W911WN-09-B-0004-0003.pdf

PDF 37 KB Posted

Attached to
RECOVERY--Y--RECOVERY--PROJECT NUMBER 10286, CHARLEROI GUARD WALLS
Solicitation number
W911WN09B0004
Issued by

About this file

Amendment 0003 to W911WN-09-B-0004

View the file

Other files

File Type Posted
Detailed Abstract of Bids - W911WN-09-B-0004 Upper and Lower Guard Walls .xls XLS spreadsheet
BID RESULTS.doc DOC document
W911WN-09-B-0004-0006.pdf PDF
W911WN-09-B-0004-0005.pdf PDF
Conformed Price Schedule-72909.pdf PDF
Conformed Price Schedule-72809.pdf PDF
W911WN-09-B-0004-0004.pdf PDF
01 30 00.10.pdf PDF
Conformed Price Schedule-Amendment 0004.pdf PDF
31 41 16.pdf PDF
01 22 00.00 10.pdf PDF
02 32 13.12.pdf PDF
02 42 00.pdf PDF
O37_LCH_99020-A.CAL —
01 74 19.10.pdf PDF
W911WN-09-B-0004-0001.zip ZIP file
03 23 00.pdf PDF
Section 01 30 00_10 Table C.pdf PDF
01 30 00.10.pdf PDF
Section 01 30 00_10 Table B.pdf PDF
Section 01 30 00_10 Table E.pdf PDF
05 50 14.pdf PDF
03 30 00.50.pdf PDF
01 52 13.20.pdf PDF
03 30 00.60.pdf PDF
Section 01 30 00_10 Table A.pdf PDF
03 31 23.pdf PDF
02 32 13.12.pdf PDF
Gate Operating Schedules.pdf PDF
W911WN-09-B-0004-0002.pdf PDF
Section 01 30 00_10 Table D.pdf PDF
35 49 23.23 25.pdf PDF
03 30 00.10.pdf PDF
01 22 00.00 10.pdf PDF
Conformed price schedule.pdf PDF
03 30 00.20.pdf PDF
03 45 33.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0001.pdf PDF
Charleroi Site Visit Attendees.doc DOC document
W911WN-09-B-0004.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

This amendment is being issued to: 1) Provide responses to additional questions received, 2) Provide additional draw ing revisions, 3) Include FAR Clause 52.245-2 by Full Text, 4) Provide an extended description for Line Item 0004, and 5) Extend the date and time for receipt of bids to 11:00 am on July 30, 2009.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0004

X 9B. DATED (SEE ITEM 11)

10-Jun-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911WN

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The following specification sections have been revised are attached to this amendment:

SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

SECTION 01 74 19.10 GENERAL REQUIREMENTS

SECTION 02 32 13.12 EXPLORATORY PILE DRIVING

SECTION 02 42 00 DISPOSAL OF MATERIALS

SECTION 31 41 16 METAL SHEET PILING

ADDITIONAL QUESTIONS AND ANSWERS

Q1. Due to the substantial weights of the pre cast pieces on this project, the contractor may need to utilize specialized lifting equipment, i.e. "A Frames" or Derricks to erect the units.

Please confirm that the equipment utilized has to meet the current EM 385-1-1 Safety and Health Requirements Manual.

A1. Yes - All equipment has to satisfy EM 385-1-1. See Specifications Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS for additional details.

Q2. Please confirm that all concrete on the project requires transport to the point of placement utilizing a concrete conveyor as specified.

A2. Correct - All concrete is to be transported via conveyor.

Q3. Section 01 74 19.10 Para 3.2 says that the trees, brush and vegetation shall be chipped and placed in stockpile area number 1. Where is stockpile number 1 located?

A3. The area is located at the Victory Follow Disposal Site. See Revised Drawing 99/20.1 for details.

Q4. Bid items 0004AF and 0004AG are for cleaning of sediment basins at the Government furnished disposal site.

a. Please provide a description of how the sediment is expected to be removed without damage to the liners.

b. What is the definition and tolerance for “clean”?

c. What is to be done with the material removed from the sediment basins?

A4. Specifications Section 01 74 19.10 paragraph 3.7 CLEANOUT OF SEDIMENTATION BASINS has been added to cover this. While the actual method is up to the contractor as detailed in the updated Specification section, the following is provided for informational purposes: the current method utilized is pumping out the water and using laborers with squeegees and a vacuum truck to remove the sediment.

Q5. Please confirm that there are no density or moisture requirements for material placed at the Government furnished disposal site.

A5. Specifications Section 02 42 00 paragraph 3.2.2 DISPOSAL AT THE GOVERNMENT FURNISHED DISPOSAL SITE has been updated to address the moisture and compaction requirements.

Q6. There does not appear to be a specific typical detail for welding the 1” plate seams on the Nose Pier. However, after reading general note #3 on drawing 037-LCH-20/LG1, it seems that the 1” plate splices are to be “complete penetration groove welds”, with fillet welds all around the WT’s and perpendicular plate junctions on the inside of the plates that occur at each splice. Please either confirm the above assumption, or provide specific direction regarding these plate splices.

A6. Yes, this understanding of the requirements is correct. The 1” thick nose pier shell plate will be fabricated using complete penetration groove welds. Unless otherwise noted on the plans, all other steel members will be welded to the shell plate using fillet welds.

Q7. Since the nose pier is to be hot dipped galvanized in smaller sections and then welded together, it is assumed that cold galvanized paint is sufficient for coating the weld seams.

Please confirm.

A7. As indicated in the Response to Question # 16 under Amendment # 2, the galvanizing note only applies to the grating, not to the nose pier.

Q8. Note 4 on drawing 037-LCH-20/LG20 states "Temporary Support Required During Concrete Placement." Does this note apply only to supporting the check post, as indicated on Detail 1 or does it apply to supporting the entire nose pier assembly during concrete placement? If it applies to the entire nose pier structure please provide the anticipated loadings and the location of the supports.

A8. Note 4 is applicable to the check post only.

ADDITIONAL DRAWING REVISIONS

1.) Replace Drawing 037-LCH-11/18 - Replace Drawing 037-LCH-99/20 with the revised drawing 037-LCH-99/20

The drawing has been revised to show stockpile area # 1.

2.) 037-LCH-20/LG2 – LOWER GUARD WALL – OVERALL PLAN AND

ELEVATION

Change the following:

a.) In the LOWER GUARDWALL ELEVATION VIEW, change the two callouts from “PZ27 SHEET PILE WALL” to “Z-PILE WALL”.

b.) Add the following as NOTE 3: “SEE SPECIFICAITIONS FOR Z-PILE

PROPERTIES”

3.) 037-LCH-20/UG17 – UPPER GUARD WALL – SHEET PILE WALL – PLAN

SECTION AND DETAILS

Change the following:

a.) In the “PLAN” view, delete the following note – “354 PIECES OF PZ35 SHEET

PILING”.

b.) In “DETAIL 1”, change the callout from “PZ 35 SHEET PILE” to “Z-PILE”.

c.) In “SECTION A”, change the callout from “PZ 35 SHEET PILE” to “Z-PILE”.

d.) Add the following note – “SEE SPECIFICAITIONS FOR Z-PILE PROPERTIES”.

4.) 037-LCH-18/6 – EXPLORATORY DRILLING AND PILE DRIVING –

COORDINATE LOCATIONS – TABLE AND NOTES

Change the following:

a.) Change the callout from “UGRW-C THROUGH UGRW-I TO BE PZ 35 SHEET PILES” to “UGRW-C THROUGH UGRW-I TO BE Z-PILES”.

b.) Change the callout from “LGRW-A THROUGH LGRW-E TO BE PZ 35 SHEET PILES” to “LGRW-A THROUGH LGRW-E TO BE Z-PILES”.

c.) Add the following as NOTE 10: “SEE SPECIFICAITIONS FOR Z-PILE

PROPERTIES”

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 24-Jul-2009 11:00 AM to 30-Jul-2009 11:00 AM.

CLIN 0004

The CLIN extended description This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0004AA - 0004AK) only. has been added.

SECTION 00700 - CONTRACT CLAUSES

The following were previously included by reference and are now included by full text:

52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (JUNE 2007)

(a) This Government Property listed in paragraph (e) of this clause is furnished to the Contractor in an ``as-is, where is'' condition. The Government makes no warranty regarding the suitability for use of the Government property specified in this contract. The Contractor shall be afforded the opportunity to inspect the Government property as specified in the solicitation.

(b) The Government bears no responsibility for repair or replacement of any lost, damaged or destroyed Government property. If any or all of the Government property is lost, damaged or destroyed or becomes no longer usable, the Contractor shall be responsible for replacement of the property at Contractor expense. The Contractor shall have title to all replacement property and shall continue to be responsible for contract performance.

(c) Unless the Contracting Officer determines otherwise, the Government abandons all rights and title to unserviceable and scrap property resulting from contract performance. Upon notification to the Contracting Officer, the Contractor shall remove such property from the Government premises and dispose of it at Contractor expense.

(d) Except as provided in this clause, Government property furnished under this contract shall be governed by the Government Property clause of this contract.

(e) Government property provided under this clause:

The following Government property is more fully described in Section 31 41 16 METAL SHEET PILING, paragraph GOVERNMENT-FURNISHED METAL SHEET PILING:

Steel Sheet Piling, PS-31 and PS27.5 and Special Sections. These materials will be furnished at the

Victory Hollow Offloading Area, Monongahela River Mile 34.5, approximately 7 miles downstream of the Charleroi Locks and Dam. The acquisition cost of these materials is $1,498,700.

The following Government properety is more fully described in Section 03 30 00.50 CONCRETE:

PRODUCTION AND TRANSPORT, paragraph Government-Furnished Concrete:

Concrete. Concrete material will be delivered o the Points of Delivery specified in Section 03 30 00.50 –

CONCRETE: PRODUCTION AND TRANSPORT. The estimated acquisition cost of these materials is $1,300,000.00.

(End of clause)

(End of Summary of Changes)