16. Attachment 8-JBLM Installation Access Information.docx

DOCX document 19 KB Posted

Attached to
Joint Base Lewis-McChord PAVEMENT IDIQ
Solicitation number
W911S8-17-R-0001
Issued by

About this file

Attachment 8-JBLM Installation Access Information

View the file

Other files

File Type Posted
SF1442_W911S8-17-R-0001_0002.pdf PDF
4. Technical Exbhibit C Statement of Work 19 Dec 2016.pdf PDF
JBLM Paving W911S8-17-R-0001 Contractor QUESTIONS 22 Dec16.pdf PDF
Pre-Proposal Conference Contractor Attendees.pdf PDF
33 71 02UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
SF30 W911S8-17-R-0001 0002.pdf PDF
Attachment 1- Sample Project 19 December 2016.pdf PDF
32 12 21-BITUMINOUS ROAD-MIX SURFACE COURSE.pdf PDF
01_45_00_10_Quality_Control_19_Dec.pdf PDF
33 71 02 JBLM DESIGN STANDARDS-UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
Site Visit Briefing W911S8-17-R-0001 JBLM Paving -29 Nov 2016.pdf PDF
SF30 W911S8-17-R-0001 0001.pdf PDF
W911S8-17-R-0001_Amendment_0001.pdf PDF
01 57 19-TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
01 42 00-SOURCES FOR REFERENCE PUBLICATIONS.pdf PDF
13. Attachment 5 - Past Performance Questionaire.docx DOCX document
32_84_24_(Irrigation_Sprinkles).pdf PDF
26_56_13.00_40_Lighting_Poles_and_Standards.pdf PDF
14. Attachment 6 Insurance Certificate of Compliance.docx DOCX document
01 78 23-OPERATION AND MAINTENANCE DATA.pdf PDF
32_17_24.00_10_(Pavement_Markings).pdf PDF
1. RFP W911S8-17-R-0001 Paving IDC.pdf PDF
01 50 00-TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
01 32 01 00 10 Project Schedule.pdf PDF
7. TE F General Decision Number WA160001 Dtd 19 Aug 16.pdf PDF
31_11_00_Clearing_ _Grubbing.pdf PDF
5. TE D-Table of Contents.pdf PDF
3. TE B Proposal Item Descriptions(09-27-16).pdf PDF
10. Attachment 2-Experience Document.docx DOCX document
6. TE E Standards Plans Drawings 25Aug16.pdf PDF
31_23_00.00_20_Excavation_ _Fill.pdf PDF
01 35 29.13 Contaminated Site.pdf PDF
32_11_24_CSBC_for_Flexible_Pavement.pdf PDF
32_31_26_(Wire_Fence_ _Gate).pdf PDF
32_31_13.53_(High_Security_Fence).pdf PDF
26_56_19.00_40_Roadway_Lighting.pdf PDF
32_93_00_(Exterior_Plants).pdf PDF
31_00_00_Earthwork.pdf PDF
2. TE A ELIN Proposal Schedule 11 Oct 16.xlsx XLSX spreadsheet
33_11_00-WATER_DISTRIBUTION.pdf PDF
01 45 00 10 Quality Control.pdf PDF
01 30 00 Administrative Requirements.pdf PDF
33_30_00-SANITARY_SEWERS.pdf PDF
01 78 00- CLOSEOUT SUBMITTALS.pdf PDF
32_01_13_BITUMINOUS_SEAL_AND_FOG_COATS.pdf PDF
32_92_19_(Seeding).pdf PDF
32_12_10_(Tack_Coat).pdf PDF
12. Attachment 4 - Relevant Contract Reference Sheet.docx DOCX document
00 10 01 - Supplementary Requirements.pdf PDF
32_12_15.13_HMA_for_Airfields.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACCESS TO JBLM

1.1. Each contractor employee who requires access to JBLM to perform work under any contract, at any tier, must obtain either a Fast Access identification badge or a visitor’s pass to obtain access. Contractors and its employees shall adhere to all applicable JBLM security and traffic laws. Procedures for commercial vehicle access to JBLM are subject to change without prior notice. Current information concerning road conditions may be obtained by calling (253) 967-1733.

1.2. FAST ACCESS PROGRAM

1.2.1. A Fast Access identification badge will only be issued to an employee, at any tier, if the employee requires access more than twice per week. A Fast Access identification badge will only be issued to contractor employees if the contractor participates in the Fast Access Program. The Fast Access Program is a voluntary program. Companies must be listed on the Contractors Authorized List (CAL).

1.2.2. The contractor shall provide information as required by the Fast Access Program Contractor, Eid Passport, Inc. (EID), to conduct a criminal history background check (CHBC) on contractor employees needing access. The contractor is responsible for paying all fees for conducting the CHBC and issuing the Fast Access identification card. If the CHBC is not adverse, a Fast Access identification badge will be issued to the contractor employee. Contractor employees with an adverse CHBS are prohibited from being issued a Fast Access identification badge. Contractor employees denied a Fast Access identification badge may only enter JBLM by obtaining a visitor’s pass; however, if the contractor employee does not meet the criteria for being issued a Fast Access identification badge, the Government may, at its sole discretion, decide not to issue a visitor’s pass to the contractor employee.

1.2.3. Contractors participating in the Fast Access Program may enter the installation through any Fast Access lane except during Force Protection (FP) Level Charlie or Delta. During FP Level Charlie or Delta, all contractor vehicles must enter through a commercial vehicle inspection point (CVIP). All passengers in the contractor vehicle must have a Fast Access identification card; otherwise, the contractor vehicle must enter through a CVIP and obtain visitor’s passes.

1.2.4. Fast Access is valid at the gates specified in the contractor access gates table below. The contractor may use any lane.

1.2.5. If the Fast Access Program is terminated for any reason, the contractor will be allowed access only through the Logistics Center Gate, the D St. Gate, and the McChord Field CVIP Gate or, when they are closed, the Madigan Gate.

1.2.6. If an employee no longer performs work under the contract, the contractor shall return the identification badge to the Visitor Center within two (2) calendar days of such change. If the identification badge cannot be returned within the required time frame for any reason, the contractor shall immediately notify both Fast Access Program contractor and the Visitor Center verbally, followed up in writing the next work day. Email notification is authorized. An employee’s inability to obtain entrance to JBLM because he/she does not have the required identification badge or visitor’s pass shall not excuse timely performance of the requirements of this contract. Badges are currently issued at the JBLM-Lewis Main Visitor Center. The Government may change the location at which identification badges are issued or returned, with or without advance notice to the contractor. Any such changes shall not be a basis for adjusting the contract price under any clause of this contract.

1.2.7. Fast Access identification badges shall not be reproduced or copied by the contractor, its subcontractors, or its employees. If an identification badge is lost, stolen, or reproduced, the contractor shall verbally report the loss, theft, or reproduction to both the RPC and the Visitor Center on the day such loss, theft, or reproduction is discovered, followed by a written report of the circumstances to both the Fast Access Program contractor and the Visitor Center within one (1) calendar day after the loss, theft, or reproduction is discovered.

1.2.8. The Fast Access identification badge shall not be used for access to any Government installation except for performance of work under the contract for which it was issued.

1.2.9. The contractor shall, upon expiration or termination of the contract, collect all identification badges and return them in to the COR.

1.2.10. RAPIDGATE®. The Fast Access Program is accomplished through RAPIDGATE®, registered trademark of Eid Passport, Inc. Contact Eid Passport for current fees. All fees, to include but not limited to company start-up, individual access, and multiple installation access are the responsibility of the contract.

· Contact customer service at RAPIDGATE® Access, Eid Passport, Incorporated, (Monday - Friday, 5AM-10PM Pacific Standard Time (PST)) at 877-727-4342 (office) or 503-924-5320 (fax) concerning the enrollment process and for additional information. Enrollment forms for Fast Access can be obtained via http://www.rapidgate.com/forms/company-enrollment-form. The preferred method of submission of enrollment forms is to scan and email documents to info@rapidgate.com. A separate enrollment form is necessary for each installation. Eid Passport is located at 10450 SW Nimbus Avenue, Bldg. R-A, Portland, Oregon 97223.

· This process may be changed without prior notification, but any long-term badge issued to contractor employees will continue to be valid until its expiration date.

1.3. VISITOR’S PASS

1.3.1. Contractor employees, at any tier, requiring access to JBLM who do not participate in the Fast Access Program, shall obtain a visitor’s pass at a JBLM Visitor Center or a Commercial Vehicle Inspection Point (CVIP). A visitor’s pass can be issued for a maximum of 30 days at a time. Companies must be listed on the CAL and employees obtaining a pass must be sponsored. Only those company employees listed on the CAL may sponsor other employees.

1.3.2. For visitor pass holders, commercial vehicle access to JBLM will be allowed ONLY at CVIP locations. See JBLM Gate Information for Contractor Access Table below. Gates are open for inbound commercial vehicle access and inspection.

1.4. JBLM GATE INFORMATION FOR CONTRACTOR ACCESS

1.4.1. Gate hours, locations, and access rules and procedures are subject to change without notice. Gate information can be obtained from the JBLM-Lewis Main Visitor Center at 967-4794 or online at http://www.lewis-mcchord.army.mil/des/le_gate_operations.htm. Any such changes shall not be a basis for adjusting the contract price under any clause of this contract.

1.4.2. Size restrictions apply at the McChord Main Gate. If commercial vehicle gates are closed on the weekends or federal holidays, commercial vehicles must use the Madigan Gate. The contractor shall anticipate delays in getting commercial vehicles onto the JBLM and take into account the time it takes to drive through JBLM to reach a given destination.

1.4.3. All commercial vehicles will be inspected. Commercial vehicles carrying a load of cement or hot asphalt for delivery shall notify the gate guard as soon as possible and request that the vehicle be given priority for being searched; however, the Government does not guarantee that the vehicle will be given priority.

1.4.4. On weekends, large vehicles needing greater than 12'-5" clearance will require a time stamped "searched" label to gain access to JBLM-North or JBLM-McChord Field. "Searched" labels will be issued at the Madigan Gate, the Liberty Gate, or the Rainier Gate. Drivers needing access must inform the gate guard that their vehicle is over 12'-5" in height and that they will require access to either JBLM-Lewis North or JBLM-McChord Field. The driver will receive a briefing on proper procedures and a "searched" label. The contractor shall ensure that its drivers, including drivers of subcontractors at any tier, comply with the procedures as explained to them for access to JBLM-Lewis North or JBLM-McChord Field.

1.4.5. When the D Street CVIP is closed during Monday through Friday, vehicles requiring access to JBLM-Lewis North will enter at the Logistics Center Gate.

JBLM GATE INFORMATION FOR CONTRACTOR ACCESS

GATE
LOCATION
Fast

Access

CVIP

Liberty (Main)
I-5 Exit 120 to Main Post
Y
Y
41st Division (North Fort)
I-5 Exit 120 to North Fort
Y
Logistics Center (POV/CVIP)
I-5 Exit 123 – Thorne Lane
Y
Y
MAMC (Madigan)
I-5 Exit 122 – Berkeley St.
Y
MAMC (CVIP)
I-5 Exit 122 – Berkeley St.

Y

East Gate
East Gate Road & 4th Div Drive (Connects to SR 507)
Y
Dupont Gate
I-5 Exit 119
Y
D Street (POV)
Access to North Fort from Dupont-Steilacoom Road
Y
D Street (CVIP)
Same as D Street (POV)

Y

Transmission Line (ASP)
Transmission Line Road
Y
Rainier Gate
From off post – access via Perimeter Road / 150th St. From on post – access via Rainier Drive and Lincoln St on Log Ctr
Y
McChord Field Main Gate
I-5 Exit 125 (Bridgeport Way)
Y
McChord Field Barnes Gate
Perimeter Road, approx ½ mile from the Lincoln Boulevard gate exit of Fort Lewis
Y
McChord Field CVIP
Perimeter Road approx ¼ mile from the Lincoln Boulevard gate exit of Fort Lewis
Y
Y

1.5. JBLM-MCCHORD FIELD AIRFIELD ENCLOSURE ACCESS

1.5.1. Access to the airfield enclosure at JBLM-McChord Field is limited per Department of Defense Security regulations. The COR will brief the contractor and provide it with a copy of the briefing, outlining the contractor’s security responsibilities. At a minimum, this briefing will include information on vehicle decals, employee badge requirements and if applicable, describe free zones associated with the contractor’s performance and restricted controlled area entry requirements. Prior to initiating work, the contractor shall supply to the COR, at a minimum, each vehicle's type and license plate number (contractor and employee privately owned vehicles), each employee's name, driver's license number, and social security number to obtain vehicle passes and employee's base badge(s) for admittance to area(s) where employees will be tasked. The contractor’s company logo will be prominently displayed on its vehicle. The COR will submit the contractor's list(s) to the DES Badging Office located in Bldg 100 on JBLM-McChord Field for mandatory background investigations and access authorization.

1.5.2. The contractor shall notify the COR of changes immediately in the contractor's vehicles or employees.

1.5.3. Fast Access badges are not valid for access to JBLM-McChord Field airfield enclosure.

1.5.4. Contractors are required to enter the airfield enclosure at the Levitow Gate, which is internal to the JBLM-McChord Field cantonment area. The Levitow Gate is located east of the intersection of Barnes Blvd and Levitow Blvd, and across the Clover Creek Bridge.

1.5.5. The flight line is a controlled area that contains restricted areas. Commercial vehicles are strictly prohibited from accessing these areas without an approved escort. The COR will coordinate with the Chief, Airfield Management (62 OSS/OSSA) for all contractors and its employees required to operate vehicles on the flight line. The agency sponsoring the contractor and its employees into controlled or restricted areas will coordinate with DES/Security Access and Control at JBLM-McChord Field.