Conformed Price Schedule-72809.pdf

PDF 289 KB Posted

Attached to
RECOVERY--Y--RECOVERY--PROJECT NUMBER 10286, CHARLEROI GUARD WALLS
Solicitation number
W911WN09B0004
Issued by

About this file

This is not an amendment to the solicitation. No additional changes are made to the price schedule. This conformed price schedule is just being provided for clarification. It was noted that the conformed price schedule provided as an attachment with Amendment 0004 did not include the estimated line item price for Item 0001AJ (added via Amendment 0002). This conformed copy is all-inclusive and bidders are requested to utilize this copy for bid preparation and submission.

View the file

Other files

File Type Posted
Detailed Abstract of Bids - W911WN-09-B-0004 Upper and Lower Guard Walls .xls XLS spreadsheet
BID RESULTS.doc DOC document
W911WN-09-B-0004-0006.pdf PDF
W911WN-09-B-0004-0005.pdf PDF
Conformed Price Schedule-72909.pdf PDF
W911WN-09-B-0004-0004.pdf PDF
01 30 00.10.pdf PDF
Conformed Price Schedule-Amendment 0004.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0003.pdf PDF
01 22 00.00 10.pdf PDF
02 32 13.12.pdf PDF
02 42 00.pdf PDF
O37_LCH_99020-A.CAL —
01 74 19.10.pdf PDF
W911WN-09-B-0004-0001.zip ZIP file
03 23 00.pdf PDF
Section 01 30 00_10 Table C.pdf PDF
01 30 00.10.pdf PDF
Section 01 30 00_10 Table B.pdf PDF
Section 01 30 00_10 Table E.pdf PDF
05 50 14.pdf PDF
03 30 00.50.pdf PDF
01 52 13.20.pdf PDF
03 30 00.60.pdf PDF
Section 01 30 00_10 Table A.pdf PDF
03 31 23.pdf PDF
02 32 13.12.pdf PDF
Gate Operating Schedules.pdf PDF
W911WN-09-B-0004-0002.pdf PDF
Section 01 30 00_10 Table D.pdf PDF
35 49 23.23 25.pdf PDF
03 30 00.10.pdf PDF
01 22 00.00 10.pdf PDF
Conformed price schedule.pdf PDF
03 30 00.20.pdf PDF
03 45 33.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0001.pdf PDF
Charleroi Site Visit Attendees.doc DOC document
W911WN-09-B-0004.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ARRA - GENERAL REQUIREMENTS

FFP

This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0001AA - 0001AJ) only.

FOB: Destination

NET AMT

0001AA 1 Lump Sum AARA-Reimbursement for Actual

FFP

Performance and Payment Bonds Premiums

0001AB 1 Lump Sum ARRA-Mobilization and Demobilization

FFP

0001AC 22 Months ARRA-Digital Progress Images

0001AD 1 Lump Sum ARRA - Construction Project Schedule

0001AE 9 Months ARRA-Maintain Concrete Testing Lab

0001AF 9 Months ARRA-Maintain Government Field Offices

0001AG 1 Lump Sum ARRA-Demolition of Building

FFP

at Downstream Laydown and Storage Area

0001AH 1 Lump Sum ARRA - Concrete Testing Lab

FFP

Repairs and Equipment

0001AJ 9 Months $1,500.00 $13,500.00 EST ARRA- Reimbursement for Utility Services

FFP

Government Field Offices and Laboratory. A unit price and total amount have been included for bidding purposes. Measurement and Payment for this item will be made in accordance with Section 01 22 00.00 10, 1.3.21.

NET AMT $13,500.00 EST

ARRA - UPPER GUARD WALL

FFP

This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0002AA - 0002BB) only.

0002AA 1 Lump Sum ARRA-Randum IN-SITU Sampling

FFP

Upper Guard Wall

0002AB 3,860 Cubic

Yard

ARRA-Pre-Excavation

0002AC 112 Linear

Foot

ARRA-Exploratory Drilling

Soil Drilling without Sampling, Upper Guard Wall

0002AD 112 Linear

Soild Drilling with Sampling, Upper Guard Wall

0002AE 152 Linear

Rock Drilling with Coring, Upper Guard Wall

0002AF 152 Linear

Sealing of Exploratory Holes with Cement Grout, Upper Guard Wall

0002AG 1 Lump Sum ARRA-Exploratory Pile Driving

FFP

0002AH 1 Lump Sum ARRA-Nose Cell

FFP

0002AJ 1 Lump Sum ARRA-Field Demonstrations

FFP

Upper Guard Wall Drilled Shafts

0002AK 670 Linear

ARRA-Permanent Casing

72-Inch Dia. Upper Guard Wall Drilled Shafts

0002AL 340 Linear

ARRA-Soil Excavation

72-Ince Dia. Upper Guard Wall Drilled Shafts

0002AM 230 Linear

ARRA-Rock Excavation

72-Inch Dia. Upper Guard Wall Drilled Shafts

0002AN 12 Each ARRA-Crosshole Sonic Logging (CSL)

FFP

0002AP 5,290 Linear

ARRA-Access Tubes, Crosshole Sonic

Logging, Upper Guard Wall Drilled Shafts

0002AQ 840 Cubic

ARRA-Transport and Place Tremie

Concrete, Mix 1, Upper Guard Wall Drilled Shafts

0002AR 3,400 Cubic

ARRA-Transport and Place Tremie

Concrete, Mix 2, Upper Guard Wall Nose Cell

0002AS 750 Cubic

ARRA-Transport and Place Mass

Concrete, Mix 7, Upper Guard Wall Nose Cell

0002AT 270 Cubic

ARRA-Transport and Place

Mass Concrete, Mix 8, Upper Guard Wall Thrust Blocks

0002AU 350 Linear

ARRA-Coring of Upper Guard Wall Drilled

Shafts

0002AV 230,880 Pound ARRA-Reinforcing Steel

FFP

0002AW 62,500 Pound ARRA-Reinforcing Steel

FFP

Upper Guard Wall Thrust Blocks

0002AX 10,270 Square

ARRA-Sheet Pile Cut-Off Wall

0002AY 1 Lump Sum ARRA-Cap Beams

FFP

0002AZ 1 Lump Sum ARRA-Precast Box Beams

FFP

0002BA 1 Lump Sum ARRA-Precast Concrete Skirts

FFP

0002BB 1 Lump Sum ARRA-Electrical Work

FFP

ARRA - LOWER GUARD WALL

FFP

This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0003AA - 0003BD) only.

0003AA 1 Lump Sum ARRA-Randum IN-SITU Sampling

FFP

Lower Guard Wall

0003AB 3,740 Cubic

ARRA-Pre-Excavation

0003AC 95 Linear

Soild Drilling without Sampling, Lower Guard Wall

0003AD 117 Linear

Soil Drilling with sampling, Lower Guard Wall

0003AE 325 Linear

Rock Drilling, with Coring, Lower Guard Wall

0003AF 325 Linear

Sealing of Exploratory Holes with Cement Grout, Lower Guard Wall

0003AG 1 Lump Sum ARRA-Exploratory Pile Driving

FFP

0003AH 1 Lump Sum ARRA-Sheet Pile Cells

FFP

0003AJ 1 Lump Sum ARRA-Field Demonstrations

FFP

Lower Guard Wall Drilled Shafts

0003AK 948 Linear

ARRA-Permanent Casing 102-Inch Dia.

0003AL 200 Linear

ARRA-Soil Excavation, 102-Inch Dia.

0003AM 325 Linear

ARRA-Rock Excavation, 102-Inch Dia.

0003AN 13 Each ARRA-Crosshole Sonic Logging (CSL)

FFP

0003AP 9,410 Linear

ARRA-Access Tubes

Crosshole Sonic Logging, Lower Guard Wall Drilled Shafts

0003AQ 280 Cubic

ARRA-Transport and Place Tremie Concrete

Mix 1, Lower Guard Wall Shaft Enclosures and Nose Pier

0003AR 850 Cubic

ARRA-Transport and Place Tremie Concrete

Mix 2, Lower Guard Wall Drilled Shafts

0003AS 240 Cubic

ARRA-Transport and Place Mass Concrete

Mix 7, Lower Guard Wall Cap Beam Infill

0003AT 1,200 Cubic

ARRA-Transport and Place Flowable

Concrete, Mix 12, Lower Guard Wall Drilled Shafts

0003AU 670 Cubic

ARRA-Transport and Place Flowable

Concrete, Mix 13, Lower Guard Wall Shaft Enclosure and Nose Pier Infill

0003AV 380 Linear

ARRA-Coring of Lower Guard Wall Drilled

Shafts

0003AW 429,000 Pound ARRA-Reinforcing Steel

FFP

0003AX 4,960 Pound ARRA-Reinforcing Steel

FFP

Lower Guard Wall Shaft Enclosures and Nose Pier

0003AY 1 Lump Sum ARRA-Shaft Superstructures

FFP

0003AZ 1 Lump Sum ARRA-Precast Concrete Panels

FFP

0003BA 1 Lump Sum ARRA-Nose Pier Superstructure

FFP

0003BB 1 Lump Sum ARRA-Cap Beams

FFP

0003BC 6,180 Square

ARRA-Sheet Pile Wall

0003BD 1 Lump Sum ARRA-Electrical Work

FFP

ARRA -GOVERNMENT FURNISHED DISPOSAL AREA

FFP

This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0004AA - 0004AK) only.

0004AA 460 Days ARRA-Environmental Control

FFP

Representative, Government Furnished Disposal Site

0004AB 18 Months ARRA-Environmental Compliance

FFP

Measurements, Sampling, Testing and Reporting Government Furnished Disposal Site

0004AC 3 Acre ARRA-Clearing

FFP

Government Furnished Disposal Site

0004AD 2,000 Linear

ARRA-Silt Fence

0004AE 1 Lump Sum ARRA-Traffic Control Devices

FFP

Permanent, Government Furnished Disposal Site

0004AF 4 Each ARRA-Cleaning of Sediment Basin No. 1

FFP

0004AG 4 Each ARRA-Cleaning of Sediment Basin No. 2

FFP

0004AH 6 Acre ARRA-Temporary Seeding

FFP

0004AJ 32,500 Cubic

ARRA-Disposal of Material in Temporary

Stockpile, Government Disposal Site

0004AK 2,150 Cubic

ARRA-Disposal of Excavated Material at Permitted Facility

TOTALS

TOTAL, GENERAL REQUIREMENTS, ITEMS 0001AA – 0001AJ $ ____________________

TOTAL, UPPER GUARD WALL, ITEMS 0002AA – 0002BB $ _________________________

TOTAL, LOWER GUARD WALL, ITEMS 0003AA – 0003BD $ _________________________

TOTAL, GOVERNMENT FURNISHED DISPOSAL AREA

ITEMS 0004AA – 0004AK $__________________________

TOTAL, ITEMS 0001AA THROUGH 0004AK, INCLUSIVE $ __________________________

Do not round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule.

File details come from the government source that posted it. Updated .