PreBidSlides_W91242-18-B-0891.ppt

PPT presentation 2 MB Posted

Attached to
C-17 Corrosion Control and Fuel Cell Hangar
Solicitation number
W91242-18-B-0891
Issued by

About this file

Pre-Bid Conference/Site Visit Slides

View the file

Other files

File Type Posted
OF_1419_-_Abstract_of_Offers_Construction_-_No_HUBZone_Preference_Final_signed.pdf PDF
OF_1419_-_Abstract_of_Offers_Construction_-_10__HUBZone_Preference_Final_signed.pdf PDF
W91242-18-B-0891-0008.pdf PDF
W91242-18-B-0891-0007.pdf PDF
W91242-18-B-0891-0006.pdf PDF
Questions_and_Answers_88-103_W91242-18-B-0891.pdf PDF
Drawings.pdf PDF
W91242-18-B-0891-0005.pdf PDF
Specifications.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
W91242-18-B-0891-0004.pdf PDF
Questions_and_Answers_32-87_W91242-18-B-0891.pdf PDF
Questions_and_Answers_16-31_W91242-18-B-0891.pdf PDF
W91242-18-B-0891-0002.pdf PDF
M-701_-_HVAC_CONTROL_DIAGRAMS_Amend_001.pdf PDF
W91242-18-B-0891-0001.pdf PDF
P-502_-_PLUMBING_DETAILS_Amend_001.pdf PDF
FX-100_-_FP_OVERALL_SITE_PLAN_Amend_001.pdf PDF
M-702_-_HVAC_CONTROL_DIAGRAMS_Amend_001.pdf PDF
Questions_and_Answers_1-15_W91242-18-B-0891.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
Solicitation_Attachment_7_-_SUPPLEMENTAL_INFO_17-Aug-2018.pdf PDF
Solicitation_Attachment_1_-_SPECS_Vol_1of2_17-Aug-2018.pdf PDF
Solicitation_Attachment_14_-_Q&A_Previous_Hangar_Solicitation.pdf PDF
Solicitation_Attachment_4_-_DRAWINGS_Vol2of4.pdf PDF
Solicitation_Attachment_6_-_DRAWINGS_Vol4of4.pdf PDF
Solicitation_Attachment_5_-_DRAWINGS_Vol3of4.pdf PDF
Solicitation_Attachment_12_-_Pre-Bid_Conference_and_Site_Visit,_Bid_Drop-Off_Map.pdf PDF
Solicitation_Attachment_8_-_Single_Source_Determination_Det-Tronics-_Hangar_Redacted.pdf PDF
Solicitation_Attachment_13_-_Visitor_Request_Worksheet.pdf PDF
Solicitation_Attachment_2_-_SPECS_Vol_2of2_17-Aug-2018.pdf PDF
W91242-18-B-0891.pdf PDF
Solicitation_Attachment_11_-_Single_Source_Determination_Monaco__Hangar_Redacted.pdf PDF
Solicitation_Attachment_3_-_DRAWINGS_Vol1of4.pdf PDF
Solicitation_Attachment_10_-_Single_Source_Determination_ATI_Systems-_Hangar_Redacted.pdf PDF
Solicitation_Attachment_9_-_Single_Source_Determination_Alerton_DDC-_Hangar_Redacted.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 October 2018 Pre-Bid Conference/Site Visit

Solicitation Number W91242-18-B-0891

C17 Corrosion Control Fuel Cell Hangar

Agenda

Introduction
Administrative Items
Process for Questions and Answers
Project Overview
Solicitation, Plans, Specifications and Amendments
Invitation for Bid Basics and Bid Requirements
Break Session- approx. 10 min
Site Visit to follow conference

Introduction Mrs. Karla Garcia – Contracting Officer 2d Lt Zachary Leddy – Contract Specialist SMSgt Bryant Alexander – Contract Specialist Maj James Eaton – COR

Administrative items- Attendance Roster Ensure you sign in on the attendance roster

We plan to post this roster to FBO.gov under Site Visit Attendance Roster in order to facilitate communication between potential subs and prime contractors

Administrative items- Site Visit A site visit will follow this presentation

Any questions you have during the site visit should be sent in writing for an official response in accordance with the solicitation.

A secondary organized site visit is not scheduled but might be if deemed necessary by the Government

Submit questions to 2d Lt Zachary Leddy and Mrs. Karla Garcia. See Section 00100 for instructions.

Questions and official answers will be posted on FBO on a non-attribution basis with solicitation information at www.fbo.gov

Submit questions NLT 7 business days prior to bid opening. Do not contact the A/E or any Gov engineering personnel directly.

Amendments will be only issued only if there is a change in the solicitation, specifications, or plans

Process for Questions and Answers

Project Overview

This project includes a 43,500 square foot hangar and a 17,500 square foot shop/admin area. Conventional shallow spread footing foundation system. Long-span custom-fabricated steel trusses with open-web steel joist supporting steel deck roof construction. Reinforced concrete masonry bearing/shear wall structure at support areas. Mezzanine floors to be reinforced concrete slab on deck with composite steel beams soil-supported slab-on-grade to be utilized. Standing seam and membrane roofing. DX Cooling with heat pump and ducted makeup air systems. Medium voltage and communications concrete encased duct banks. Fire suppression pump house with high expansion foam system in hangar bay. Structural rigid airfield paving, heavy duty flexible paving, standard flexible, and rigid paving. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project.
Will meet a USGBC LEED® Silver Certifiable level of construction.

Brand Name Items:

Alerton: Direct Digital Control (DDC)

Acoustic Technology, Inc. Systems: Mass Notification System

Det-Tronics: Eagle Quantum Premier Fire Detection/Releasing System

Monaco: Fire alarm control panel, transceiver, antenna

Project Overview- Bid Schedule Base plus 4 Additive Bid Items (ABIs) Base:

CLIN 0001, FFP

Base Bid C-17 Hangar QUANTITY: 1 UNIT: Job Non personal services: Provide all plant, labor, new and current material, transportation, , tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to construct a new 43,500 square foot hangar and 17,500 square foot shop/admin area in accordance with specs and drawings dated 08/17/2018.

CLIN 0002, FFP

Base Bid- Unsuitable Soils QUANTITY: 500 UNIT: Cubic Yard

Project Overview- Bid Schedule Additive Bid Items

CLIN 0003, FFP

ADDITIVE BID ITEM PRIORITY #1- Operable Partitions QUANTITY: 1 UNIT: Job

CLIN 0004, FFP

ADDITIVE BID ITEM PRIORITY #2- General Hangar Items (Fuel Resistant Resinous Flooring, Hangar Flood Task Lighting, Ace HVAC Ductwork).

QUANTITY: 1 UNIT: Job

CLIN 0005, FFP

ADDITIVE BID ITEM PRIORITY #3- General Exterior Items (Landscaping, Ornamental Fence and Knee Wall).

QUANTITY: 1 UNIT: Job

CLIN 0006, FFP

ADDITIVE BID ITEM PRIORITY #4- Miscellaneous Hangar Items (Demountable Partitions, Exterior Flightline Signage).

QUANTITY: 1 UNIT: Job

A Firm Fixed Price contract will be awarded
Invitation for Bid Procedures
Unrestricted
NAICS: 236220
Period of Performance: 540 calendar days after Notice to Proceed is issued
NTP will be issued after approval of Performance and Payment Bonds and all required pre-construction submittals
Magnitude of Construction: $25M to $30M
CLINs: Base plus 4 Additive Bid Items

Project Overview- Schedule

Synopsis: 17 Aug 2018
Solicitation Posted: 17 Sep 2018
Bid Opening Date/Time: 1 Nov 2018, 2:00PM EST
Deadline to submit questions: 23 Oct 2018
Projected award date: 18 Jan 2019

Solicitation, Plans, Specifications and Amendments

Located on the Federal Business Opportunities website: www.fbo.gov
The plans and specs have been posted in FBO.
The Government is not liable for information furnished by any other source
Amendments (SF30) will be posted to FBO. It is the offerors responsibility to check the website periodically for any amendments to the solicitation.

DISCLAIMER

The following is a brief overview of the bid requirements BIDDERS ARE STRONGLY CAUTIONED TO CAREFULLY READ THE REQUIREMENTS OF THE SOLICITATION AND COMPLY ACCORDINGLY Invitation for Bids Procedures and Bid Requirements

Invitation for Bids Procedures

IMPORTANT: Refer to the solicitation and FAR Part 14 for details

Public bid opening occurs. Prices are read to the public. There will be no discussion
Bidders must submit sealed bids to be opened at the time and place stated in the solicitation for the public opening of bids
After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price and the price-related factors included in the invitation.

Determination of Responsibility IMPORTANT: Refer to the solicitation and FAR Part 9 for details

A bidder is determined to be responsible in accordance with FAR 9.104

To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work.

CLINS 0003 through 0006 are additive bid items.

The Government will determine apparent low bidder in accordance with the procedure described in provision 252.236-7007, Additive or Deductive Items.

Invitation for Bids Procedures Additive Bid Items- DFARS 252.236-7007 How is the low offeror determined and the items to be awarded determined?

The Gov will determine the amount of funds available before the bid opening
Low offeror shall be:
Eligible for an award
Offers the lowest aggregate amount for the first or base bid item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive items that provide the most features within the funds determined available

How is the low offeror determined and the items to be awarded determined?

(Continuation)

Invitation for Bids Procedures Additive Bid Items- DFARS 252.236-7007 The KO will evaluate all bids on the basis of the same additive or deductive items.

If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities; and

Add that next item if an award may be made that includes that item and is within the available funds.

The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if –
It is in the best interest of the Government;
Funds are available at the time of award; and
The low offeror's price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.

Example The amount available is $100,000.

Invitation for Bids Procedures Additive Bid Items- DFARS 252.236-7007 Offeror A's base bid and four additives:

Totals:
Base$85,000$85,000
ABI priority #1$10,000$95,000
ABI priority #2$8,000$95K+8k= $103,000 (exceed funds; ABI skipped)
ABI priority #3$6,000$95K+6K= $101,000 (exceed funds; ABI skipped)
ABI priority #4$4,000$95K+4K= $99,000 (Low offeror)

Offeror B's base bid and four additives:

Totals:
Base$80,000$80,000
ABI priority #1$16,000$96,000
ABI priority #2$9,000$96K+$9K= $105,000 (exceed funds; ABI skipped)
ABI priority #3$7,000$96K+$7K=$103,000 (exceed funds; ABI skipped)
ABI priority #4$4,000$96K+$4K= $100,000

The aggregate amount of offeror A's bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives.

The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.

What to expect at the Bid Opening Bid opening officer (BOO) will announce exact time bids are due and that no more bids will be accepted If there are ABI’s, the amount of funds available will be announced, and announced for each source of funds Bids are opened and read out loud with no comment on responsiveness (FAR 14.301) of bids, and recorded BOO opens Government estimate, records Abstract will be certified and posted to www.fbo.gov as soon as practical. Low bidder determined in accordance with DFARS 252.236-7007

Bid Requirements

What you must submit (see Section 00010)

SF 1442, (Blocks 14-20c)
Do not enter less than 90 days in Block 17
Section 00010, Bid Schedule- all items must be priced
IAW Clause 252.236-7008, Contract Prices- Bidding Schedules (Dec 1991).The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans and specifications.
Section 00600, Reps and Certs
In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov
Acknowledge all Amendments (SF 30)
Bid Bond/Guarantee, 20% (Standard Form 24)
Power of Attorney
The bid opening will occur at the time and date specified in Block 13 of the SF1442 at 4930 Minuteman Way, Charlotte, NC 28208 (map included in solicitation attachments).
Hand Carried Bids- must be deposited in the repository prior to the time established for opening of bids.
Mailed bids- must be received at the location specified in block 7 of the SF1442 prior to the time established for opening of bids.
Repository and Mailing Address: 4930 Minuteman Way, Charlotte, NC 28208. Attention: Contracting Office, 2d Lt Zachary Leddy
Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and in accordance with clause 52.214-7.

Bid Requirements- Bid Submission

Break

File details come from the government source that posted it.