W91242-18-B-0891-0008.pdf
PDF 692 KB Posted
- Attached to
- C-17 Corrosion Control and Fuel Cell Hangar
- Solicitation number
- W91242-18-B-0891
About this file
Amendment
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FJRP159062
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see next page for amendment details. Bid opening date/time remains Wednesday 28 November 2018 at 1:00pm EST.
The purpose of this amendment is to update the Wage Determination from General Decision Number NC180037, dated 07/13/2018, to General Decision Number NC180037, dated 11/09/2018 (see section 00800).
Due to a technical issue, w hat should have been Amendment 0002 w as issued as Amendment 0003. As of 15 November 2018, the Government has issued Amendment 0001 dated 12 Oct 18, Amendment 0003 dated 29 October 2018, Amendment 0004 dated 30 October 2018, Amendment 0005 dated 14 Nov 2018, Amendment 0006 dated 15 Nov 2018, Amendment 0007 dated 16 Nov 2018, and Amendment 0008 dated 20 Nov 2018.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9124218B0891
X 9B. DATED (SEE ITEM 11)
17-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Nov-2018
CODE
145 AW/ NC AIR NATIONAL GUARD (W91242)
145 AW/MSC CONTRACTING OFFICE - WAWF W91242
4930 MINUTEMAN WAY
CHARLOTTE NC 28208-3866
W91242 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124218B0891
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008
Amendment 0008 updates the Wage Determination from General Decision Number NC180037, dated 07/13/2018, to General Decision Number NC180037, dated 11/09/2018 (see section 00800).
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SECTION 00100
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. DESCRIPTION OF THE PROJECT: Construct C-17 Corrosion Control and Fuel Cell Hangar.
This project includes a 43,500 square foot hangar and a 17,500 square foot shop/admin area. Conventional shallow spread footing foundation system. Long-span custom-fabricated steel trusses with open-web steel joist supporting steel deck roof construction. Reinforced concrete masonry bearing/shear wall structure at support areas. Mezzanine floors to be reinforced concrete slab on deck with composite steel beams soil-supported slab-on-grade to be utilized.
Standing seam and membrane roofing. DX Cooling with heat pump and ducted makeup air systems. Medium voltage and communications concrete encased duct banks. Fire suppression pump house with high expansion foam system in hangar bay. Structural rigid airfield paving, heavy duty flexible paving, standard flexible, and rigid paving. This project will achieve a USGBC LEED® Silver Certifiable level of construction.
2. INSTRUCTIONS TO BIDDERS:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W91242-18-B-0891 entitled C-17 Corrosion Control and Fuel Cell Hangar, Project Number FJRP159062, at the 145th Airlift Wing, Charlotte, NC.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. Solicitation is Unrestricted. In accordance with FAR Clause 52.219-4 Alternate I, Notice of Price
Evaluation Preference for HUBZone Small Business concerns the HUBZone preference of 10% is applicable.
3. EVALUATION FOR AWARD. Reference DFARS 252.236-7007. FAR 52.217-5.
4. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
4.1. A pre-bid conference will be conducted on October 2, 2018 at 9:00AM EST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at 4930 Minuteman Way, Charlotte, NC 28208. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference. See solicitation attachment 12, Pre-Bid Conference and Site Visit, Bid Drop-Off Map for more information.
4.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the solicitation attachment 13 “Visitor Request Worksheet” for all attendees to 2d Lt Zachary Leddy at Zachary.d.leddy.mil@mail.mil. Please complete blocks 1.3, and 1.5 through 1.8 for all persons attempting to gain access to the installation.
4.3. This information must be provided in advance, 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
4.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
4.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
4.6. A record of the conference shall be made and furnished to all prospective bidders via posting at http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
5. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
5.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W91242-18-B-0891 Email: zachary.d.leddy.mil@mail.mil and karla.m.garcia4.civ@mail.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:_____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.2. All questions and requests for information (RFI) must be received NOT LATER THAN seven (7) working days prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS
EARLY IN THIS PROCESS.
4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.
However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov
4.4. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 OR by returning a signed copy of each amendment by the time set for receipt of bids.
4.5. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
4.5.1. Amendments, if/when issued will be posted to https://www.fbo.gov/ for electronic downloading.
This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
6. BID REPOSITORY AND BID OPENING:
6.1. A bid repository is provided for hand carried bids and is located at 4930 Minuteman Way, Charlotte, NC
28208. Hand carried bids must be deposited in the repository prior to the time established for opening of bids.
Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Visitor request worksheets must be re-submitted 3 business days prior to bid opening. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
6.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 at 4930 Minuteman
Way, Charlotte, NC 28208, Building 63. See solicitation attachment 12, Pre-Bid Conference and Site Visit, Bid Drop-Off Map for more information. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
7. Q&A – PREVIOUS SOLICITATION: Attachment 14 to this solicitation includes Q&As received from the previous C-17 Corrosion Control and Fuel Cell Hangar, solicitation W91242-18-R-0001. All plans, specifications, and drawings attached to this solicitation have been updated to reflect changes made as a result of the previous Q&As.
8. WAGE DETERMINATION:
8.1. Construction Wage Rates are applicable to this project are General Decision Number NC180037, dated 07/13/2018 11/09/2018 for Mecklenburg County, North Carolina. Applicable wage rates can be found at https://wdol.gov/.
9. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
10. CLAUSES:
10.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
11. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
12. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
13. SUBCONTRACTING PLAN – – (NOTE: Only required of Large Business Offerors). If required, offerors shall prepare and submit their subcontracting plan in accordance with FAR Clause 52.219-9 Alt I and DFARS Clause 252.219-7003. The National Guard Bureau Subcontracting Goals for use in development of your plan are as follows: Small Business 33%; Small Disadvantaged Business 5%; Woman-owned Small Business 5%;
Service Disabled Veteran Owned Business 3%; and Hub Zone firms 3%
13.1. Submit the Small Business Subcontracting Plan in a format to accommodate evaluation in accordance with
AFARS 5119.704. In accordance with FAR 19.7, “The Small Business Subcontracting Program”, and FAR clause 52.219-9, “Small Business Subcontracting Plan” Alternate I, subcontracting plans shall be evaluated for acceptability by the contracting team using the criteria set forth in AFARS Appendix DD- Subcontracting Plan Evaluation Guide that can be found at http://farsite.hill.af.mil/vfafara.htm.
Subcontracting goals shall be consistent with NGB Goals unless non-consistency is well justified. Goals must be challenging but achievable. To be acceptable, plans must adequately address the required statutory elements. The date for submittal of the Subcontracting Plan will be established in the Determination of Responsibility letter sent to the apparent low bidder after bid opening.
14. List of Brand Name or Sole Source Justifications posted on FBO
a. Monaco Radio Transceiver
b. Det-Tronics releasing panel and flame detectors
c. Acoustic Technology, Inc. Base Wide Mass Notification System
d. Alerton Direct Digital Control
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: NC180037 11/09/2018 NC37
Superseded General Decision Number: NC20170037
State: North Carolina
Construction Type: Building
County: Mecklenburg County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 04/13/2018 2 07/13/2018 3 11/09/2018
ELEC0379-009 01/01/2018
Rates Fringes
ELECTRICIAN......................$ 25.34 13%+7.55
On smokestacks where electrical work performed is above 40
ft. from the ground: $0.50 per hour additional.
Work from swinging scaffolds, bosun chairs, or raw structural steel: $0.50 per hour additional.
* IRON0848-005 02/01/2018
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.00 13.50
PLUM0421-002 07/01/2017
Rates Fringes
PLUMBER/PIPEFITTER (Excluding HVAC System Installation)........$ 28.65 10.45
SUNC2011-018 08/24/2011
Rates Fringes
BRICKLAYER.......................$ 19.75 9.18
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 15.41 0.00
CEMENT MASON/CONCRETE FINISHER...$ 16.41 0.00
DRYWALL HANGER...................$ 13.83 0.00
FORM WORKER......................$ 14.09 0.00
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)............................$ 17.36 2.23
LABORER: Common or General......$ 12.00 2.40
LABORER: Landscape & Irrigation.......................$ 9.13 0.28
LABORER: Pipelayer..............$ 13.35 2.80
LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.00 2.48
OPERATOR: Bulldozer.............$ 16.00 1.87
OPERATOR: Crane.................$ 19.77 4.48
OPERATOR: Forklift..............$ 13.86 0.00
OPERATOR: Grader/Blade..........$ 15.72 1.49
OPERATOR: Loader................$ 16.17 0.25
PAINTER: Brush, Roller and Spray............................$ 14.13 2.88
ROOFER...........................$ 13.16 0.74
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 17.70 1.68
SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation.....................$ 15.96 1.01
SPRINKLER FITTER (Fire Sprinklers)......................$ 15.52 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)