Response_to_Vendor_Questions__3-_Yuma_PG_ISS_4-21-17.pdf

PDF 26 KB Posted

Attached to
Installation Support Services for Yuma Proving Ground, AZ
Solicitation number
W9124R-15-R-0001
Issued by

About this file

Responses to Vendor Questions #3

View the file

Other files

File Type Posted
W9124R-15-R-0001-0005.pdf PDF
W9124R-15-R-0001-0005_conformed.pdf PDF
Attachment_1_PWS_15R0001_YPG-ISS_-_5-19-17_v7L.pdf PDF
W9124R-15-R-0001-0004.pdf PDF
Attachment_1_PWS_15R0001_YPG-ISS_-_5-18-17_v5L.pdf PDF
W9124R-15-R-0001-0003_conformed.docx.pdf PDF
ISS_15R0001_USAYPG_-_Technical_Exhibit_2_-_Workload_History_-_20170511.pdf PDF
W9124R-15-R-0001-0003.pdf PDF
Response_to_Vendor_Questions_-_Final.pdf PDF
Attachment_1_PWS_15R0001_YPG-ISS_-_5-9-17_v6L.pdf PDF
revised_Technical_Exhibit_3_-_Performance_Requirements_Summary_-_20170504.pdf PDF
Response_to_Vendor_Questions__8_5-10-17_.pdf PDF
Response_to_Vendor_Questions__7_5-4-17_.pdf PDF
Attachment_1_PWS_15R0001_YPG-ISS_-_4-27-17_v1L.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_21_-_Labor_Categories_Rev_4-26-17.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_1_-_Real_Property_Inventory_-_20170426.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_5_-_Equipment_In_Place_-_20170426.docx DOCX document
ISS_15R0001_USAYPG_-_Technical_Exhibit_2_-_Workload_History_-_20170426.docx DOCX document
W9124R-15-R-0001-0002.pdf PDF
ISS_15R0001_USAYPG_-_Technical_Exhibit_24_-_Boiler_Size.docx DOCX document
Attachment_5_NEW__5-2-17.xlsx XLSX spreadsheet
Attach__6_YPG_CBA_2015_2020.pdf PDF
Response_to_Vendor_Questions__6_posted_5-2-17_.pdf PDF
Response_to_Vendor_Questions__5_posted_4-26-17.pdf PDF
Response_to_Vendor_Questions__4_posted_4-25-17.docx DOCX document
Response_to_Vendor_Questions__2.pdf PDF
Responses_to_Vendor_Questions_4-14-17.pdf PDF
Attachment_3_Vehicle_list.xlsx XLSX spreadsheet
W9124R-15-R-0001.pdf PDF
ISS 15R0001 USAYPG - Technical Exhibit 15 - Grounds Inventory.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 20 - Cathodic Protection System PM Checklist.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 7 - Electrical Substations.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 3 - Performance Requirements Summary - 20170327.docx DOCX document
Attachment_1_PWS_15R0001_YPG-ISS_-_3-30-17_v5L.pdf PDF
ISS_15R0001_USAYPG_-_Technical_Exhibit_3_-_Performance_Requirements_Summary_-_20170327_v2L.pdf PDF
ISS 15R0001 USAYPG - Technical Exhibit 12 - Water Storage Tanks.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 21 - Labor Categories .docx DOCX document
Attachment_2_WD_3-30-17.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 8 - ICE PM Checklist.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 5 - Equipment In Place.docx DOCX document
Attach_L_-_3_SKtr_Consent_for_Release.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 22 - Government Furnished Property.docx DOCX document
Attachment_1_PWS_15R0001_YPG-ISS_-_3-30-17_v5L.pdf PDF
ISS_15T0001_USAYPG_-_Technical_Exhibit_23.pdf PDF
Attach_L_-_1_PP_Relevant_Contracts_Sheet.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 19 - Cathodic Protection System Locations.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 13 - Water Pumping Booster Stations.docx DOCX document
ISS 15R0001 USAYPG - Technical Exhibit 6 - Deliverables 20170330.docx DOCX document
Attachment_5_YPG_Price_Breakdown_-_for_evaluation.xlsx XLSX spreadsheet
ISS 15R0001 USAYPG - Technical Exhibit 17 - POL Facilities Locations and Equipment.docx DOCX document
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses to Questions #3

1 Paragraph C.5.3.3 Detailed Estimates, requires the Contractor’s estimate to be within +/- 10% of the actual cost of the project. This evaluation process was appropriate in the current contract where the Contractor was performing the work, but most of these estimates will be performed via other contract vehicles by other Contractors. How can the awardee of this contract’s estimators be held responsible for other Contractor’s prices or performance? We recommend that this contract’s estimates are prepared with the same estimating system (RSMeans ?) as the Contractor who will be performing the work. Estimates should be compared in the same format. Also recommend desk estimates be prepared in RSMeans as an IGE for the Government to compare with MATOC/JOC contractor’s estimates for the specified project.

The contractor is responsible for their estimators and the estimates they produce.

2 Ref. Section L contains Provision 52.216-1 Type of Contract which states “The Government contemplates award of a Cost-Plus-Fixed-Fee contract resulting from this solicitation.” Is this correct? If so, which CLINs in Section B is/are CPFF?

Per the Solicitation document, Provision 52.216-1 states “The Government contemplates award of a Fixed Price/Cost Reimbursable contract resulting from this solicitation.”

3 Ref. Workload History - Will the Government provide historical data for Food Service Equipment Maintenance & Repair (C.5.4)

The Government has verified that the requirement for Food Service Equipment Maintenance & Repair is accurately labeled in the PWS. Please clarify if your question pertains to Food Service Equipment or Paragraph C.5.4.

4 Will the Government provide historical data Water Supply Distribution Systems (C.5.10)

The Government has verified that the requirement for Water Supply Distribution Systems is accurately labeled in the PWS. Please clarify if your question pertains to Water Supply Distribution Systems or Paragraph C.5.10.

5 Will the Government provide historical data Sanitary Sewage Collection Systems (C.5.11)?

The Government has verified that the requirement for Sanitary Sewage Collection Systems is accurately labeled in the PWS. Please clarify if your question pertains to Sanitary Sewage Collection Systems or Paragraph C.5.11.

6 Will the Government provide historical data Sanitary Landfill Operations (C. 5.16)

The Government has verified that the requirement for Sanitary Landfill Operations is accurately labeled in the PWS. Please clarify if your question pertains to Sanitary Landfill Operations or Paragraph C.5.16.

7 Paragraph C.1.4.8.1.2 Qualifications, requires the Project Manager to have five years operation experience with minimum of two years as the Project Manager on Operation and Maintenance (O&M) contract greater than $20 million per year, and the Alternate Project Manager with $10 million per year. The $20 million per year is more than twice the value of this contract, and an unreasonable requirement for a contract with a $38.5M

The requirement is not too restrictive based on the complexity of the tasks and the historical value of the contract.

small business set aside. We recommend a lower dollar amount more in line with the value of this contract.

8 Paragraph C.4.5.4.3 Record Files, requires the Contractor to maintain a system of record files to include purchase orders, vendor receipts and issue slips in order to establish an audit trail for all purchases and issues. This appears to be a paragraph that would be included in Cost Contracts. All of the CLINs are FPP, and Contractor’s performance should be evaluated based on the quality and timeliness of the completion of services. The Contractor should not be required to provide an audit trail for materials included in an FFP.

This RFP will result in a FFP contract with Cost Reimbursable CLINs which will require the level of administration described in para C.4.5.4.3.

9 Section L, Para 3.3.5: Make reference to Attachment #21 in 2nd paragraph.

• Where is Attachment #21 in the proposal documents or is the Technical Exhibit 21?

If so are the labor categories just suggested or ones that must be staffed against and no changes allowed either adding more or changing what is there, please clarify?

• Paragraph should read “Technical Exhibit #21”

• Technical Exhibit #21 was prepared as guidelines for the offeror to utilize for demonstrating their staffing plan. It is the responsibility of the offeror to provide the labor categories necessary to perform the tasks described in the PWS.

10 RFP Section L, Para 2.1.2 Page Limitations: The draft had a page limit of 75, will the page limit be increased to 125 vs 75 since the spacing is 1.5 and all the areas to be addressed in Para 3.3 Factor 1, Mission Capability?

The page limit will be increased to 125 in the forthcoming Amendment.

11 Will you please provide a Sign-In Sheet from the Site Visit held on April 18th?

No. Due to Privacy concerns, the Sign- In Sheet from the Site Visit will not be posted. If you require that information, you will need to submit a Freedom of Information Act Request.

File details come from the government source that posted it. Updated .