SECTION 32 92 23 Page 1
SECTION 32 92 23
SODDING
04/06
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 RELATED REQUIREMENTS
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.7 TIME LIMITATIONS
PART 2 PRODUCTS
2.1 SODS
2.2 WILDFLOWER SOD
2.3 TOPSOIL
2.4 SOIL CONDITIONERS
2.5 FERTILIZER
2.6 WATER
PART 3 EXECUTION
3.1 PREPARATION
3.2 SODDING
3.3 PROTECTION OF TURF AREAS
3.4 RENOVATION OF EXISTING TURF AREA
3.5 RESTORATION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (2013a) Agricultural Liming Materials
ASTM D 4427 (2013) Peat Samples by Laboratory Testing
ASTM D 4972 (2013) pH of Soils
TURFGRASS PRODUCERS INTERNATIONAL (TPI)
TPI GSS (1995) Guideline Specifications to Turfgrass Sodding
U.S. DEPARTMENT OF AGRICULTURE (USDA)
SECTION 32 92 23 Page 2
DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey
Laboratory Methods Manual, Version 3.0
1.2 DEFINITIONS
1.2.1 Stand of Turf
100 percent ground cover of the established species.
1.3 RELATED REQUIREMENTS
Section 31 00 00 EARTHWORK, Section 32 84 24 IRRIGATION SPRINKLER SYSTEMS, Section 32 92 19 SEEDING, Section 32 93 00 EXTERIOR PLANTS, and Section 32 05 33 LANDSCAPE ESTABLISHMENT applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Fertilizer
Include physical characteristics, and recommendations. Submit manufacturer documentation indicating type and percentage of biobased content or written justification of non-use per paragraph 2.4.
SD-06 Test Reports
Topsoil composition tests (reports and recommendations).
SD-07 Certificates
Nursery Sod farm certification for sods. Indicate type of sod in accordance with TPI GSS.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Sod Protection
Protect from drying out and from contamination during delivery, on-site storage, and handling.
1.5.1.2 Fertilizer, Gypsum, Sulfur, Iron, and Lime Delivery
SECTION 32 92 23 Page 3
Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum, sulphur, iron, and lime may be furnished in bulk with certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Sod Storage
Lightly sprinkle with water, cover with moist burlap, straw, or other approved covering; and protect from exposure to wind and direct sunlight until planted. Provide covering that will allow air to circulate so that internal heat will not develop. Do not store sod longer than 24 hours. Do not store directly on concrete or bituminous surfaces.
1.5.2.2 Topsoil
Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.
1.5.2.3 Handling
Do not drop or dump materials from vehicles.
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit.
1.7 TIME LIMITATIONS
1.7.1 Sod
Place sod a maximum of thirty six hours after initial harvesting, in accordance with TPI GSS as modified herein.
PART 2 PRODUCTS
2.1 SODS
2.1.1 Classification
Nursery grown, certified as classified in the TPI GSS. Machine cut sod at a uniform thickness of 3/4 inch within a tolerance of 1/4 inch, excluding top growth and thatch. Each individual sod piece shall be strong enough to support its own weight when lifted by the ends. Broken pads, irregularly shaped pieces, and torn or uneven ends will be rejected.
2.1.2 Purity
Sod species shall be genetically pure, free of weeds, pests, and disease.
SECTION 32 92 23 Page 4
2.2 TOPSOIL
2.2.1 On-Site Topsoil
Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 00 00 EARTHWORK.
2.2.2 Off-Site Topsoil
Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the Contractor.
2.2.3 Composition
Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits:
Silt 25-50 percent Clay 10-30 percent Sand 20-35 percent pH 5.5 to 7.0 Soluble Salts 600 ppm maximum
2.3 SOIL CONDITIONERS
Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein.
2.3.1 Lime
Commercial grade burnt limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602 of not less than 80 percent.
2.3.2 Aluminum Sulfate
Commercial grade.
2.3.3 Sulfur
100 percent elemental
2.3.4 Iron
100 percent elemental
SECTION 32 92 23 Page 5
2.3.5 Peat
Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427 as modified herein. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation.
2.3.6 Sand
Clean and free of materials harmful to plants.
2.3.7 Perlite
Horticultural grade.
2.3.8 Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:
2.3.8.1 Particle Size
Minimum percent by weight passing:
No. 4 mesh screen 95 No. 8 mesh screen 80
2.3.8.2 Nitrogen Content
Minimum percent based on dry weight:
Fir Sawdust 0.7 Fir or Pine Bark 1.0
2.3.9 Gypsum
Coarsely ground gypsum comprised of calcium sulfate dihydrate 91 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.
2.3.10 Calcined Clay
Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No.
100 sieve. Bulk density: A maximum 40 pounds per cubic foot.
2.4 FERTILIZER
Fertilizer shall conform to EPA requirements in accordance with Section 01 62 35 RECYCLED / RECOVERED MATERIALS. In addition, fertilizer shall meet the minimum biobased content requirement established by the USDA's BioPreferred program (2002 Farm Bill) unless the designer, SECTION 32 92 23 Page 6
Contractor, or Task or Delivery Order determines that no biobased product can be obtained within the cost, performance, or availability requirements of the contract. If such determination of non-use is made, the Contractor or subcontractor shall complete and submit the JBLM Construction Green Procurement Exception Form. Using this form, the Contractor shall specify the reason for exception (unreasonable price, inadequate performance, non-availability) and provide all associated information (including copies of all supporting evidence). This form is available from the Contracting Official or the JBLM Green Procurement Program Coordinator (Building 1210, (253) 966-6466, LEWISPWGreenProcurement@conus.army.mil). The Contractor shall submit the completed form via email (with copies of supporting documents included) to the Contracting Officer's Representative. The Contractor shall include the following address in the carbon copy ("cc") line of the email:
LEWISPWGreenProcurement@conus.army.mil. The Contractor shall keep attached file sizes to a minimum to avoid transmission errors associated with JBLM security. If use of email is not possible, the Contractor shall coordinate the submission of these documents with the Contracting Officer's Representative and ask that they forward copies to the JBLM Green Procurement Coordinator (Bldg 1210, 966-6466). More information can be found at http://www.biopreferred.gov/ProposedAndFinalRegulations.aspx.
2.4.1 Granular Fertilizer
Synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
As stated in the Delivery or Task Order.
2.5 WATER
Source of water shall be approved by Contracting Officer and of suitable quality for irrigation containing no element toxic to plant life.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 EXTENT OF WORK
Provide soil preparation (including soil conditioners), fertilizing, and sodding of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.
3.1.2 Soil Preparation
Provide 4 inches of on-site topsoil to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer, pH adjusters, and soil conditioners into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer.
Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.
3.1.2.1 Fertilizer Application Rates
SECTION 32 92 23 Page 7
Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site. For bidding purposes only apply at rates for the following:
Synthetic Granular Fertilizer 100 pounds per acre.
3.2 SODDING
3.2.1 Finished Grade and Topsoil
Prior to the commencement of the sodding operation, the Contractor shall verify that finished grades are as indicated on drawings; the placing of topsoil, smooth grading, and compaction requirements have been completed in accordance with Section 31 00 00 EARTHWORK.
The prepared surface shall be a maximum 1 inch below the adjoining grade of any surfaced area. New surfaces shall be blended to existing areas. The prepared surface shall be completed with a light raking to remove from the surface debris and stones over a minimum 5/8 inch in any dimension.
3.2.2 Placing
Place sod a maximum of 36 hours after initial harvesting, in accordance with TPI GSS as modified herein.
3.2.3 Sodding Slopes and Ditches
For slopes 2:1 and greater, lay sod with long edge perpendicular to the contour. For V-ditches and flat bottomed ditches, lay sod with long edge perpendicular to flow of water. Anchor each piece of sod with wood pegs or wire staples maximum 2 feet on center.
3.2.4 Finishing
After completing sodding, blend edges of sodded area smoothly into surrounding area. Air pockets shall be eliminated and a true and even surface shall be provided. Frayed edges shall be trimmed and holes and missing corners shall be patched with sod.
3.2.5 Rolling
Immediately after sodding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width.
3.2.6 Watering
Start watering areas sodded as required by daily temperature and wind conditions. Apply water at a rate sufficient to ensure thorough wetting of soil to minimum depth of 6 inches. Run-off, puddling, and wilting shall be prevented. Unless otherwise directed, watering trucks shall not be driven over turf areas. Watering of other adjacent areas or plant material shall be prevented.
3.3 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
SECTION 32 92 23 Page 8
3.4 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
-- End of Section --
SECTION 32 92 23 Page 9
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Stand of Turf |
| 1.3 RELATED REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Delivery |
| 1.5.1.1 Sod Protection |
| 1.5.1.2 Fertilizer, Gypsum, Sulfur, Iron, and Lime Delivery |
| 1.5.2 Storage |
| 1.5.2.1 Sod Storage |
| 1.5.2.2 Topsoil |
| 1.5.2.3 Handling |
| 1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS |
| 1.6.1 Restrictions |
| 1.7 TIME LIMITATIONS |
| 1.7.1 Sod |
| PART 2 PRODUCTS |
| 2.1 SODS |
| 2.1.1 Classification |
| 2.1.2 Purity |
| 2.2 TOPSOIL |
| 2.2.1 On-Site Topsoil |
| 2.2.2 Off-Site Topsoil |
| 2.2.3 Composition |
| 2.3 SOIL CONDITIONERS |
| 2.3.1 Lime |
| 2.3.2 Aluminum Sulfate |
| 2.3.3 Sulfur |
| 2.3.4 Iron |
| 2.3.5 Peat |
| 2.3.6 Sand |
| 2.3.7 Perlite |
| 2.3.8 Composted Derivatives |
| 2.3.8.1 Particle Size |
| 2.3.8.2 Nitrogen Content |
| 2.3.9 Gypsum |
| 2.3.10 Calcined Clay |
| 2.4 FERTILIZER |
| 2.4.1 Granular Fertilizer |
2.5 WATER
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 EXTENT OF WORK |
| 3.1.2 Soil Preparation |
| 3.1.2.1 Fertilizer Application Rates |
| 3.2 SODDING |
| 3.2.1 Finished Grade and Topsoil |
| 3.2.2 Placing |
| 3.2.3 Sodding Slopes and Ditches |
| 3.2.4 Finishing |
| 3.2.5 Rolling |
| 3.2.6 Watering |
| 3.3 PROTECTION OF TURF AREAS |
| 3.4 RESTORATION |