01 57 19-TEMPORARY ENVIRONMENTAL CONTROLS

View the file

Other files

File Type Posted
SF1442_W911S8-17-R-0001_0002.pdf PDF
4. Technical Exbhibit C Statement of Work 19 Dec 2016.pdf PDF
JBLM Paving W911S8-17-R-0001 Contractor QUESTIONS 22 Dec16.pdf PDF
Pre-Proposal Conference Contractor Attendees.pdf PDF
33 71 02UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
SF30 W911S8-17-R-0001 0002.pdf PDF
Attachment 1- Sample Project 19 December 2016.pdf PDF
32 12 21-BITUMINOUS ROAD-MIX SURFACE COURSE.pdf PDF
01_45_00_10_Quality_Control_19_Dec.pdf PDF
33 71 02 JBLM DESIGN STANDARDS-UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
Site Visit Briefing W911S8-17-R-0001 JBLM Paving -29 Nov 2016.pdf PDF
SF30 W911S8-17-R-0001 0001.pdf PDF
W911S8-17-R-0001_Amendment_0001.pdf PDF
01 42 00-SOURCES FOR REFERENCE PUBLICATIONS.pdf PDF
13. Attachment 5 - Past Performance Questionaire.docx DOCX document
32_84_24_(Irrigation_Sprinkles).pdf PDF
26_56_13.00_40_Lighting_Poles_and_Standards.pdf PDF
14. Attachment 6 Insurance Certificate of Compliance.docx DOCX document
01 78 23-OPERATION AND MAINTENANCE DATA.pdf PDF
32_17_24.00_10_(Pavement_Markings).pdf PDF
1. RFP W911S8-17-R-0001 Paving IDC.pdf PDF
01 50 00-TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
01 32 01 00 10 Project Schedule.pdf PDF
7. TE F General Decision Number WA160001 Dtd 19 Aug 16.pdf PDF
31_11_00_Clearing_ _Grubbing.pdf PDF
5. TE D-Table of Contents.pdf PDF
3. TE B Proposal Item Descriptions(09-27-16).pdf PDF
10. Attachment 2-Experience Document.docx DOCX document
6. TE E Standards Plans Drawings 25Aug16.pdf PDF
31_23_00.00_20_Excavation_ _Fill.pdf PDF
01 35 29.13 Contaminated Site.pdf PDF
32_11_24_CSBC_for_Flexible_Pavement.pdf PDF
32_31_26_(Wire_Fence_ _Gate).pdf PDF
32_31_13.53_(High_Security_Fence).pdf PDF
26_56_19.00_40_Roadway_Lighting.pdf PDF
32_93_00_(Exterior_Plants).pdf PDF
31_00_00_Earthwork.pdf PDF
2. TE A ELIN Proposal Schedule 11 Oct 16.xlsx XLSX spreadsheet
33_11_00-WATER_DISTRIBUTION.pdf PDF
01 45 00 10 Quality Control.pdf PDF
01 30 00 Administrative Requirements.pdf PDF
33_30_00-SANITARY_SEWERS.pdf PDF
01 78 00- CLOSEOUT SUBMITTALS.pdf PDF
32_01_13_BITUMINOUS_SEAL_AND_FOG_COATS.pdf PDF
16. Attachment 8-JBLM Installation Access Information.docx DOCX document
32_92_19_(Seeding).pdf PDF
32_12_10_(Tack_Coat).pdf PDF
12. Attachment 4 - Relevant Contract Reference Sheet.docx DOCX document
00 10 01 - Supplementary Requirements.pdf PDF
32_12_15.13_HMA_for_Airfields.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBLM DESIGN STANDARDS

SECTION 01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS

11/15

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 EROSION AND SEDIMENT CONTROL

1.4 SUBMITTALS

1.5 DELIVERY, STORAGE AND HANDLING

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 INSPECTIONS

PART 1 GENERAL

1. Storm Water Management Manual for Western Washington.

2. EPA NPDES Construction General Permit. Applies to all projects having a total ground disturbance of an acre or greater and will or have a potential to discharge to US Waters.

3. Low Impact Development Technical Guidance Manual for Puget Sound

4. Erosion and Sediment Control. Provide appropriate erosion and sediment controls on all construction sites that will have ground disturbance. Proper implementation and maintenance of appropriate best management practices (BMPs) is critical to control any adverse water quality impacts from construction activities adequately. Discharges must not violate the state’s surface water quality standards (WAC Chapter 173-201A) and groundwater quality standards (WAC Chapter 173-200).

SECTION 01 57 23

TEMPORARY STORMWATER POLLUTION CONTROL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 832-R-92-005 (most current) Storm water Management for Construction Activities Developing Pollution Preventions and Plans and Best Management Practices http://www.ecy.wa.gov/programs/wq/stormwater/manual.html#How_to_Find_the_Stormwater_Manual_on_the http://www.psp.wa.gov/downloads/LID/LID_manual2005.pdf

Construction General Permit (most current) Construction General Permit, Environmental

Protection Agency NPDES General Permit for Storm water Discharges From Construction Activities

Storm water Management Manual (Most Current) Storm water Management Manual for

Western Washington State Department of Ecology Publication

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 122.26 Storm water Discharges (Applicable to State NPDES

Programs, see Section 123.25)

1.2 SYSTEM DESCRIPTION

The work consists of implementing the storm water pollution prevention measures to prevent sediments from entering United States bodies of water or municipal separate storm sewer systems leading to a United State body of water as specified in this Section in conformance with the requirements of Section 01 57

20.00 10 ENVIRONMENTAL PROTECTION, and the National Pollution Discharge Elimination System (NPDES) permit attached to that Section.

1.3 E R O S I O N AND SEDIMENT CONTROLS

If applicable contractors will comply with the EPA NPDES Construction General Permit specific control measures. In addition, the control measures described in the Western Washington Storm water Management Manual are authorized. Any deviation from the manual stated above must have approval from the DPW.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Storm water Pollution Prevention Plan; G

JBLM has a NDPES Construction General Permit for the installation and a general Storm water Pollution Prevention Plan (SWPPP). If applicable, the Contractor shall obtain individual permit coverage under the EPA's NDPES Construction General Permit by submitting a Notice of Intent to the EPA. A requirement of the permit is to prepare a SWPPP. The SWPPP must meet the requirements of the EPA's NPDES General Permit for Storm water from Construction Activities, and must be approved by JBLM Environmental Division prior to submitting the NOI.

The site specific SWPPP must be prepared in accordance with good engineering practices and must include the detailed areas required by the Construction General Permit. The SWPPP shall be submitted to the Water Program Office, Environmental Division, Public Works as early as possible for approval, in case changes or corrections must be made, but no later than 10 days prior to beginning work. The EPA SWPPP template must be used.

Approval of the Contractor's SWPPP will not relieve the Contractor of responsibility for adequate management of storm water. The SWPPP is a dynamic document. The Contractor must implement the SWPPP in accordance with the Construction General Permit requirements.

SD-06 Test Reports

Storm water Inspection Reports for General Permit Erosion and Sediment Controls

SD-07 Certificates

Mill Certificate or Affidavit

Certificate attesting that the Contractor has met all specified requirements.

SD-08 Closeout Submittals

Permit Termination

The permit must be terminated in accordance with the Construction General Permit. The notice of termination must be submitted to the Environmental Protection Agency (EPA).

The permit holder must request an inspection by a qualified member of Public Works Water Program before termination request is submitted to EPA. At the discretion of the Water Program, an inspection may or may not be conducted prior to permit termination.

SD-09 Closeout Submittals

A copy of the Notice of Termination and EPA confirmation letter must be submitted to Public Works Water Program.

SD-11 Closeout Submittals

The SWPPP must be terminated in accordance with the Construction General Permit.

The site will be inspected by a qualified member of the Public Works Water Program before termination request is submitted. Contractors shall request inspection prior to termination.

1.5 DELIVERY, STORAGE, AND HANDLING

All identification, storage and handling will be in accordance with the most current version of the Storm water Management Manual for Western Washington.

PART 2 PRODUCTS

Provide products that comply with the Storm water Management Manual for Western Washington.

PART 3 EXECUTION

Execute in accordance with the Storm water Management Manual for Western Washington.

3.1 INSPECTIONS

3.1.1 General

Inspections shall be in accordance with the Construction General Permit.

-- END OF SECTION --