OF_1419_-_Abstract_of_Offers_Construction_-_No_HUBZone_Preference_Final_signed.pdf

PDF 310 KB Posted

Attached to
C-17 Corrosion Control and Fuel Cell Hangar
Solicitation number
W91242-18-B-0891
Issued by

About this file

Bid Opening abstract without 10% HUBZone preference included

View the file

Other files

File Type Posted
OF_1419_-_Abstract_of_Offers_Construction_-_10__HUBZone_Preference_Final_signed.pdf PDF
W91242-18-B-0891-0008.pdf PDF
W91242-18-B-0891-0007.pdf PDF
W91242-18-B-0891-0006.pdf PDF
Questions_and_Answers_88-103_W91242-18-B-0891.pdf PDF
Drawings.pdf PDF
W91242-18-B-0891-0005.pdf PDF
Specifications.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
W91242-18-B-0891-0004.pdf PDF
Questions_and_Answers_32-87_W91242-18-B-0891.pdf PDF
Questions_and_Answers_16-31_W91242-18-B-0891.pdf PDF
W91242-18-B-0891-0002.pdf PDF
M-701_-_HVAC_CONTROL_DIAGRAMS_Amend_001.pdf PDF
W91242-18-B-0891-0001.pdf PDF
P-502_-_PLUMBING_DETAILS_Amend_001.pdf PDF
FX-100_-_FP_OVERALL_SITE_PLAN_Amend_001.pdf PDF
M-702_-_HVAC_CONTROL_DIAGRAMS_Amend_001.pdf PDF
Questions_and_Answers_1-15_W91242-18-B-0891.pdf PDF
PreBidSlides_W91242-18-B-0891.ppt PPT presentation
Site_Visit_Sign_in_Sheet.pdf PDF
Solicitation_Attachment_7_-_SUPPLEMENTAL_INFO_17-Aug-2018.pdf PDF
Solicitation_Attachment_1_-_SPECS_Vol_1of2_17-Aug-2018.pdf PDF
Solicitation_Attachment_14_-_Q&A_Previous_Hangar_Solicitation.pdf PDF
Solicitation_Attachment_4_-_DRAWINGS_Vol2of4.pdf PDF
Solicitation_Attachment_6_-_DRAWINGS_Vol4of4.pdf PDF
Solicitation_Attachment_5_-_DRAWINGS_Vol3of4.pdf PDF
Solicitation_Attachment_12_-_Pre-Bid_Conference_and_Site_Visit,_Bid_Drop-Off_Map.pdf PDF
Solicitation_Attachment_8_-_Single_Source_Determination_Det-Tronics-_Hangar_Redacted.pdf PDF
Solicitation_Attachment_13_-_Visitor_Request_Worksheet.pdf PDF
Solicitation_Attachment_2_-_SPECS_Vol_2of2_17-Aug-2018.pdf PDF
W91242-18-B-0891.pdf PDF
Solicitation_Attachment_11_-_Single_Source_Determination_Monaco__Hangar_Redacted.pdf PDF
Solicitation_Attachment_3_-_DRAWINGS_Vol1of4.pdf PDF
Solicitation_Attachment_10_-_Single_Source_Determination_ATI_Systems-_Hangar_Redacted.pdf PDF
Solicitation_Attachment_9_-_Single_Source_Determination_Alerton_DDC-_Hangar_Redacted.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

145th Airlift Wing Charlotte, NC

C-17 Corrosion Control and Fuel Cell Hangar

Base Bid - C-17 Hangar

Base Bid - Unsuitable Soils

Option #1 - Operable Partitions

Option #2 - General Hangar Items

Option #3 - General Exterior Items

Option #4 - Miscellaneous Hangar Items

Job

CY

Job

Job

Job

Job

27,517,933.00

71.46

28,521.00

318,060.00

254,137.00

119,619.00

27,517,933.00

35,730.00

28,521.00

318,060.00

254,137.00

119,619.00

34,833,617.00

20,329.00

268,212.00

159,431.00

107,020.00

34,833,617.00

20,329.00

268,212.00

159,431.00

107,020.00

27,585,000.00

110.00

19,000.00

238,000.00

124,000.00

149,000.00

27,585,000.00

55,000.00

19,000.00

238,000.00

124,000.00

149,000.00

W91242-18-B-0891 1 3

Karla M. Garcia, Contracting Officer

Lego - Carothers JV1 Cleveland Construction, Inc.

SF24 Bid Bond, 20% SF24 Bid Bond, 20%

7 7

11/28/201809/17/2018

87.23 43,613.00

X

Total 28,274,000.00 35,432,222.00 28,170,000.00

This abstract does not include the 10% HUBZone preference in accordance with FAR 52.219-4 Alt 1

(HUBZone) (Large)

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W91242-18-B-0891

C-17 Corrosion Control and Fuel Cell Hangar

SF24 Bid Bond, 20% SF24 Bid Bond, 20% SF24 Bid Bond, 20% SF24 Bid Bond, 20%

7 7 7 7

100,731.0090,000.00174,000.0085,000.00Job16

137,350.00195,000.00190,000.00222,000.00Job15

196,570.00280,000.00319,000.00418,000.00Job14

32,007.0015,000.0018,700.0020,000.00Job13

72.0080.00110.001,080.00CY5002

1 Job 30,866,000.00 29,395,000.00

AMOUNT

30,325,000.00 28,647,000.00

2 3

3 4 5 6

Robinson Mechanical Contractors, Inc.

Poettker Construction Company Archer Western Federal JV Walbridge Aldinger LLC

Total 32,151,000.00 30,151,700.00 30,945,000.00 29,149,658.00

(Large) (Large) (Large) (Large)

This abstract does not include the 10% HUBZone preference in accordance with FAR 52.219-4 Alt 1

85,000.00

222,000.00

418,000.00

20,000.00

540,000.00

30,866,000.00

174,000.00

190,000.00

319,000.00

18,700.00

55,000.00

29,395,000.00

90,000.00

195,000.00

280,000.00

15,000.00

40,000.00

30,325,000.00

100,731.00

137,350.00

196,570.00

32,007.00

36,000.00

28,647,000.00

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W91242-18-B-0891

C-17 Corrosion Control and Fuel Cell Hangar

SF24 Bid Bond, 20%

97,000.00Job16

110,000.00Job15

203,000.00Job14

22,000.00Job13

110.00CY5002

1 Job 31,598,000.00

3 3

Edison Foard Construction Services, Inc.

Total 32,085,000.00

This abstract does not include the 10% HUBZone preference in accordance with FAR 52.219-4 Alt 1

(Large)

97,000.00

110,000.00

203,000.00

22,000.00

55,000.00

31,598,000.00

OF 1419 - Abstract of Offers Construction - No HUBZone Preference
OF 1419A - Abstract Construction - Continuation Sheet1 - No HUBZone Preference
OF 1419A - Abstract Construction - Continuation Sheet2 - No HUBZone Preference
3 DATE OPENED 11282018:
NAME AND TITLE OF CERTIFYING OFFICIAL Type Karla M Garcia Contracting Officer:
DATE SIGNED:
16390000Row1:
16390000Row1_2:
16390000Row2:
16390000Row2_2:
16390000Row3:
16390000Row3_2:
16390000Row4:
16390000Row4_2:
16390000Row5:
16390000Row5_2:
16390000Row6:
16390000Row6_2:
16390000Row7:
16390000Row7_2:
2018-11-30T11:11:46-0500
GARCIA.KARLA.M.1258341399

Text1: 11/30/2018

File details come from the government source that posted it.