5. TE D-Table of Contents.pdf

PDF 34 KB Posted

Attached to
Joint Base Lewis-McChord PAVEMENT IDIQ
Solicitation number
W911S8-17-R-0001
Issued by

About this file

Technical Exhibit D-Table of Contents

View the file

Other files

File Type Posted
SF1442_W911S8-17-R-0001_0002.pdf PDF
4. Technical Exbhibit C Statement of Work 19 Dec 2016.pdf PDF
JBLM Paving W911S8-17-R-0001 Contractor QUESTIONS 22 Dec16.pdf PDF
Pre-Proposal Conference Contractor Attendees.pdf PDF
33 71 02UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
SF30 W911S8-17-R-0001 0002.pdf PDF
Attachment 1- Sample Project 19 December 2016.pdf PDF
32 12 21-BITUMINOUS ROAD-MIX SURFACE COURSE.pdf PDF
01_45_00_10_Quality_Control_19_Dec.pdf PDF
33 71 02 JBLM DESIGN STANDARDS-UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
Site Visit Briefing W911S8-17-R-0001 JBLM Paving -29 Nov 2016.pdf PDF
SF30 W911S8-17-R-0001 0001.pdf PDF
W911S8-17-R-0001_Amendment_0001.pdf PDF
01 57 19-TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
01 42 00-SOURCES FOR REFERENCE PUBLICATIONS.pdf PDF
13. Attachment 5 - Past Performance Questionaire.docx DOCX document
32_84_24_(Irrigation_Sprinkles).pdf PDF
26_56_13.00_40_Lighting_Poles_and_Standards.pdf PDF
14. Attachment 6 Insurance Certificate of Compliance.docx DOCX document
01 78 23-OPERATION AND MAINTENANCE DATA.pdf PDF
32_17_24.00_10_(Pavement_Markings).pdf PDF
1. RFP W911S8-17-R-0001 Paving IDC.pdf PDF
01 50 00-TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
01 32 01 00 10 Project Schedule.pdf PDF
7. TE F General Decision Number WA160001 Dtd 19 Aug 16.pdf PDF
31_11_00_Clearing_ _Grubbing.pdf PDF
3. TE B Proposal Item Descriptions(09-27-16).pdf PDF
10. Attachment 2-Experience Document.docx DOCX document
6. TE E Standards Plans Drawings 25Aug16.pdf PDF
31_23_00.00_20_Excavation_ _Fill.pdf PDF
01 35 29.13 Contaminated Site.pdf PDF
32_11_24_CSBC_for_Flexible_Pavement.pdf PDF
32_31_26_(Wire_Fence_ _Gate).pdf PDF
32_31_13.53_(High_Security_Fence).pdf PDF
26_56_19.00_40_Roadway_Lighting.pdf PDF
32_93_00_(Exterior_Plants).pdf PDF
31_00_00_Earthwork.pdf PDF
2. TE A ELIN Proposal Schedule 11 Oct 16.xlsx XLSX spreadsheet
33_11_00-WATER_DISTRIBUTION.pdf PDF
01 45 00 10 Quality Control.pdf PDF
01 30 00 Administrative Requirements.pdf PDF
33_30_00-SANITARY_SEWERS.pdf PDF
01 78 00- CLOSEOUT SUBMITTALS.pdf PDF
32_01_13_BITUMINOUS_SEAL_AND_FOG_COATS.pdf PDF
16. Attachment 8-JBLM Installation Access Information.docx DOCX document
32_92_19_(Seeding).pdf PDF
32_12_10_(Tack_Coat).pdf PDF
12. Attachment 4 - Relevant Contract Reference Sheet.docx DOCX document
00 10 01 - Supplementary Requirements.pdf PDF
32_12_15.13_HMA_for_Airfields.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE * Specification Sections ((Divisions 1, 26, 32, 33 )- Various Various

Division 01 - General Requirements

00 10 01 Supplementary Requirements 15-Aug-16 9

01 10 05 Site Specific Supplementary Requirements 15-Aug-16 3

01 22 00.00 10 Price And Payment Procedures 15-Aug-16 3

01 30 00 Administrative Requirements 15-Aug-16 5

01 32 01.00 10 Project Schedule 15-Feb-16 15

01 33 00 Submittal Procedures 11-May-16 11

01 33 29 Sustainability Reporting 15-Feb-16 3

01 35 26 Governmental Safety Requirements 15-Nov-16 20

01 35 29.13 Health, Safety, And Emergency Response Procedures For Contaminated Sites

15-Nov-16 23

01 35 45.00 10 Chemical Data Quality Control 6-Apr-16 11

01 42 00 Sources For Reference Publications 14-Nov-16 36

01 45 00.10 10 Quality Control System (QCS) 10-Feb-16 12

01 45 00.10 20 Quality Control For Minor Construction 10-Feb-16 15

01 50 00 Temporary Construction Facilities And Controls 9-Aug-16 4

01 57 19 Temporary Environmental Controls 15-Nov-16 3

01 58 00 Project Identification 9-Aug-16 6

01 74 19 Construction And Demolition Waste Management 7-Jan-16 16

01 78 00 Closeout Submittals 11-Aug-16 12

01 78 23 Operation And Maintenance Data 15-Aug-16

Division 26 - Electrical

26 56 00 Exterior Lighting 13-May-16 26

26 56 13.00 40 Lighting Poles And Standards 14-Nov-16 26

26 56 19.00 40 Roadway Lighting 0 16-May-16 12

DIVISION 31 - EARTHWORK

31 00 00 Earthwork 8-Aug-16 26

31 11 00 Clearing And Grubbing 8-Aug-16 4

31 23 00.00 20 Excavation And Fill 11-Feb-16 45

Division 32 - Exterior Improvements

32 01 13 Bituminous Seal And Fog Coats 8-Aug-16 23

32 01 19 Field Molded Sealants For Sealing Joints In Rigid Pavements

8-Aug-16 17

32 10 00 [Pervious] Bituminous Concrete Pavement 8-Aug-16 2

32 11 24 Graded Crushed Aggregate Base Course For [Pervious][Flexible] Pavement

11-Nov-16 13

32 12 10 Bituminous Tack And Prime Coats 8-Aug-16 14

32 12 11 Bituminous Surface Treatment 8-Nov-16 14

32 12 15.13 Hot-Mix Asphalt Airfield Paving 15-Nov-16 39

32 12 16 Hot-Mix Asphalt (HMA) For Roads 9-Aug-16 22

32 12 21 Bituminous Road-Mix Surface Course 8-Aug-16 18

32 13 11 Concrete Pavement For Airfields And Other Heavy- Duty Pavements

15-Nov-16 84

32 15 00 Aggregate Surface Course 8-Apr-16 12

32 16 13 Concrete Sidewalks And Curbs And Gutters 8-Apr-16 20

32 17 24.00 10 Pavement Markings 8-Apr-16 18

32 31 13 Chain Link Fences And Gates 10-Aug-16 18

32 31 13.53 High-Security Chain Link Fences And Gates 8-Apr-16 17

32 31 26 Wire Fences And Gates 8-Apr-16 7

32 84 24 Irrigation Sprinkler Systems 11-Aug-16 26

32 92 19 Seeding 6-Oct-16 11

32 92 23 Sodding 6-Apr-16 9

32 93 00 Exterior Plants 10-Feb-16 20

Division 33 - Utilities

33 11 00 Water Utility Distribution Piping 16-May-16 33

33 30 00 Sanitary Sewers 8-Apr-16 26

33 40 00 Storm Drainage Utilities 10-Feb-16 30