Section 01 30 00_10 Table E.pdf

PDF 45 KB Posted

Attached to
RECOVERY--Y--RECOVERY--PROJECT NUMBER 10286, CHARLEROI GUARD WALLS
Solicitation number
W911WN09B0004
Issued by

About this file

TABLE E LOWER POOL - EXCEEDENCE DURATION AFTER POOL LOWERED

View the file

Other files

File Type Posted
Detailed Abstract of Bids - W911WN-09-B-0004 Upper and Lower Guard Walls .xls XLS spreadsheet
BID RESULTS.doc DOC document
W911WN-09-B-0004-0006.pdf PDF
W911WN-09-B-0004-0005.pdf PDF
Conformed Price Schedule-72909.pdf PDF
Conformed Price Schedule-72809.pdf PDF
W911WN-09-B-0004-0004.pdf PDF
01 30 00.10.pdf PDF
Conformed Price Schedule-Amendment 0004.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0003.pdf PDF
01 22 00.00 10.pdf PDF
02 32 13.12.pdf PDF
02 42 00.pdf PDF
O37_LCH_99020-A.CAL —
01 74 19.10.pdf PDF
W911WN-09-B-0004-0001.zip ZIP file
03 23 00.pdf PDF
Section 01 30 00_10 Table C.pdf PDF
01 30 00.10.pdf PDF
Section 01 30 00_10 Table B.pdf PDF
05 50 14.pdf PDF
03 30 00.50.pdf PDF
01 52 13.20.pdf PDF
03 30 00.60.pdf PDF
Section 01 30 00_10 Table A.pdf PDF
03 31 23.pdf PDF
02 32 13.12.pdf PDF
Gate Operating Schedules.pdf PDF
W911WN-09-B-0004-0002.pdf PDF
Section 01 30 00_10 Table D.pdf PDF
35 49 23.23 25.pdf PDF
03 30 00.10.pdf PDF
01 22 00.00 10.pdf PDF
Conformed price schedule.pdf PDF
03 30 00.20.pdf PDF
03 45 33.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0001.pdf PDF
Charleroi Site Visit Attendees.doc DOC document
W911WN-09-B-0004.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Charleroi Upper and Lower Guard Walls

TABLE E

LOWER POOL EXCEEDENCE DURATION AFTER POOL LOWERED

TABULATED VALUES ARE AVG % OF THE TIME THAT THE POOL (COL 1)

& CORRESPONDING DISCHARGE (COL 2) ARE EXPECTED TO BE EXCEEDED

Pool El., ft Q cfs Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Min pool = El. 723.7 (Future Normal Pool)

723.7 0 100 100 100 100 100 100 100 100 100 100 100 100 100

724.0 3100 88 93 98 94 82 54 41 36 27 32 67 86 66

725.0 7000 62 73 85 68 50 25 16 15 9 12 33 61 42

726.0 10200 49 57 68 51 34 16 9 10 5 7 21 43 31

727.0 13200 38 45 56 39 25 12 7 7 3 4 14 32 23

728.0 16500 29 36 44 28 18 9 5 4 2 3 9 23 18

729.0 20000 20 26 33 19 13 7 3 3 1 2 6 16 13

730.0 23300 16 20 26 14 11 6 2 2 1 1 4 12 10

731.0 27200 11 15 20 10 8 4 2 2 0.9 1 3 8 7.0

732.0 31400 8 11 14 6 6 3 1 1 0.5 0.7 2 6 4.9

733.0 35500 5 7 9 3 4 2 0.5 0.5 0.3 0.5 0.8 4 3.0

734.0 40300 4 4 6 2 3 2 0.3 0.3 0.2 0.3 0.6 3 2.0

735.0 45200 3 3 4 1 1 1 0.1 0.2 0.1 0.2 0.4 2 1.4

736.0 49500 2 2 2 1 1 0.9 0.1 0.2 0.1 0.2 0.4 2 1.0

737.0 55000 1 2 2 0.8 0.8 0.7 0.1 0.2 <0.1 0.1 0.3 1 0.8

738.0 60500 1 2 2 0.6 0.6 0.6 0.1 0.2 <0.1 0.1 0.3 1 0.7

739.0 66000 0.8 1 1 0.4 0.3 0.4 <0.1 0.2 <0.1 0.1 0.2 0.9 0.5

740.0 71500 0.5 0.9 0.8 0.3 0.1 0.2 <0.1 0.1 <0.1 0.1 0.2 0.7 0.3

741.0 77000 0.4 0.7 0.6 0.2 0.1 0.2 <0.1 0.1 <0.1 0.1 0.1 0.5 0.3

742.0 82500 0.3 0.5 0.5 0.2 0.1 0.1 <0.1 0.1 <0.1 0.1 0.1 0.4 0.2

743.0 88000 0.3 0.3 0.4 0.1 <0.1 0.1 <0.1 0.1 <0.1 <0.1 0.1 0.2 0.1

744.0 93000 0.2 0.2 0.4 0.1 <0.1 0.1 <0.1 <0.1 <0.1 <0.1 0.1 0.2 0.1

745.0 98500 0.2 0.1 0.3 0.1 <0.1 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.1 0.1

746.0 103500 0.1 0.1 0.2 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.1 0.1

747.0 109000 0.1 0.1 0.2 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.1 <0.1

748.0 114500 0.1 <0.1 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1

749.0 120000 <0.1 <0.1 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1

750.0 125500 <0.1 <0.1 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1

751.0 132000 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1

SECTION 01 30 00.10 TABLE E

File details come from the government source that posted it. Updated .