Solicitation_Attachment_6_-_DRAWINGS_Vol4of4.pdf
PDF 24 MB Posted
- Attached to
- C-17 Corrosion Control and Fuel Cell Hangar
- Solicitation number
- W91242-18-B-0891
About this file
Not Listed
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
54321
D C
B A
/8
/2
:3
:4
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
NORTH CAROLINA AIR NATIONAL GUARD
C-17 CORROSION CONTROL AND FUEL CELL HANGAR
145th AIRLIFT WING
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
CONTRACT NO.: W9133L-15-D-0002
TASK ORDER NO.: D303
PN: FJRP159062
B-3 FINAL DESIGN SUBMISSION
17 AUGUST 2018
VOLUME 4 OF 4
GENERAL, EQUIPMENT, MECHANICAL, PLUMBING, FIRE PROTECTION,
FIRE ALARM, ELECTRICAL, TELECOMMUNICATIONS & SECURITY
DRAWING INDEX
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E
R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018
/1
/2
:0 :5
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
G-001
D. FLIPPEN
N. FREY
B. DYSON
GENERAL
DRAWING INDEX
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
E-002 C-17 HANGAR AREA CLASSIFICATION PLAN
ED101 ELECTRICAL SITE DEMOLITION PLAN
ES101 C-17 HANGAR ELECTRICAL SITE PLAN
EL101 C-17 HANGAR LIGHTING PLAN - OVERALL
EL102 C-17 HANGAR PARTIAL LIGHTING PLAN - AREA A
EL103 C-17 HANGAR PARTIAL LIGHTING PLAN - AREA B AND C
EL104 C-17 HANGAR PARTIAL LIGHTING PLAN - AREA D
EL105 C-17 HANGAR PARTIAL LIGHTING PLAN - AREA E
EL106 C-17 HANGAR PARTIAL UPPER LEVEL LIGHTING PLAN - AREA D
EL107 C-17 HANGAR PARTIAL UPPER LEVEL LIGHTING PLAN - AREA E
EL108 C-17 HANGAR MECHANICAL PLATFORM LIGHTING PLAN - AREA A & C
EP101 C-17 HANGAR POWER PLAN - OVERALL
EP102 C-17 HANGAR PARTIAL POWER PLAN - AREA A
EP103 C-17 HANGAR PARTIAL POWER PLAN - AREA B AND C
EP104 C-17 HANGAR PARTIAL POWER PLAN - AREA D
EP105 C-17 HANGAR PARTIAL POWER PLAN - AREA E
EP106 C-17 HANGAR MECHANICAL PLATFORM POWER PLAN - AREA A & C
EP107 C-17 HANGAR PARTIAL ROOF POWER PLAN - AREA A
EP108 C-17 HANGAR PARTIAL ROOF POWER PLAN - AREA B
EG101 GROUNDING AND LIGHTNING PROTECTION PLAN
EG102 C-17 HANGAR AIRCRAFT GROUNDING PLAN - AREA D
EG103 C-17 HANGAR AIRCRAFT GROUNDING PLAN - AREA E
E-112 C-17 FIRE PUMP BUILDING - ELECTRICAL PLANS
E-401 C-17 HANGAR ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-601 C-17 HANGAR - ELECTRICAL SINGLE LINE DIAGRAM
E-602 C-17 HANGAR ELECTRICAL GROUNDING RISER DIAGRAM
E-701 LIGHTING FIXTURE SCHEDULE
E-702 FEEDER SCHEDULE
E-711 C-17 HANGAR PANEL SCHEDULES
E-712 C-17 HANGAR PANEL SCHEDULES
E-713 C-17 HANGAR PANEL SCHEDULES
E-801 MECHANICAL EQUIPMENT SCHEDULE
E-802 PLUMBING AND ELECTRICAL EQUIPMENT SCHEDULES
TELECOMMUNICATIONS & SECURITY
T-001 TELECOM SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
TS101 SITE PLAN
T-101 TELECOM OVERALL TELECOM PLAN
T-102 TELECOM C-17 HANGAR PARTIAL TELECOM PLAN-AREA A
T-103 TELECOM C-17 HANGAR PARTIAL TELECOM PLANS-AREA B AND C
T-104 TELECOM C-17 HANGAR PARTIAL FLOOR PLANS-MECHANICAL PLATFORMS
T-105 TELECOM C-17 HANGAR PARTIAL TELECOM PLAN-AREA D
T-106 TELECOM C-17 HANGAR PARTIAL TELECOM PLANS - AREA E
T-201 TELECOM RACK ELEVATIONS
T-202 CONDUIT ELEVATIONS
T-401 ENLARGED TELECOM PLANS
TS401 ENLARGED COMM HUT 72 PLAN AND DETAILS
T-501 TELECOM OUTLET DETAILS
T-502 TELECOM DETAILS
T-503 SECURITY DETAILS
T-504 TELECOM SITE DETAILS
T-601 TELECOM ONE-LINE DIAGRAMS
T-602 SECURITY ONE-LINE DIAGRAMS
MECHANICAL
M-001 HVAC GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
M-101 C-17 HANGAR OVERALL HVAC PLAN
M-102 C-17 HANGAR PARTIAL HVAC PLAN - AREA A
M-103 C-17 HANGAR PARTIAL HVAC PLANS - AREAS B AND C
M-104 C-17 HANGAR PARTIAL HVAC PLAN - AREA D
M-105 C-17 HANGAR PARTIAL HVAC PLAN - AREA E
M-106 C-17 HANGAR MECHANICAL EQUIPMENT PLATFORMS HVAC PLANS
M-112 C-17 FIRE PUMP BUILDING HVAC PLAN
M-141 C-17 HANGAR HVAC ROOF PLAN
M-301 C-17 HANGAR HVAC SECTIONS
M-302 C-17 HANGAR HVAC SECTIONS
M-303 C-17 HANGAR HVAC SECTIONS
M-401 C-17 HANGAR HVAC ENLARGED PLANS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-601 C-17 HANGAR HVAC SCHEDULES
M-602 C-17 HANGAR HVAC SCHEDULES
M-701 HVAC CONTROL DIAGRAMS
M-702 HVAC CONTROL DIAGRAMS
M-703 HVAC BAS POINT FUNCTION SCHEDULE
M-704 HVAC BAS POINT FUNCTION SCHEDULE
PLUMBING
P-001 PLUMBING GENERAL NOTES, LEGEND, AND ABBREVIATIONS
P-101 C-17 HANGAR OVERALL SANITARY PIPING PLAN
P-102 C-17 HANGAR PARTIAL SANITARY PIPING PLAN - AREA A
P-103 C-17 HANGAR PARTIAL SANITARY PIPING PLANS - AREAS B AND C
P-104 C-17 HANGAR PARTIAL SANITARY PIPING PLAN - AREA D
P-105 C-17 HANGAR PARTIAL SANITARY PIPING PLAN - AREA E
P-106 C-17 HANGAR MECHANICAL EQUIPMENT PLATFORM SANITARY PLANS
P-111 C-17 HANGAR OVERALL PLUMBING PIPING PLAN
P-112 C-17 HANGAR PARTIAL PLUMBING PIPING PLAN - AREA A
P-113 C-17 HANGAR PARTIAL PLUMBING PIPING PLAN - AREAS B AND C
P-114 C-17 HANGAR PARTIAL PLUMBING PIPING PLAN - AREA D
P-115 C-17 HANGAR PARTIAL PLUMBING PIPING PLAN - AREA E
P-116 C-17 HANGAR MECHANICAL EQUIPMENT PLATFORM PLUMBING PIPING PLAN
P-131 C-17 PUMP HOUSE SANITARY AND WATER PIPING PLAN
P-401 C-17 HANGAR ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 C-17 HANGAR SANITARY PIPING RISER DIAGRAM
P-902 C-17 HANGAR SANITARY PIPING RISER DIAGRAM AREAS C, D, E, A
P-903 C-17 HANGAR DOMESTIC WATER PIPING RISER DIAGRAM AREAS C, D, E
P-904 C-17 HANGAR DOMESTIC WATER PIPING RISER DIAGRAM AREAS A AND B
FIRE SUPPRESSION
FX-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
FX-100 OVERALL FIRE SUPPRESSION SITE PLAN
FX-101 C-17 HANGAR OVERALL FLOOR PLAN
FX-102 C-17 HANGAR PARTIAL FLOOR PLAN - AREA A
FX-103 C-17 HANGAR PARTIAL FLOOR PLAN - AREAS B AND C
FX-104 C-17 HANGAR PARTIAL FLOOR PLAN - AREA D
FX-105 C-17 HANGAR PARTIAL FLOOR PLAN - AREA E
FX-106 C-17 HANGAR FLOOR PLAN - MECHANICAL MEZZANINES
FX-112 C-17 FIRE PUMP BUILDING FLOOR PLAN AND SECTIONS
FX-113 C-17 FIRE PUMP BUILDING ISOMETRIC VIEWS
FX-501 DETAILS
FX-502 ENLARGED PLANS AND DETAILS
FIRE ALARM
FA-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
FA-101 C-17 HANGAR OVERALL FLOOR PLAN
FA-102 C-17 HANGAR PARTIAL FLOOR PLAN - AREA A
FA-103 C-17 HANGAR PARTIAL FLOOR PLAN - AREAS B AND C
FA-104 C-17 HANGAR PARTIAL FLOOR PLAN - AREA D
FA-105 C-17 HANGAR PARTIAL FLOOR PLAN - AREA E
FA-106 C-17 HANGAR FLOOR PLAN - MECHANICAL MEZZANINES AND FIRE PUMP BUILDING
FA-501 DETAILS AND RISER DIAGRAM
FA-502 HANGAR MATRICES OF OPERATION
ARCHITECTURAL
A-001 GENERAL NOTES
A-101 C-17 HANGAR OVERALL FLOOR PLAN
A-102 C-17 HANGAR PARTIAL FLOOR PLAN - AREA A
A-102A C-17 HANGAR PARTIAL FLOOR PLAN - OPTIONAL LINE ITEMS
A-103 C-17 HANGAR PARTIAL FLOOR PLANS - AREAS B AND C
A-104 C-17 HANGER PARTIAL FLOOR PLAN - AREA D
A-105 C-17 HANGAR PARTIAL FLOOR PLAN - AREA E
A-106 C-17 HANGAR MECHANICAL EQUIPMENT PLATFORM PLANS
A-112 FIRE PUMP BUILDING
A-121 C-17 HANGAR OVERALL REFLECTED CEILING PLAN
A-122 C-17 HANGAR PARTIAL REFLECTED CEILING PLAN - AREA A
A-123 C-17 HANGAR PARTIAL REFLECTED CEILING PLANS - AREAS B AND C
A-124 C-17 HANGAR PARTIAL REFLECTED CEILING PLAN - AREA D
A-125 C-17 HANGAR PARTIAL REFLECTED CEILING PLAN - AREA E
A-126 C-17 HANGAR PARTIAL REFLECTED CEILING PLANS - AREAS A AND C
A-141 C-17 HANGAR OVERALL ROOF PLAN
A-142 C-17 HANGAR PARTIAL ROOF PLAN - AREA A
A-143 C-17 HANGAR PARTIAL ROOF PLAN - AREA B
A-201 C-17 HANGAR EXTERIOR ELEVATIONS
A-202 C-17 HANGAR EXTERIOR ELEVATIONS
A-203 C-17 HANGAR PARTIAL EXTERIOR ELEVATIONS
A-301 C-17 HANGAR BUILDING SECTIONS
A-401 C-17 HANGAR ENLARGED PLANS AND INTERIOR ELEVATIONS
A-402 C-17 HANGAR ENLARGED PLANS AND INTERIOR ELEVATIONS
A-403 C-17 HANGAR ENLARGED SECTIONS AND INTERIOR ELEVATIONS
A-421 C-17 HANGAR ENLARGED STAIR PLANS AND SECTIONS
A-422 C-17 HANGAR ENLARGED STAIR PLANS AND SECTIONS
A-423 C-17 HANGAR LADDER DETAILS
A-451 C-17 HANGAR STAIR DETAILS
A-501 C-17 HANGAR EXTERIOR WALL SECTIONS
A-502 C-17 HANGAR EXTERIOR WALL SECTIONS
A-503 C-17 HANGAR EXTERIOR WALL SECTIONS
A-511 EXTERIOR WALL DETAILS
A-512 EXTERIOR WALL DETAILS
A-521 ENLARGED PLAN DETAILS
A-522 ENLARGED PLAN DETAILS
A-531 EXTERIOR DETAILS
A-532 EXTERIOR DETAILS
A-533 EXTERIOR DETAILS
A-534 EXTERIOR DETAILS
A-571 INTERIOR DETAILS
A-572 INTERIOR DETAILS
A-573 INTERIOR DETAILS
A-601 MATERIAL LEGEND
A-602 C-17 HANGAR ROOM FINISH SCHEDULES
A-604 C-17 HANGAR AND FIRE PUMP BUILDING DOOR SCHEDULE
A-606 WINDOW TYPES
A-607 STRUCTURED POLYCARBONTE WALL PANEL TYPES
A-701 PARTITION TYPES
A-702 DOOR DETAILS
A-703 DOOR DETAILS
A-704 HANGAR DOOR ELEVATIONS AND DETAILS
A-705 STOREFRONT AND CURTAINWALL DETAILS
A-706 LOUVER TYPES AND DETAILS
A-711 TYPICAL PARTITION DETAILS
EQUIPMENT
Q-101 C-17 HANGAR OVERALL EQUIPMENT PLAN
Q-102 C-17 HANGAR PARTIAL EQUIPMENT AND ROOF PLANS - AREAS A AND B
Q-301 C-17 HANGAR BUILDING SECTIONS
Q-601 C-17 HANGAR EQUIPMENT SCHEDULE
GENERAL
G-000 COVER
G-001 DRAWING INDEX
G-002 NOTES, ABBREVIATIONS, AND SYMBOLS
LIFE SAFETY
LS-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
LS-002 CODE COMPLIANCE SITE PLAN
LS-101 C-17 HANGAR OVERALL FLOOR PLAN
CIVIL
C-001 NOTES, LEGENDS & ABBREVIATIONS
C-002 CONSTRUCTION PLAN
C-101 EXISTING CONDITIONS PLAN
CD-101 SITE DEMOLITION PLAN
CS-100 OVERALL SITE LAYOUT PLAN
CS-101 SITE LAYOUT PLAN
CS-102 JOINT LAYOUT PLAN
CS-401 ENLARGED SITE LAYOUT PLAN
CG-101 SITE GRADING & DRAINAGE PLAN
CG-111 EROSION & SEDIMENT CONTROL PLAN - PHASE I
CG-121 EROSION & SEDIMENT CONTROL PLAN - PHASE II
CG-501 EROSION & SEDIMENT CONTROL NOTES AND DETAILS
CG-502 EROSION & SEDIMENT CONTROL NOTES AND DETAILS
CU-101 SITE UTILITY PLAN
CU-201 UTILITY PROFILES
CU-202 UTILITY PROFILES
CU-203 UTILITY PROFILES
CU-204 UTILITY PROFILES
CU-205 UTILITY PROFILES
CU-401 UTILITY PROFILES
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
C-504 CONSTRUCTION DETAILS
C-505 CONSTRUCTION DETAILS
C-506 CONSTRUCTION DETAILS
LANDSCAPE
L-101 LANDSCAPE PLANS
L-500 LANDSCAPE DETAILS
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 WIND LOAD DIAGRAMS & ABBREVIATIONS
S-101 C-17 HANGAR OVERALL FOUNDATION PLAN
S-102 C-17 HANGAR PARTIAL FOUNDATION PLAN - AREA A
S-103 C-17 HANGAR PARTIAL FOUNDATION PLAN - AREAS B AND C
S-104 C-17 HANGAR PARTIAL FOUNDATION PLAN - AREA D
S-105 C-17 HANGAR PARTIAL FOUNDATION PLAN - AREA E
S-112 C-17 FIRE PUMP HOUSE PLANS AND ELEVATIONS
S-121 C-17 HANGAR - OVERALL FRAMING PLAN - EQUIPMENT PLATFORM & LOW ROOF
S-122 C-17 HANGAR - PARTIAL FRAMING PLAN - EQUIPMENT PLATFORM & LOW ROOF - AREA A
S-123 C-17 HANGAR - PARTIAL FRAMING PLANS - EQUIPMENT PLATFORM & LOW ROOF - AREAS B & C
S-141 C-17 HANGAR - OVERALL FRAMING PLAN - UPPER EQUIPMENT PLATFORM & MID-ROOF BOTTOM
CHORD LEVEL
S-142 C-17 HANGAR - PARTIAL FRAMING PLANS - EQUIPMENT PLATFORMS - AREAS A AND C
S-143 C-17 HANGAR - PARTIAL FRAMING PLAN - MID-ROOF BOTTOM CHORD LEVEL - AREA D
S-151 C-17 HANGAR - OVERALL FRAMING PLAN - MID-ROOF & UPPER ROOF BOTTOM CHORD LEVEL
S-152 C-17 HANGAR PARTIAL FRAMING PLAN - MID-ROOF LEVEL - AREA D
S-153 C-17 HANGAR PARTIAL FRAMING PLAN UPPER ROOF BOTTOM CHORD LEVEL - AREA E
S-161 C-17 HANGAR UPPER ROOF FRAMING PLAN
S-201 C-17 HANGAR BRACED FRAME AND GIRT ELEVATIONS
S-202 C-17 HANGAR BRACED FRAME AND GIRT ELEVATIONS
S-203 C-17 HANGAR BRACED FRAME AND GIRT ELEVATIONS
S-204 C-17 HANGAR BRACED FRAME AND GIRT ELEVATIONS
S-205 C-17 HANGAR BRACED FRAME AND GIRT ELEVATIONS
S-206 C-17 HANGAR TRUSS ELEVATIONS
S-207 C-17 HANGAR TRUSS ELEVATIONS
S-208 C-17 HANGAR TRUSS ELEVATIONS
S-209 C-17 HANGAR CMU WALL ELEVATIONS
S-210 C-17 HANGAR CMU WALL ELEVATIONS
S-211 C-17 HANGAR CMU WALL ELEVATIONS
S-212 C-17 HANGAR CMU WALL ELEVATIONS
S-421 STAIR FRAMING PLANS AND SECTIONS
S-422 STAIR FRAMING PLANS AND SECTIONS
S-501 TYPICAL DETAILS
S-502 TYPICAL DETAILS
S-503 TYPICAL DETAILS
S-504 TYPICAL DETAILS
S-505 TYPICAL DETAILS
S-506 TYPICAL DETAILS
S-510 SECTIONS & DETAILS
S-511 SECTIONS & DETAILS
S-512 SECTIONS & DETAILS
S-520 SECTIONS & DETAILS
S-521 SECTIONS & DETAILS
S-522 SECTIONS & DETAILS
S-523 SECTIONS & DETAILS
S-526 SECTIONS & DETAILS
S-527 SECTIONS & DETAILS
GENERAL SYMBOLS
MATCH LINE
KEYED NOTE
DOOR TAG
PARTITION TYPE TAG
(FIRST DIGIT INDICATES HOURLY FIRE RATING)
ELEVATION TARGET
NORTH ARROW
REVISION CLOUD
REVISION DESIGNATION TAG
WINDOW / LOUVER TYPE TAG
COLUMN REFERENCE
BREAK LINE
INDICATES PLAN NORTH
INTERIOR ELEVATION DESIGNATION
EXTERIOR ELEVATION DESIGNATION
SECTION / DETAIL DESIGNATION
DETAIL DESIGNATION
DRAWING /DETAIL LOCATION DESIGNATION
DRAWING/DETAIL TITLE
DRAWING NUMBER DESIGNATION
WHERE FIRST REFERENCED
DRAWING/DETAIL LIMITS
DRAWING / DETAIL LOCATION
DESIGNATION
DRAWING NUMBER DESIGNATION
WHERE FIRST REFERENCED
DRAWING / DETAIL LOCATION DESIGNATION
DRAWING NUMBER DESIGNATION WHERE SHOWN
DRAWING/DETAIL LOCATION DESIGNATION
DRAWING NUMBER DESIGNATION WHERE SHOWN
DRAWING NUMBER DESIGNATION WHERE SHOWN
DRAWING/DETAIL LOCATION DESIGNATION
DRAWING SCALE
ROOM TAG
GLASS TAGG1
A1
A-100
A1
A-100
A1
A-200
A1A-400
W1
N
1A
MATCH LINE
A1 / A-101
A1
DRAWING NAME
1/8" = 1'-0"
A-123
DRAWING DESIGNATION
ROOM NAME
ROOM NUMBER
ROOM NAME
ELEMENT ELEVATED
EL:XX' - XX"
PROJECT GENERAL NOTES
1. THIS DRAWING HAS GENERAL INFORMATION, NOT ALL MAY APPLY TO THIS PROJECT.
2. THE "OWNER" IS THE NORTH CAROLINA AIR NATIONAL GUARD. THE "ARCHITECT/ENGINEER" IS
JACOBS.
3. IF, AT ANY TIME, THE CONTRACTOR DISCOVERS A CONDITION WHICH CONFLICTS WITH THE
DRAWINGS AND/OR SPECIFICATION OR IF THE CONTRACTOR DISCOVERS AN UNCLEAR OR
MISLEADING DIRECTIVE GIVEN IN THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR SHALL
BRING THE ISSUE IMMEDIATELY TO THE ATTENTION OF THE COR.
4. DO NOT SCALE THE DRAWINGS - FOLLOW WRITTEN DIMENSIONS ONLY.
5. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO FABRICATION AND/OR
CONSTRUCTION.
6. ALL WORK INDICATED ON THE DRAWINGS IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
UNLESS OTHERWISE NOTED.
7. KEYED NOTES LISTED ON DRAWINGS REFER ONLY TO THOSE KEYED NOTE SYMBOLS ASSOCIATED
WITH THE PARTICULAR DRAWING WHERE THE KEYED NOTES ARE LISTED.
8. RESPECTIVE PLUMBING, MECHANICAL, ELECTRICAL AND FIRE PROTECTION SUBCONTRACTORS
SHALL PROVIDE GENERAL CONTRACTOR WITH ALL REQUIRED ACCESS PANELS FOR GENERAL
CONTRACTOR TO INSTALL IN THE BUILDING.
9. ALL EXPOSED STEEL SHALL BE PAINTED UNLESS OTHERWISE NOTED.
10. THERE ARE NO ASBESTOS CONTAINING MATERIALS SPECIFIED AND THEY SHALL NOT BE USED ON
THIS PROJECT.
11. COORDINATE THE WORK OF ALL TRADES AND CHECK ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE COR AND SHALL BE RESOLVED BEFORE PROCEEDING WITH
THE WORK.
12. THE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, ELECTRICAL, TELECOMMUNICATIONS, EQUIPMENT AND SECURITY DRAWINGS, ARE SUPPLEMENTARY TO THE
ARCHITECTURAL DRAWINGS. IF A DISCREPANCY EXISTS BETWEEN THE ARCHITECTURAL DRAWINGS AND ENGINEER'S DRAWINGS, SUCH DISCREPANCY SHALL BE BROUGHT TO THE COR'S ATTENTION IN WRITING PRIOR TO INSTALLATION OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE
ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT CONTRACTOR'S
EXPENSE.
13. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED, BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR
DETAILS SHALL BE USED SUBJECT TO REVIEW BY THE ARCHITECT.
14. REFER TO FIRE SUPPRESSION AND ALARM DRAWINGS AND ELECTRICAL DRAWINGS FOR LOCATIONS
OF FIRE ALARM HORNS/STROBES, EXIT SIGNS, AND EMERGENCY LIGHTING.
15. RUBBER-TIRED EQUIPMENT SHALL BE USED FOR TRANSPORTING MATERIALS AND EQUIPMENT ON PAVED SURFACES AND WITHIN THE BUILDING. VEHICLES MOVING ON FLOOR SLABS SHALL HAVE TIRE
BOOTS. DUCT TAPE ON TIRES IS NOT ALLOWED.
16. EXPOSED CONCRETE FLOORS SHALL BE PROTECTED DURING CONSTRUCTION AND SHALL BE FREE OF ALL CONSTRUCTION MARKERS, STAINS, PAINTS, OIL, OR OTHER DEFECTS. PATCH, IF REQUIRED, PRIOR TO HARDENING AND SEALING.
17. CONFINE EQUIPMENT, STORAGE OF MATERIALS, AND OPERATIONS OF WORKERS TO LIMITS
INDICATED AND AS DIRECTED.
18. ALL TRUCKS HAULING DEBRIS FROM THE PROJECT SITE OR MATERIAL TO THE PROJECT SHALL BE
EQUIPPED WITH THE MEANS TO COVER LOADS AND WITH WATERPROOF TAILGATES WHICH SHUT
TIGHTLY AND DO NOT PERMIT THE DEBRIS TO SPILL FROM THE TAILGATE AREA. TRUCK BEDS SHALL BE SWEPT CLEAN AT THE TAILGATE BEFORE LEAVING FROM THE WORK AREA. SIDEBOARDS SHALL BE KEPT IN GOOD REPAIR. UNDER NO CIRCUMSTANCES WILL TRUCKS BE PERMITTED TO BE LOADED
GREATER THAN THE LEGAL LIMIT OR HIGHER THAN THE SIDEBOARDS.
19. OWNER WILL MAKE USE OF THE AREAS IN AND SURROUNDING THE CONSTRUCTION AREAS. EVERY EFFORT SHALL BE MADE TO MINIMIZE THE DISTURBANCE TO EMPLOYEES, PATRONS, AND TENANTS.
20. MANUFACTURER'S NAME AND/OR MODEL NUMBERS ARE BEING UTILIZED FOR BASIS OF DESIGN ONLY.
THE SPECIFICATION OUTLINES THE SPECIFIC CRITERIA FOR THE EQUIPMENT OR MATERIAL AND IS
NON-PROPRIETARY.
21. ALL UTILITY LINES IN PUBLIC AREAS SHALL BE ENCLOSED IN FLOOR, WALL OR CEILING
CONSTRUCTION UNLESS OTHERWISE NOTED.
22. MANUFACTURED MATERIALS, EQUIPMENT, ETC SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS, AND ABA REQUIREMENTS UNLESS
OTHERWISE NOTED.
23. IF DRAWINGS IN THIS SET ARE NOT 30"x 42" THEY HAVE BEEN REVISED FROM THEIR ORIGINAL SIZE.
SCALES NOTED ON PLANS AND DETAILS ARE NO LONGER APPLICABLE.
24. PROVIDE A RED LINED "RECORD" CONSTRUCTION DOCUMENT SET AT THE SITE. THE OWNER
RESERVES THE RIGHT TO REVIEW THESE DOCUMENTS ON A DAILY BASIS.
25. LOCATE ALL UNDERGROUND UTILITIES, ETC. PRIOR TO THE START OF CONSTRUCTION.
26. KEEP MEANS OF EGRESS STAIRS AND CORRIDORS PROPERLY ILLUMINATED AND FREE OF
OBSTRUCTIONS AT ALL TIMES DURING CONSTRUCTION.
27. WORK SHALL CONFORM TO APPLICABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR
SHALL OBTAIN ALL REQUIRED BUILDING AND OCCUPANCY PERMITS.
28. ESTABLISH A SITE BENCHMARK FOR ALL SUBCONTRACTORS TO USE. ALL TRADES SHALL USE THE
SAME BENCHMARK
29. ITEMS INDICATED ON THE DRAWINGS AS "GFGI" MEANS GOVERNMENT FURNISHED AND GOVERNMENT
INSTALLED. COORDINATE WITH THE GOVERNMENT FOR THE REQUIRED POWER, PLUMBING, AND
OTHER REQUIRED UTILITIES AS APPLICABLE.
30. ITEMS INDICATED ON THE DRAWINGS AS "GFCI" MEANS GOVERNMENT FURNISHED AND CONTRACTOR
INSTALLED. COORDINATE WITH ALL SCOPE OF WORK.
31. ALL SUSPENDED ITEMS OF THE WORK EXCEEDING 31 POUNDS IN WEIGHT (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS PIPING NETWORKS) SHALL BE ANCHORED TO RESIST A HORIZONTAL LOAD EQUAL TO 0.5 TIMES THE COMPONENT WEIGHT IN ACCORDANCE WITH UFC 4-010-01. THIS REQUIREMENT DOES NOT PRECLUDE REQUIREMENTS FOR SEISMIC ANCHORAGE IN ACCORDANCE WITH ASCE 7-05
AND THE PROJECT SPECIFICATIONS. FOR ADDITIONAL INFORMATION ON EQUIPMENT SUPPORT
FRAMING REFERENCE STRUCTURAL.
32. FOR LIFE SAFETY PLANS REFER TO LS-101.
33. FOR SIGNAGE SCHEDULE REFER TO SPECIFICATION SECTION 10 14 00 SIGNAGE. FOR TYPICAL SIGN
MOUNTING HEIGHTS REFER TO A-001.
34. DO NOT PAINT BUILDING GROUNDING CABLES.
35. PROVIDE SURFICIAL TERMITE TREATMENT UNDER ENTIRE FOOT PRINT OF THE C-17 HANGAR.
36. ALL PENETRATIONS THROUGH SHEET METAL ROOF SHALL BE COORDINATED WITH THE SHEET METAL
ROOFING MANUFACTURER / INSTALLER TO ENSURE PENETRATIONS LAND BETWEEN
SEAMS/BATTENS. MOUNT ALL PIPING, EQUIPMENT, DUCTWORK, ETC. AS HIGH AS POSSIBLE IN ALL AREAS UNLESS OTHERWISE NOTED. ALL HANGER SUPPORTS SHALL BE ATTACHED TO STRUCTURAL
STEEL. NOTHING MAY BE SUPPORTED FROM ROOF DECK.
37. ANY OF THE SYMBOLS / MATERIAL REFERENCED ON THIS DRAWING MAY OR MAY NOT OCCUR AS A
PART OF THIS PROJECT AND ARE PROVIDED FOR REFERENCE ONLY.
GENERAL ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
ACI AMERICAN CONCRETE INSTITUTE
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTURCITON
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION AND AIR
CONDITIONING ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND
MATERIALS
AV AUDIO VISUAL
AWP ACOUSTIC WALL PANEL
BD BOARD
BLDG BUILDING
BM BEAM
BOT BOTTOM
CFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPT CARPET TILE
DIA DIAMETER
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
EL REFERENCE ELEVATION
ELEC ELECTRIC OR ELECTRICAL
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXPAN EXPANSION
EXT EXTERIOR
EXTG EXISTING
FCO FLOOR CLEAN OUT
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND
EQUIPMENT
FIN FINISH
FLR FLOOR
FM FACTORY MANUAL
GA GAGE OR GAUGE
GALV GALVANIZED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GL GLASS
GYP GYPSUM
OA OVERALL
OC ON CENTER
OFD OVERFLOW DRAIN
OH OPPOSITE HAND
OLI OPTIONAL LINE ITEM
OPNG OPENING
OPP OPPOSITE
PART PARTITION
PH PHASE
PLAM PLASTIC LAMINATE
PLAS PLASTIC OR PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PREFAB PREFABRICATED
PRESS PRESSURE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PTD PAINTED
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCED STEEL BAR
REF REFERENCE
REQ'D REQUIRED
RM ROOM
RO ROUGH OPENING
SCHED SCHEDULE
SHT SHEET
SIM SIMILAR
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SPEC SPECIFICATION(S)
SQ SQUARE
SF SQUARE FOOT
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
T TREAD
TELECOM TELECOMMUNICATIONS
THK THICK OR THICKNESS
TOC TOP OF CONCRETE
TBD TO BE DETERMINED
TCNA TILE COUNCIL OF NORTH
AMERICA
TOS TOP OF SLAB
TPO THERMOPLASTIC POLYOLEFIN
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
V VOLTS
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
WD WOOD
WR WATER RESISTANT
WWF WELDED WIRE FABRIC
HD HEAD
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HT HEIGHT
HORIZ HORIZONTAL
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
IT INFORMATION TECHNOLOGY
JAN JANITOR
JT JOINT
LAM LAMINATE
MAX MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N NORTH
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRIC
MANUFACTURERS ASSOCIATION
NGB NATIONAL GUARD BUREAU
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
MATERIAL LEGEND
STEEL
THERMAL INSULATION (BATT)
THERMAL INSULATION (RIGID)
GYPSUM BOARD
CONCRETE
EARTH
GRANULAR FILL
ACOUSTICAL PANEL CEILING
WOOD ROUGH
CMU
WOOD BLOCKING, SHIM
PARTICLEBOARD OR PLYWOOD
GLASS
CARPET
SOLID SURFACE MATERIAL
LOCATION MAP
PROJECT SITE
NOT TO SCALE
PROJECT SITE - C-17 HANGAR
NOT TO SCALE
PROJECT LOCATION
OPTIONAL LINE ITEMS (OLI) GENERAL NOTES
1. OPERABLE PARTITION WITH STRUCTURAL SUPPORTS AND WING WALL TO REPLACE PARTITION TYPE
0E BETWEEN CLASSROOMS - SEE A1/A-102A AND C1/A-571 FOR INFORMATION
2. FUEL RESISTANT RESINOUS FLOORING - REFER TO A-602 FOR INFORMATION
3. ADDITION OF HANGAR FLOOD LIGHTING - REFER TO ELECTRICAL DRAWINGS
4. ACE HVAC DUCTWORK - REFER TO MECHANICAL DRAWINGS
5. LANDSCAPING AND ORNAMENTAL FENCE / KNEE WALL - REFER TO LANDSCAPE AND CIVIL DRAWINGS
6. DEMOUNTABLE PARTITIONS - REFER TO NOTES AND PLAN ON SHEET A102A FOR INFORMATION
7. EXTERIOR FLIGHT LINE SIGNAGE. REFER TO A-202 FOR INFORMATION
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018 12" = 1'-0"
/8
/2
:3
:5
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
G-002
D. FLIPPEN
N. FREY
B. DYSON
GENERAL
NOTES, ABBREVIATIONS,
AND SYMBOLS
N
N
FIRST SERGEANT
H106
MAINTENANCE SQ CDR
H107
FUEL CELL HANGAR
H160
HA
HA.5
HB
HC
HD
HE
HE.5
HF
H6
H5
H4
HA.1
HC.2
HC.4
HC.6
HC.8
G.5HE.9AHHB.8HB.6HB.4HB.2
H2
H3
H1
A1
Q-301
WORKSTAND / EQUIPMENT STORAGE
H165
H1
H4
H2
H2
H3
H3
3.8
J.1H.1G.1
J
H
G
37' - 0"
Q-102
A1
Q-102
A2
WORKSTAND / EQUIPMENT STORAGE
H156
ELECTRICAL ROOM
H167
HEF EQUIPMENT
H168
WASH GEAR DRYING
H153
TOOL CRIB
H154
FUEL SYSTEM OFFICE
H151
CORRIDOR
H149
STAIR 01
HS101
FUEL SYSTEM SUPERVISOR
H152
LOBBY
H102
CONFERENCE ROOM
H104
BREAK ROOM
H110
CLASSROOM
H109
CLASSROOM
H108
JUNIOR OFFICERS
H105
Q-102
A4
EQUIPMENT PLAN GENERAL NOTES
1. REFER TO Q-601 FOR EQUIPMENT SCHEDULE
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018As indicated
/8
/2
:3
:1
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
Q-101
P.LANGENFELD
J. PIERCE
G. STAACK
EQUIPMENT
C-17 HANGAR
OVERALL EQUIPMENT PLAN
1/16" = 1'-0"A1
OVERALL EQUIPMENT FLOOR PLAN
1/8" = 1'-0"
24'4' 8' 16'
B
C
A
KEY PLAN
D
E
EQUIPMENT PLAN GENERAL NOTES
1. REFER TO Q-601 FOR EQUIPMENT SCHEDULE
HD
HC.2
HC.4
HC.6
HC.8
G.5HE.9H1
3.8
H.1G.1
1 21 2
1 2
1 31 3
CC1M CC2M
CC2C
CC2E
CC3E
CC1E
HE
HE.5
HF
G.5HE.9
H2
J.1H.1G.1
J
/A2 Q-102
MATCH LINE
SM1
SM2
SM2
SM3
SM4
SM5
SM6
SM7
SM9
SM8
SM2
SM2
SM10
SM11SM12SM13
SM15 SM14
SM18
SM16
SM17SM19
METAL SHOP
H126
HD
HC.2
HC.4
HC.6
HC.8
G.5HE.9
H1
3.8
H.1G.1
WOMEN
H133
WOMEN SHOWER / LOCKERS
H134
MEN SHOWER / LOCKERS
H132
MEN
H131
CORRIDOR
H135
STENCIL ROOM
H136
COMPOSITE SHOP
H138
COMPOSITE SHOP
H137
RECEIVING AND STAGING
H139
MATCH LINE
COMPOSITE SHOP BOOTHS
H140
/A1 Q-102
D1
Q-301
D3
Q-301
1' - 2"11
C6
C5C5C4
S1
S2
C1
C2
C3
CC2CC4
CC3
CC1
C
C 1A
C C
2A
EQUIPMENT SCHEDULE KEYED NOTES
1. THESE ITEMS ARE PART OF VENDOR DESIGNED SYSTEM. REFER TO SPECIFICATION
SECTION 41 34 23.33
2. ROOF TOP UNIT MOUNTED ON ROOF CURB
3. ROOF TOP FAN MOUNTED ON CURB WITH GRAVITY VENTILATOR AT TOP OF STACK
4. MAINTAIN 1'-0" CLEARANCE BETWEEN ITEM CC2M AND ROOF CRICKET
5. UNDER FLOOR TRENCH - REFER TO STRUCTURAL.
6. MECHANICAL EQUIPMENT - REFER TO MECHANICAL DRAWINGS
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018As indicated
/8
/2
:3
:2
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
Q-102
P.LANGENFELD
J. PIERCE
G. STAACK
EQUIPMENT
C-17 HANGAR
PARTIAL EQUIPMENT AND ROOF PLANS - AREAS A AND B
1/8" = 1'-0"
24'4' 8' 16'
B
C
A
KEY PLAN
D
E
1/8" = 1'-0"
Q-101
A4
PARTIAL EQUIPMENT ROOF PLAN - AREA B
1/8" = 1'-0"
Q-101
A1
PARTIAL EQUIPMENT PLAN - AREA A
1/8" = 1'-0"
Q-101
A2
PARTIAL EQUIPMENT PLAN - AREA B
FINISH FLOOR
EL: 100' - 0"
H6 H5 H4 H2H3 H1
H4
MINIMUM
10' - 0"
C
LE
A R
C
LE
A R
T O
P O
F F
U S
E
LA
G E
8'
/4
(T O
P O
F A
IR
C
R A
F T
T A
IL
/4
M
IN
IM
U
M L
IF
T
H1
H3
FINISH FLOOR
EL: 100' - 0"
CC1M
CC1
21 31
FINISH FLOOR
EL: 100' - 0"
CC2M
CC2
EQUIPMENT SCHEDULE KEYED NOTES
1. THESE ITEMS ARE PART OF VENDOR DESIGNED SYSTEM. REFER TO SPECIFICATION
SECTION 41 34 23.33
2. ROOF TOP UNIT MOUNTED ON ROOF CURB
3. ROOF TOP FAN MOUNTED ON CURB WITH GRAVITY VENTILATOR AT TOP OF STACK
4. MAINTAIN 1'-0" CLEARANCE BETWEEN ITEM CC2M AND ROOF CRICKET
5. UNDER FLOOR TRENCH - REFER TO STRUCTURAL.
6. MECHANICAL EQUIPMENT - REFER TO MECHANICAL DRAWINGS
EQUIPMENT PLAN GENERAL NOTES
1. REFER TO Q-601 FOR EQUIPMENT SCHEDULE
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018As indicated
/8
/2
:3
:3
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
Q-301
P.LANGENFELD
J. PIERCE
G. STAACK
EQUIPMENT
C-17 HANGAR
BUILDING SECTIONS
1/8" = 1'-0"A1
BUILDING SECTION
1/8" = 1'-0"
Q-102
D1
BUILDING SECTION - SANDING ROOM
1/8" = 1'-0"
Q-102
D3
BUILDING SECTION - PAINT BOOTH
EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE REMARKS
1. CEILING MOUNTED
2. FIXED RAIL
3. DUAL RAIL
4. UTILITES FROM WALL OR CEILING DEPENDING ON LOCATION, ABOVE BENCH TOP
5. ELECTRICAL DROP FROM CEILING
6. ELECTRICAL WALL MOUNT
7. 1,000 CFH NATURAL GAS AT 14" TO 28" WC
8. CONTRACTOR TO FURNISH AND INSTALL ELECTRIC REEL AND AIR REEL
9. 870 CFH NATURAL GAS AT 2 TO 5 PSI
10. OVEN WILL BE PURCHASED BY GOVERNMENT WITH OVEN SETUP AND TESTING INCLUDED.
CONTRACTOR IS RESPONSIBLE FOR UTILITIES (GAS AND ELECTRIC) AND EXHAUST VENT
THROUGH ROOF
11. POWER FROM CC1A
12. POWER FROM CC2A
13. THESE ITEMS ARE PART OF VENDOR DESIGNED SYSTEM. REFER TO SPECIFICATIONS
SECTION 41 34 23.33
14. GOVERNMENT WILL RELOCATE , CONTRACTOR TO MAKE ELECTRICAL CONNECTION
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018 12" = 1'-0"
/8
/2
:3
:3
P
M B
IM
/U
S
N o rt h C a ro lin a A ir N a ti o n a l G u a rd /N
C A
N G
C
H a n g a r
A
R C
H
V
.r v t
Q-601
P.LANGENFELD
N. BOYER
G. STAACK
EQUIPMENT
C-17 HANGAR
EQUIPMENT SCHEDULE
ROOM NO. EQUIP. NO. EQUIPMENT NAME QTY
NEW (N) /
RELOCATED (R) FUNDING
POWER SUPPLY
AIR SUPPLY
BREATHING
AIR REMARKSVOLTAGE PHASE
LOAD
(AMPS) CONNECTION
COMPOSITE SHOP
H138 C1 GLASS BEAD BLASTER 1 N GF/CI 480 3 12 HARDWIRE 50 CFM 100 PSI 6
H138 C2 PLASTIC MEDIA BLASTER 1 N GF/CI 480 3 12 HARDWIRE 50 CFM 100 PSI 6
H138 C3 OVEN 1 N GF/CI 480 3 30 HARDWIRE - - 7, 10
H137 C4 FREEZER 1 N GF/GI 120 SINGLE - 5-20R - 6
H137 C5 FLAMMABLE CABINET 2 N GF/GI - - - - -
H137 C6 WORK TABLE 1 N GF/GI 120 SINGLE - OVERHEAD REEL 100PSI - REEL 5, 8
COMPOSITE SHOP BOOTHS
H140 CC1 SANDING ROOM SYSTEM 1 N CF/CI - - - - 100 PSI (4) 2 9, 11, 13
H140 CC1A ELECTRICAL PANEL - SANDING ROOM
SYSTEM
1 N CF/CI 480 3 100 HARDWIRE - 13
H140 CC2 SPRAY BOOTH SYSTEM 1 N CF/CI - - - - 100 PSI (4) 2 9, 12, 13
H140 CC2A ELECTRICAL PANEL - SPRAY BOOTH
SYSTEM
1 N CF/CI 480 3 300 HARDWIRE - 13
H140 CC3 PAINT MIXING ROOM 1 N CF/CI 110 SINGLE 20 HARDWIRE 100 PSI (4) 13
H140 CC4 AIR SHOWER 1 N CF/CI 110 SINGLE 15 HARDWIRE - 13
FUEL CELL HANGAR
H160 H1 MONORAIL HOIST - 500 LB 1 N CF/CI 480 3 5 DISCONNECT &
J-BOX
- 1
H160 H2 FALL ARREST - 2 LANYARDS EACH 2 N CF/CI - - - - - 1, 2
H160 H3 FALL ARREST - 1 LANYARDS EACH 2 N CF/CI - - - - - 1, 2
H160 H4 FALL ARREST - 2 LANYARDS EACH 1 N CF/CI - - - - - 1, 3
METAL SHOP
H126 SM1 BENCH STOCK CABINETS 1 R GF/GI - - - - -
H126 SM2 WORK BENCHES 4 R GF/GI 120 SINGLE - DUPLEX 5-20R 100 PSI EACH 4
H126 SM3 METAL SHRINKER & STRETCHER 1 R GF/GI - - - - -
H126 SM4 THROATLESS SHEAR 1 R GF/GI - - - - -
H126 SM5 ROTEX PUNCH 1 R GF/GI - - - - -
H126 SM6 POWER SLIP ROLLER 1 R GF/CI 208 3 5 HARDWIRE - 5, 14
H126 SM7 BELT SANDER 1 R GF/GI 280 3 5.3 RECEPTACLE
TBD
- 5
H126 SM8 DRILL PRESS 1 R GF/GI 120 SINGLE 4 5-20R - 5
H126 SM9 BOX & PAN BRAKE 1 R GF/GI - - - - -
H126 SM10 HAND CRANK SLIP ROLLER 1 R GF/GI - - - - -
H126 SM11 CORNICE BRAKE 1 R GF/GI - - - - -
H126 SM12 FOOT SHEAR 1 R GF/GI - - - - -
H126 SM13 POWER BRAKE 1 R GF/CI 480 3 8 HARDWIRE - 5, 14
H126 SM14 POWER SHEAR 1 R GF/CI 208 3 61 HARDWIRE - 5, 14
H126 SM15 DO-ALL BANDSAW 1 R GF/CI 208 3 11 HARDWIRE - 5, 14
H126 SM16 METAL STORAGE RACK 1 R GF/GI - - - - -
H126 SM17 TUBE FLARER 1 R GF/GI 208 3 16 RECEPTACLE
TBD
100 PSI 6
H126 SM18 PRODUCTION TUBE BENDER 1 R GF/GI - - - - -
H126 SM19 TUBING STORAGE 1 R GF/GI - - - - -
ROOF
CC1E SANDING ROOM EXHAUST 1 N CF/CI - SINGLE - - - 11, 13
CC1M SANDING ROOM MAKEUP AIR 1 N CF/CI 120 SINGLE - - - 11, 13
CC2C PAINT BOOTH COMPRESSOR /
CONDENSER
1 N CF/CI - SINGLE - 5-20R - 12, 13
CC2E PAINT BOOTH EXHAUST 1 N CF/CI - SINGLE - 5-20R - 12, 13
CC2M PAINT BOOTH MAKEUP AIR 1 N CF/CI - SINGLE - 5-20R - 12, 13
CC3E MIXING ROOM EXHAUST 1 N CF/CI - SINGLE - 5-20R - 13
STENCIL ROOM
H136 S1 SMALL STENCIL MACHINE 1 N GF/GI 120 SINGLE - 5-20R - 6
H136 S2 LARGE STENCIL MACHINE 1 N GF/GI 120 SINGLE - 5-20R - 6
AFMS AIRFLOW MEASUREN STATION
AX AUXILIARY CONTACT
BAS BUILDING AUTOMATION SYSTEM
CD CONTROL DAMPER
CI CURRENT INPUT
CO CARBON DIOXIDE SENSOR
CR CURRENT RELAY
CV CONTROL VALVE
DDCP DIRECT DIGITAL CONTROL PANEL
DDCS DIRECT DIGITAL CONTROL SYSTEM
DP DIFFERENTIAL PRESSURE SWITCH
ED ENABLE/DISABLE
FACP FIRE ALARM CONTROL PANEL
H HUMIDISTAT
HSP HIGH STATIC PRESSURE SWITCH
M MOTOR/ACTUATOR
N.C NORMALY CLOSED
NO NORMALY OPEN
OA OUTDOOR AIR
PD PRESSURE DIFFERENTIAL SENSOR
PDI PRESSURE DIFFERENTIAL INDICATOR
PI PRESSURE INDICATOR
S SMOKE DETECTOR
SS START/STOP CONTROL
T THERMOSTAT/VAV SPACE TEMPERATURE SENSOR
TI TEMPERATURE INDICATOR
TS TEMPERATURE SENSOR
CM CONTROL MODULE
AL ANALOG INPUT
DI DIGITAL INPUT
SW SWITCH
ABBREVIATION DESCRIPTION
AO ANALOG OUTPUT
DO DIGITAL OUTPUT
ABBREVIATION DESCRIPTION
AFF ABOVE FINISH FLOOR
AFMS AIRFLOW MEASURING STATION
AHU AIR HANDLING UNIT
ARCH ARCHITECTURAL
AS AIR SEPARATOR
B BOILER
BDD BACKDRAFT DAMPER
BFF BELOW FINISHED FLOOR
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHW CHILLED WATER
CLG CEILING
CU CONDENSING UNIT
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
D DRAIN
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DG DOOR GRILLE
DIA DIAMETER
DN DOWN
EA EXHAUST AIR
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EL ELEVATION
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
F FILTER
FCU FAN COIL UNIT
FD FIRE DAMPER
FPM FEET PER MINUTE
FSD FIRE SMOKE DAMPER
GA GAUGE
H HUMIDISTAT,HUMIDIFIER,OR HEIGHT
HC HEATING COIL
HP HORSEPOWER
HVAC HEATING, VENTILATING, AIR CONDITIONING
HZ HERTZ
ID INSIDE DIAMETER
IH INTAKE HOOD
KW KILOWATT
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MVD MANUAL VOLUME DAMPER
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
ø DIAMETER SYMBOL
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OD OUTSIDE DIAMETER
PD PRESSURE DROP/ PRESSURE DIFFERENTIAL
PH PHASE
PHC PREHEAT COIL
RA RETURN AIR
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
SA SUPPLY AIR
SD SMOKE DAMPER
SEG SIDEWALL EXHAUST GRILLE
SF SUPPLY FAN
SP STATIC PRESSURE
SR SUPPLY REGISTER
SRG SIDEWALL RETURN GRILLE
SS STAINLESS STEEL
SSG SIDEWALL SUPPLY GRILLE
T THERMOSTAT/ TEMPERATURE SENSOR
TEMP TEMPERATURE
TG TRANSFER GRILLE
TOD TOP OF DUCT
TOP TOP OF PIPE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
V VENT/VOLT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
WG WATER GAUGE
SQ FT SQUARE FEET
PID PHOTO IONIZATION DETECTOR
CRAC COMPUTER ROOM AIR CONDITIONING.
1. NOT ALL PIPING SUPPORTS HAVE BEEN LOCATED ON THE DRAWINGS. PROVIDE SUPPORTS
AS PER SPECIFICATION.
2. PROVIDE ACCESS DOORS FOR ALL DEVICES PER SPECIFICATIONS.
3. SEE LIFE SAFETY PLANS FOR ALL RATED WALLS AND PARTITIONS.
ALL PENETRATIONS SHALL BE PROTECTED ACCORDINGLY.
4. CONSTRUCT DUCTWORK PLENUMS OF THE SAME PRESSURE CLASSIFICATIONS AS THE
HIGHEST CLASS ADJACENT DUCTWORK UNLESS OTHERWISE SPECIFIED.
5. PROVIDE MANUAL VOLUME DAMPERS ON EVERY BRANCH DUCT EXCEPT RUNOUTS TO AIR
TERMINAL BOXES.
6. WHEN THERMOSTATS TO BE SUPPLIED WITH THE FAN COIL UNITS ARE NOT LOCATED ON THE
DRAWINGS, PROVIDE INTEGRAL MOUNTED THERMOSTAT.
7. NOT ALL VALVES, INSTRUMENTS AND MISCELLANEOUS PIPING COMPONENTS HAVE BEEN
SHOWN ON THE PLAN DRAWINGS. PROVIDE VALVES AND INSTRUMENTS AS REQUIRED BY
FLOW DIAGRAMS, DETAILS AND SPECIFICATIONS IN ADDITION TO THOSE SHOWN ON PLAN
DRAWINGS.
8. DO NOT LOCATE ANY HYDRONIC OR DRAINAGE PIPING DIRECTLY ABOVE ELECTRICAL
EQUIPMENT AND PANELS (INCLUDING INSTRUMENTATION AND FIRE ALARM PANELS).
9. ALL RECTANGULAR AND OVAL SHORT RADIUS AND MITERED SUPPLY DUCT ELBOWS SHALL
HAVE TURNING VANES.
10. MOUNT ALL MANUALLY ADJUSTABLE THERMOSTATS AT 4' A.F.F. UNLESS NOTED OTHERWISE.
COORDINATE FINAL LOCATION OF ALL THERMOSTATS WITH FINAL INSTALLED FURNITURE.
11. MOUNT ALL PRESSURE SENSING AND TRANSMITTING DEVICES AND ALL OTHER NON-
ADJUSTABLE DEVICES AT 48" A.F.F. UNLESS NOTED OTHERWISE. COORDINATE FINAL
LOCATION OF ALL THERMOSTATS WITH FINAL INSTALLED FURNITURE.
12. PROVIDE FIRESTOP AT ALL DUCTWORK PENETRATIONS THROUGH FIRE RATED FLOORS AND
WALLS
13. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE INTERNATIONAL MECHANICAL
CODE 2015.
14. SEE ARCHITECTURAL DRAWINGS AND REFLECTED CEILING PLANS FOR EXACT LOCATION
OF DOORS, WINDOWS, CEILING DIFFUSERS, ETC
15. PROVIDE MANUFACTURER’S RECOMMENDED CLEARANCES AROUND ALL EQUIPMENT FOR
AIRFLOW MAINTENANCE AND FILTER REMOVAL.
16. LOCATE EXHAUST FANS, OUTLETS, AND GAS FLUES A MINIMUM OF 15’-0” FROM ANY OUTSIDE
AIR INTAKE.
17. VERTICAL AND HORIZONTAL OFFSETS SHOWN IN DUCTS INDICATE THE GENERAL
RELATIONSHIP OF THE LOCATIONS OF THE SYSTEMS. PROVIDE ADDITIONAL OFFSETS
SIMILAR TO THOSE SHOWN AS REQUIRED TO SUIT CONSTRUCTION. COORDINATE
INSTALLATION WITH OTHER TRADES.
18. VALVES, CONTROLS, DAMPERS, FANS, ETC., SHALL BE INSTALLED IN ACCESSIBLE
LOCATIONS. PROVIDE ADEQUATELY SIZED ACCESS DOORS WHERE REQUIRED.
19. INSTALL PIPING AND DUCTWORK TO AVOID ARCHITECTURAL FRAMING, STRUCTURAL
MEMBERS AND OTHER CONSTRUCTION AND PROVIDE NECESSARY FITTINGS AND
OFFSETS. CONTRACTOR SHALL COORDINATE DUCT AND PIPING LAYOUT WITH ALL OTHER
TRADES BEFORE FABRICATION AND INSTALLATION. DUCT AND PIPING SHALL NOT BE
LOCATED ABOVE ELECTRICAL PANELS OR EQUIPMENT.
20. LOCATE CEILING AIR OUTLETS ACCORDING TO THE ARCHITECTURAL REFLECTED CEILING
PLANS. CONTRACTOR SHALL CONFIRM CEILING TYPES SHOWN ON ARCHITECTURAL
DRAWINGS AND INSTALL CEILING TYPE SUPPLY AND RETURN OR EXHAUST OUTLETS TO SUIT
CONDITIONS.
21. DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS IN INCH UNITS UNLESS OTHERWISE
NOTED.
22. WHERE FLEXIBLE DUCT CONNECTORS ARE USED, THEY SHALL BE EQUAL TO OR GREATER
THAN CROSS-SECTIONAL AREA OF DUCTS SHOWN. MAXIMUM ALLOWABLE LENGTH SHALL
BE 5'-0". NO FLEX DUCT ALLOWED ON RETURN OR EXHAUST SYSTEMS.
23. PROVIDE TURNING VANES IN RECTANGULAR DUCT ELBOWS. VOLUME DAMPERS SHALL BE
INSTALLED IN ALL BRANCH SUPPLY AND EXHAUST OR RETURN DUCTS. LOCATE DAMPERS AS
DISTANT AS POSSIBLE FROM EXHAUST OR RETURN DUCTS. FOR AREAS WITH GYPSUM
BOARD CEILING WHERE NO ACCESS DOORS ARE ALLOWED, PROVIDE REMOTE DAMPER
ACTUATORS. PROVIDE MEANS TO ACCESS AND OPERATE AFTER INSULATION IS INSTALLED.
24. MECHANICAL AND PLUMBING EQUIPMENT SHALL BE U.L. LISTED OR ETL APPROVED.
25. PROVIDE MIN. 4" THICK HOUSEKEEPING PADS (OR GREATER IF REQ'D FOR CONDENSATE
TRAP CLEARANCE) FOR FLOOR MOUNTED EQUIPMENT PER STRUCTURAL DRAWINGS.
PROVIDE ADEQUATE SUPPORT FOR WALL-MOUNTED EQUIPMENT.
26. CONTRACTOR SHALL PROVIDE INSULATED REFRIGERANT PIPING ON SPLIT DX UNITS SIZED
PER MANUFACTURER'S RECOMMENDATIONS.
27. MOUNT PIPING, DUCTWORK, AND EQUIPMENT AS HIGH AS POSSIBLE IN EXPOSED AREAS,
UNLESS NOTED OTHERWISE. ALL HANGER SUPPORTS SHALL BE ATTACHED TO STRUCTURAL
STEEL. NO SUPPORTS SHALL BE ATTACHED TO THE ROOF DECK.
28. ALL MISCELLANEOUS SUPPORT STEEL SHALL BE PROVIDED BY DIVISION 23 UNLESS NOTED
OTHERWISE.
29. PIPE PENETRATIONS THROUGH SLAB AND WALLS SHALL HAVE PIPE SLEEVES WITH FIRE
PROOF MATERIAL. CAULK ANNULAR SPACE BETWEEN PIPE AND SLEEVE. PIPES THRU
INTERIOR WALLS SHALL HAVE ESCUTCHEONS. REFER TO LIFE SAFETY PLANS FOR
LOCATIONS OF ALL FIRE RATED WALLS.
30. FLEX DUCT CONNECTIONS SHALL MATCH RESPECTIVE CEILING DIFFUSER
NECK SIZE DIAMETER SPECIFIED IN DIFFUSER, REGISTER, AND GRILLE
SCHEDULE. MAXIMUM ALLOWABLE LENGTH SHALL BE 5 FT. NO FLEX DUCT
ALLOWED ON RETURN OR EXHAUST DUCT SYSTEMS.
31. PROVIDE MINIMUM OF 4 TIMES DUCT DIAMETER OF STRAIGHT DUCT PRIOR
TO ALL VAV TERMINAL INLETS. REFER TO VAV DETAIL FOR MORE INFORMATION
32. ALLOW 4 FT OF STRAIGHT DUCT DOWNSTREAM OF VAV TERMINAL BEFORE
FIRST RUNOUT AND INSIDE OF THE DUCT SHALL BE EQUAL TO DISCHARGE SIZE.
33. PROVIDE MERV-8 TEMPORARY FILTERS ON ALL RETURNS AND PROTECT ALL
DUCTWORK FROM CONSTRUCTION DEBRIS. REPLACE FILTERS EVERY TWO WEEKS.
33. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. IF THERE IS A
DISCREPANCY BETWEEN DRAWINGS AND SPECIFICATIONS, THE MOST STRINGENT
REQUIREMENT SHALL APPLY.
34. ALL EXPOSED DUCTWORK TO BE DOUBLE WALL AND INSULATED.
OUTSIDE AIR DUCT WITH TURN UP/DOWN
RETURN AIR DUCT WITH TURN UP/DOWN
EXHAUST AIR DUCT WITH TURN UP/DOWN
AVERAGING TEMPERATURE SENSOR (LEFT)
THERMOSTAT (RIGHT)
CO2
CARBON DIOXIDE DETECTOR.
DUCT MOUNTED (LEFT)
ROOM MOUNTED (RIGHT)
SP
STATIC PRESSURE TRANSMITTER.
DUCT MOUNTED (LEFT)
ROOM MOUNTED (RIGHT)
DP
DIFFERENTIAL PRESSURE
TRANSMITTER. DUCT MOUNTED (LEFT)
ROOM MOUNTED (RIGHT)
OA
RA
EA
SMOKE DAMPER. W/ ACCESS PANEL.
REFER TO ELECTRICAL DRAWINGS FOR
POWER REQUIREMENTS.
0" x1 6"
BRANCH DUCT SIZE SAME
AS NECK UNLESS
OTHERWISE NOTED.
AIR TERMINAL TYPE.
REFER TO SCHEDULE
SHEET
AIR FLOW RATE, CFM
THROW PATTERN (3-WAY SHOWN). 4-WAY
THROW UNLESS OTHERWISE NOTED.
XXX
XXX
SUPPLY AIR DUCT WITH TURN UP/DOWNSA SA
FIRE DAMPER W/ ACCESS PANEL
COMBINATION FIRE/SMOKE DAMPER.
SHOWING ACCESS PANEL. REFER TO
ELECTRICAL DRAWINGS FOR POWER
REQUIREMENTS.
MITERED ELBOW W/O TURNING VANES
AND WITH LINER. USE ONLY ON
TRANSFER AIR DUCTS.
90° RECTANGULAR MITERED ELBOW
90° ROUND RADIUS ELBOW
90° OVAL GORED ELBOW
SUPPLY RETURN EXHAUST
FLEX DUCT
SA SA
RA RA RA
EA EA EA
OA OA OA
CO
CARBON MONOXIDE DETECTOR.
DUCT MOUNTED (LEFT)
ROOM MOUNTED (RIGHT)
MOTORIZED DAMPER
M
M
DUCTWORK
SIZE (INCHES)
SOUND ATTENUATORSDSD
ROOF EXHAUST FAN (LEFT)
WALL PROPELLER EXHAUST FAN (RIGHT)
EFEF-XX
CD CONDENSATE PIPING CD
RS/RL REFRIGERANT SUCTION & LIQUID PIPINGRS/RL
RECTANGULAR TEE
ROUND TEE
OVAL TEE
45° RECTANGULAR MITERED ELBOW
45° ROUND RADIUS ELBOW
45° OVAL GORED ELBOW
TEE
90°
ELBOW
45°
ELBOW
45°
TAP
45° RECTANGULAR TAP
45° ROUND TAP
45° OVAL TAP
SW EMERGENCY HVAC SHUTDOWN
SWITCH. DUCT MOUNTED (LEFT)
ROOM MOUNTED (RIGHT)
E EMERGENCY HVAC SHUTDOWN SWITCH.
DUCT MOUNTED (LEFT)
ROOM MOUNTED (RIGHT)
MAN BAR W/ ACCESS PANEL
VAV SINGLE DUCT
VAV BYPASS-SHUTOFF
VAV REHEAT
EF-XX
FSDFSD
S
FD
T'A T AHU-XX
FSDCO2 CO2
SP SP
DP DP
CO CO
S
SW SW
E E
KEYNOTE REFERENCE#
AXXX
SECTION HEAD
BALL VALVE
WATER METER
CAPPED PIPE
CONCENTRIC REDUCER
DIRECTION OF FLOW
FLANGED CONNECTION
FLEXIBLE CONNECTION
FLOW METER
GLOBE VALVE
MANUAL AIR VENT
METERED BALANCING VALVE
W/PRESSURE TAPS
GAS COCK
PIPE SLEEVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
SQUARE HEAD COCK
"Y" TYPE STRAINER (W/HOSE END VALVE)
STRAINER W/BLOW DOWN VALVE
THERMOMETER / THERMOSTAT
VACUUM BREAKER
SOLENOID VALVE.
AUTOMATIC AIR VENT
PRESSURE GAUGE
CHECK VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
SHUT OFF VALVE
IAINNFCOQUEIAEENTSCI
G E
O
GR
APH I A E PENE TR
AM
U S
A I R
N A T I ON A L
GU
AR
D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018As indicated
8/ 9/
:2
6:
P M
B
IM
U
S
N or th C ar ol in a
A ir
N at io na l G ua rd /N
C A
N G
C
H an ga r
M E
C H
_V
.r vt
M-001
J. STAMPER
S. KOWALCZYK
S. KOWALCZYK
MECHANICAL
HVAC GENERAL NOTES,
LEGENDS, AND ABBREVIATIONS
SYMBOL ABBREV. DESCRIPTION
ABBREVIATIONS CONTROLS & INSTRUMENTATION
VALVES AND ACCESSORIES LEGEND
GENERAL SYMBOLS
GENERAL NOTES HVAC LEGEND
M
M-102 A1
M-103 A1
M-103 A3
C1
M-302
A1
M-302
HA
HB
HA.5
HC
HD
HE
HE.5
HF
HA.1
H6 H5
H3
H2 H1
HE.9 G.5HB.2 HB.4 HB.6 HB.8
HC.9
HC.8
HC.6
HC.4
HC.2
H
G
J
3.8
G.1 H.1 J.1
M-104 A1
M-105 A1
A4
M-302
C3
M-303
A1
M-303
A2
M-303
IAINNFCOQUEIAEENTSCI
G E
O
GR
APH I A E PENE TR
AM
U S
A I R
N A T I ON A L
GU
AR
D
C I
V
I L
E N G I N E E R
I N
G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018 1/16" = 1'-0"
8/ 9/
:2
7:
P M
B
IM
U
S
N or th C ar ol in a
A ir
N at io na l G ua rd /N
C A
N G
C
H an ga r
M E
C H
_V
.r vt
M-101
J. STAMPER
S. KOWALCZYK
S. KOWALCZYK
MECHANICAL
C-17 HANGAR
OVERALL HVAC PLAN
1/16" = 1'-0"A1 OVERALL HVAC PLAN
B
C
A
KEY PLAN
D
E
1/16" = 1'-0"
8' 16' 32' 48'
A. REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES, ABBREVIATIONS,
SYMBOLS, AND LINE DESIGNATIONS.
GENERAL NOTES:
KEYNOTES
12x10 SA x1
0 S A
12x10 SA
VAV-1-01
VAV-1-05
VAV-1-02
VAV-1-03
VAV-1-04
VAV-1-09
VAV-1-08
S1C
S1C
S1C
S1C
S1B
R1B
R1A
S1B
S1C
S1B
S1B
S1B
S1C
S1C
S1C
E1A
S1B
S1C
12x10
CORRIDOR
H155
TOOL CRIB
H154
WASH GEAR DRYING
H153
FUEL SYSTEM
SUPERVISOR
H152
CLASSROOM
H108
CORRIDOR
H103
MAINTENANCE SQ CDR
H107
FIRST SERGEANT
H106
CONFERENCE ROOM
H104
LOBBY
H102
VESTIBULE
H101
METAL SHOP
H126
SHOP OFFICE
H116
WOMEN
H133
CORRIDOR
H130
TER
H128
CTK CAGE
H127
8x8
MEN
H113
FAB SUPERVISOR
H118
WOMEN
H114
S1C
A4
M-301
E1A
C4
M-301
S2A
FUEL SYSTEM OFFICE
H151
12x10 SA
HE
HE.5
HF
H6
H5
H4
H3
H2
HE.9
HC.9
H
G
J
3.8
J.1
E3B
E3B
14"ø EA
IDU-03
12x8 SA
VAV-1-07
x1
0 S A
R1A
R1E x1
SA
14x14 SA
A2
M-302
R1D
S2A
8"ø SA
FAB SUPERVISOR
H117
EF-05
EF-02
A3
M-302
40x18 EA
40x18 EA
"ø
E A
30"ø EA
C3
M-303
A1
M-303
R1D
S4A
150 S4A
6"ø SA
6"ø SA x1
2 R A
CLASSROOM
H109
BREAK ROOM
H110
CHANGING ROOM B
H120
LOCKERS
H119
MEN
H131
STENCIL ROOM
H136
JUNIOR OFFICERS
H105
R1C
R1A
CORRIDOR
H149
15x15 RA
L-3
TYP.-2
T
T
T T
T
T
T
T
T
T
CORRIDOR
H125
T
L-1
EF-10
E3B
S2A
S2A
S2A
10"ø OA
CHANGING ROOM A
H121
E2A
V A
V -2
-0
E2A
44"ø EA
38"ø EA
38"ø EA
S1B
54"ø EA
TYP.-2
6x6 EA 6x6 EA6x6 EA
8"ø EA
EF-09
S1B
S1B x1
4 S A
20x14 SA
28x14 SA
S1D
S1D
26x16 RA
26x16 RA 16x16 OA
18"ø OA
22"ø EA
E3B
E3B
16x16 OA
S1B x1
4 O A
14"ø OA
14"ø OA
10"ø EA
S1C
S1C
12x10 SA
R3A
S4A
S1B
VAV-1-06
S1B
6"ø SA
6"ø RA
14x14 EA
18x18 EA
S1B
S1B
R1D
14x14 RA
T1B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
S3B
"ø
E A
E3B
E3B
E3B
"ø
S A
14"ø SA
"ø
S A
16"ø SA
"ø
S A
"ø SA
136x70 EA
"ø SA
6" ø
SA
DF-01
12x10 SA
12x10 OA x1
2 R A
FACILITY
MAINTENANCE
STORAGE
H115
S1B
S1C x1
EA
x1
EA
8"ø O
A
SW 11
E2A
E2A
E2BE2B
E1C
E1C
10x10
10x10
E1C
E1C x1
0 E A
1/2" CD
"ø R
A
"ø
O A
"ø
S A
14x12 C
C
C
DDCP
DDCP
S1B
S1C
S1C
14"ø OA
22"ø EA16"ø EA
18"ø EA
18"ø EA
"ø
E A
6"ø OA
S2A
TYP.-2
TYP.
S1C
M-301
IAINNFCOQUEIAEENTSCI
G E
O
GR
APH I A E PENE TR
AM
U S
A I R
N A T I ON A L
GU
AR
D
C I
V
I L
E N G I N E E R
I N
G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018 1/8" = 1'-0"
8/ 9/
:2
7:
P M
B
IM
U
S
N or th C ar ol in a
A ir
N at io na l G ua rd /N
C A
N G
C
H an ga r
M E
C H
_V
.r vt
M-102
J. STAMPER
S. KOWALCZYK
S. KOWALCZYK
MECHANICAL
C-17 HANGAR
PARTIAL HVAC PLAN - AREA A
B
C
A
KEY PLAN
D
E
1/8" = 1'-0"A1 PARTIAL HVAC PLAN - AREA A
1 26X16 RA DUCT UP TO RTU-01. REFER TO SHEET M-141 FOR
CONTINUATION.
2 28X14 SA DUCT DOWN FROM RTU-01. REFER TO SHEET M-141 FOR
CONTINUATION.
3 28X54 OA DUCT UP TO DOAS-01. REFER TO SHEET M-141 FOR
CONTINUATION.
4 22"Ø EA DUCT UP TO DOAS-01. REFER TO SHEET M-141 FOR
CONTINUATION.
5 PROVIDE FIRE DAMPER AS INDICATED. REFERENCE LIFE SAFETY
PLANS FOR ALL RATED WALLS AND PARTITIONS. REFERENCE DETAIL
C2/M-501.
6 SEE LINEAR SLOT DETAIL D4/M-502 FOR MORE INFORMATION.
7 MOUNT VAV TERMINAL AND SUPPORT FROM STRUCTURE ABOVE.
REFERENCE DETAIL C4/M-501. TYPICAL FOR ALL VAV TERMINALS.
8 WALL MOUNTED FAN COIL UNIT WITH INTEGRAL CONDENSATE PUMP.
SEE DETAIL D4/M-501.
9 ROUTE DUCTWORK UP AND OVER STRUCTURAL MEMBERS AS
SHOWN.
10 REFRIGERANT PIPING UP TO ROOF. SEE SHEET M-141 FOR
CONTINUATION.
11 EMERGENCY AIR DISTRIBUTION SHUTDOWN SWITCH WITH HINGED
CLEAR COVER, WARNING SIGN AND TAG. WHEN SWITCH IS
ACTIVATED, ALL MECHANICAL EQUIPMENT CONTROLLED BY BAS
SHALL SHUT DOWN.
12 PROVIDE WIRE MESH GRILLE AT 44X22 RA BELLMOUTH OPENING.
13 SEE DETAIL A3 ON SHEET M-106 FOR CONTINUATION.
14 50" DEEP PLENUM FULL SIZE OF LOUVER.
15 THE FIRST 25 FEET OF RECTANGULAR SUPPLY DUCTWORK
ASSOCIATED WITH RTU-01 SHALL BE PROVIDED WTH ELASTOMERIC
DUCT LINER.
16 THE FIRST 25 FEET OF RECTANGULAR RETURN DUCTWORK
ASSOCIATED WITH RTU-01 SHALL BE PROVIDED WTH ELASTOMERIC
DUCT LINER.
1/8" = 1'-0"
24'4' 8' 16'
KEYNOTES
A. REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES, ABBREVIATIONS,
SYMBOLS, AND LINE DESIGNATIONS.
ELECTRICAL
ROOM
H167
HEF EQUIPMENT
H168
ODU-01
IDU-01
CU-03
CORRIDOR
H169
ODU-02
HA
HB
HA.5
HA.1
H6
H5
H4
H3
H2
TR
H166
IDU-02
x1
44"ø EA
38"ø EA
30"ø EA
18"ø EA
C4
M-302
E3A
A4
M-302
EF-06
C5
M-303
EF-01
"ø
E A
40x18 EA
C1
M-303
E3A
WORKSTAND /
EQUIPMENT
STORAGE
H165
L-1
TYP.-2
8"ø EA
"ø
E A
RS/RL
3/4" CD
3/4" CD
3/4" CD
RS/RL
DF-01
T
T
T
8"ø
EA
EF-08
EF-13
10x10 EA
10x10 EA
L-9
E3B
L-10
18"ø OA
RISE UP
COMPOSITE SHOP
H137
RECEIVING AND
STAGING
H139
CORRIDOR
H135
MEN SHOWER /
LOCKERS
H132
"ø
S A
"ø
S A
"ø
S A
10"ø
E2A
E2A
E2A
E2A
MEN
H131
COMPOSITE SHOP
H138
STENCIL ROOM
H136
S2A
S3B
S3B
WOMEN
H133
5 5
HD
H1
HE.9 G.5
HC.8
HC.6 HC.6
HC.4
HC.2
3.8
G.1 H.1
S3B
A5
M-302
"ø
E A
"ø
E A
"ø
E A
40x18
40x18
96x40 EA
EF-07
WOMEN SHOWER /
LOCKERS
H134
COMPOSITE SHOP
BOOTHS
H140
COMPOSITE SHOP
BOOTHS
H140
22"ø
COMPOSITE SHOP
BOOTHS
H140
L-2
VAV-2-04
VAV-2-02
12"ø SA
VAV-2-05
VAV-2-03
S3B
(TYP. 7)
"ø
S A
"ø
S A
22"ø
12"ø SA
12"ø SA
40x18
E3B
E3B
10x10 EA
"ø
E A x1
EA
COMPOSITE SHOP
BOOTHS
H140
S3B
12"ø SA
16"ø SA
E3B
E3B
S3B
E3B
E3B
"ø
E A
14"ø EA
T
T
T
T1AT1A
R1F
R1F
T
10x10
10x10
6x66x6
6x6
R4A
R4A
S3B
S3B
12"ø
14"ø
"ø
"ø
R A
"ø
O A
"ø
S A
8" ø
16"ø
12"ø
S3B
S3B
S2A
IAINNFCOQUEIAEENTSCI
G E
O
GR
APH I A E PENE TR
AM
U S
A I R
N A T I ON A L
GU
AR
D
C I
V
I L
E N G I N E E R
I N
G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 CORROSION CONTROL & FUEL CELL HANGAR
54321
D C
B A
08/17/2018 1/8" = 1'-0"
8/ 9/
:2
7:
P M
B
IM
U
S
N or th C ar ol in a
A ir
N at io na l G ua rd /N
C A
N G
C
H an ga r
M E
C H
_V
.r vt
M-103
J. STAMPER
S. KOWALCZYK
S. KOWALCZYK
MECHANICAL
C-17 HANGAR
PARTIAL HVAC PLANS - AREAS B AND C
B
C
A
KEY PLAN
D
E
1/8" = 1'-0"A1 PARTIAL HVAC PLAN - AREA C
1/8" = 1'-0"A3 PARTIAL HVAC PLAN - AREA B
1 10X10 EA UP TO EXHAUST FAN EF-01 ON ROOF. REFER TO SHEET
M-141 FOR CONTINUATION.
2 10X10 EA UP TO EXHAUST FAN EF-02 ON ROOF. REFER TO SHEET
M-141 FOR CONTINUATION.
3 30"Ø SA UP TO RTU-02. PROVIDE DUCTWORK TRANSITION TO
EQUIPMENT CONNECTION SIZE AS REQUIRED.
4 32"Ø RA UP TO RTU-02. PROVIDE DUCTWORK TRANSITION TO
EQUIPMENT CONNECTION SIZE.
5 FANS, DUCTWORK, VENTILATORS, CONTROLS, AND ALL ASSOCIATED
COMPONENTS FOR PAINT AND SANDING BOOTH ARE PART OF A
DELEGATED DESIGN TO BE PROVIDED BY THE BOOTH
MANUFACTURERS.
6 CONDENSING UNIT MOUNTED ON 4" CONCRETE EQUIPMENT PAD.
SEE DETAIL A4/M-502. MAINTAIN MANUFACTURER'S RECOMMENDED
CLEARANCES.
7 WALL MOUNTED FAN COIL UNIT. SEE DETAIL D4/M-501.
8 MOUNT BOTTOM OF EXHAUST GRILL AT 6' ABOVE FINISHED FLOOR.
9 REFER TO SHEET M-106 FOR CONTINUATION.
11 ROUTE CONDENSATE PIPING DOWN THE WALL AND ROUTE TO
NEAREST FLOOR DRAIN. REFER TO PLUMBING DRAWINGS FOR
EXACT LOCATION.
1…