Revised SECTION 02 42 00 DISPOSAL OF MATERIALS
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Charleroi Locks and Dam - Upper and Lower Guard Walls
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 42 00
DISPOSAL OF MATERIALS
PART 1 GENERAL
1.1 SUMMARY
1.2 RELATED WORK SPECIFIED ELSEWHERE
1.3 REFERENCES
1.4 DEFINITIONS
1.4.1 Permitted Solid Waste Disposal Facility
1.5 GENERAL
1.6 SUBMITTALS
1.7 WORK PLAN - DISPOSAL OF MATERIALS
1.8 DUST CONTROL
1.9 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.10 BURNING
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION
3.1 BACKGROUND
3.1.1 General
3.1.2 Government-Furnished Disposal Site
3.1.3 Environmental Characteristics of Underwater Excavated Material
3.2 SPECIAL DISPOSAL REQUIREMENTS
3.2.1 Disposal of Soil and Rock
3.2.2 Disposal at the Government-Furnished Disposal Site
3.2.3 Disposal of Solid Wastes
3.2.4 Disposal of Used Tires
3.2.5 Construction Debris
3.2.6 Disposal of Contractor Generated Hazardous Wastes
3.2.7 Containment of Debris
3.2.8 Hauling Materials to Disposal Facilities
3.3 WASTE MANIFESTS
3.4 CONTRACTOR QUALITY CONTROL
3.4.1 Quality Control Personnel
3.4.2 Testing Laboratory
3.4.3 Contractor Quality Control - Disposal of Materials
3.4.4 CQC Inspections and Tests
-- End of Section Table of Contents --
SECTION 02 42 00 Page 1 W911WN-09-B-0004 Revised by Amendment No. 0003
SECTION 02 42 00
DISPOSAL OF MATERIALS
PART 1 GENERAL
1.1 SUMMARY
This Section specifies the requirements for disposal of all materials under this contract.
1.2 RELATED WORK SPECIFIED ELSEWHERE
Environmental Protection - Section 01 57 20.00 10 ENVIRONMENTAL
PROTECTION
Construction and Demolition Waste Management - Section 01 74 19
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
Operation of Government Furnished Disposal Site - Section 01 74 19.10
OPERATION OF DISPOSAL SITE
Seeding and Mulching - Section 32 92 19 SEEDING
1.3 REFERENCES
The publication listed below forms a part of this specification to the extent referenced. The publication is referred to in the text by the basic designation only.
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH 94-113 (1994; 4th Ed) NIOSH Manual of Analytical Methods
PENNSYLVANIA CODE (PA CODE)
25 Pa. Code 287 Environmental Protection; Part 1, Department of Environmental Protection;
Subpart D, Environmental Health and Safety; Article IX, Residual Waste Management; Chapter 287, Residual Waste Management - General
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) Safety -- Safety and Health Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
40 CFR 261 Identification and Listing of Hazardous Waste
SECTION 02 42 00 Page 2
1.4 DEFINITIONS
1.4.1 Permitted Solid Waste Disposal Facility
Solid waste shall include, but not limited to, municipal, residual or hazardous wastes, including solid, liquid, semisolid or contained gaseous materials, as defined by 25 Pa. Code 287. A permitted solid waste disposal facility is a landfill or other facility which is properly permitted by the Commonwealth of Pennsylvania, Department of Environmental Protection (PADEP) for the disposal of municipal, residual, or construction/demolition waste. The facility shall be permitted to accept the particular material being disposed. A listing of PADEP permitted solid waste disposal facility sites for the Southwestern region is provided in an attachment to this section of the specifications. It is noted that this list may not be complete and the Contractor is advised to contact the PA Department of Environmental Protection to obtain a listing of permitted commercial disposal sites.
1.5 GENERAL
The Corps of Engineers' Manual EM 385-1-1 shall be consulted and applicable sections complied with by the Contractor while performing the work specified in this section. The current OSHA and EPA requirements, and the Code of Federal Regulations 29 CFR 1910 shall also be consulted.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Work Plan - Disposal of Materials; G, RE
The procedures proposed for the collection, handling, transport and disposal of excavated materials and byproducts of demolition operations shall be submitted for approval.
SD-06 Test Reports
Testing
A copy of all permitted solid waste disposal facility required testing of sediments shall be furnished to the Contracting Officer.
CQC Inspections and Tests
Copies of all inspection, and (laboratory and field) test reports, required by the permitted solid waste disposal facility owner shall be submitted to the Contracting Officer.
SD-07 Certificates
Testing Laboratory; G, RE
Written certification that the laboratory proposed to perform
SECTION 02 42 00 Page 3 any additional testing required by the permitted solid waste disposal facility owner is accredited by the American Industrial Hygiene Association (AIHA). State certification will be acceptable.
Waste Manifests
The Contractor shall complete and submit an original copy of all waste manifests to the Contracting Officer to document the disposal of all solid and chemical wastes. Examples of acceptable hazardous and non-hazardous waste manifests are included at the end of this Section of the Specifications.
1.7 WORK PLAN - DISPOSAL OF MATERIALS
The procedures proposed for the collection, handling, transport and disposal of excavated materials and byproducts of demolition operations shall be submitted for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials, protection of property, equipment and machinery which is to remain undisturbed, protection of existing features, coordination with other work in progress, and coordination with lock operating requirements. The disposal procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.
No work shall commence until the Contractor has received the Contracting Officer's approval in writing. The plan shall addresses the handling and any site storage of materials in accordance the requirements contained herein. The plan shall clearly identify the means by which all materials will be disposed of in accordance with the requirements specified herein.
The plan shall ensure that all materials are handled, transported and disposed of properly, and shall provide the name of the commercially available, permitted solid waste disposal facility.
1.8 DUST CONTROL
The amount of dust shall be controlled to prevent the spread of dust to the surrounding area. Dust shall be controlled by regularly sweeping and/or spray washing pavement areas, and sprinkling/watering dry bare areas, and sheltering source areas susceptible to wind erosion (where practical).
Dust at the concrete processing area shall be controlled in accordance with Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, paragraph "AIR RESOURCES".
1.9 ENVIRONMENTAL PROTECTION REQUIREMENTS
The Contractor shall comply with all applicable Federal, State, and local laws and regulations. The Contractor shall provide environmental protective measures and procedures to prevent and control pollution, limit habitat disruption, and correct environmental damage that occurs during construction as specified in Section 01 57 20.00 10 ENVIRONMENTAL
PROTECTION.
1.10 BURNING
Burning of debris will not be permitted. Torch cutting of metals coated with lead shall only be permitted with coordination with the Contracting Officer.
SECTION 02 42 00 Page 4
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION
3.1 BACKGROUND
3.1.1 General
Spoil from construction operations will consist of sands, silts, clays and gravels from the riverbed overburden; flat-lying, interbedded sedimentary rock consisting of soft claystone, siltstone, clayshale, siltshale coal/carbonaceous shale and a thin limestone.
3.1.2 Government-Furnished Disposal Site
Disposal of excavated material that meet Clean Fill Standards shall be performed at a Government furnished site (Victory Hollow Disposal Site) located in the Victory Hills area of Washington County, 34.5 river miles upstream of the Point in Pittsburgh, or approximately 7 miles downstream of Charleroi Locks and Dam. The Government-furnished disposal site shall be operated and maintained by the Contractor. Materials which do not meet Clean Fill Standards shall be disposed of at a commercially available, permitted facility. No materials shall be larger than 24 inches in any dimension when placed in the area.
3.1.3 Environmental Characteristics of Underwater Excavated Material
An environmental assessment program was developed to determine the presence or absence of chemical contaminants in the river sediments. This program was conducted by the Government. It also determined the extent of these sediments and whether this material exceeds the Pennsylvania Department of Environmental Protection Statewide Health Standards. The "Report on Environmental Sampling and Testing for Sediment Characterization, Pool 3 and Locks and Dam 4, Monongahela River Project, Elizabeth to Charleroi, PA", Dated 6 March 1998" was prepared. Of the total volume of overburden to be excavated, the report concluded that none of the material exceeds the non-residential standards and only a small percentage exceeded the residential standards. The material exceeding the residential standards was located in four areas, and has been removed under other contracts in three of those areas. The only remaining material exceeding residential standards is located in a single area directly downstream of the dam, and is outside the Contractor's work limits.
3.2 SPECIAL DISPOSAL REQUIREMENTS
3.2.1 Disposal of Soil and Rock
All underwater excavated soil and rock materials and excavated materials removed from the riverbed associated with construction under this contract, including excavation of materials from drilled shaft construction and from underwater excavation activities, shall be placed in the Government furnished disposal site at Victory Hollow if testing results indicate that it meets the Clean Fill Standards. Material shall be sampled in accordance with Section 02 32 16 SAMPLING, ANALYSES, AND STAGING OF SEDIMENT MATERIALS. Material to be disposed of at the Government-furnished disposal site shall be hauled to the disposal site using barges to transport the material to the off-loading facility. If the material complies with Clean Fill Standards, it shall be off-loaded from the barges and placed into suitable hauling equipment of a type to prevent spillage during hauling.
SECTION 02 42 00 Page 5
Materials distributed within the disposal site shall not be hauled over the improved public roads and streets. Hauling shall only occur on the unimproved areas shown. All other rubbish, debris and other solid wastes and materials not meeting the Clean Fill Standards shall be disposed of at a commercially available, permitted disposal facility. Transport and placement of all materials shall be in accordance with applicable Federal, state and local requirements. Disposal of underwater excavated material in streams or in the river will not be permitted. The Contractor's attention is directed to the fact that the soft and saturated excavated material may require temporary placement in the temporary holding area at the off loading site, to allow excess water to drain from the material.
3.2.2 Disposal at the Government-Furnished Disposal Site
Material disposal at the Government-furnished disposal site at Victory Hollow shall be performed only in those areas designated on the contract drawings. Hazardous, toxic, and radiological wastes (HTRW) shall not be disposed of at Victory Hollow. Disposal operations shall be managed and controlled to prevent erosion of soil or sediment from entering nearby waters or wetlands. Disposal operations shall be developed and managed in accordance with the grading plan shown on the drawings.
Underwater excavated materials and sediment from cleaning of sediment basins shall initially be placed in the Sediment Dewatering Area until it is sufficiently dry to haul to the Upland Disposal Site. Material will be considered to be sufficiently dry for disposal when a sample of the material passes the paint filter test (EPA SW-846 Method 9095).
The material placed at the Government furnished disposal site shall be rough graded by a dozer or other suitable equipment to conform to the lines and grades indicated on the drawings and to ensure proper drainage.
Material shall be placed in layers of approximately nine inches loose depth and compacted with 5 complete passes of the spreading equipment. A complete pass is defined as movement back and forth. No density testing will be required of the material placed. The fill placement shall be seeded and mulched upon completion of disposal operations in accordance with the requirements of Section 32 92 19 SEEDING. The temporary seeding and cover requirements of Section 32 92 19 SEEDING also applies to the disposal site
3.2.3 Disposal of Solid Wastes
Solid waste shall be considered material such as removed demolished items, rubbish, debris, garbage, and other discarded solid materials generated by demolition activities, general construction activities, and all excavated materials, as defined in paragraph "Permitted Solid Waste Disposal Facility". Solid waste shall also be considered material such as tires and other rubber products, metals and metal products, plastics, paper, wood, debris and other discarded solid materials. All solid waste materials that are generated by the demolition and construction activities shall be placed in containers and disposed of on a regular schedule in accordance with Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.
3.2.4 Disposal of Used Tires
The Contractor shall transport and dispose of tires in compliance with Federal, State, and local requirements. A list of used tire processors is provided in an attachment to this section of the specifications.
SECTION 02 42 00 Page 6
3.2.5 Construction Debris
Construction debris is defined as products of demolition except for concrete debris from the demolition of the locks. Demolition products, including but not limited to reinforcing steel, miscellaneous metals, timber piles, and other recyclable materials shall be recycled to the maximum extent possible. Recycling and disposal shall be in accordance with Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.
Concrete debris shall be disposed of as specified herein.
3.2.6 Disposal of Contractor Generated Hazardous Wastes
Hazardous wastes are hazardous substances as defined in 40 CFR 261, or as defined by applicable State and local regulations. Hazardous waste generated by construction activities shall be removed from the work area and be disposed in compliance with Federal, State, and local requirements.
The Contractor shall segregate hazardous waste from other materials and wastes, and shall protect such wastes from the weather by placing them in a safe covered location; precautionary measures against accidental spillage such as berming or other appropriate measures shall be taken. Hazardous waste shall be removed from Government property within 60 days. The Contractor shall be responsible for preparing all waste manifests (EPA Form No. 8700-22 "Uniform Hazardous Waste Manifest Form"). A copy of the form is attached at the end of this section. A copy of each waste manifest and a copy of the disposal certificate from the Resource Conservation and Recovery Act (RCRA) facility shall be furnished to the Contracting Officer. Hazardous waste shall not be dumped onto the ground, into storm sewers or open water courses, or into the sanitary sewer system.
3.2.7 Containment of Debris
Debris from excavation and construction operations shall not be permitted to enter the river. All materials shall be contained in a manner to permit complete removal from the site.
3.2.8 Hauling Materials to Disposal Facilities
Care shall be exercised in hauling the materials to the disposal facilities to preclude spillage and damage to public and private property and thoroughfares. Any materials spilled from the hauling equipment shall be removed by the Contractor at the Contractor's expense. The Contractor shall make all necessary arrangements and comply with all requirements associated with hauling the materials over streets and roads.
3.3 WASTE MANIFESTS
The Contractor shall submit an original copy of all waste manifests prepared for disposal of solid and chemical wastes to the Contracting Officer.
3.4 CONTRACTOR QUALITY CONTROL
3.4.1 Quality Control Personnel
The Contractor's CQC System Manager and supplemental staff member(s) for General QC Inspections shall be experienced in the all aspects of the proposed disposal methods. The Contractor shall present to the Contracting Officer the credentials of his CQC System Manager and staff member(s) that will be inspecting the removal and disposal of materials under this
SECTION 02 42 00 Page 7 contract, showing the(these) individual(s) is (are) versed in the various necessary inspection techniques. Each QC staff member shall have had training and experience in inspection and record keeping as presented herein. Submission of CQC staff qualification and additional requirements for Contractor QC are described in Section 01 45 01 USACE QUALITY CONTROL.
3.4.2 Testing Laboratory
The Contractor shall secure the services of a Corps of Engineers approved independent laboratory to perform all testing as required by the permitted solid waste disposal facility owners or as otherwise specified under this contract. The laboratory utilized shall be AIHA accredited and shall have demonstrated proficiency in the analysis to be performed as evidenced by successfully passing participation in the joint NIOSH/AIHA Analytical Testing Proficiency Program (PAT). A listing of AIHA approved laboratories and PAT participants may be obtained by calling AIHA in Richmond, VA, Ph.
(703) 849-8888. All testing shall utilize NIOSH approved sampling and analytical methods as described in NIOSH 94-113. The approved laboratory shall provide all monitors and testing equipment, in proper working and calibrated condition.
3.4.3 Contractor Quality Control - Disposal of Materials
The Contractor shall establish and maintain a quality control system for all disposal operations. The Contractors QC system shall conform to the applicable provision of Section 01 45 01 USACE QUALITY CONTROL.
Contractor's quality control is that system by which a Contractor regulates, tests, and inspects his procedures, equipment, materials, and personnel so that all disposal operations will comply with the requirements of these project specifications. The Contractor's QC staff shall perform all necessary inspections including those conducted for safety and conformance with this technical section, and shall report all findings and any problems to the Contracting Officer. All inspection and test result forms shall be designed by the Contractor and approved by the Contracting Officer. Inspections shall be conducted in accordance with paragraphs, hereunder.
3.4.4 CQC Inspections and Tests
The results of all inspections and tests required under this section shall be recorded on the approved forms for the particular inspection or test.
The Contractor's QC personnel shall deliver these forms to the Contracting Officer within the allotted time limits as noted hereunder. These requirements do not relieve the Contractor of the obligation to report certain failures immediately as required in prior and ensuing paragraphs.
Such reports of failures and the action taken shall be confirmed in writing in the routine reports. The Contracting Officer has the right to examine all Contractor quality control records at any time.
-- End of Section --