32 11 24 CSBC for Flexible Pavement

View the file

Other files

File Type Posted
SF1442_W911S8-17-R-0001_0002.pdf PDF
4. Technical Exbhibit C Statement of Work 19 Dec 2016.pdf PDF
JBLM Paving W911S8-17-R-0001 Contractor QUESTIONS 22 Dec16.pdf PDF
Pre-Proposal Conference Contractor Attendees.pdf PDF
33 71 02UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
SF30 W911S8-17-R-0001 0002.pdf PDF
Attachment 1- Sample Project 19 December 2016.pdf PDF
32 12 21-BITUMINOUS ROAD-MIX SURFACE COURSE.pdf PDF
01_45_00_10_Quality_Control_19_Dec.pdf PDF
33 71 02 JBLM DESIGN STANDARDS-UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
Site Visit Briefing W911S8-17-R-0001 JBLM Paving -29 Nov 2016.pdf PDF
SF30 W911S8-17-R-0001 0001.pdf PDF
W911S8-17-R-0001_Amendment_0001.pdf PDF
01 57 19-TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
01 42 00-SOURCES FOR REFERENCE PUBLICATIONS.pdf PDF
13. Attachment 5 - Past Performance Questionaire.docx DOCX document
32_84_24_(Irrigation_Sprinkles).pdf PDF
26_56_13.00_40_Lighting_Poles_and_Standards.pdf PDF
14. Attachment 6 Insurance Certificate of Compliance.docx DOCX document
01 78 23-OPERATION AND MAINTENANCE DATA.pdf PDF
32_17_24.00_10_(Pavement_Markings).pdf PDF
1. RFP W911S8-17-R-0001 Paving IDC.pdf PDF
01 50 00-TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
01 32 01 00 10 Project Schedule.pdf PDF
7. TE F General Decision Number WA160001 Dtd 19 Aug 16.pdf PDF
31_11_00_Clearing_ _Grubbing.pdf PDF
5. TE D-Table of Contents.pdf PDF
3. TE B Proposal Item Descriptions(09-27-16).pdf PDF
10. Attachment 2-Experience Document.docx DOCX document
6. TE E Standards Plans Drawings 25Aug16.pdf PDF
31_23_00.00_20_Excavation_ _Fill.pdf PDF
01 35 29.13 Contaminated Site.pdf PDF
32_31_26_(Wire_Fence_ _Gate).pdf PDF
32_31_13.53_(High_Security_Fence).pdf PDF
26_56_19.00_40_Roadway_Lighting.pdf PDF
32_93_00_(Exterior_Plants).pdf PDF
31_00_00_Earthwork.pdf PDF
2. TE A ELIN Proposal Schedule 11 Oct 16.xlsx XLSX spreadsheet
33_11_00-WATER_DISTRIBUTION.pdf PDF
01 45 00 10 Quality Control.pdf PDF
01 30 00 Administrative Requirements.pdf PDF
33_30_00-SANITARY_SEWERS.pdf PDF
01 78 00- CLOSEOUT SUBMITTALS.pdf PDF
32_01_13_BITUMINOUS_SEAL_AND_FOG_COATS.pdf PDF
16. Attachment 8-JBLM Installation Access Information.docx DOCX document
32_92_19_(Seeding).pdf PDF
32_12_10_(Tack_Coat).pdf PDF
12. Attachment 4 - Relevant Contract Reference Sheet.docx DOCX document
00 10 01 - Supplementary Requirements.pdf PDF
32_12_15.13_HMA_for_Airfields.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 11 24 Page 1

SECTION 32 11 24

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT\

11/11

PART 1 GENERAL

1.1 REFERENCES

1.2 RELATED SECTIONS

1.3 SUBMITTALS

1.4 DELIVERY AND STORAGE

1.5 WEATHER LIMITATIONS

1.6 CONSTRUCTION EQUIPMENT

1.7 SUSTAINABLE DESIGN REQUIREMENTS

PART 2 PRODUCTS

2.1 MATERIALS

PART 3 EXECUTION

3.1 BASE COURSE

3.2 OPENING AND OPERATION OF PITS

3.3 MIXING OF MATERIALS

3.4 PLACING

3.5 COMPACTING AND FINISHING

3.6 PROOF ROLLING

3.7 FINISHING AT EDGES OF BASE COURSE

3.8 FIELD QUALITY CONTROL

3.9 MAINTENANCE

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 117 (2013) Standard Test Method for Materials Finer than 75-um (No.

200) Sieve in Mineral Aggregates by Washing

ASTM C 131/C131M (2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM C 136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse

Aggregates

ASTM C 29/C 29M (2009) Standard Test Method for Bulk Density ("Unit Weight") and Voids in Aggregate

SECTION 32 11 24 Page 2

ASTM D 1556/D1556M (2015; E 2016) Density and Unit Weight of Soil in Place by the

Sand-Cone Method

ASTM D 1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D 1883 (2014) CBR (California Bearing Ratio) of Laboratory-Compacted

Soils

ASTM D 2217 (1985; R 1998) Wet Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants

ASTM D 4318 (2010; E 2014) Liquid Limit, Plastic Limit, and Plasticity Index of

Soils

ASTM D 75/D75M (2014) Standard Practice for Sampling Aggregates

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) New construction Rating System

1.2 RELATED SECTIONS

NONE

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Aggregates; (LEED)

Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.

Local/Regional Materials; (LEED)

Submit documentation indicating distance between manufacturing facility and the project site.

Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.

SD-06 Test Reports

Gradation

Bearing ratio

Liquid limit

SECTION 32 11 24 Page 3

Plasticity index

Percentage of wear

Density

Gradation

Smoothness

Density

Thickness

1.4 DELIVERY AND STORAGE

Inspect materials delivered to site for damage and store as to prevent segregation and contamination.

1.5 WEATHER LIMITATIONS

Do not construct base course when atmospheric temperature is below 35 degrees F or when rainfall or other weather conditions detrimentally affect the quality of the finished course.

1.6 CONSTRUCTION EQUIPMENT

Equipment shall be dependable and adequate for the purpose intended. Maintain equipment in satisfactory and safe operating condition. Subject to approval, special equipment dictated by local conditions may be used.

Calibrated equipment, such as scales, batching equipment, spreaders, and similar items, shall have been recalibrated by an approved calibration laboratory within 12 months of commencing work.

1.7 SUSTAINABLE DESIGN REQUIREMENTS

1.7.1 Local/Regional Materials

See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements.

Aggregate materials may be locally available.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Aggregates

Consist of durable and sound crushed concrete, crushed masonry, crushed tile, crushed gravel, crushed stone, or crushed slag, free of lumps or balls of clay or other objectionable matter. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total recycled content requirements. Material may contain post-consumer or post-industrial recycled content. Crushed stone and gravel shall be free from flat, elongated, soft, or disintegrated pieces. Crushed gravel retained on a No. 4 sieve shall have at least 90 percent by weight with at least two fractured faces and 100 percent by weight with at least one fractured face. Base course materials samples shall have a bearing ratio of at least 100 as determined by laboratory tests on a 4-day soaked specimen in accordance with ASTM D 1883; compact specimen in accordance with ASTM D 1557, Method D. Determine grain size in accordance with ASTM C 136 and amount of material finer than 200 mesh sieve in accordance with ASTM C 117. Aggregate, other than slag, shall have a percentage of wear not exceeding 40 when tested in accordance with ASTM C 131, Grading A. Slag shall be an air-cooled, blast furnace product having a dry weight of not less than 70 pounds per cubic foot when tested in accordance with ASTM C 29/C 29M and shall consist of

SECTION 32 11 24 Page 4 angular fragments uniform in density and quality, reasonably free from thin, elongated pieces, dirt, or other objectionable material. Soil binder material, that portion of material passing the No. 40 sieve, shall be of such composition that the composite material conforms to the requirements specified herein. The base course shall be of such nature that it can be compacted readily with watering and rolling to a firm, stable base and shall conform to one of the following sizes:

Percentage by Weight Passing

Square Mesh Laboratory Sieves

Size Numbers

Sieves Size Numbers

1 2 3 2 inch 100 - - 1 1/2 inch 70-100 100 - 1 inch 45-80 60-100 100 1/2 inch 30-60 30-65 40-70 No. 4 20-50 20-50 20-50 No. 10 15-40 15-40 15-40 No. 40 5-25 5-25 5-25 No. 200 0-10 0-10 0-10

That portion of the material passing the No. 40sieve shall have a liquid limit of not more than 25 and a plasticity index of not more than 5 as determined by ASTM D 4318. Prepare samples in accordance with ASTM D 2217, Procedure A.

2.1.2 Pervious Base Course

Base aggregate for pervious pavement systems shall consist of aggregate as specified in paragraph Aggregates except as specified below. Material passing the No. 200 sieve is not permitted. Unevenly graded screenings and stone dust are not permitted.

2.1.2.1 Asphalt-Treated Permeable Base

Asphalt binder shall be steam-refined asphalt, grade AR-8000. "Popcorn mix" aggregate shall conform to the following grading:

Sieves Percent Passing 1 inch 100 3/4 inch 90-100 1/2 inch 35-65 3/8 inch 20-45

SECTION 32 11 24 Page 5

No. 4 0-10 No. 8 0-5

2.1.2.2 Cement-Treated Permeable Base

Portland cement binder shall be Type II Modified. Pozzolan shall not be substituted for portland cement.

Aggregate shall conform to the 1 inch x No. 4 primary nominal coarse aggregate grading, with 52 to 85 percent by weight passing through a 3/4 inch sieve.

PART 3 EXECUTION

3.1 BASE COURSE

Construct the graded aggregate base course on a prepared subgrade, as indicated. Verify compacted subgrade, granular base, or stabilized soil is acceptable and ready to support paving and imposed loads. Provide line and grade stakes for control. Place grade stakes in lanes parallel to the centerline of areas to be paved and space for string lining or other control methods. The base course shall consist of aggregate processed, deposited, spread, and compacted on a prepared surface. The Contractor shall be responsible for protection of completed areas against detrimental effects. Recondition, reshape, and recompact areas damaged by freezing, rainfall, or other weather conditions.

3.2 OPENING AND OPERATION OF PITS

Perform stripping, clearing, processing, and blending in the opening of new pits and operation of existing pits as necessary to obtain acceptable material. Open pits in a manner to expose the vertical faces of the deposits for suitable working depths, following which the material shall be obtained in successive vertical cuts extending through the exposed strata. Waste strata and pockets of unsuitable materials overlaying or occurring in the deposit. Change or modify the method of operating the pits, and the processing and blending of the material when necessary to obtain material conforming to the specified requirements. Upon completion of the work, condition pits to drain readily and leave in a satisfactory condition.

3.3 MIXING OF MATERIALS

Mix aggregates in a stationary or traveling plant. Proportion aggregates by weight or volume in such quantities that specified gradation, liquid limit, and plasticity index requirements are met after the base course has been placed and compacted. Incorporate, during the mixing operation, water in quantities sufficient to provide the necessary moisture content for the specified compaction. Mixing operations shall produce satisfactory uniform blending and the method of discharging into trucks shall not produce segregation.

3.4 PLACING

Do not dump mixed materials in piles, but place on prepared subgrade or subbase in layers of uniform thickness with a spreader. When a compacted course 6 inches in thickness is required, place material in a single layer.

When a compacted course in excess of 6 inches is required, place material in layers of equal thickness. Do not exceed 6 inches or have less than 3 inches in thickness for any compacted layer. Place layers so that when compacted, they will be true to grades or levels required with the least possible surface disturbance. Where the base course is constructed in more than one layer, clean previously constructed layers of loose and foreign matter.

Maintain material water content during the placing period to obtain the compaction specified. Make adjustments in placing procedures or equipment to obtain true grades, to minimize segregation and degradation, to reduce or increase water content, and to insure a satisfactory base course.

3.4.1 Stationary-Plant Method

Mix aggregates, binder material and water until a uniform homogeneous mixture is obtained. Do not dump materials in piles; place in layers of essentially uniform thickness, not to exceed 6 inches after compaction, by an

SECTION 32 11 24 Page 6 approved spreader. Tail gate spreading will be acceptable only with permission, under conditions such as where space limitations prohibit use of the spreader.

3.4.2 Windrow Traveling-Plant Method

Place aggregates and binder materials in windrows of such cross section and proportions that, when picked up, mixed, and redeposited in windrows, the finished mixture shall conform to the specified requirements. Do not exceed the rated capacity of the traveling plant with the size of the windrow of the combined materials. Add water, in quantity sufficient to provide the necessary moisture content for compacting, to the aggregates at the time of mixing. Mix materials uniformly by the traveling plant, deposit in windrows of uniform cross section, and spread in a layer of uniform thickness to the required contour and grades.

3.5 COMPACTING AND FINISHING

Immediately following the placing, spread the finished mixture uniformly in a layer and bring to optimum moisture content. The loose thickness and the surface of the layer shall be such that the specified density and the required thickness shall be obtained after compaction. Compact the layer with steel-faced, vibrating or pneumatic-tired rollers, or other suitable compacting equipment or combinations thereof. Continue compacting until the layer is compacted through the full depth to a field density of at least 100 percent of the maximum density at optimum moisture content tested in accordance with ASTM D 1556. In areas not accessible to rollers or compactors, compact the mixture with mechanical hand tampers. If the mixture is excessively moistened by rain, aerate by blade graders, or other suitable equipment. Aerate until the moisture content of the material is that needed to obtain the required density. Finish the surface of the layer by a combination of rolling and blading.

Final surface shall be smooth and free from waves, irregularities, and ruts or soft yielding spots.

3.6 PROOF ROLLING

On the center 25 feet of taxiways and on the center 100 feet of runways, in addition to compacting the base course to the required density, proof roll the top surface of the completed base course by making eight coverages with a heavy rubber-tired roller having four tires with each tire loaded to 30,000 pounds or more and inflated to at least 150 psi. Make four coverages over other areas to be paved, excluding the runway over-runs, blast protection areas, and shoulders. A coverage is defined as one application of one tire print over each point in the surface of the designated area. When under the action of the proof rolling, the base course yields, pumps, or otherwise fails, remove, replace with suitable materials, and recompact materials in the base course or in the underlying layers indicated to be unsatisfactory. The speed of the roller shall not exceed 5 miles per hour. Obtain approval upon completion of the proof rolling of the base course.

3.7 FINISHING AT EDGES OF BASE COURSE

Place earth or other approved materials along the edges of the base course in such quantity that it will compact to the thickness of the course being constructed. When the course is being constructed in two or more layers, place material to the thickness of each layer. In each operation, allow at least a one foot width of the shoulder to be rolled and compacted simultaneously with the rolling and compacting of each layer.

3.8 FIELD QUALITY CONTROL

Approve materials and material sources in advance of the use of such materials in the work. Replace base where samples are removed. Take duplicate samples at the same time and in the same manner as the original.

3.8.1 Sampling

3.8.1.1 Aggregates at the Source

Prior to production and delivery of aggregates, take at least one initial sample in accordance with ASTM D 75.

Collect each sample by taking three incremental samples at random from the source material to make a composite

SECTION 32 11 24 Page 7 sample of not less than 50 pounds. Repeat above sampling when source of material is changed or when unacceptable deficiencies or variations from specified grading of materials are found in testing.

3.8.1.2 During Construction

Take one random sample from each 1000 tons of completed course material, but not less than one random sample per day's run. Take samples in accordance with ASTM D 75.

3.8.1.3 Sample Identification

Place each sample in a clean container, securely fastened to prevent loss of material. Tag each sample for identification and with the following information:

Contract No._______________________________________ Sample No._____________________ Quality __________ Date of Sample_____________________________________ Sampler____________________________________________ Source_____________________________________________ Intended Use_______________________________________ For Testing________________________________________

3.8.2 Testing

3.8.2.1 Aggregates

Test each sample of base course material without delay. Make gradationtests from each sample in accordance with ASTM C 136. Make sieve analysis on material passing the No. 200 sieve in accordance with ASTM C 117.

3.8.2.2 Smoothness Tests

Test with a 10 foot straightedge, applied parallel with and at right angles to the center line of the paved area.

Correct deviations in the surface in excess of 3/8 inch by loosening, adding or removing material, reshaping, watering, and compacting. The smoothness requirements specified herein apply only to the top layer when base course is constructed in more than one layer.

3.8.2.3 Field Density Tests

ASTM D 1556 or ASTM D 2922 and ASTM D 3017. Take one test for each 500 square yards of each layer of base course.

3.8.2.4 Laboratory Density Tests

In accordance with ASTM D 1557, Method D.

3.8.2.5 Thickness Tests

Measure thickness of base course at intervals such that there will be a depth measurement for at least each 500 square yards of complete base course. Make depth measurements by test holes, at least 3 inches in diameter, through the base course. Where base course deficiency is more than 1/2 inch, correct by scarifying, adding mixture of proper gradation, reblading, and recompacting. Where the measured thickness is more than 1/2 inch thicker than indicated, consider it as the indicated thickness plus 1/2 inch for determining the average. The average thickness is the average of the depth measurements and shall not underrun the thickness indicated.

3.9 MAINTENANCE

SECTION 32 11 24 Page 8

After construction is completed, maintain the base course throughout, except where portion of the succeeding course is under construction thereon. Maintenance includes drainage, rolling, shaping, and watering, as necessary, to maintain the course in proper condition. Correct deficiencies in thickness, composition, construction, smoothness, and density, which develop during the maintenance, to conform to the requirements specified herein. Maintain sufficient moisture by light sprinkling with water at the surface to prevent a dusty condition.

-- End of Section --

PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED SECTIONS
1.3 SUBMITTALS
1.4 DELIVERY AND STORAGE
1.5 WEATHER LIMITATIONS
1.6 CONSTRUCTION EQUIPMENT
1.7 SUSTAINABLE DESIGN REQUIREMENTS
1.7.1 Local/Regional Materials
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Aggregates
2.1.2 Pervious Base Course
2.1.2.1 Asphalt-Treated Permeable Base
2.1.2.2 Cement-Treated Permeable Base
PART 3 EXECUTION
3.1 BASE COURSE
3.2 OPENING AND OPERATION OF PITS
3.3 MIXING OF MATERIALS
3.4 PLACING
3.4.1 Stationary-Plant Method
3.4.2 Windrow Traveling-Plant Method
3.5 COMPACTING AND FINISHING
3.6 PROOF ROLLING
3.7 FINISHING AT EDGES OF BASE COURSE
3.8 FIELD QUALITY CONTROL
3.8.1 Sampling
3.8.1.1 Aggregates at the Source
3.8.1.2 During Construction
3.8.1.3 Sample Identification
3.8.2 Testing
3.8.2.1 Aggregates
3.8.2.2 Smoothness Tests
3.8.2.3 Field Density Tests
3.8.2.4 Laboratory Density Tests
3.8.2.5 Thickness Tests

3.9 MAINTENANCE