_Questions__6_posted_5-2-17_.pdf PDF
Response_to_Vendor_Questions__5_posted_4-26-17.pdf PDF
Response_to_Vendor_Questions__3-_Yuma_PG_ISS_4-21-17.pdf PDF
Responses_to_Vendor_Questions_4-14-17.pdf PDF
Attach_L_-_3_SKtr_Consent_for_Release.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 22 - Government Furnished Property.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 13 - Water Pumping Booster Stations.docx DOCX document
Attachment_5_YPG_Price_Breakdown_-_for_evaluation.xlsx XLSX spreadsheet
ISS 15R0001 USAYPG - Technical Exhibit 17 - POL Facilities Locations and Equipment.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 16 - Roads and Test Courses.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_3_-_Performance_Requirements_Summary_-_20170327_v2L.pdf PDF
Attachment_3_Vehicle_list.xlsx XLSX spreadsheet
W9124R-15-R-0001.pdf PDF
ISS 15R0001 USAYPG - Technical Exhibit 15 - Grounds Inventory.docx DOCX document
Attachment_5_YPG_Price_Breakdown_-_for_evaluation_v2.xlsx XLSX spreadsheet
ISS 15R0001 USAYPG - Technical Exhibit 11 - Boiler-Heater Visible Emisions Inspection Checklist.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 9 - ICE Visible Emisions Inspection Checklist.docx DOCX document
W9124R-15-R-0001-0001.pdf PDF
ISS 15R0001 USAYPG - Technical Exhibit 18 - POL Facilities Bi-Monthly Checklist.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 2 - Workload History.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 14 - Ground Water Wells.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 1 - Real Property Inventory.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 20 - Cathodic Protection System PM Checklist.docx DOCX document
Attachment_2_WD_3-30-17.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 21 - Labor Categories .docx DOCX document
Attach_L_-_1_PP_Relevant_Contracts_Sheet.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 6 - Deliverables 20170330.docx DOCX document
Attach_L_-_2_PPQ.pdf PDF
ISS_15R0001_USAYPG_-_Technical_Exhibit_5_-_Equipment_In_Place.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_18_-_POL_Facilities_Bi-Monthly_Checklist.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_3_-_Performance_Requirements_Summary_-_20161005.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_7_-_Electrical_Substations.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_20_-_Cathodic_Protection_System_PM_Checklist.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_11_-_Boiler-Heater_Visible_Emisions_Inspection_Checklist.docx DOCX document
draft_Solicitation_15R0001_USAYPG_-3-2-17.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_22_-_Government_Furnished_Property.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_12_-_Water_Storage_Tanks.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_15_-_Grounds_Inventory.docx DOCX document
Show all 50

Installation Support Services for Yuma Proving Ground, AZ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 8

INTERNAL COMBUSTION ENGINE PREVENTIVE MAINTENANCE CHECKLIST

PM 5095GENM - PM System D5095 210 2900 Monthly

Emergency Diesel Generator, Over 15 KVA

Employee Check
Employee Check
Comments
Satisfactory
Unsatisfactory
1
Check with the operation or area personnel for any obvious deficiencies.
2
Check engine oil level; add as required.
3
Check battery charge and electrolyte specific gravity, add water as required; check terminals for corrosion, clean as required.
4
Check belts for wear and proper tension; adjust as necessary
5
Check that crank case heater is operating.
6
Check wiring, connections, switches, etc.; adjust as required.
7
Perform 30 minute generator test run; check for proper operation.
8
Check fuel level with gauge pole, add as required.
9
Wipe dust and dirt from engine and generator.
10
Clean area around generator.
11
Fill out maintenance checklist and report deficiencies.

Employee Signature __________________________________

Date ______________________________

PM System D5095 210 2900 Annual

Emergency Diesel Generator, Over 15 KVA

Employee Check
Employee Check
Comments
Satisfactory
Unsatisfactory
1
Check with the operation or area personnel for any obvious deficiencies.
2
Check engine oil level; add as required.
3
Change engine oil and oil filter.
4
Check battery charge and electrolyte specific gravity, add water as required; check terminals for corrosion, clean as required.
5
Check belts for wear and proper tension; adjust as necessary
6
Check that crank case heater is operating.
7
Check engine air filter; change as required.
8
Check wiring, connections, switches, etc.; adjust as required.
9
Check spark plug or injector nozzle condition; service or replace as required.
10
Perform 30 minute generator test run; check for proper operation.
11
Check fuel level with gauge pole, add as required.
12
Wipe dust and dirt from engine and generator.
13
Clean area around generator.
14
Fill out maintenance checklist and report deficiencies.