Detailed Abstract of Bids - W911WN-09-B-0004 Upper and Lower Guard Walls .xls

XLS spreadsheet 146 KB Posted

Attached to
RECOVERY--Y--RECOVERY--PROJECT NUMBER 10286, CHARLEROI GUARD WALLS
Solicitation number
W911WN09B0004
Issued by

About this file

Detailed abstract of all bids received

View the file

Other files

File Type Posted
BID RESULTS.doc DOC document
W911WN-09-B-0004-0006.pdf PDF
W911WN-09-B-0004-0005.pdf PDF
Conformed Price Schedule-72909.pdf PDF
Conformed Price Schedule-72809.pdf PDF
W911WN-09-B-0004-0004.pdf PDF
01 30 00.10.pdf PDF
Conformed Price Schedule-Amendment 0004.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0003.pdf PDF
01 22 00.00 10.pdf PDF
02 32 13.12.pdf PDF
02 42 00.pdf PDF
O37_LCH_99020-A.CAL —
01 74 19.10.pdf PDF
W911WN-09-B-0004-0001.zip ZIP file
03 23 00.pdf PDF
Section 01 30 00_10 Table C.pdf PDF
01 30 00.10.pdf PDF
Section 01 30 00_10 Table B.pdf PDF
Section 01 30 00_10 Table E.pdf PDF
05 50 14.pdf PDF
03 30 00.50.pdf PDF
01 52 13.20.pdf PDF
03 30 00.60.pdf PDF
Section 01 30 00_10 Table A.pdf PDF
03 31 23.pdf PDF
02 32 13.12.pdf PDF
Gate Operating Schedules.pdf PDF
W911WN-09-B-0004-0002.pdf PDF
Section 01 30 00_10 Table D.pdf PDF
35 49 23.23 25.pdf PDF
03 30 00.10.pdf PDF
01 22 00.00 10.pdf PDF
Conformed price schedule.pdf PDF
03 30 00.20.pdf PDF
03 45 33.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0001.pdf PDF
Charleroi Site Visit Attendees.doc DOC document
W911WN-09-B-0004.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

0
0
FOR
0
0
0
0
0
Including Amendments 1, 2, 3, 4, 5, 6
0
DEPARTMENT OF THE ARMY
Pittsburgh District, Corps of Engineers
William S. Moorhead Federal Building, 1000 Liberty Avenue
Pittsburgh, Pennsylvania 15222-4186
GOVERNMENT REASONABLE CONTRACT ESTIMATE OF COST
GOVERNMENT REASONABLE CONTROL ESTIMATE OF COST
WITHOUT PROFIT TO A CONTRACTOR
WITH PROFIT TO A CONTRACTOR
FOR
Bids Opened
Proposals Received by
DEPARTMENT OF THE ARMY
Pittsburgh District, Corps of Engineers
William S. Moorhead Federal Building, 1000 Liberty Avenue
Pittsburgh, Pennsylvania 15222-4186
535000.0
165.0
160.0
160.0
150.0
150.0
2.5
1.75
1.25
1.75

IGE

Charleroi Locks and Dam
Upper and Lower Guard Walls
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
ITEMDESCRIPTION* QUANTITYU/MU/PAMOUNT
0001GENERAL REQUIREMENTS
0001AAARRA - REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS1LUMP SUM$500,000$500,000
0001ABARRA - MOBILIZATION AND DEMOBILIZATION1LUMP SUM$600,000$600,000
0001ACARRA - DIGITAL PROGRESS IMAGES22MONTHS$665$14,630
0001ADARRA - CONSTRUCTION PROJECT SCHEDULE1LUMP SUM$55,000$55,000
0001AEARRA - MAINTAIN CONCRETE TESTING LAB9MONTHS$14,150$127,350
0001AFARRA - MAINTAIN GOVERNMENT FIELD OFFICES9MONTHS$6,750$60,750
0001AGARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE AREA.1LUMP SUM$30,000$30,000
0001AHARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT1LUMP SUM$40,500$40,500
0001AJREIMBURSEMENT FOR UTILITY SERVICES9LUMP SUM$1,500$13,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$1,441,730
0002UPPER GUARD WALL
0002AAARRA - RANDUM IN-SITU SAMPLING, UPPER GUARD WALL1LUMP SUM$51,150$51,150
0002ABARRA - UPPER GUARD WALL, PRE-EXCAVATION3,860CUBIC YARD$110$424,600
0002ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, UPPER GUARD WALL112LINEAR FEET$280$31,360
0002ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, UPPER GUARD WALL112LINEAR FEET$395$44,240
0002AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER GUARD WALL152LINEAR FEET$360$54,720
0002AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, UPPER GUARD WALL152LINEAR FEET$180$27,360
0002AGARRA - EXPLORATORY PILE DRIVING,UPPER GUARD WALL1LUMP SUM$165,000$165,000
0002AHARRA - UPPER GUARD WALL, NOSE CELL1LUMP SUM$470,000$470,000
0002AJARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS1LUMP SUM$356,000$356,000
0002AKARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS670LINEAR FEET$1,710$1,145,700
0002ALARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS340LINEAR FEET$1,570$533,800
0002AMARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS230LINEAR FEET$2,890$664,700
0002ANARRA - CROSSHOLE SONIC LOGGING (CSL) UPPER GUARD WALL DRILLED SHAFTS12EACH$1,965$23,580
0002APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL DRILLED SHAFTS5,290LINEAR FEET$8$44,436
0002AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD WALL DRILLED SHAFTS840CUBIC YARD$116$97,440
0002ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD WALL NOSE CELL3,400CUBIC YARD$16$54,400
0002ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD WALL NOSE CELL750CUBIC YARD$66$49,500
0002ATARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD WALL THRUST BLOCKS270CUBIC YARD$180$48,600
0002AUARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS350LINEAR FEET$190$66,500
0002AVARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS230,880POUNDS$4$935,064
0002AWARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS62,500POUNDS$4$250,000
0002AXARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL19,342Square Feet$102$1,972,884
0002AYARRA - UPPER GUARD WALL, CAP BEAMS1LUMP SUM$2,147,500$2,147,500
0002AZARRA - UPPER GUARD WALL, PRECAST BOX BEAMS1LUMP SUM$4,900,000$4,900,000
0002BAARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS1LUMP SUM$1,640,000$1,640,000
0002BBARRA - UPPER GUARD WALL, ELECTRICAL WORK1LUMP SUM$131,000$131,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$16,329,534
0003LOWER GUARD WALL
0003AAARRA - RANDUM IN-SITU SAMPLING, LOWER GUARD WALL1LUMP SUM$47,200$47,200
0003ABARRA - LOWER GUARD WALL, PRE-EXCAVATION3,740CUBIC YARD$104$388,960
0003ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, LOWER GUARD WALL95LINEAR FEET$418$39,710
0003ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, LOWER GUARD WALL117LINEAR FEET$380$44,460
0003AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER GUARD WALL325LINEAR FEET$320$104,000
0003AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, LOWER GUARD WALL325LINEAR FEET$123$39,975
0003AGARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL1LUMP SUM$160,000$160,000
0003AHARRA - LOWER GUARD WALL, SHEET PILE CELLS1LUMP SUM$667,000$667,000
0003AJARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS1LUMP SUM$614,000$614,000
0003AKARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS948LINEAR FEET$2,145$2,033,460
0003ALARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS200LINEAR FEET$3,600$720,000
0003AMARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS325LINEAR FEET$6,750$2,193,750
0003ANARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED SHAFTS13EACH$2,270$29,510
0003APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL DRILLED SHAFTS9,410LINEAR FEET$10$94,100
0003AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER280CUBIC YARD$73$20,440
0003ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD WALL DRILLED SHAFTS850CUBIC YARD$86$72,845
0003ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD WALL CAP BEAM INFILL240CUBIC YARD$105$25,200
0003ATARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER GUARD WALL DRILLED SHAFTS1,200CUBIC YARD$53$63,600
0003AUARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER GUARD WALL SHAFTSUPERSTRUCTURE AND NOSE PIER INFILL670CUBIC YARD$23$15,410
0003AVARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS380LINEAR FEET$230$87,400
0003AWARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS429,000POUNDS$4$1,866,150
0003AXARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER4,960POUNDS$6$30,752
0003AYARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES1LUMP SUM$3,013,000$3,013,000
0003AZARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS1LUMP SUM$5,475,000$5,475,000
0003BAARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE1LUMP SUM$4,475,000$4,475,000
0003BBARRA - LOWER GUARD WALL, CAP BEAMS1LUMP SUM$642,000$642,000
0003BCARRA - LOWER GUARD WALL, SHEET PILE WALL11,638SQUARE FEET$78$907,764
0003BDARRA - LOWER GUARD WALL, ELECTRICAL WORK1LUMP SUM$84,000$84,000
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$23,954,686
0004GOVERNMENT-FURNISHED DISPOSAL AREA
0004AAARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE, GOVERNMENT-FURNISHED DISPOSAL AREA460DAYS$60$27,600
0004ABARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING GOVERNMENT FURNISHED DISPOSAL SITE18MONTHS$1,345$24,210
0004ACARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE3ACRES$6,575$19,725
0004ADARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA2,000LINEAR FEET$5$10,400
0004AEARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED DISPOSAL AREA1LUMP SUM$124,000$124,000
0004AFARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$40,000$160,000
0004AGARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$80,000$320,000
0004AHARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE6ACRES$7,000$42,000
0004AJARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT FURNISHED DISPOSAL SITE32,500CUBIC YARDS$26$828,750
0004AKARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY2,150CUBIC YARDS$115$247,250
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,803,935
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$1,441,730
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$16,329,534
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$23,954,686
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,803,935
TOTAL, ITEMS 0001AA THRU 0004AK$43,529,885

Trumbull_Brayman

Charleroi Locks and Dam
Upper and Lower Guard Walls
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
ITEMDESCRIPTION* QUANTITYU/MU/PAMOUNT
0001GENERAL REQUIREMENTS
0001AAARRA - REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS1LUMP SUM$185,000$185,000
0001ABARRA - MOBILIZATION AND DEMOBILIZATION1LUMP SUM$250,000$250,000
0001ACARRA - DIGITAL PROGRESS IMAGES22MONTHS$220$4,840
0001ADARRA - CONSTRUCTION PROJECT SCHEDULE1LUMP SUM$25,000$25,000
0001AEARRA - MAINTAIN CONCRETE TESTING LAB9MONTHS$500$4,500
0001AFARRA - MAINTAIN GOVERNMENT FIELD OFFICES9MONTHS$3,500$31,500
0001AGARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE AREA.1LUMP SUM$12,000$12,000
0001AHARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT1LUMP SUM$45,000$45,000
0001AJREIMBURSEMENT FOR UTILITY SERVICES9MONTHS$1,500$13,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$571,340
0002UPPER GUARD WALL
0002AAARRA - RANDUM IN-SITU SAMPLING, UPPER GUARD WALL1LUMP SUM$35,000$35,000
0002ABARRA - UPPER GUARD WALL, PRE-EXCAVATION3,860CUBIC YARD$33$127,380
0002ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, UPPER GUARD WALL112LINEAR FEET$100$11,200
0002ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, UPPER GUARD WALL112LINEAR FEET$150$16,800
0002AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER GUARD WALL152LINEAR FEET$170$25,840
0002AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, UPPER GUARD WALL152LINEAR FEET$40$6,080
0002AGARRA - EXPLORATORY PILE DRIVING,UPPER GUARD WALL1LUMP SUM$50,000$50,000
0002AHARRA - UPPER GUARD WALL, NOSE CELL1LUMP SUM$850,000$850,000
0002AJARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS1LUMP SUM$99,500$99,500
0002AKARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS670LINEAR FEET$1,500$1,005,000
0002ALARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS340LINEAR FEET$250$85,000
0002AMARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS230LINEAR FEET$2,100$483,000
0002ANARRA - CROSSHOLE SONIC LOGGING (CSL) UPPER GUARD WALL DRILLED SHAFTS12EACH$1,000$12,000
0002APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL DRILLED SHAFTS5,290LINEAR FEET$14$74,060
0002AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD WALL DRILLED SHAFTS840CUBIC YARD$500$420,000
0002ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD WALL NOSE CELL3,400CUBIC YARD$325$1,105,000
0002ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD WALL NOSE CELL750CUBIC YARD$475$356,250
0002ATARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD WALL THRUST BLOCKS270CUBIC YARD$2,500$675,000
0002AUARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS350LINEAR FEET$160$56,000
0002AVARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS230,880POUNDS$2$404,040
0002AWARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS62,500POUNDS$2$140,625
0002AXARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL19,342Square Feet$120$2,321,040
0002AYARRA - UPPER GUARD WALL, CAP BEAMS1LUMP SUM$1,950,000$1,950,000
0002AZARRA - UPPER GUARD WALL, PRECAST BOX BEAMS1LUMP SUM$3,350,000$3,350,000
0002BAARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS1LUMP SUM$1,450,000$1,450,000
0002BBARRA - UPPER GUARD WALL, ELECTRICAL WORK1LUMP SUM$90,000$90,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$15,198,815
0003LOWER GUARD WALL
0003AAARRA - RANDUM IN-SITU SAMPLING, LOWER GUARD WALL1LUMP SUM$25,000$25,000
0003ABARRA - LOWER GUARD WALL, PRE-EXCAVATION3,740CUBIC YARD$25$93,500
0003ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, LOWER GUARD WALL95LINEAR FEET$100$9,500
0003ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, LOWER GUARD WALL117LINEAR FEET$150$17,550
0003AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER GUARD WALL325LINEAR FEET$170$55,250
0003AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, LOWER GUARD WALL325LINEAR FEET$40$13,000
0003AGARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL1LUMP SUM$70,000$70,000
0003AHARRA - LOWER GUARD WALL, SHEET PILE CELLS1LUMP SUM$925,000$925,000
0003AJARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS1LUMP SUM$400,000$400,000
0003AKARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS948LINEAR FEET$2,000$1,896,000
0003ALARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS200LINEAR FEET$270$54,000
0003AMARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS325LINEAR FEET$2,800$910,000
0003ANARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED SHAFTS13EACH$1,000$13,000
0003APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL DRILLED SHAFTS9,410LINEAR FEET$14$131,740
0003AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER280CUBIC YARD$500$140,000
0003ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD WALL DRILLED SHAFTS850CUBIC YARD$600$510,000
0003ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD WALL CAP BEAM INFILL240CUBIC YARD$1,000$240,000
0003ATARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER GUARD WALL DRILLED SHAFTS1,200CUBIC YARD$300$360,000
0003AUARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER GUARD WALL SHAFTSUPERSTRUCTURE AND NOSE PIER INFILL670CUBIC YARD$400$268,000
0003AVARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS380LINEAR FEET$160$60,800
0003AWARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS429,000POUNDS$2$750,750
0003AXARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER4,960POUNDS$4$19,840
0003AYARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES1LUMP SUM$1,475,000$1,475,000
0003AZARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS1LUMP SUM$2,400,000$2,400,000
0003BAARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE1LUMP SUM$975,000$975,000
0003BBARRA - LOWER GUARD WALL, CAP BEAMS1LUMP SUM$500,000$500,000
0003BCARRA - LOWER GUARD WALL, SHEET PILE WALL11,638SQUARE FEET$130$1,512,940
0003BDARRA - LOWER GUARD WALL, ELECTRICAL WORK1LUMP SUM$90,000$90,000
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$13,915,870
0004GOVERNMENT-FURNISHED DISPOSAL AREA
0004AAARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE, GOVERNMENT-FURNISHED DISPOSAL AREA460DAYS$510$234,600
0004ABARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING GOVERNMENT FURNISHED DISPOSAL SITE18MONTHS$1,300$23,400
0004ACARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE3ACRES$10,000$30,000
0004ADARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA2,000LINEAR FEET$9$18,000
0004AEARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED DISPOSAL AREA1LUMP SUM$16,500$16,500
0004AFARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$16,000$64,000
0004AGARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$20,000$80,000
0004AHARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE6ACRES$1,800$10,800
0004AJARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT FURNISHED DISPOSAL SITE32,500CUBIC YARDS$11$357,500
0004AKARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY2,150CUBIC YARDS$45$96,750
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$931,550
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$571,340
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$15,198,815
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$13,915,870
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$931,550
TOTAL, ITEMS 0001AA THRU 0004AK$30,617,575

Administrator:

Changed this from LUMP SUM to MONTHS - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB

Mahan

Charleroi Locks and Dam
Upper and Lower Guard Walls
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
ITEMDESCRIPTION* QUANTITYU/MU/PAMOUNT
0001GENERAL REQUIREMENTS
0001AAARRA - REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS1LUMP SUM$142,000$142,000
0001ABARRA - MOBILIZATION AND DEMOBILIZATION1LUMP SUM$3,000,000$3,000,000
0001ACARRA - DIGITAL PROGRESS IMAGES22MONTHS$700$15,400
0001ADARRA - CONSTRUCTION PROJECT SCHEDULE1LUMP SUM$15,000$15,000
0001AEARRA - MAINTAIN CONCRETE TESTING LAB9MONTHS$1,700$15,300
0001AFARRA - MAINTAIN GOVERNMENT FIELD OFFICES9MONTHS$3,200$28,800
0001AGARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE AREA.1LUMP SUM$23,000$23,000
0001AHARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT1LUMP SUM$46,000$46,000
0001AJREIMBURSEMENT FOR UTILITY SERVICES9MONTHS$1,500$13,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$3,299,000
0002UPPER GUARD WALL
0002AAARRA - RANDUM IN-SITU SAMPLING, UPPER GUARD WALL1LUMP SUM$17,300$17,300
0002ABARRA - UPPER GUARD WALL, PRE-EXCAVATION3,860CUBIC YARD$22$84,920
0002ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, UPPER GUARD WALL112LINEAR FEET$85$9,520
0002ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, UPPER GUARD WALL112LINEAR FEET$120$13,440
0002AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER GUARD WALL152LINEAR FEET$135$20,520
0002AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, UPPER GUARD WALL152LINEAR FEET$25$3,800
0002AGARRA - EXPLORATORY PILE DRIVING,UPPER GUARD WALL1LUMP SUM$96,000$96,000
0002AHARRA - UPPER GUARD WALL, NOSE CELL1LUMP SUM$450,000$450,000
0002AJARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS1LUMP SUM$590,000$590,000
0002AKARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS670LINEAR FEET$318$213,060
0002ALARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS340LINEAR FEET$2,450$833,000
0002AMARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS230LINEAR FEET$2,650$609,500
0002ANARRA - CROSSHOLE SONIC LOGGING (CSL) UPPER GUARD WALL DRILLED SHAFTS12EACH$1,500$18,000
0002APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL DRILLED SHAFTS5,290LINEAR FEET$11$58,190
0002AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD WALL DRILLED SHAFTS840CUBIC YARD$65$54,600
0002ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD WALL NOSE CELL3,400CUBIC YARD$120$408,000
0002ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD WALL NOSE CELL750CUBIC YARD$170$127,500
0002ATARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD WALL THRUST BLOCKS270CUBIC YARD$970$261,900
0002AUARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS350LINEAR FEET$140$49,000
0002AVARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS230,880POUNDS$1$277,056
0002AWARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS62,500POUNDS$1$87,500
0002AXARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL19,342Square Feet$65$1,257,230
0002AYARRA - UPPER GUARD WALL, CAP BEAMS1LUMP SUM$1,600,000$1,600,000
0002AZARRA - UPPER GUARD WALL, PRECAST BOX BEAMS1LUMP SUM$4,224,000$4,224,000
0002BAARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS1LUMP SUM$1,300,000$1,300,000
0002BBARRA - UPPER GUARD WALL, ELECTRICAL WORK1LUMP SUM$75,000$75,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$12,739,036
0003LOWER GUARD WALL
0003AAARRA - RANDUM IN-SITU SAMPLING, LOWER GUARD WALL1LUMP SUM$17,300$17,300
0003ABARRA - LOWER GUARD WALL, PRE-EXCAVATION3,740CUBIC YARD$115$430,100
0003ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, LOWER GUARD WALL95LINEAR FEET$85$8,075
0003ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, LOWER GUARD WALL117LINEAR FEET$120$14,040
0003AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER GUARD WALL325LINEAR FEET$135$43,875
0003AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, LOWER GUARD WALL325LINEAR FEET$25$8,125
0003AGARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL1LUMP SUM$60,000$60,000
0003AHARRA - LOWER GUARD WALL, SHEET PILE CELLS1LUMP SUM$735,000$735,000
0003AJARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS1LUMP SUM$560,000$560,000
0003AKARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS948LINEAR FEET$430$407,640
0003ALARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS200LINEAR FEET$4,100$820,000
0003AMARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS325LINEAR FEET$4,300$1,397,500
0003ANARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED SHAFTS13EACH$1,500$19,500
0003APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL DRILLED SHAFTS9,410LINEAR FEET$11$103,510
0003AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER280CUBIC YARD$250$70,000
0003ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD WALL DRILLED SHAFTS850CUBIC YARD$65$55,250
0003ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD WALL CAP BEAM INFILL240CUBIC YARD$120$28,800
0003ATARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER GUARD WALL DRILLED SHAFTS1,200CUBIC YARD$65$78,000
0003AUARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER GUARD WALL SHAFTSUPERSTRUCTURE AND NOSE PIER INFILL670CUBIC YARD$195$130,650
0003AVARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS380LINEAR FEET$140$53,200
0003AWARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS429,000POUNDS$1$386,100
0003AXARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER4,960POUNDS$2$7,440
0003AYARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES1LUMP SUM$980,000$980,000
0003AZARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS1LUMP SUM$2,350,000$2,350,000
0003BAARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE1LUMP SUM$1,300,000$1,300,000
0003BBARRA - LOWER GUARD WALL, CAP BEAMS1LUMP SUM$261,000$261,000
0003BCARRA - LOWER GUARD WALL, SHEET PILE WALL11,638SQUARE FEET$56$655,801
0003BDARRA - LOWER GUARD WALL, ELECTRICAL WORK1LUMP SUM$150,000$150,000
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$11,130,906
0004GOVERNMENT-FURNISHED DISPOSAL AREA
0004AAARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE, GOVERNMENT-FURNISHED DISPOSAL AREA460DAYS$500$230,000
0004ABARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING GOVERNMENT FURNISHED DISPOSAL SITE18MONTHS$7,000$126,000
0004ACARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE3ACRES$4,500$13,500
0004ADARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA2,000LINEAR FEET$4$8,500
0004AEARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED DISPOSAL AREA1LUMP SUM$6,200$6,200
0004AFARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$28,000$112,000
0004AGARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$54,000$216,000
0004AHARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE6ACRES$1,500$9,000
0004AJARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT FURNISHED DISPOSAL SITE32,500CUBIC YARDS$12$378,625
0004AKARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY2,150CUBIC YARDS$45$96,750
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,196,575
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$3,299,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$12,739,036
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$11,130,906
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,196,575
TOTAL, ITEMS 0001AA THRU 0004AK$28,365,517

Administrator:

Changed this from LUMP SUM to MONTHS - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB

Mascaro

Charleroi Locks and Dam
Upper and Lower Guard Walls
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
ITEMDESCRIPTION* QUANTITYU/MU/PAMOUNT
0001GENERAL REQUIREMENTS
0001AAARRA - REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS1LUMP SUM$140,000$140,000
0001ABARRA - MOBILIZATION AND DEMOBILIZATION1LUMP SUM$2,000,000$2,000,000
0001ACARRA - DIGITAL PROGRESS IMAGES22MONTHS$10,000$220,000
0001ADARRA - CONSTRUCTION PROJECT SCHEDULE1LUMP SUM$40,000$40,000
0001AEARRA - MAINTAIN CONCRETE TESTING LAB9MONTHS$5,000$45,000
0001AFARRA - MAINTAIN GOVERNMENT FIELD OFFICES9MONTHS$7,000$63,000
0001AGARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE AREA.1LUMP SUM$10,000$10,000
0001AHARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT1LUMP SUM$50,000$50,000
0001AJREIMBURSEMENT FOR UTILITY SERVICES9MONTHS$1,500$13,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$2,581,500
0002UPPER GUARD WALL
0002AAARRA - RANDUM IN-SITU SAMPLING, UPPER GUARD WALL1LUMP SUM$40,000$40,000
0002ABARRA - UPPER GUARD WALL, PRE-EXCAVATION3,860CUBIC YARD$50$193,000
0002ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, UPPER GUARD WALL112LINEAR FEET$200$22,400
0002ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, UPPER GUARD WALL112LINEAR FEET$250$28,000
0002AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER GUARD WALL152LINEAR FEET$300$45,600
0002AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, UPPER GUARD WALL152LINEAR FEET$40$6,080
0002AGARRA - EXPLORATORY PILE DRIVING,UPPER GUARD WALL1LUMP SUM$200,000$200,000
0002AHARRA - UPPER GUARD WALL, NOSE CELL1LUMP SUM$600,000$600,000
0002AJARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS1LUMP SUM$600,000$600,000
0002AKARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS670LINEAR FEET$2,800$1,876,000
0002ALARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS340LINEAR FEET$1,200$408,000
0002AMARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS230LINEAR FEET$675$155,250
0002ANARRA - CROSSHOLE SONIC LOGGING (CSL) UPPER GUARD WALL DRILLED SHAFTS12EACH$1,500$18,000
0002APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL DRILLED SHAFTS5,290LINEAR FEET$20$105,800
0002AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD WALL DRILLED SHAFTS840CUBIC YARD$90$75,600
0002ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD WALL NOSE CELL3,400CUBIC YARD$10$34,000
0002ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD WALL NOSE CELL750CUBIC YARD$40$30,000
0002ATARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD WALL THRUST BLOCKS270CUBIC YARD$1,000$270,000
0002AUARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS350LINEAR FEET$200$70,000
0002AVARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS230,880POUNDS$2$461,760
0002AWARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS62,500POUNDS$2$125,000
0002AXARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL19,342Square Feet$120$2,321,040
0002AYARRA - UPPER GUARD WALL, CAP BEAMS1LUMP SUM$2,900,000$2,900,000
0002AZARRA - UPPER GUARD WALL, PRECAST BOX BEAMS1LUMP SUM$4,800,000$4,800,000
0002BAARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS1LUMP SUM$1,800,000$1,800,000
0002BBARRA - UPPER GUARD WALL, ELECTRICAL WORK1LUMP SUM$80,000$80,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$17,265,530
0003LOWER GUARD WALL
0003AAARRA - RANDUM IN-SITU SAMPLING, LOWER GUARD WALL1LUMP SUM$25,000$25,000
0003ABARRA - LOWER GUARD WALL, PRE-EXCAVATION3,740CUBIC YARD$50$187,000
0003ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, LOWER GUARD WALL95LINEAR FEET$200$19,000
0003ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, LOWER GUARD WALL117LINEAR FEET$250$29,250
0003AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER GUARD WALL325LINEAR FEET$300$97,500
0003AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, LOWER GUARD WALL325LINEAR FEET$40$13,000
0003AGARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL1LUMP SUM$200,000$200,000
0003AHARRA - LOWER GUARD WALL, SHEET PILE CELLS1LUMP SUM$2,000,000$2,000,000
0003AJARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS1LUMP SUM$750,000$750,000
0003AKARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS948LINEAR FEET$2,600$2,464,800
0003ALARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS200LINEAR FEET$2,250$450,000
0003AMARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS325LINEAR FEET$3,800$1,235,000
0003ANARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED SHAFTS13EACH$1,500$19,500
0003APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL DRILLED SHAFTS9,410LINEAR FEET$20$188,200
0003AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER280CUBIC YARD$80$22,400
0003ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD WALL DRILLED SHAFTS850CUBIC YARD$110$93,500
0003ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD WALL CAP BEAM INFILL240CUBIC YARD$80$19,200
0003ATARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER GUARD WALL DRILLED SHAFTS1,200CUBIC YARD$80$96,000
0003AUARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER GUARD WALL SHAFTSUPERSTRUCTURE AND NOSE PIER INFILL670CUBIC YARD$60$40,200
0003AVARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS380LINEAR FEET$200$76,000
0003AWARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS429,000POUNDS$2$858,000
0003AXARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER4,960POUNDS$2$11,160
0003AYARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES1LUMP SUM$1,700,000$1,700,000
0003AZARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS1LUMP SUM$2,500,000$2,500,000
0003BAARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE1LUMP SUM$1,700,000$1,700,000
0003BBARRA - LOWER GUARD WALL, CAP BEAMS1LUMP SUM$400,000$400,000
0003BCARRA - LOWER GUARD WALL, SHEET PILE WALL11,638SQUARE FEET$120$1,396,560
0003BDARRA - LOWER GUARD WALL, ELECTRICAL WORK1LUMP SUM$80,000$80,000
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$16,671,270
0004GOVERNMENT-FURNISHED DISPOSAL AREA
0004AAARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE, GOVERNMENT-FURNISHED DISPOSAL AREA460DAYS$390$179,400
0004ABARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING GOVERNMENT FURNISHED DISPOSAL SITE18MONTHS$1,700$30,600
0004ACARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE3ACRES$10,000$30,000
0004ADARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA2,000LINEAR FEET$5$10,000
0004AEARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED DISPOSAL AREA1LUMP SUM$125,000$125,000
0004AFARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$5,000$20,000
0004AGARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$5,000$20,000
0004AHARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE6ACRES$2,500$15,000
0004AJARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT FURNISHED DISPOSAL SITE32,500CUBIC YARDS$15$487,500
0004AKARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY2,150CUBIC YARDS$100$215,000
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,132,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$2,581,500
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$17,265,530
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$16,671,270
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,132,500
TOTAL, ITEMS 0001AA THRU 0004AK$37,650,800

Administrator:

Changed this from LUMP SUM to MONTHS - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB

Kokosing

Charleroi Locks and Dam
Upper and Lower Guard Walls
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
ITEMDESCRIPTION* QUANTITYU/MU/PAMOUNT
0001GENERAL REQUIREMENTS
0001AAARRA - REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS1LUMP SUM$170,000$170,000
0001ABARRA - MOBILIZATION AND DEMOBILIZATION1LUMP SUM$400,000$400,000
0001ACARRA - DIGITAL PROGRESS IMAGES22MONTHS$500$11,000
0001ADARRA - CONSTRUCTION PROJECT SCHEDULE1LUMP SUM$5,000$5,000
0001AEARRA - MAINTAIN CONCRETE TESTING LAB9MONTHS$2,100$18,900
0001AFARRA - MAINTAIN GOVERNMENT FIELD OFFICES9MONTHS$3,600$32,400
0001AGARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE AREA.1LUMP SUM$10,000$10,000
0001AHARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT1LUMP SUM$60,000$60,000
0001AJREIMBURSEMENT FOR UTILITY SERVICES9MONTHS$1,500$13,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$720,800
0002UPPER GUARD WALL
0002AAARRA - RANDUM IN-SITU SAMPLING, UPPER GUARD WALL1LUMP SUM$15,000$15,000
0002ABARRA - UPPER GUARD WALL, PRE-EXCAVATION3,860CUBIC YARD$60$231,600
0002ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, UPPER GUARD WALL112LINEAR FEET$130$14,560
0002ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, UPPER GUARD WALL112LINEAR FEET$180$20,160
0002AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER GUARD WALL152LINEAR FEET$200$30,400
0002AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, UPPER GUARD WALL152LINEAR FEET$40$6,080
0002AGARRA - EXPLORATORY PILE DRIVING,UPPER GUARD WALL1LUMP SUM$68,000$68,000
0002AHARRA - UPPER GUARD WALL, NOSE CELL1LUMP SUM$600,000$600,000
0002AJARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS1LUMP SUM$1,000,000$1,000,000
0002AKARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS670LINEAR FEET$510$341,700
0002ALARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS340LINEAR FEET$965$328,100
0002AMARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS230LINEAR FEET$650$149,500
0002ANARRA - CROSSHOLE SONIC LOGGING (CSL) UPPER GUARD WALL DRILLED SHAFTS12EACH$1,350$16,200
0002APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL DRILLED SHAFTS5,290LINEAR FEET$8$39,675
0002AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD WALL DRILLED SHAFTS840CUBIC YARD$315$264,600
0002ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD WALL NOSE CELL3,400CUBIC YARD$185$629,000
0002ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD WALL NOSE CELL750CUBIC YARD$225$168,750
0002ATARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD WALL THRUST BLOCKS270CUBIC YARD$1,200$324,000
0002AUARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS350LINEAR FEET$140$49,000
0002AVARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS230,880POUNDS$1$334,776
0002AWARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS62,500POUNDS$1$56,250
0002AXARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL19,342Square Feet$58$1,121,836
0002AYARRA - UPPER GUARD WALL, CAP BEAMS1LUMP SUM$2,500,000$2,500,000
0002AZARRA - UPPER GUARD WALL, PRECAST BOX BEAMS1LUMP SUM$5,468,000$5,468,000
0002BAARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS1LUMP SUM$700,000$700,000
0002BBARRA - UPPER GUARD WALL, ELECTRICAL WORK1LUMP SUM$110,000$110,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$14,587,187
0003LOWER GUARD WALL
0003AAARRA - RANDUM IN-SITU SAMPLING, LOWER GUARD WALL1LUMP SUM$15,000$15,000
0003ABARRA - LOWER GUARD WALL, PRE-EXCAVATION3,740CUBIC YARD$35$130,900
0003ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, LOWER GUARD WALL95LINEAR FEET$130$12,350
0003ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, LOWER GUARD WALL117LINEAR FEET$180$21,060
0003AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER GUARD WALL325LINEAR FEET$200$65,000
0003AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, LOWER GUARD WALL325LINEAR FEET$40$13,000
0003AGARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL1LUMP SUM$30,000$30,000
0003AHARRA - LOWER GUARD WALL, SHEET PILE CELLS1LUMP SUM$450,000$450,000
0003AJARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS1LUMP SUM$970,000$970,000
0003AKARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS948LINEAR FEET$600$568,800
0003ALARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS200LINEAR FEET$1,800$360,000
0003AMARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS325LINEAR FEET$2,750$893,750
0003ANARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED SHAFTS13EACH$1,350$17,550
0003APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL DRILLED SHAFTS9,410LINEAR FEET$8$70,575
0003AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER280CUBIC YARD$310$86,800
0003ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD WALL DRILLED SHAFTS850CUBIC YARD$320$272,000
0003ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD WALL CAP BEAM INFILL240CUBIC YARD$290$69,600
0003ATARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER GUARD WALL DRILLED SHAFTS1,200CUBIC YARD$320$384,000
0003AUARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER GUARD WALL SHAFTSUPERSTRUCTURE AND NOSE PIER INFILL670CUBIC YARD$200$134,000
0003AVARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS380LINEAR FEET$140$53,200
0003AWARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS429,000POUNDS$1$536,250
0003AXARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER4,960POUNDS$2$7,936
0003AYARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES1LUMP SUM$2,600,000$2,600,000
0003AZARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS1LUMP SUM$2,400,000$2,400,000
0003BAARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE1LUMP SUM$2,000,000$2,000,000
0003BBARRA - LOWER GUARD WALL, CAP BEAMS1LUMP SUM$380,000$380,000
0003BCARRA - LOWER GUARD WALL, SHEET PILE WALL11,638SQUARE FEET$55$640,090
0003BDARRA - LOWER GUARD WALL, ELECTRICAL WORK1LUMP SUM$100,000$100,000
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$13,281,861
0004GOVERNMENT-FURNISHED DISPOSAL AREA
0004AAARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE, GOVERNMENT-FURNISHED DISPOSAL AREA460DAYS$400$184,000
0004ABARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING GOVERNMENT FURNISHED DISPOSAL SITE18MONTHS$7,000$126,000
0004ACARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE3ACRES$2,500$7,500
0004ADARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA2,000LINEAR FEET$10$20,000
0004AEARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED DISPOSAL AREA1LUMP SUM$90,000$90,000
0004AFARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$6,000$24,000
0004AGARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$6,000$24,000
0004AHARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE6ACRES$6,000$36,000
0004AJARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT FURNISHED DISPOSAL SITE32,500CUBIC YARDS$13$409,500
0004AKARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY2,150CUBIC YARDS$73$156,950
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,077,950
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$720,800
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$14,587,187
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$13,281,861
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$1,077,950
TOTAL, ITEMS 0001AA THRU 0004AK$29,667,798

Administrator:

Changed this from LUMP SUM to MONTHS - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB Administrator:

Added formula for calculation - JWB

Goettle

Charleroi Locks and Dam
Upper and Lower Guard Walls
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
ITEMDESCRIPTION* QUANTITYU/MU/PAMOUNT
0001GENERAL REQUIREMENTS
0001AAARRA - REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS1LUMP SUM$200,000$200,000
0001ABARRA - MOBILIZATION AND DEMOBILIZATION1LUMP SUM$1,400,000$1,400,000
0001ACARRA - DIGITAL PROGRESS IMAGES22MONTHS$3,700$81,400
0001ADARRA - CONSTRUCTION PROJECT SCHEDULE1LUMP SUM$75,000$75,000
0001AEARRA - MAINTAIN CONCRETE TESTING LAB9MONTHS$3,000$27,000
0001AFARRA - MAINTAIN GOVERNMENT FIELD OFFICES9MONTHS$2,300$20,700
0001AGARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE AREA.1LUMP SUM$65,000$65,000
0001AHARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT1LUMP SUM$36,000$36,000
0001AJREIMBURSEMENT FOR UTILITY SERVICES9MONTHS$1,500$13,500
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$1,918,600
0002UPPER GUARD WALL
0002AAARRA - RANDUM IN-SITU SAMPLING, UPPER GUARD WALL1LUMP SUM$50,000$50,000
0002ABARRA - UPPER GUARD WALL, PRE-EXCAVATION3,860CUBIC YARD$96$370,560
0002ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, UPPER GUARD WALL112LINEAR FEET$190$21,280
0002ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, UPPER GUARD WALL112LINEAR FEET$305$34,160
0002AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER GUARD WALL152LINEAR FEET$295$44,840
0002AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, UPPER GUARD WALL152LINEAR FEET$85$12,920
0002AGARRA - EXPLORATORY PILE DRIVING,UPPER GUARD WALL1LUMP SUM$50,000$50,000
0002AHARRA - UPPER GUARD WALL, NOSE CELL1LUMP SUM$1,335,000$1,335,000
0002AJARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS1LUMP SUM$875,000$875,000
0002AKARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS670LINEAR FEET$640$428,800
0002ALARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS340LINEAR FEET$985$334,900
0002AMARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED SHAFTS230LINEAR FEET$1,420$326,600
0002ANARRA - CROSSHOLE SONIC LOGGING (CSL) UPPER GUARD WALL DRILLED SHAFTS12EACH$4,500$54,000
0002APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL DRILLED SHAFTS5,290LINEAR FEET$13$66,125
0002AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD WALL DRILLED SHAFTS840CUBIC YARD$1,375$1,155,000
0002ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD WALL NOSE CELL3,400CUBIC YARD$200$680,000
0002ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD WALL NOSE CELL750CUBIC YARD$228$171,000
0002ATARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD WALL THRUST BLOCKS270CUBIC YARD$1,571$424,170
0002AUARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS350LINEAR FEET$290$101,500
0002AVARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS230,880POUNDS$2$415,584
0002AWARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS62,500POUNDS$2$112,500
0002AXARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL19,342Square Feet$110$2,127,620
0002AYARRA - UPPER GUARD WALL, CAP BEAMS1LUMP SUM$2,816,000$2,816,000
0002AZARRA - UPPER GUARD WALL, PRECAST BOX BEAMS1LUMP SUM$2,758,000$2,758,000
0002BAARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS1LUMP SUM$1,330,000$1,330,000
0002BBARRA - UPPER GUARD WALL, ELECTRICAL WORK1LUMP SUM$113,000$113,000
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$16,208,559
0003LOWER GUARD WALL
0003AAARRA - RANDUM IN-SITU SAMPLING, LOWER GUARD WALL1LUMP SUM$38,000$38,000
0003ABARRA - LOWER GUARD WALL, PRE-EXCAVATION3,740CUBIC YARD$96$359,040
0003ACARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING, LOWER GUARD WALL95LINEAR FEET$200$19,000
0003ADARRA - EXPLORATORY DRILLING, SOIL DRILLING, WITH SAMPLING, LOWER GUARD WALL117LINEAR FEET$240$28,080
0003AEARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER GUARD WALL325LINEAR FEET$267$86,775
0003AFARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH CEMENT GROUT, LOWER GUARD WALL325LINEAR FEET$59$19,175
0003AGARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL1LUMP SUM$53,000$53,000
0003AHARRA - LOWER GUARD WALL, SHEET PILE CELLS1LUMP SUM$1,105,000$1,105,000
0003AJARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS1LUMP SUM$875,000$875,000
0003AKARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS948LINEAR FEET$750$711,000
0003ALARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS200LINEAR FEET$1,672$334,400
0003AMARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED SHAFTS325LINEAR FEET$2,000$650,000
0003ANARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED SHAFTS13EACH$4,507$58,591
0003APARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL DRILLED SHAFTS9,410LINEAR FEET$16$150,560
0003AQARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER280CUBIC YARD$124$34,720
0003ARARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD WALL DRILLED SHAFTS850CUBIC YARD$166$141,100
0003ASARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD WALL CAP BEAM INFILL240CUBIC YARD$58$13,920
0003ATARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER GUARD WALL DRILLED SHAFTS1,200CUBIC YARD$77$92,400
0003AUARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER GUARD WALL SHAFTSUPERSTRUCTURE AND NOSE PIER INFILL670CUBIC YARD$62$41,540
0003AVARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS380LINEAR FEET$247$93,860
0003AWARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS429,000POUNDS$2$772,200
0003AXARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT SUPERSTRUCTURES AND NOSE PIER4,960POUNDS$2$8,928
0003AYARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES1LUMP SUM$1,425,000$1,425,000
0003AZARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS1LUMP SUM$2,225,000$2,225,000
0003BAARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE1LUMP SUM$1,000,000$1,000,000
0003BBARRA - LOWER GUARD WALL, CAP BEAMS1LUMP SUM$550,000$550,000
0003BCARRA - LOWER GUARD WALL, SHEET PILE WALL11,638SQUARE FEET$25$290,950
0003BDARRA - LOWER GUARD WALL, ELECTRICAL WORK1LUMP SUM$113,000$113,000
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$11,290,239
0004GOVERNMENT-FURNISHED DISPOSAL AREA
0004AAARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE, GOVERNMENT-FURNISHED DISPOSAL AREA460DAYS$600$276,000
0004ABARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING GOVERNMENT FURNISHED DISPOSAL SITE18MONTHS$22,500$405,000
0004ACARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE3ACRES$7,500$22,500
0004ADARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA2,000LINEAR FEET$15$30,000
0004AEARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED DISPOSAL AREA1LUMP SUM$22,500$22,500
0004AFARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$15,000$60,000
0004AGARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED DISPOSAL SITE4EACH$30,000$120,000
0004AHARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE6ACRES$3,000$18,000
0004AJARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT FURNISHED DISPOSAL SITE32,500CUBIC YARDS$50$1,625,000
0004AKARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY2,150CUBIC YARDS$225$483,750
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$3,062,750
TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA THRU 0001AJ$1,918,600
TOTAL, UPPER GUARD WALL, ITEMS 0002AA THRU 0002BB, INCLUSIVE$16,208,559
TOTAL, LOWER GUARD WALL, ITEMS 0003AA THRU 0003BD, INCLUSIVE$11,290,239
TOTAL, GOVERNMENT-FURNISHED DISPOSAL AREA, ITEMS 0004AA THRU 0004AK, INCLUSIVE$3,062,750
TOTAL, ITEMS 0001AA THRU 0004AK$32,480,148

Administrator:

Changed this from LUMP SUM to MONTHS -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .