FX-100_-_FP_OVERALL_SITE_PLAN_Amend_001.pdf

PDF 130 KB Posted

Attached to
C-17 Corrosion Control and Fuel Cell Hangar
Solicitation number
W91242-18-B-0891
Issued by

About this file

FX-100

View the file

Other files

File Type Posted
OF_1419_-_Abstract_of_Offers_Construction_-_No_HUBZone_Preference_Final_signed.pdf PDF
OF_1419_-_Abstract_of_Offers_Construction_-_10__HUBZone_Preference_Final_signed.pdf PDF
W91242-18-B-0891-0008.pdf PDF
W91242-18-B-0891-0007.pdf PDF
W91242-18-B-0891-0006.pdf PDF
Questions_and_Answers_88-103_W91242-18-B-0891.pdf PDF
Drawings.pdf PDF
W91242-18-B-0891-0005.pdf PDF
Specifications.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
W91242-18-B-0891-0004.pdf PDF
Questions_and_Answers_32-87_W91242-18-B-0891.pdf PDF
Questions_and_Answers_16-31_W91242-18-B-0891.pdf PDF
W91242-18-B-0891-0002.pdf PDF
M-701_-_HVAC_CONTROL_DIAGRAMS_Amend_001.pdf PDF
W91242-18-B-0891-0001.pdf PDF
P-502_-_PLUMBING_DETAILS_Amend_001.pdf PDF
M-702_-_HVAC_CONTROL_DIAGRAMS_Amend_001.pdf PDF
Questions_and_Answers_1-15_W91242-18-B-0891.pdf PDF
PreBidSlides_W91242-18-B-0891.ppt PPT presentation
Site_Visit_Sign_in_Sheet.pdf PDF
Solicitation_Attachment_7_-_SUPPLEMENTAL_INFO_17-Aug-2018.pdf PDF
Solicitation_Attachment_1_-_SPECS_Vol_1of2_17-Aug-2018.pdf PDF
Solicitation_Attachment_14_-_Q&A_Previous_Hangar_Solicitation.pdf PDF
Solicitation_Attachment_4_-_DRAWINGS_Vol2of4.pdf PDF
Solicitation_Attachment_6_-_DRAWINGS_Vol4of4.pdf PDF
Solicitation_Attachment_5_-_DRAWINGS_Vol3of4.pdf PDF
Solicitation_Attachment_12_-_Pre-Bid_Conference_and_Site_Visit,_Bid_Drop-Off_Map.pdf PDF
Solicitation_Attachment_8_-_Single_Source_Determination_Det-Tronics-_Hangar_Redacted.pdf PDF
Solicitation_Attachment_13_-_Visitor_Request_Worksheet.pdf PDF
Solicitation_Attachment_2_-_SPECS_Vol_2of2_17-Aug-2018.pdf PDF
W91242-18-B-0891.pdf PDF
Solicitation_Attachment_11_-_Single_Source_Determination_Monaco__Hangar_Redacted.pdf PDF
Solicitation_Attachment_3_-_DRAWINGS_Vol1of4.pdf PDF
Solicitation_Attachment_10_-_Single_Source_Determination_ATI_Systems-_Hangar_Redacted.pdf PDF
Solicitation_Attachment_9_-_Single_Source_Determination_Alerton_DDC-_Hangar_Redacted.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-17 CORROSION

CONTROL & FUEL CELL

HANGAR

A. SHEET ILLUSTRATES EXISTING AND PROPOSED WATER MAINS AND FIRE

HYDRANTS LOCATIONS, FOR REFERENCE ONLY. THE HYDRANT

IDENTIFICATION NUMBERS ARE SHOWN. REFER TO CIVIL PLANS FOR

ADDITIONAL INFORMATION.

GENERAL NOTES

FLOOR PLAN KEYED NOTES

IAINNFCOQUEIAEENTSCI

GEOGR APH I A E PENE TR AM

US

A I R

N A T I ON A L

GU AR

D

C I V I L

E N G I N E E R I N G

N

FJRP

159062

145TH AIRLIFT WING

NORTH CAROLINA AIR NATIONAL GUARD

CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA

SCALE

DESIGNED BY

REVIEWED BY

DATE

AE PROJ. NO.

DRAWN BY

SHEET

PROJECT NO.

NCANG CIVIL ENGINEERING

REVISIONS

INITIALDESCRIPTIONDATEREV

CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA

F6W71900

C-17 CORROSION CONTROL & FUEL CELL HANGAR

54321

D C

B A

08/17/2018As indicated

/2

/2

4:

:0

PM

BI

M

U

S

- N or th

C ar ol in a Ai r N at io na l G ua rd /N

C A

N G

C

H an ga r - F

IR

E_

V

.rv t

FX-100

J.BEALS

M.OWENS

J.McLAUGHLIN

FIRE SUPPRESSION

OVERALL SITE PLAN

PROPOSED HYDRANT

3/64" = 1'-0"A1 FIRE SUPPRESSION OVERALL SITE PLAN

INCOMING FIRE WATER MAIN

FROM PUMP HOUSE AND

INCOMING DOMESTIC WATER

PUMP HOUSE

EXISTING WATER

TANK

GAUGE HYDRANT

FLOW HYDRANT

FUTURE CONNECTION TO

HANGAR 51

INCOMING FIRE WATER MAIN

FROM PUMP HOUSE AND

INCOMING DOMESTIC WATER

1 THE PROJECT SCOPE INCLUDES SUPPLYING THE NEW FIRE SUPPRESSION

SYSTEMS FROM THE EXISTING 280,000 GALLON WATER STORAGE TANK.

PERFORM THE FOLLOWING REPAIRS/ENHANCEMENTS TO THE EXISTING

TANK PRIOR TO CONNECTING THE NEW FIRE PUMP:

• INSTALL THERMOMETER AT GROUND LEVEL.

• INSTALL PRESSURE GAUGE AT GROUND LEVEL THAT READS FEET AND

PSI.

• INSTALL A FROST-PROOF DRAIN WITH LOCKING DEVICE.

• CLEAN TANK NAME PLATE AND REINSTALL IT.

• PROVIDE STAINLESS STEEL BOLTS FOR MANWAYS.

• CLEAN AND LUBRICATE ALL MOVING PARTS OF THE LIQUID LEVEL

INDICATOR AND PROVIDE GAUGE THAT READS IN FEET AND PSI.

• PROVIDE AN OSHA AND AWWA APPROVED SHELL LADDER WITH A

CABLE TYPE LADDER SAFETY CLIMB DEVICE AND POST A FALL

PROTECTION REQUIRED SIGN.

• EXTEND THE OVERFLOW DOWN THE EXTERIOR TO GRADE WITH

PROPER STANDOFFS, AND A FLAPPER VALVE AND SCREEN.

• EXTEND THE EXISTING HANDRAIL SYSTEM AROUND THE ROOF OF THE

TANK AND COMPLETE WITH TOEBOARD AND INTERMEDIATE RAILL.

• PROVIDE A SECONDARY 36" ROOF MANWAY WITH CONFIED SPACE

ENTRY SIGN AND EXTERIOR PLATFORM.

• PROVIDE NEW LOCK FOR EXISTING MANWAY.

• REPLACE THE EXISTING ROOF VENT WITH A VACUUM-PRESSURE,

FROST PROOF VENT AND SCREEN.

• CLEAN AND PAINT EXISTING INTERIOR LADDER.

1 10/4/2018 REBID MFO

Sheets
FX-100 - OVERALL FIRE SUPPRESSION SITE PLAN

File details come from the government source that posted it.