01 22 00.00 10.pdf

PDF 74 KB Posted

Attached to
RECOVERY--Y--RECOVERY--PROJECT NUMBER 10286, CHARLEROI GUARD WALLS
Solicitation number
W911WN09B0004
Issued by

About this file

REVISED SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

View the file

Other files

File Type Posted
Detailed Abstract of Bids - W911WN-09-B-0004 Upper and Lower Guard Walls .xls XLS spreadsheet
BID RESULTS.doc DOC document
W911WN-09-B-0004-0006.pdf PDF
W911WN-09-B-0004-0005.pdf PDF
Conformed Price Schedule-72909.pdf PDF
Conformed Price Schedule-72809.pdf PDF
W911WN-09-B-0004-0004.pdf PDF
01 30 00.10.pdf PDF
Conformed Price Schedule-Amendment 0004.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0003.pdf PDF
01 22 00.00 10.pdf PDF
02 32 13.12.pdf PDF
02 42 00.pdf PDF
O37_LCH_99020-A.CAL —
01 74 19.10.pdf PDF
W911WN-09-B-0004-0001.zip ZIP file
03 23 00.pdf PDF
Section 01 30 00_10 Table C.pdf PDF
01 30 00.10.pdf PDF
Section 01 30 00_10 Table B.pdf PDF
Section 01 30 00_10 Table E.pdf PDF
05 50 14.pdf PDF
03 30 00.50.pdf PDF
01 52 13.20.pdf PDF
03 30 00.60.pdf PDF
Section 01 30 00_10 Table A.pdf PDF
03 31 23.pdf PDF
02 32 13.12.pdf PDF
Gate Operating Schedules.pdf PDF
W911WN-09-B-0004-0002.pdf PDF
Section 01 30 00_10 Table D.pdf PDF
35 49 23.23 25.pdf PDF
03 30 00.10.pdf PDF
Conformed price schedule.pdf PDF
03 30 00.20.pdf PDF
03 45 33.pdf PDF
31 41 16.pdf PDF
W911WN-09-B-0004-0001.pdf PDF
Charleroi Site Visit Attendees.doc DOC document
W911WN-09-B-0004.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Charleroi Locks and Dam - Upper and Lower Guard Walls

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 REFERENCES

1.2 LUMP SUM PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.1.3 Payment Item

1.2.2 Construction Project Schedule

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.2.3 Payment Item

1.2.3 Demolition of Building at Laydown Area

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.3.3 Payment Item

1.2.4 Concrete Testing Lab Repairs and Equipment

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.2.4.3 Payment Item

1.2.5 Random In-Situ Sampling

1.2.5.1 Payment

1.2.5.2 Unit of Measure

1.2.5.3 Payment Item

1.2.6 Exploratory Pile Driving

1.2.6.1 Payment

1.2.6.2 Unit of Measure

1.2.6.3 Payment Item

1.2.7 Cellular Structures

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.7.3 Payment Items

1.2.8 Field Demonstrations

1.2.8.1 Unit of Measure

1.2.8.2 Payment Items

1.2.9 Precast Concrete Items

1.2.9.1 Payment

1.2.9.2 Unit of Measure

1.2.9.3 Payment Items

1.2.10 Lower Guard Wall Nose Pier Superstructure

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.10.3 Payment Items

1.2.11 Electrical Work

1.2.11.1 Payment

1.2.11.2 Unit of Measure

SECTION 01 22 00.00 10 Page 1 W911WN-09-B-0004 Revised by Amendment No. 0002

1.2.11.3 Payment Items

1.2.12 Traffic Control Device

1.2.12.1 Payment

1.2.12.2 Unit of Measure

1.2.12.3 Payment Item

1.3 UNIT PRICE PAYMENT ITEMS

1.3.1 Digital Progress Images

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.1.3 Unit of Measure

1.3.1.4 Payment Item

1.3.2 Maintain Government Facilities

1.3.2.1 Payment

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.2.4 Payment Item

1.3.3 Underwater Excavation

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

1.3.3.4 Payment Items

1.3.4 Exploratory Programs

1.3.4.1 Payment

1.3.4.2 Measurement

1.3.4.3 Unit of Measure

1.3.4.4 Payment Item

1.3.5 Permanent Casing, Drilled Shafts

1.3.5.1 Payment

1.3.5.2 Measurement

1.3.5.3 Unit of Measure

1.3.5.4 Payment Items

1.3.6 Soil and Rock Excavation, Drilled Shafts

1.3.6.1 Payment

1.3.6.2 Measurement

1.3.6.3 Unit of Measure

1.3.6.4 Payment Items

1.3.7 Crosshole Sonic Logging

1.3.7.1 Payment

1.3.7.2 Measurement

1.3.7.3 Unit of Measure

1.3.7.4 Payment Items

1.3.8 Access Tubes, Crosshole Sonic Logging

1.3.8.1 Payment

1.3.8.2 Measurement

1.3.8.3 Unit of Measure

1.3.8.4 Payment Items

1.3.9 Concrete Placement

1.3.9.1 Payment

1.3.9.2 Measurement

1.3.9.3 Unit of Measure

1.3.9.4 Payment Items

1.3.10 Coring of Drilled Shafts

1.3.10.1 Payment

1.3.10.2 Measurement

1.3.10.3 Unit of Measure

1.3.10.4 Payment Items

1.3.11 Reinforcing Steel

1.3.11.1 Payment

1.3.11.2 Measurement

SECTION 01 22 00.00 10 Page 2

1.3.11.3 Unit of Measure

1.3.11.4 Payment Items

1.3.12 Steel Piling for Cut-Off Walls

1.3.12.1 Payment

1.3.12.2 Measurement

1.3.12.3 Unit of Measure

1.3.12.4 Payment Items

1.3.13 Environmental Control Representative

1.3.13.1 Payment

1.3.13.2 Measurement

1.3.13.3 Unit of Measure

1.3.13.4 Payment Item

1.3.14 Environmental Compliance Measurement, Sampling, Testing and

Reporting

1.3.14.1 Payment

1.3.14.2 Measurement

1.3.14.3 Unit of Measure

1.3.14.4 Payment Item

1.3.15 Clearing of Government Furnished Disposal Site

1.3.15.1 Payment

1.3.15.2 Measurement

1.3.15.3 Unit of Measure

1.3.15.4 Payment Item

1.3.16 Silt Fences and Fabric Fences

1.3.16.1 Payment

1.3.16.2 Payment

1.3.16.3 Unit of Measure

1.3.16.4 Payment Item

1.3.17 Government Furnished Disposal Site, Sediment Basins

1.3.17.1 Payment

1.3.17.2 Measurement

1.3.17.3 Unit of Measure

1.3.17.4 Payment Items

1.3.18 Seeding and Vegetation

1.3.18.1 Payment

1.3.18.2 Measurement

1.3.18.3 Unit of Measure

1.3.18.4 Payment Items

1.3.19 Disposal of Existing Material at Government-Furnished Disposal

Site

1.3.19.1 Payment

1.3.19.2 Measurement

1.3.19.3 Unit of Measure

1.3.19.4 Payment Items

1.3.20 Disposal of Existing Material at Permitted Facility

1.3.20.1 Payment

1.3.20.2 Measurement

1.3.20.3 Unit of Measure

1.3.20.4 Payment Items

1.3.21 Reimbursement for Utility Services

1.3.21.1 Payment

1.3.21.2 Measurement

1.3.21.3 Unit of Measure

1.3.21.4 Payment Item

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00.00 10 Page 3

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 4

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A 615/A 615M (2008b) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

1.2 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization, as defined in Special Contract Requirement PAYMENT FOR

MOBILIZATION AND DEMOBILIZATION.

1.2.1.2 Unit of Measure

Unit of measure: lump sum.

1.2.1.3 Payment Item

0001AB ARRA - MOBILIZATION AND DEMOBILIZATION

1.2.2 Construction Project Schedule

1.2.2.1 Payment

Payment for this item shall constitute full compensation for preparation and periodic update of a comprehensive project construction schedule as specified in Section 01 32 01.00 10 PROJECT SCHEDULE. Payment shall also

SECTION 01 22 00.00 10 Page 5 include all costs for the initial schedule; report preparations; monthly updates; and all other incidental costs to prepare, monitor and update the construction project schedule as specified.

1.2.2.2 Unit of Measure

Unit of measure: lump sum.

1.2.2.3 Payment Item

0001AD ARRA - CONSTRUCTION PROJECT SCHEDULE

1.2.3 Demolition of Building at Laydown Area

1.2.3.1 Payment

Payment for this item shall constitute full compensation for demolition of the existing building at the downstream laydown and storage area behind the Lower Guide Wall as specified in Section 31 60 00 DEMOLITION. Payment shall also include all costs for the removing and disposing of the building as specified.

1.2.3.2 Unit of Measure

Unit of measure: lump sum.

1.2.3.3 Payment Item

0001AG ARRA - DEMOLITION OF BUILDING AT DOWNSTREAM LAYDOWN AND STORAGE

AREA

1.2.4 Concrete Testing Lab Repairs and Equipment

1.2.4.1 Payment

Payment for this item shall constitute full compensation for repairing the Government concrete testing lab and furnishing new equipment as specified in Section 01 52 13.20 GOVERNMENT FACILITIES. Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to repair the doors and walls and furnish and install new testing equipment.

1.2.4.2 Unit of Measure

Unit of measure: lump sum.

1.2.4.3 Payment Item

0001AH ARRA - CONCRETE TESTING LAB REPAIRS AND EQUIPMENT

1.2.5 Random In-Situ Sampling

1.2.5.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to perform the random in-situ sampling prior to excavation at the lock site as specified in Section 02 32 16 SAMPLING, ANALYSES, AND STAGING OF SEDIMENT MATERIALS. Payment for sampling of excavated material will be included in the applicable contract

SECTION 01 22 00.00 10 Page 6 unit price for the excavated material. Payment for sampling of existing stockpiled material will be included in the contract price for disposal of the stockpiled material.

1.2.5.2 Unit of Measure

Unit of measure: lump sum.

1.2.5.3 Payment Item

0002AA ARRA - RANDOM IN-SITU SAMPLING, UPPER GUARD WALL

0003AA ARRA - RANDOM IN-SITU SAMPLING, LOWER GUARD WALL

1.2.6 Exploratory Pile Driving

1.2.6.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for the required exploratory pile driving tests, as shown on the contract drawings and specified in Section 02 32 13.12 EXPLORATORY PILE DRIVING. Payment will include completion of all test piles including furnishing test pile and test sheets. Payment shall also include all costs required for all advanced planning and engineering; report preparation; and all other incidental costs to complete the exploratory pile driving as shown and specified.

1.2.6.2 Unit of Measure

Unit of measure: lump sum.

1.2.6.3 Payment Item

0002AG ARRA - EXPLORATORY PILE DRIVING, UPPER GUARD WALL

0003AG ARRA - EXPLORATORY PILE DRIVING, LOWER GUARD WALL

1.2.7 Cellular Structures

1.2.7.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for the sheet pile cells as shown on the contract drawings and as specified, except that payment for items for which piling will be furnished by the Government shall include only costs for delivery and installation of the piling, and fabrication as required.

Payments shall include costs for guide templates; frames and supports to stabilize the piling during erection operations; removal of obstructions;

sheet pile materials and installation; pile removal and redriving;

excavation and granular fill; grout; and all other incidental costs in connection with these aspects of the work under this contract. Payment for these items shall also include costs for shop and field fabrications;

performing measurements for payment; testing of materials and products incorporated into the work; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract. Payment for Lower Guard Wall Sheet Pile Cells shall include cell fill. Concrete fill for the Upper Guard Wall Nose Cell will be paid for separately.

SECTION 01 22 00.00 10 Page 7

1.2.7.2 Unit of Measure

Unit of measure: lump sum.

1.2.7.3 Payment Items

0002AH ARRA - UPPER GUARD WALL, NOSE CELL

0003AH ARRA - LOWER GUARD WALL, SHEET PILE CELLS

1.2.8 Field Demonstrations

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to perform the various concrete demonstrations as specified in Section 03 30 00.20 CONCRETE: FIELD DEMONSTRATIONS, which include demonstration drilled shafts and all other incidental costs to complete this item of work as specified in Section

03 30 00.20 CONCRETE: FIELD DEMONSTRATIONS.

1.2.8.1 Unit of Measure

Unit of measure: lump sum.

1.2.8.2 Payment Items

0002AJ ARRA - FIELD DEMONSTRATIONS, UPPER GUARD WALL DRILLED SHAFTS

0003AJ ARRA - FIELD DEMONSTRATIONS, LOWER GUARD WALL DRILLED SHAFTS

1.2.9 Precast Concrete Items

1.2.9.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install the precast concrete items as shown on the contract drawings and specified, including, all reinforced precast concrete; steel bars and dowels integral with the items; all miscellaneous embedded items integrally cast directly into the items; and joint materials. Payment shall include the costs of furnishing and installing the structural support bracing systems required to erect the items. These payments shall also include all costs required for testing of materials and products incorporated into the work; temporary scaffolding and supports; all advanced planning and engineering; and all other incidental costs to complete these items of work.

Payment for Lower Guard Wall precast shaft superstructures, concrete panels, and cap beams shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install these items. Drilled shafts and placement of concrete and reinforcing steel in the shaft superstructures will be paid for separately.

Payment for Upper Guard Wall precast cap beams and thrust blocks, box beams, and concrete skirts shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install these items. Drilled shafts and placement of concrete and reinforcing steel in the thrust blocks will be paid for separately.

1.2.9.2 Unit of Measure

Unit of measure: lump sum.

SECTION 01 22 00.00 10 Page 8

1.2.9.3 Payment Items

0002AY ARRA - UPPER GUARD WALL, CAP BEAMS

0002AZ ARRA - UPPER GUARD WALL, PRECAST BOX BEAMS

0002BA ARRA - UPPER GUARD WALL, PRECAST CONCRETE SKIRTS

0003AY ARRA - LOWER GUARD WALL, SHAFT SUPERSTRUCTURES

0003AZ ARRA - LOWER GUARD WALL, PRECAST CONCRETE PANELS

0003BB ARRA - LOWER GUARD WALL, CAP BEAMS

1.2.10 Lower Guard Wall Nose Pier Superstructure

1.2.10.1 Payment

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install the nose pier superstructure as shown on the contract drawings and specified.

Payment shall include the costs of furnishing and installing the structural support bracing systems required to erect the item. This payments shall also include all costs required for testing of materials and products incorporated into the work; temporary scaffolding and supports; all advanced planning and engineering; and all other incidental costs to complete these items of work. Placement of concrete and reinforcing steel in the nose pier superstructure will be paid for separately.

1.2.10.2 Unit of Measure

Unit of measure: lump sum.

1.2.10.3 Payment Items

0003BA ARRA - LOWER GUARD WALL, NOSE PIER SUPERSTRUCTURE

1.2.11 Electrical Work

1.2.11.1 Payment

Payment for electrical work shall include furnishing and installing the conduit and other electrical equipment as shown and as specified in Section

26 20 00 ELECTRICAL WORK.

1.2.11.2 Unit of Measure

Unit of measure: lump sum.

1.2.11.3 Payment Items

0002BB ARRA - UPPER GUARD WALL, ELECTRICAL WORK

0003BD ARRA - LOWER GUARD WALL, ELECTRICAL WORK

1.2.12 Traffic Control Device

1.2.12.1 Payment

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs for furnishing and installing the traffic control device at the Government-furnished disposal area. Payment shall include electrical service to the traffic control device.

SECTION 01 22 00.00 10 Page 9

1.2.12.2 Unit of Measure

Unit of measure: lump sum.

1.2.12.3 Payment Item

0004AE ARRA - TRAFFIC CONTROL DEVICES, PERMANENT, GOVERNMENT-FURNISHED

DISPOSAL AREA

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.3.1 Digital Progress Images

1.3.1.1 Payment

Payment shall constitute full compensation for all labor, equipment, material and supply costs for furnishing monthly digital progress images as specified in Section 01 32 33 DIGITAL PROGRESS IMAGES.

1.3.1.2 Measurement

Measurement will be made of the number of months that sets of photographs are taken and delivered to the Contracting Officer as approved or directed by the Contracting Officer or his authorized representative. Each set shall consist of all specified hardcopies and electronic copies for each photographic session as specified in Section 01 32 33 DIGITAL PROGRESS

IMAGES.

1.3.1.3 Unit of Measure

Unit of Measure: Months

1.3.1.4 Payment Item

0001AC ARRA - DIGITAL PROGRESS IMAGES

1.3.2 Maintain Government Facilities

1.3.2.1 Payment

Payment for this item shall constitute full compensation for maintaining the Government concrete testing lab and Government Field Offices as specified in Section 01 52 13.20 GOVERNMENT FACILITIES. Payment for this item shall constitute full compensation for all labor, equipment, and supply costs to maintain the concrete testing lab, including maintenance and repair of all equipment and utilities. Payment for utility services will be reimbursed under Item 0001AJ REIMBURSEMENT FOR UTILITY SERVICES, GOVERNMENT FIELD OFFICES AND LABORATORY.

SECTION 01 22 00.00 10 Page 10

1.3.2.2 Measurement

Measurement for maintaining the concrete testing shall be the number of months that maintenance is performed in a manner satisfactory to the Contracting Officer.

1.3.2.3 Unit of Measure

Unit of Measure: Months

1.3.2.4 Payment Item

0001AE ARRA - MAINTAIN CONCRETE TESTING LAB

0001AF ARRA - ARRA - MAINTAIN GOVERNMENT FIELD OFFICES

1.3.3 Underwater Excavation

1.3.3.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for performing the work including:

transporting the materials to the Government-furnished disposal site;

off-loading; hauling and depositing material at the Government-furnished disposal site; control of effluents from the Contractor's operations;

performing measurements for payment; and all other incidental costs in connection with these aspects of the work under this contract. Payment shall also include cost of sampling and analysis of excavated sediment in the barges prior to disposal. Payment for disposal of materials that do not meet Clean Fill Standards at a commercially available, permitted disposal facility will be made as specified for Item 0004AJ DISPOSAL OF

EXCAVATED MATERIAL AT PERMITTED FACILITY.

1.3.3.2 Measurement

All measurement for payment will be based on information gathered from surveys (soundings) made at the project site prior to the commencement of excavation operations and again following the completion of excavation.

Areas sounded more than 30 days prior to excavation shall be re-sounded if requested by the Government. The Contractor shall notify the Contracting Officer at least two days before sounding is made. No measurement will be made for removal of any materials beyond that indicated on the contract drawings and tolerances described on the plans and in the specifications.

The Contractor shall sound the riverbed over the area to be excavated by a method and with equipment acceptable to the Contracting Officer. Any areas not conforming with the specified tolerances shall be corrected and resounded, at the Contractor's expense. The Contractor shall perform additional soundings as necessary during the progress of the work to verify depths. All sounding data shall be furnished to the Contracting Officer promptly after the information has been obtained and compiled. Initial soundings shall constitute the original cross sections from which all measurements will be based to calculate the quantity of excavation accomplished, without regard to any changes in the surface that may occur during the performance of the work. The second set of soundings shall constitute the final cross-sections from which measurement will be made, and shall be used to verify that the specified bottom elevations and slopes have been achieved. However, no measurement for payment will be made for any material over-excavated beyond that permitted by the allowable tolerances for the specified bottom elevation or specified side slopes.

Unless otherwise specified and/or approved, quantities shall be calculated

SECTION 01 22 00.00 10 Page 11 in cubic yards by the average end area method based on the initial and final soundings. The Contractor is responsible for any additional excavation required to bring the area within the tolerances specified or shown prior to beginning any work upon which the excavation depends at no additional cost to the Government, and no additional measurement or payment will be made for such additional excavation.

1.3.3.3 Unit of Measure

Unit of Measure: Cubic Yards

1.3.3.4 Payment Items

0002AB ARRA - UPPER GUARD WALL, PRE-EXCAVATION

0003AB ARRA - LOWER GUARD WALL, PRE-EXCAVATION

1.3.4 Exploratory Programs

1.3.4.1 Payment

Payment for the these items will be made for costs associated with mobilization and demobilization of all necessary drilling equipment, floating plant, labor equipment and materials, and for performing the drilling and sampling as specified. No separate payment will be made for mobilizing the drilling equipment from water access, which costs are considered incidental. Payment will be made only for the drilling of exploratory holes that are included on the contract drawings, or are directed by the Contracting Officer to be so drilled. Payment will not be made for any hole for which satisfactory records (and samples), as determined by the Contracting Officer, are not furnished.

1.3.4.2 Measurement

All measurements shall be made in the presence of the Contracting Officer's Authorized Representative (COAR). The Contractor shall preserve all exploratory holes in good condition until final measurements are made and until the records and samples have been examined and accepted.

Soil drilling without sampling will be measured to the nearest linear foot, based on the linear feet of holes that were actually drilled through overburden in accordance with the specifications. Measurements will be made from the "original ground surface" to the point at which sampling of the boring begins. The "original ground surface" shall be interpreted as the river bottom for exploratory borings made in the river.

Soil drilling with sampling will be measured for payment to the nearest linear foot, based on the linear feet of holes that were actually drilled through the overburden in accordance with the specifications. Measurement will be made from the elevation at which drive sampling is started to the elevation at which drive sampling is completed.

Rock drilling with coring will be measured for payment to the nearest linear foot, based on the linear feet of holes that were actually cored through rock in accordance with the specifications. Measurement will be made from the elevation at which rock coring is started to the elevation at which rock coring is completed.

Rock drilling without coring will be measured for payment to the nearest linear foot, based on the linear feet of holes that were actually drilled

SECTION 01 22 00.00 10 Page 12 through rock without coring in accordance with the specifications.

Measurement will be made from the elevation at which rock drilling is started to the elevation at which rock drilling is completed.

Sealing of exploratory holes will be measured for payment to the nearest linear foot, based on the linear feet of holes that are sealed in accordance with the specifications. Measurement will be made from the elevation of the top of the hole to the elevation at which rock drilling was completed.

1.3.4.3 Unit of Measure

Unit of Measure: Linear Feet

1.3.4.4 Payment Item

0002AC ARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING,

UPPER GUARD WALL

0002AD ARRA - EXPLORATORY DRILLING, SOIL DRILLING WITH SAMPLING, UPPER

GUARD WALL

0002AE ARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, UPPER

GUARD WALL

0002AF ARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH

CEMENT GROUT, UPPER GUARD WALL

0003AC ARRA - EXPLORATORY DRILLING, SOIL DRILLING WITHOUT SAMPLING,

LOWER GUARD WALL

0003AD ARRA - EXPLORATORY DRILLING, SOIL DRILLING WITH SAMPLING, LOWER

GUARD WALL

0003AE ARRA - EXPLORATORY DRILLING, ROCK DRILLING, WITH CORING, LOWER

GUARD WALL

0003AF ARRA - EXPLORATORY DRILLING, SEALING OF EXPLORATORY HOLES WITH

CEMENT GROUT, LOWER GUARD WALL

1.3.5 Permanent Casing, Drilled Shafts

1.3.5.1 Payment

Payment for the these items will be made for costs associated with installation of the permanent casing for the drilled shafts, including all costs of equipment,labor, materials and supplies to complete the required work as indicated on the drawings. No separate payment will be made for accessories and payment shall be included in the contract unit price for the items of work to which the accessories are incidental.

1.3.5.2 Measurement

Measurements for permanent steel casing shall be to the nearest linear foot, based on the actual length of permanent casing in-place from the tip elevation to the final cutoff elevation. No measurement will be made for permanent casing above the cutoff elevation. No separate payment will be made for cut-off or splicing of permanent steel casings. Lengths of casing shall be ordered based on the results of the exploratory borings (See Section 02 32 13.11 EXPLORATORY DRILLING).

1.3.5.3 Unit of Measure

Unit of Measure: Linear Feet

SECTION 01 22 00.00 10 Page 13

1.3.5.4 Payment Items

0002AK ARRA - PERMANENT CASING, 72-INCH DIA. UPPER GUARD WALL DRILLED

SHAFTS

0003AK ARRA - PERMANENT CASING, 102-INCH DIA. LOWER GUARD WALL DRILLED

SHAFTS

1.3.6 Soil and Rock Excavation, Drilled Shafts

1.3.6.1 Payment

Payment for the these items will be made for costs associated with soil and rock excavation for the drilled shafts, including all costs of equipment,labor, materials and supplies to complete the required work as indicated on the drawings. No separate payment will be made for accessories and payment shall be included in the contract unit price for the items of work to which the accessories are incidental.

1.3.6.2 Measurement

Measurements for soil excavation will be to the nearest linear foot, based on the length actually drilled through overburden to the top of rock.

Measurements will be made from the "original ground surface" to the elevation at which rock is encountered. Top of rock shall be established from the results of the exploratory borings (See Section 02 32 13.11

EXPLORATORY DRILLING).

Measurements for rock excavation will be to the nearest linear foot, based on the length actually drilled through rock to the final tip elevation. Top of rock and final tip elevations shall be established from the results of the exploratory borings (See Section 02 32 13.11 EXPLORATORY DRILLING).

1.3.6.3 Unit of Measure

Unit of Measure: Linear Foot

1.3.6.4 Payment Items

0002AL ARRA - SOIL EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED

SHAFTS

0002AM ARRA - ROCK EXCAVATION, 72-INCH DIA. UPPER GUARD WALL DRILLED

SHAFTS

0003AL ARRA - SOIL EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED

SHAFTS

0003AM ARRA - ROCK EXCAVATION, 102-INCH DIA. LOWER GUARD WALL DRILLED

SHAFTS

1.3.7 Crosshole Sonic Logging

1.3.7.1 Payment

Payment for the these items will be made for costs associated with crosshole sonic logging for the drilled shafts, including all costs of equipment,labor, materials and supplies to complete the required work as indicated on the drawings. No separate payment will be made for accessories and payment shall be included in the contract unit price for the items of work to which the accessories are incidental. Payment shall include all costs associated with that item as installed or completed.

SECTION 01 22 00.00 10 Page 14

1.3.7.2 Measurement

Measurements for crosshole sonic logging (CSL) shall be the number of shafts on which crosshole sonic logging has been performed. Note that multiple testing events performed on the same shaft will be considered as one logging; only one crosshole sonic logging will be paid for each shaft, and payment will be made upon receipt of passing test reports for the entire shaft.

1.3.7.3 Unit of Measure

Unit of Measure: Each

1.3.7.4 Payment Items

0002AN ARRA - CROSSHOLE SONIC LOGGING (CSL), UPPER GUARD WALL DRILLED

SHAFTS

0003AN ARRA - CROSSHOLE SONIC LOGGING (CSL), LOWER GUARD WALL DRILLED

SHAFTS

1.3.8 Access Tubes, Crosshole Sonic Logging

1.3.8.1 Payment

Payment for the these items will be made for costs associated with installation of the access tubes for crosshole sonic logging for the drilled shafts, including all costs of equipment,labor, materials and supplies to complete the required work as indicated on the drawings. No separate payment will be made for accessories and payment shall be included in the contract unit price for the items of work to which the accessories are incidental.

1.3.8.2 Measurement

Measurements for access tubes for Crosshole Sonic Testing shall be to the nearest linear foot, based on the actual linear feet of access tubes incorporated in the steel reinforcing cages.

1.3.8.3 Unit of Measure

Unit of Measure: Linear Feet

1.3.8.4 Payment Items

0002AP ARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, UPPER GUARD WALL

DRILLED SHAFTS

0003AP ARRA - ACCESS TUBES, CROSSHOLE SONIC LOGGING, LOWER GUARD WALL

DRILLED SHAFTS

1.3.9 Concrete Placement

1.3.9.1 Payment

Payment for these items will be made at the respective contract prices per cubic yard, which prices shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the concrete work, including transporting the Government-furnished concrete from the Points of Delivery to the placement location, except reinforcement and embedded parts that are specified to be paid for separately.

SECTION 01 22 00.00 10 Page 15

1.3.9.2 Measurement

Pay lines for concrete structures are the neat lines of the structures as shown on the drawings. Measurement of concrete shall be made on the basis of the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the structure, and within the tolerances specified. No measurement will be made of concrete placed outside the tolerances specified or for the excavation unless otherwise approved by the Contracting Officer. No deduction shall be made for rounded or beveled edges or space occupied by metal work, reinforcing steel, electrical conduits or other items, nor for voids or embedded items that are either less than five cubic feet in volume or one square foot in cross section.

1.3.9.3 Unit of Measure

Unit of Measure: Cubic Yard

1.3.9.4 Payment Items

0002AQ ARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, UPPER GUARD

WALL DRILLED SHAFTS

0002AR ARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, UPPER GUARD

WALL NOSE CELL

0002AS ARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, UPPER GUARD

WALL NOSE CELL

0002AT ARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 8, UPPER GUARD

WALL THRUST BLOCKS

0003AQ ARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 1, LOWER GUARD

WALL SHAFT SUPERSTRUCTURES AND NOSE PIER

0003AR ARRA - TRANSPORT AND PLACE TREMIE CONCRETE, MIX 2, LOWER GUARD

WALL DRILLED SHAFTS

0003AS ARRA - TRANSPORT AND PLACE MASS CONCRETE, MIX 7, LOWER GUARD

WALL CAP BEAM INFILL

0002AT ARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 12, LOWER

GUARD WALL DRILLED SHAFTS

0003AU ARRA - TRANSPORT AND PLACE FLOWABLE CONCRETE, MIX 13, LOWER

GUARD WALL SHAFT SUPERSTRUCTURE AND NOSE PIER INFILL

1.3.10 Coring of Drilled Shafts

1.3.10.1 Payment

Payment for the these item will be made for costs associated with completion of the coring of the drilled shafts, including all costs of equipment,labor, materials and supplies to complete the required work as indicated on the drawings. No separate payment will be made for accessories and payment shall be included in the contract unit price for the items of work to which the accessories are incidental.

1.3.10.2 Measurement

Measurements coring for verification of crosshole sonic logging results shall be to the nearest linear foot, based on the actual linear feet of coring performed.

SECTION 01 22 00.00 10 Page 16

1.3.10.3 Unit of Measure

Unit of Measure: Linear Feet

1.3.10.4 Payment Items

0002AU ARRA - CORING OF UPPER GUARD WALL DRILLED SHAFTS

0003AV ARRA - CORING OF LOWER GUARD WALL DRILLED SHAFTS

1.3.11 Reinforcing Steel

1.3.11.1 Payment

Payment for reinforcing steel shall constitute full compensation for furnishing and installing the reinforcing as shown and specified. Payment shall include all labor, equipment, materials and supplies to complete these items of work, including drilling and grouting holes for dowels as indicated. Payment will not include the amount of steel reinforcing used in precast concrete items items for which payment is made as lump sum or each.

1.3.11.2 Measurement

Concrete Reinforcement will be measured for payment based upon the quantity of pounds in place. The measured lengths will be converted to weights for the size of bars listed by the use of the nominal weights per linear foot specified in ASTM A 615/A 615M. Steel in laps indicated on the drawings or required by the Contracting Officer will be paid for at the contract unit price. No payment will be made for the additional steel in laps which are authorized for the convenience of the Contractor.

1.3.11.3 Unit of Measure

Unit of Measure: Pounds

1.3.11.4 Payment Items

0002AV ARRA - REINFORCING STEEL, UPPER GUARD WALL DRILLED SHAFTS

0002AW ARRA - REINFORCING STEEL, UPPER GUARD WALL THRUST BLOCKS

0003AW ARRA - REINFORCING STEEL, LOWER GUARD WALL DRILLED SHAFTS

0003AX ARRA - REINFORCING STEEL, LOWER GUARD WALL SHAFT

SUPERSTRUCTURES AND NOSE PIER

1.3.12 Steel Piling for Cut-Off Walls

1.3.12.1 Payment

Payment for the these items shall constitute full compensation for all labor, equipment, materials and supplies for completing the items of work as shown and as specified. Payments shall include costs for guide templates; removal of obstructions; pile removal and redriving; performing measurements for payment; and all other incidental costs in connection with these aspects of the work under this contract. Payment for these items shall also include costs for shop and field fabrications; performing measurements for payment; testing of materials and products incorporated into the work; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract. The Contractor shall anticipate that 10% of the quantity of piles will hit obstructions, and that this cost shall be included in the

SECTION 01 22 00.00 10 Page 17 cost of piling.

1.3.12.2 Measurement

The actual quantity of sheet piling, fabricated piling and special piling will be based on information gathered from surveys and field measurements and the results of the exploratory drilling and pile driving tests.

Measurements shall be the actual linear feet of piling installed IN THE PERMANENT WORK, and accepted by the Contracting Officer. No separate measurement or payment will be made for pile cutoffs or splices or for piling that is used for installation of permanent piling, but cutoff. The Contracting Officer shall approve all methods and procedures for quantity surveys.

1.3.12.3 Unit of Measure

Unit of Measure: Linear Feet

1.3.12.4 Payment Items

0002AX ARRA - UPPER GUARD WALL, SHEET PILE CUT-OFF WALL

0003BC ARRA - LOWER GUARD WALL, SHEET PILE WALL

1.3.13 Environmental Control Representative

1.3.13.1 Payment

Payment for environmental control representative shall constitute full compensation for all labor, equipment, and supply costs for performing the specified activities.

1.3.13.2 Measurement

Measurement for environmental control representative shall be the number of days this individual is working and actually performing the required duties in a manner satisfactory to the Contracting Officer.

1.3.13.3 Unit of Measure

Unit of Measure: Days

1.3.13.4 Payment Item

0004AA ARRA - ENVIRONMENTAL CONTROL REPRESENTATIVE,

GOVERNMENT-FURNISHED DISPOSAL AREA

1.3.14 Environmental Compliance Measurement, Sampling, Testing and Reporting

1.3.14.1 Payment

Payment for environmental compliance measurements, sampling, testing and reporting shall constitute full compensation for all labor, equipment, material and supply costs for performing the specified actions within the established deadlines.

1.3.14.2 Measurement

Measurement for environmental compliance measurements, sampling, testing and reporting shall be the number of months that measurement, sampling, SECTION 01 22 00.00 10 Page 18 testing and reporting is completed in a manner satisfactory to the Contracting Officer.

1.3.14.3 Unit of Measure

Unit of Measure: Months

1.3.14.4 Payment Item

0004AB ARRA - ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, GOVERNMENT-FURNISHED DISPOSAL AREA

b. 1.3.15 Clearing of Government Furnished Disposal Site

1.3.15.1 Payment

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to perform and clearing activities at the disposal site, except for those items of work which are paid for separately.

1.3.15.2 Measurement

Measurement shall be made on the basis of the number of acres of area cleared as specified and as shown on the drawings.

1.3.15.3 Unit of Measure

Unit of Measure: Acres

1.3.15.4 Payment Item

0004AC ARRA - CLEARING, GOVERNMENT FURNISHED DISPOSAL SITE

1.3.16 Silt Fences and Fabric Fences

1.3.16.1 Payment

Payment for these items shall constitute full compensation for providing all plant, labor, material, and equipment and performing all operations necessary to perform this work as shown and as specified, including the inspection and maintenance of these items.

1.3.16.2 Payment

Measurement will be made by the linear foot of material installed and accepted.

1.3.16.3 Unit of Measure

Unit of Measure: Linear Feet

1.3.16.4 Payment Item

0004AD ARRA - SILT FENCE, GOVERNMENT-FURNISHED DISPOSAL AREA

SECTION 01 22 00.00 10 Page 19

1.3.17 Government Furnished Disposal Site, Sediment Basins

1.3.17.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to clean the sediment basins as specified or as otherwise required in the environmental permit, including removal and disposal of the material, and any other costs in connection with these items of work.

1.3.17.2 Measurement

Measurement will be made of the number of times that each sediment basin is cleaned as required and approved or directed by the Contracting Officer or his authorized representative.

1.3.17.3 Unit of Measure

Unit of measure: Each.

1.3.17.4 Payment Items

0004AF ARRA - CLEANING OF SEDIMENT BASIN NO. 1, GOVERNMENT FURNISHED

DISPOSAL SITE

0004AG ARRA - CLEANING OF SEDIMENT BASIN NO. 2, GOVERNMENT FURNISHED

DISPOSAL SITE

1.3.18 Seeding and Vegetation

1.3.18.1 Payment

Payment for seeding operations shall constitute full compensation for all labor, equipment, material and supply costs to provide a satisfactory stand of turf over the disturbed areas and areas indicated to be seeded, including spreading topsoil, seeding and mulching and other incidental work. Payment for seeding and mulching the area disturbed by demolition of the truck scales and associated items will be included in the lump sum price for the demolition.

1.3.18.2 Measurement

Measurement for all seeding operations will be made by the acre of area that contains a satisfactory stand of vegetation.

1.3.18.3 Unit of Measure

Unit of measure: Acre.

1.3.18.4 Payment Items

0004AH ARRA - TEMPORARY SEEDING, GOVERNMENT FURNISHED DISPOSAL SITE

1.3.19 Disposal of Existing Material at Government-Furnished Disposal Site

1.3.19.1 Payment

Payment for disposal of existing stockpiled material at the Victory Hollow disposal site shall constitute full compensation for all labor, equipment, material and supply costs to sample, load, haul and spread the material as

SECTION 01 22 00.00 10 Page 20 specified.

1.3.19.2 Measurement

Measurement will be made of the number of cubic yards excavated from the stockpile and disposed of at the Upland Fill Placement Site.

1.3.19.3 Unit of Measure

Unit of measure: Cubic Yard.

1.3.19.4 Payment Items

0004AJ ARRA - DISPOSAL OF MATERIAL IN TEMPORARY STOCKPILE, GOVERNMENT

FURNISHED DISPOSAL SITE

1.3.20 Disposal of Existing Material at Permitted Facility

1.3.20.1 Payment

Payment for additional costs associated with disposal of excavated material which does not meet Clean Fill Standards at a permitted disposal facility shall constitute full compensation for all labor, equipment, material and supply costs to haul and spread the material as specified. Payment for excavation, sampling, and testing will be made as specified for the excavation.

1.3.20.2 Measurement

Measurement will be made of the number of cubic yards or excavated material transported to and disposed of at a permitted facility.

1.3.20.3 Unit of Measure

Unit of measure: Cubic Yard.

1.3.20.4 Payment Items

0004AJ ARRA - DISPOSAL OF EXCAVATED MATERIAL AT PERMITTED FACILITY

1.3.21 Reimbursement for Utility Services

1.3.21.1 Payment

The Contractor will be reimbursed by the Government for actual cost of sewage, water, telephone, and electric, Internet, and security services for the Government field offices and laboratory. This reimbursement will be made only for utility costs directly associated with the Government facilities, and shall not include any power company services related to providing utility services to the Contractor's facilities. An amount has been inserted for bidding purposes. The Contractor shall be reimbursed the actual utility costs only, as established by invoice and evidence of full payment to the utility company. The Contractor shall submit receipts for reimbursement.

1.3.21.2 Measurement

Measurement will be made of the number of months that the monthly utility bills for the Government facilities are paid by the Contractor as approved

SECTION 01 22 00.00 10 Page 21 or directed by the Contracting Officer or his authorized representative.

1.3.21.3 Unit of Measure

Unit of measure: Month.

1.3.21.4 Payment Item

0001AJ ARRA - Reimbursement For Utility Services, Government Field Offices and Laboratory

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00.00 10 Page 22

01 22 00.00 10 - MEASUREMENT AND PAYMENT
01 22 00.00 10 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 LUMP SUM PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.1.3 Payment Item
1.2.2 Construction Project Schedule
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.2.3 Payment Item
1.2.3 Demolition of Building at Laydown Area
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.2.3.3 Payment Item
1.2.4 Concrete Testing Lab Repairs and Equipment
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.4.3 Payment Item
1.2.5 Random In-Situ Sampling
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.2.5.3 Payment Item
1.2.6 Exploratory Pile Driving
1.2.6.1 Payment
1.2.6.2 Unit of Measure
1.2.6.3 Payment Item
1.2.7 Cellular Structures
1.2.7.1 Payment
1.2.7.2 Unit of Measure
1.2.7.3 Payment Items
1.2.8 Field Demonstrations
1.2.8.1 Unit of Measure
1.2.8.2 Payment Items
1.2.9 Precast Concrete Items
1.2.9.1 Payment
1.2.9.2 Unit of Measure
1.2.9.3 Payment Items
1.2.10 Lower Guard Wall Nose Pier Superstructure
1.2.10.1 Payment
1.2.10.2 Unit of Measure
1.2.10.3 Payment Items
1.2.11 Electrical Work
1.2.11.1 Payment
1.2.11.2 Unit of Measure
1.2.11.3 Payment Items
1.2.12 Traffic Control Device
1.2.12.1 Payment
1.2.12.2 Unit of Measure
1.2.12.3 Payment Item
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Digital Progress Images
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measure
1.3.1.4 Payment Item
1.3.2 Maintain Government Facilities
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
1.3.2.4 Payment Item
1.3.3 Underwater Excavation
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.3.4 Payment Items
1.3.4 Exploratory Programs
1.3.4.1 Payment
1.3.4.2 Measurement
1.3.4.3 Unit of Measure
1.3.4.4 Payment Item
1.3.5 Permanent Casing, Drilled Shafts
1.3.5.1 Payment
1.3.5.2 Measurement
1.3.5.3 Unit of Measure
1.3.5.4 Payment Items
1.3.6 Soil and Rock Excavation, Drilled Shafts
1.3.6.1 Payment
1.3.6.2 Measurement
1.3.6.3 Unit of Measure
1.3.6.4 Payment Items
1.3.7 Crosshole Sonic Logging
1.3.7.1 Payment
1.3.7.2 Measurement
1.3.7.3 Unit of Measure
1.3.7.4 Payment Items
1.3.8 Access Tubes, Crosshole Sonic Logging
1.3.8.1 Payment
1.3.8.2 Measurement
1.3.8.3 Unit of Measure
1.3.8.4 Payment Items
1.3.9 Concrete Placement
1.3.9.1 Payment
1.3.9.2 Measurement
1.3.9.3 Unit of Measure
1.3.9.4 Payment Items
1.3.10 Coring of Drilled Shafts
1.3.10.1 Payment
1.3.10.2 Measurement
1.3.10.3 Unit of Measure
1.3.10.4 Payment Items
1.3.11 Reinforcing Steel
1.3.11.1 Payment
1.3.11.2 Measurement
1.3.11.3 Unit of Measure
1.3.11.4 Payment Items
1.3.12 Steel Piling for Cut-Off Walls
1.3.12.1 Payment
1.3.12.2 Measurement
1.3.12.3 Unit of Measure
1.3.12.4 Payment Items
1.3.13 Environmental Control Representative
1.3.13.1 Payment
1.3.13.2 Measurement
1.3.13.3 Unit of Measure
1.3.13.4 Payment Item
1.3.14 Environmental Compliance Measurement, Sampling, Testing and Reporting
1.3.14.1 Payment
1.3.14.2 Measurement
1.3.14.3 Unit of Measure
1.3.14.4 Payment Item
1.3.15 Clearing of Government Furnished Disposal Site
1.3.15.1 Payment
1.3.15.2 Measurement
1.3.15.3 Unit of Measure
1.3.15.4 Payment Item
1.3.16 Silt Fences and Fabric Fences
1.3.16.1 Payment
1.3.16.2 Payment
1.3.16.3 Unit of Measure
1.3.16.4 Payment Item
1.3.17 Government Furnished Disposal Site, Sediment Basins
1.3.17.1 Payment
1.3.17.2 Measurement
1.3.17.3 Unit of Measure
1.3.17.4 Payment Items
1.3.18 Seeding and Vegetation
1.3.18.1 Payment
1.3.18.2 Measurement
1.3.18.3 Unit of Measure
1.3.18.4 Payment Items
1.3.19 Disposal of Existing Material at Government-Furnished Disposal Site
1.3.19.1 Payment
1.3.19.2 Measurement
1.3.19.3 Unit of Measure
1.3.19.4 Payment Items
1.3.20 Disposal of Existing Material at Permitted Facility
1.3.20.1 Payment
1.3.20.2 Measurement
1.3.20.3 Unit of Measure
1.3.20.4 Payment Items
1.3.21 Reimbursement for Utility Services
1.3.21.1 Payment
1.3.21.2 Measurement
1.3.21.3 Unit of Measure
1.3.21.4 Payment Item
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION Not Applicable

File details come from the government source that posted it. Updated .