32 93 00 Exterior Plants

View the file

Other files

File Type Posted
SF1442_W911S8-17-R-0001_0002.pdf PDF
4. Technical Exbhibit C Statement of Work 19 Dec 2016.pdf PDF
JBLM Paving W911S8-17-R-0001 Contractor QUESTIONS 22 Dec16.pdf PDF
Pre-Proposal Conference Contractor Attendees.pdf PDF
33 71 02UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
SF30 W911S8-17-R-0001 0002.pdf PDF
Attachment 1- Sample Project 19 December 2016.pdf PDF
32 12 21-BITUMINOUS ROAD-MIX SURFACE COURSE.pdf PDF
01_45_00_10_Quality_Control_19_Dec.pdf PDF
33 71 02 JBLM DESIGN STANDARDS-UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
Site Visit Briefing W911S8-17-R-0001 JBLM Paving -29 Nov 2016.pdf PDF
SF30 W911S8-17-R-0001 0001.pdf PDF
W911S8-17-R-0001_Amendment_0001.pdf PDF
01 57 19-TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
01 42 00-SOURCES FOR REFERENCE PUBLICATIONS.pdf PDF
13. Attachment 5 - Past Performance Questionaire.docx DOCX document
32_84_24_(Irrigation_Sprinkles).pdf PDF
26_56_13.00_40_Lighting_Poles_and_Standards.pdf PDF
14. Attachment 6 Insurance Certificate of Compliance.docx DOCX document
01 78 23-OPERATION AND MAINTENANCE DATA.pdf PDF
32_17_24.00_10_(Pavement_Markings).pdf PDF
1. RFP W911S8-17-R-0001 Paving IDC.pdf PDF
01 50 00-TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
01 32 01 00 10 Project Schedule.pdf PDF
7. TE F General Decision Number WA160001 Dtd 19 Aug 16.pdf PDF
31_11_00_Clearing_ _Grubbing.pdf PDF
5. TE D-Table of Contents.pdf PDF
3. TE B Proposal Item Descriptions(09-27-16).pdf PDF
10. Attachment 2-Experience Document.docx DOCX document
6. TE E Standards Plans Drawings 25Aug16.pdf PDF
31_23_00.00_20_Excavation_ _Fill.pdf PDF
01 35 29.13 Contaminated Site.pdf PDF
32_11_24_CSBC_for_Flexible_Pavement.pdf PDF
32_31_26_(Wire_Fence_ _Gate).pdf PDF
32_31_13.53_(High_Security_Fence).pdf PDF
26_56_19.00_40_Roadway_Lighting.pdf PDF
31_00_00_Earthwork.pdf PDF
2. TE A ELIN Proposal Schedule 11 Oct 16.xlsx XLSX spreadsheet
33_11_00-WATER_DISTRIBUTION.pdf PDF
01 45 00 10 Quality Control.pdf PDF
01 30 00 Administrative Requirements.pdf PDF
33_30_00-SANITARY_SEWERS.pdf PDF
01 78 00- CLOSEOUT SUBMITTALS.pdf PDF
32_01_13_BITUMINOUS_SEAL_AND_FOG_COATS.pdf PDF
16. Attachment 8-JBLM Installation Access Information.docx DOCX document
32_92_19_(Seeding).pdf PDF
32_12_10_(Tack_Coat).pdf PDF
12. Attachment 4 - Relevant Contract Reference Sheet.docx DOCX document
00 10 01 - Supplementary Requirements.pdf PDF
32_12_15.13_HMA_for_Airfields.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 93 00 Page 1

SECTION 32 93 00

EXTERIOR PLANTS

02/10

PART 1 GENERAL

1.1 REFERENCES

1.2 RELATED REQUIREMENTS

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.5 DELIVERY, STORAGE, AND HANDLING

1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS

1.7 GUARANTEE

1.8 SUSTAINABLE DESIGN REQUIREMENTS

PART 2 PRODUCTS

2.1 PLANTS

2.2 TOPSOIL

2.3 SOIL CONDITIONERS

2.4 PLANTING SOIL MIXTURES

2.5 FERTILIZER

2.7 DRAINAGE PIPE FOR PLANT PITS AND BEDS

2.8 MULCH

2.9 STAKING AND GUYING MATERIAL

2.10 EDGING MATERIAL

2.11 ANTIDESICCANTS

2.12 EROSION CONTROL MATERIALS

2.13 ROOT CONTROL BARRIER

2.14 WATER

2.15 MYCORRHIZAL FUNGI INOCULUM

2.16 SOURCE QUALITY CONTROL

PART 3 EXECUTION

3.1 EXTENT OF WORK

3.2 ALTERNATIVE HERBICIDE TREATMENT (SOLARIZING SOIL)

3.3 PREPARATION

3.4 PLANT BED PREPARATION

3.5 PLANT INSTALLATION

3.6 RESTORATION AND CLEAN UP

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WOOD-PRESERVERS' ASSOCIATION (AWPA)

SECTION 32 93 00 Page 2

AWPA P5 (2015) Standard for Waterborne Preservatives

AWPA T1 (2015) Use Category System: Processing and Treatment

Standard

AWPA U1 (2015) Use Category System: User Specification for Treated Wood

ASTM INTERNATIONAL (ASTM)

ASTM A 580/A 580M (2015) Standard Specification for Stainless Steel Wire

ASTM C 602 (2013a) Agricultural Liming Materials

ASTM D 4427 (2013) Peat Samples by Laboratory Testing

ASTM D 4972 (2013) pH of Soils

ASTM D 5268 (2013) Topsoil Used for Landscaping Purposes

L.H. BAILEY HORTORIUM (LHBH)

LHBH (1976) Hortus Third

U.S. DEPARTMENT OF AGRICULTURE (USDA)

DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey

Laboratory Methods Manual, Version 3.0

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System

1.2 RELATED REQUIREMENTS

Section 31 00 00 EARTHWORK, Section 32 84 24 IRRIGATION SPRINKLER SYSTEMS, Section 32 92 23 SEEDING, Section 32 92 23 SODDING, and Section 32 05 33 LANDSCAPE ESTABLISHMENT applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

SECTION 32 93 00 Page 3

State Landscape Contractor's License

Time Restrictions and Planting Conditions

Indicate anticipated dates and locations for each type of planting.

SD-03 Product Data

Local/Regional Materials; (LEED)

Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.

Peat Composted Derivatives Organic Mulch Materials

Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.

Gypsum; (LEED) Mulch; G Ground Stakes Recycled Plastic Edging; (LEED) Hose; (LEED)

Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.

Fertilizer

Submit manufacturer documentation indicating type and percentage of biobased content or written justification of non-use per paragraph 2.5.

Weed control fabric; G Root control barrier; G Staking Material Ground Stakes Wood Edging; (LEED)

Submit documentation certifying products are from salvaged/recovered lumber sources and indicating percentage of salvaged/recovered content per unit of product.

Metal anchors

Erosion control materials

Hydraulic mulch

SECTION 32 93 00 Page 4

Submit manufacturer documentation indicating type of recovered materials and the percentage of such material that is (1) recovered and (2) postconsumer recycled content.

Alternately, submit written justification of non-use per Section 01 62 35 RECYCLED /

RECOVERED MATERIALS.

Edging

SD-04 Samples

Mulch; G

Submit one pint of mulch.

SD-06 Test Reports

Topsoil composition tests

Percolation Test

SD-07 Certificates

Nursery certifications

Indicate names of plants in accordance with the LHBH, including type, quality, and size.

1.4 QUALITY ASSURANCE

1.4.1 Topsoil Composition Tests

Commercial test from an independent testing laboratory including basic soil groups (moisture and saturation percentages, Nitrogen-Phosphorus-Potassium (N-P-K) ratio, pH (ASTM D 4972), soil salinity), secondary nutrient groups (calcium, magnesium, sodium, Sodium Absorption Ratio (SAR), micronutrients (zinc, manganese, iron, copper), toxic soil elements (boron, chloride, sulfate), cation exchange and base saturation percentages, and soil amendment and fertilizer recommendations with quantities for plant material being transplanted. Soil required for each test shall include a maximum depth of 18 inches of approximately 1 quart volume for each test. Areas sampled should not be larger than 1 acre and should contain at least 6-8 cores for each sample area and be thoroughly mixed.

Problem areas should be sampled separately and compared with samples taken from adjacent non-problem areas. The location of the sample areas should be noted and marked on a parcel or planting map for future reference.

1.4.2 Nursery Certifications

a. Indicate on nursery letterhead the name of plants in accordance with the LHBH, including botanical common names, quality, and size.

b. Mycorrhizal fungi inoculum for plant material treated.

1.4.3 State Landscape Contractor's License

SECTION 32 93 00 Page 5

Construction company shall hold a landscape contractors license in the state where the work is performed and have a minimum of five years landscape construction experience. Submit copy of license and three references for similar work completed in the last five years.

1.4.4 Percolation Test

Immediately following rough grading operation, identify a typical location for one of the largest trees and or shrubs and excavate a pit per the project details. Fill the pit with water to a depth of 12 inches.

The length of time required for the water to percolate into the soil, leaving the pit empty, shall be measured by the project Landscape Architect and verified by the Contracting Officer. Within six hours of the time the water has drained from the pit, the Contractor, with the Contracting Officer and project Landscape Architect present, shall again fill the pit with water to a depth of 12 inches. If the water does not completely percolate into the soil within 9 hours, a determination shall be made whether a drainage system or a soil penetrant will be required for each tree and or shrub being transplanted.

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Delivery

1.5.1.1 Branched Plant Delivery

Deliver with branches tied and exposed branches covered with material which allows air circulation.

Prevent damage to branches, trunks, root systems, and root balls and desiccation of leaves.

1.5.1.2 Soil Amendment Delivery

Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum, sulfur, iron, and lime may be furnished in bulk with a certificate indicating the above information. Store in dry locations away from contaminates.

1.5.1.3 Plant Labels

Deliver plants with durable waterproof labels in weather-resistant ink. Provide labels stating the correct botanical and common plant name and variety as applicable and size as specified in the list of required plants. Attach to plants, bundles, and containers of plants. Groups of plants may be labeled by tagging one plant. Labels shall be legible for a minimum of 60 days after delivery to the planting site.

1.5.2 Storage

1.5.2.1 Plant Storage and Protection

Store and protect plants not planted on the day of arrival at the site as follows:

a. Shade and protect plants in outside storage areas from the wind and direct sunlight until planted.

b. Heel-in bare root plants.

SECTION 32 93 00 Page 6

c. Protect balled and burlapped plants from freezing or drying out by covering the balls or roots with moist burlap, sawdust, wood chips, shredded bark, peat moss, or other approved material. Provide covering which allows air circulation.

d. Keep plants in a moist condition until planted by watering with a fine mist spray.

e. Do not store plant material directly on concrete or bituminous surfaces.

1.5.2.2 Fertilizer, Gypsum, pH Adjusters and Mulch Storage

Store in dry locations away from contaminants.

1.5.2.3 Topsoil

Prior to stockpiling topsoil, eradicate on site undesirable growing vegetation. Clear and grub existing vegetation three to four weeks prior to stockpiling existing topsoil.

1.5.2.4 Root Control Barrier and Weed Control Fabric

Store materials on site in enclosures or under protective covering in dry location. Store under cover out of direct sunlight. Do not store materials directly on ground.

1.5.3 Handling

Do not drop or dump plants from vehicles. Avoid damaging plants being moved from nursery or storage area to planting site. Handle boxed, balled and burlapped, bare root, container plants carefully to avoid damaging or breaking the earth ball or root structure. Do not handle plants by the trunk or stem. Puddle bare-root plants after removal from the heeling-in bed to protect roots from drying out.

Remove damaged plants from the site.

1.5.4 TIME LIMITATION

Except for container-grown plant material, the time limitation from digging to installing plant material shall be a maximum of 90 days. The time limitation between installing the plant material and placing the mulch shall be a maximum of 24 hours.

1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS

1.6.1 Restrictions

Do not plant when ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit

1.7 GUARANTEE

All plants shall be guaranteed for one year beginning on the date of inspection by the Contracting Officer to commence the plant establishment period, against defects including death and unsatisfactory growth, except for defects resulting from lack of adequate maintenance, neglect, or abuse by the Government or by weather conditions unusual for the warranty period.

SECTION 32 93 00 Page 7

At end of warranty period, replace planting materials that die or have 25 percent or more of their branches that die during the construction operations or the guarantee period.

1.8 SUSTAINABLE DESIGN REQUIREMENTS

1.8.1 Local/Regional Materials

See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Landscaping materials may be locally available.

PART 2 PRODUCTS

2.1 PLANTS

2.1.1 Regulations and Varieties

Furnish nursery stock in accordance with ANSI Z60.1, except as otherwise specified or indicated.

Each plant or group of planting shall have a "key" number indicated on the nursery certifications of the plant schedule. Furnish plants, including turf grass, grown under climatic conditions similar to those in the locality of the project. Spray plants budding into leaf or having soft growth with an antidesiccant before digging. Plants of the same specified size shall be of uniform size and character of growth. All plants shall comply with all Federal and State Laws requiring inspection for plant diseases and infestation.

2.1.2 Shape and Condition

Well-branched, well-formed, sound, vigorous, healthy planting stock free from disease, sunscald, windburn, abrasion, and harmful insects or insect eggs and having a healthy, normal, and undamaged root system.

2.1.2.1 Deciduous Trees and Shrubs

Symmetrically developed and of uniform habit of growth, with straight boles or stems, and free from objectionable disfigurements.

2.1.2.2 Evergreen Trees and Shrubs

Well developed symmetrical tops with typical spread of branches for each particular species or variety.

2.1.2.3 Ground Covers and Vines

Number and length of runners and clump sizes indicated, and of the proper age for the grade of plants indicated, furnished in removable containers, integral containers, or formed homogeneous soil section.

2.1.3 Plant Size

Minimum sizes measured after pruning and with branches in normal position, shall conform to measurements indicated, based on the average width or height of the plant for the species as specified in ANSI Z60.1. Plants larger in size than specified may be provided with approval of the Contracting Officer. When larger plants are provided, increase the ball of earth or spread of roots in accordance with ANSI Z60.1.

SECTION 32 93 00 Page 8

2.1.4 Root Ball Size

All box-grown, field potted, field boxed, collected, plantation grown, bare root, balled and burlapped, container grown, processed-balled, and in-ground fabric bag-grown root balls shall conform to ANSI Z60.1. All wrappings and ties shall be biodegradable. Root growth in container grown plants shall be sufficient to hold earth intact when removed from containers. Root bound plants will not be accepted.

2.1.4.1 Mycorrhizal Fungi Inoculum

Before shipment, root systems shall contain mycorrhizal fungi inoculum.

2.1.5 Growth of Trunk and Crown

2.1.5.1 Deciduous Trees

A height to caliper relationship shall be provided in accordance with ANSI Z60.1. Height of branching shall bear a relationship to the size and species of tree specified and with the crown in good balance with the trunk. The trees shall not be "poled" or the leader removed.

a. Single stem: The trunk shall be reasonably straight and symmetrical with crown and have a persistent main leader.

b. Multi-stem: All countable stems, in aggregate, shall average the size specified. To be considered a stem, there shall be no division of the trunk which branches more than 6 inches from ground level.

2.1.5.2 Palms

Palms shall have the specified height as measured from the base of the trunk to the base of the fronds or foliage in accordance with ANSI Z60.1. The palm shall have straight trunk and healthy fronds or foliage as typical for the variety grown in the region of the project. Palms trimmed or pruned for delivery shall retain a minimum of 6 inches of foliage at the crown as a means of determining plant health.

2.1.5.3 Deciduous Shrubs

Deciduous shrubs shall have the height and number of primary stems recommended by ANSI Z60.1.

Acceptable plant material shall be well shaped, with sufficient well-spaced side branches, and recognized by the trade as typical for the species grown in the region of the project.

2.1.5.4 Coniferous Evergreen Plant Material

Coniferous Evergreen plant material shall have the height-to-spread ratio recommended by ANSI Z60.1. The coniferous evergreen trees shall not be "poled" or the leader removed. Acceptable plant material shall be exceptionally heavy, well shaped and trimmed to form a symmetrical and tightly knit plant. The form of growth desired shall be as indicated.

2.1.5.5 Broadleaf Evergreen Plant Material

SECTION 32 93 00 Page 9

Broadleaf evergreen plant material shall have the height-to-spread ratio recommended by ANSI Z60.1.

Acceptable plant material shall be well shaped and recognized by the trade as typical for the variety grown in the region of the project.

2.1.5.6 Ground Cover and Vine Plant Material

Ground cover and vine plant material shall have the minimum number of runners and length of runner recommended by ANSI Z60.1. Plant material shall have heavy, well developed and balanced crown with vigorous, well developed root system and shall be furnished in containers.

2.2 TOPSOIL

2.2.1 Existing Soil

Modify to conform to requirements specified in paragraph entitled "Composition."

2.2.2 On-Site Topsoil

Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 00 00 EARTHWORK and 31

23 00.00 20 EXCAVATION AND FILL.

2.2.3 Off-Site Topsoil

Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the Contractor.

2.2.4 Composition

Evaluate soil for use as topsoil in accordance with ASTM D 5268. From 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, plants, and other debris and objectionable materials. Other components shall conform to the following limits:

Silt 25-50 percent Clay 10-30 percent Sand 20-35 percent pH 5.5 to 7.0 Soluble Salts 600 ppm maximum

2.3 SOIL CONDITIONERS

Provide singly or in combination as required to meet specified requirements for topsoil. Soil conditioners shall be nontoxic to plants.

2.3.1 Lime

SECTION 32 93 00 Page 10

Commercial grade burnt limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602 of not less than 80 percent.

2.3.2 Aluminum Sulfate

Commercial grade.

2.3.3 Sulfur

100 percent elemental

2.3.4 Iron

100 percent elemental

2.3.5 Peat

Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427 as modified herein. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation. Biobased content shall be a minimum of 100 percent. Peat shall not contain invasive species, including seeds.

2.3.6 Sand

Clean and free of materials harmful to plants.

2.3.7 Perlite

Horticultural grade.

2.3.8 Composted Derivatives

Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, invasive species, including seeds, and soil stabilized with nitrogen and having the following properties:

2.3.8.1 Particle Size

Minimum percent by weight passing:

No. 4 mesh screen 95 No. 8 mesh screen 80

2.3.8.2 Nitrogen Content

Minimum percent based on dry weight:

Fir Sawdust 0.7 Fir or Pine Bark 1.0

2.3.8.3 Biobased Content

SECTION 32 93 00 Page 11

Minimum 100 percent.

2.3.9 Gypsum

Coarsely ground gypsum comprised of calcium sulfate dihydrate 91 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.

2.4 PLANTING SOIL MIXTURES

100 percent topsoil as specified herein.

2.5 FERTILIZER

Fertilizer shall conform to EPA requirements in accordance with Section 01 62 35 RECYCLED / RECOVERED MATERIALS. In addition, fertilizer shall meet the minimum biobased content requirement established by the USDA's BioPreferred program (2002 Farm Bill) unless the designer, Contractor, or Task or Delivery Order determines that no biobased product can be obtained within the cost, performance, or availability requirements of the contract. If such determination of non-use is made, the Contractor or subcontractor shall complete and submit the JBLM Construction Green Procurement Exception Form. Using this form, the Contractor shall specify the reason for exception (unreasonable price, inadequate performance, non-availability) and provide all associated information (including copies of all supporting evidence). This form is available from the Contracting Official or the JBLM Green Procurement Program Coordinator (Building 1210, (253) 966-6466, LEWISPWGreenProcurement@conus.army.mil). The Contractor shall submit the completed form via email (with copies of supporting documents included) to the Contracting Officer's Representative. The Contractor shall include the following address in the carbon copy ("cc") line of the email:

LEWISPWGreenProcurement@conus.army.mil. The Contractor shall keep attached file sizes to a minimum to avoid transmission errors associated with JBLM security. If use of email is not possible, the Contractor shall coordinate the submission of these documents with the Contracting Officer's Representative and ask that they forward copies to the JBLM Green Procurement Coordinator (Bldg 1210, 966-6466). More information can be found at http://www.biopreferred.gov/ProposedAndFinalRegulations.aspx.

2.5.1 Granular Fertilizer

Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:

As stated in the Delivery or Task Order.

2.5.2 Fertilizer Tablets

Organic, plant tablets composed of tightly compressed fertilizer chips forming a tablet that is insoluble in water, is designed to provide a continuous release of nutrients for at least 24 months and contains the following minimum percentages, by weight, of plant food nutrients:

As stated in the Delivery or Task Order.

2.6 WEED CONTROL FABRIC

SECTION 32 93 00 Page 12

2.6.1 Roll Type Polypropylene or Polyester Mats

Fabric shall be woven, needle punched or non-woven and treated for protection against deterioration due to ultraviolet radiation. Fabric shall be minimum 99 percent opaque to prevent photosynthesis and seed germination from occurring, yet allowing air, water and nutrients to pass thru to the roots.

Minimum weight shall be 5 ounces per square yard with a minimum thickness of 20 mils with a 20 year (minimum) guarantee.

2.7 MULCH

Free from noxious weeds, mold, pesticides, or other deleterious materials.

2.7.1 Organic Mulch Materials

Wood Cellulose Fiber Mulch shall conform to EPA requirements in accordance with Section 01 62 35

RECYCLED / RECOVERED MATERIALS.

Wood cellulose fiber, wood chips, ground or shredded barkpine straw mulch, or pine needles from site when available. Biobased content shall be a minimum of 100 percent. Wood cellulose fiber shall be processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to an appropriate color to facilitate visual metering of materials application. Paper-based hydraulic mulch shall contain a minimum of 100 percent post-consumer recycled content. Wood-based hydraulic mulch shall contain a minimum of 100 percent recycled material.

2.7.2 Recycled Organic Mulch

Recycled mulch may include compost, tree trimmings, or pine needles with a gradation that passes through a 2-1/2 by 2-1/2 inchscreen. It shall be cleaned of all sticks a minimum 1 inch in diameter and plastic materials a minimum 3 inches length. The material shall be treated to retard the growth of mold and fungi.

2.8 STAKING AND GUYING MATERIAL

2.8.1 Staking Material

2.8.1.1 Tree Support Stakes

Rough sawn hard wood free of knots, rot, cross grain, bark, long slivers, or other defects that impair strength. Stakes shall be minimum 2 inches square or 2 1/2 inch diameter by 8 feet long, pointed at one end.

2.8.1.2 Ground Stakes

FSC-certified or salvaged wood or 100 percent post-consumer recycled content plastic, 2 inches square are by 3 feet long, pointed at one end.

2.8.2 Guying Material

2.8.2.1 Guying Wire

12 gauge annealed galvanized steel, ASTM A 580/A 580M.

SECTION 32 93 00 Page 13

2.8.2.2 Guying Cable

Minimum five-strand, 3/16 inch diameter galvanized steel cable.

2.8.3 Hose Chafing Guards

New or used 2 ply 3/4 inch diameter reinforced rubber or plastic hose, black or dark green, all of same color.

2.8.4 Flags

White, 6 inches long, fastened to guying wires or cables.

2.8.5 Turnbuckles

Galvanized or cadmium-plated steel with minimum 3 inch long openings fitted with screw eyes. Eye bolts shall be galvanized or cadmium-plated steel with one inch diameter eyes and screw length 1 1/2 inches, minimum.

2.8.6 Deadmen

4 by 8 inch rectangular or 8 inch diameter by36 inch long, wood material.

2.8.7 Metal Anchors

2.8.7.1 Driven Anchors

Malleable iron, arrow shaped, galvanized, sized as follows:

Tree Caliper Anchor Size

2 inches and under 3 inches 3 to 6 inches 4 inches 6 to 8 inches 6 inches 8 to 10 inches 8 inches 10 to 12 inches 10 inches

2.8.7.2 Screw Anchors

Steel, screw type with welded-on 3 inch round helical steel plate, minimum 3/8 inch diameter, 15 inches long.

2.9 EDGING MATERIAL

2.9.1 Wood Edging

FSC-certified salvaged and as specified in Section 06 10 00 ROUGH CARPENTRY. Redwood, Cypress, or Western Red Cedar wood edging shall be free of solvent at time of delivery. Minimum 8 by 1/2 inch treated in accordance with AWPA U1 and AWPA T1 with preservatives conforming to

SECTION 32 93 00 Page 14

AWPA P5 before installation. Anchoring stakes shall be the same material as wood edging, 1/2 by 2 inches, 12 inches long.

2.9.2 Recycled Plastic Edging

100 percent recycled polyethylene edging, resistant to insects, termites, boring worms, splintering and rotting, and shall not absorb moisture or promote bacterial growth. Minimum 1 by 6 inch, capable of bending a minimum 36 radius, integrally colored with connections. Anchors and stakes shall be of the same manufacturer and color as the edging. Materials shall conform to EPA requirements in conformance with Section 01 62 35 RECYCLED / RECOVERED MATERIALS.

http://www.epa.gov/epawaste/conserve/tools/cpg/products/edging.htm

2.9.3 Concrete Edging

Cast-in-place 6 by 6 inch concrete mowstrip. Provide tooled contraction joints to a depth of 3/4 inch after the surface has been finished. Provide joints every 5 lineal feet. Provide 1/2 inch thick expansion joints at change of direction and where mowstrip abuts rigid pavement. Provide a floated finish, then finish with a flexible bristle broom. 2500 psi compressive concrete strength at 28 days as specified under Section 03 30 00 CAST-IN-PLACE CONCRETE.

2.10 EROSION CONTROL MATERIALS

Erosion control material shall conform to the following:

2.10.1 Erosion Control Blanket

70 percent agricultural straw/30 percent coconut fiber matrix stitched with a degradable nettings, designed to degrade within 12 months.

2.10.2 Erosion Control Fabric

Fabric shall be knitted construction of polypropylene yarn with uniform mesh openings 3/4 to 1 inch square with strips of biodegradable paper. Filler paper strips shall have a minimum life of 6 months.

2.10.3 Erosion Control Net

Net shall be heavy, twisted jute mesh, weighing approximately 1.22 pounds per linear yard and 4 feet wide with mesh openings of approximately 1 inch square.

2.10.4 Hydrophilic Colloids

Hydrophilic colloids shall be physiologically harmless to plant and animal life without phytotoxic agents. Colloids shall be naturally occurring, silicate powder based, and shall form a water insoluble membrane after curing. Colloids shall resist mold growth.

2.10.5 Erosion Control Material Anchors

Erosion control anchors shall be as recommended by the manufacturer.

2.11 WATER

SECTION 32 93 00 Page 15

Source of water to be approved by Contracting Officer and suitable quality for irrigation and shall not contain elements toxic to plant life.

2.11.1 Hose

Hoses used for watering shall be a minimum of 60 percent post-consumer rubber or plastic.

2.12 MYCORRHIZAL FUNGI INOCULUM

Mycorrhizal fungi inoculum shall be composed of multiple-fungus inoculum as recommended by the manufacturer for the plant material specified.

2.13 SOURCE QUALITY CONTROL

The Contracting Officer and Landscape Architect of Record will inspect plant materials at the project site and approve them. Tag plant materials for size and quality.

PART 3 EXECUTION

3.1 EXTENT OF WORK

Provide soil preparation, fertilizing, tree, shrub, vine, groundcover, and planting, edging, staking and guying, weed control fabric, erosion control material and root control barrier installation and a mulch topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.

3.2 PREPARATION

3.2.1 Layout

Stake out approved plant material locations and planter bed outlines on the project site before digging plant pits or beds. The Contracting Officer reserves the right to adjust plant material locations to meet field conditions. Do not plant closer than 24 inches to a building wall, pavement edge, fence or wall edge and other similar structures.

3.2.2 Soil Preparation

3.2.2.1 Fertilizer Application Rates

Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site. For bidding purposes only apply at rates for the following:

3.2.3 Subsoil Drainage for Plant Pits and Beds

Provide as indicated.

3.3 PLANT BED PREPARATION

Verify location of underground utilities prior to excavation. Protect existing adjacent turf before excavations are made. Where planting beds occur in existing turf areas, remove turf to a depth that will ensure removal of entire root system. Measure depth of plant pits from finished grade. Depth of plant

SECTION 32 93 00 Page 16 pit excavation shall be as indicated and provide proper relation between top of root ball and finished grade. Install plant material as specified in paragraph entitled "Plant Installation." Do not install trees within 10 feet of any utility lines or building walls.

3.4 PLANT INSTALLATION

3.4.1 Individual Plant Pit Excavation

Excavate pits at least 16 inches larger in diameter as the size of ball or container to depth shown.

3.4.2 Plant Beds with Multiple Plants

Excavate plant beds continuously throughout entire bed as outlined to depth shown.

3.4.3 Handling and Setting

Move plant materials only by supporting the root ball. Set plants on hand compacted layer of prepared backfill soil mixture 6 inches thick and hold plumb in the center of the pit until soil has been tamped firmly around root ball. Set plant materials, in relation to surrounding finish grade, one to 2 inches above depth at which they were grown in the nursery, collecting field or container. Replace plant material whose root balls are cracked or damaged either before or during the planting process.

Plant material shall be set in plant beds according to the drawings. Backfill soil mixture shall be placed on previously scarified subsoil to completely surround the root balls, and shall be brought to a smooth and even surface, blending to existing areas.

3.4.3.1 Balled and Burlapped Stock

Backfill with topsoil to approximately half the depth of ball and then tamp and water. Carefully remove or fold back excess burlap and tying materials from the top a minimum 1/3 depth from the top of the rootball. Tamp and complete backfill, place mulch topdressing, and water. Remove wires and non-biodegradable materials from plant pit prior to backfill operations.

3.4.3.2 Bare-Root Stock

Plant so roots are arranged in a natural position. Place roots in water a minimum of 30 minutes prior to planting. Carefully work topsoil among roots. Tamp remainder of backfill, place mulch topdressing and water.

3.4.3.3 Container Grown Stock

Remove from container and prevent damage to plant or root system.

3.4.3.4 Ground Covers and Vines

Plant after placing mulch topdressing. Do not remove plant materials from flats or containers until immediately before planting. Space at intervals indicated. Plant at a depth to sufficiently cover all roots. Start watering areas planted as required by temperature and wind conditions. Apply water at a rate sufficient to ensure thorough wetting of soil to a depth of 6 inches without run off or puddling.

Smooth planting areas after planting to provide even, smooth finish. Mulch as indicated.

SECTION 32 93 00 Page 17

Smooth planting areas before planting to provide even, smooth finish. Plant after placing weed control fabric and mulch topdressing. Do not remove plant material from flats or containers until immediately before planting. Space at the intervals indicated. Plant at a depth to sufficiently cover all roots. Start watering areas planted as required by temperature and wind conditions. Apply water at a rate sufficient to ensure thorough wetting of soil to a depth of 6 inches without run off or puddling. Add mulch topdressing as needed.

3.4.4 Earth Mounded Watering Basin for Individual Plant Pits

Form with topsoil around each plant by replacing a mound of topsoil around the edge of each plant pit.

Watering basins shall be 6 inches deep for trees and 4 inches deep for shrubs. Eliminate basins around plants in plant beds containing multiple plants.

Form with topsoil around each plant by placing a mound of topsoil around the edge of each plant pit.

Watering basins shall be 6 inches deep for trees and 4 inches deep for shrubs. Construct watering basin in a 4 1/2 foot diameter circle around specimen (not planted in a close group) trees and shrubs.

3.4.5 Erosion Control Material

Install in accordance with manufacturer's instructions.

3.4.6 Placement of Mulch Topdressing

Place specified mulch topdressing on top of weed control fabric covering total area enclosed by edging.

Place mulch topdressing to a depth of 3 inches.

3.4.7 Mulch Topdressing

Provide mulch topdressing over entire planter bed surfaces and individual plant surfaces including earth mound watering basin around plants to a depth of 3 inches after completion of plant installation and before watering. Keep mulch out of the crowns of shrubs. Place mulch a minimum 2 to 3 inches away from trunk of shrub or tree. Place on top of any weed control fabric.

3.4.8 Installation of Edging

Uniformly edge beds of plants to provide a clear cut division line between planted area and adjacent lawn. Construct bed shapes as indicated. Install edging material as indicated and as per manufacturer's instructions. Install edging with minimum one inch left above ground level.

3.4.9 Fertilization

3.4.9.1 Fertilizer Tablets

Place fertilizer planting tablets evenly spaced around the plant pits to the manufacturer's recommended depth.

3.4.9.2 Granular Fertilizer

Apply granular fertilizer as a top coat prior to placing mulch layer and water thoroughly.

SECTION 32 93 00 Page 18

3.4.10 Watering

Start watering areas planted as required by temperature and wind conditions. Apply water at a rate sufficient to ensure thorough wetting of soil to a depth of 12 inches without run off.

3.4.11 Staking and Guying

3.4.11.1 Staking

Stake plants with the number of stakes indicated complete with double strand of 12 gage guy wire as detailed. Attach guy wire half the tree height but not more than 5 feet high. Drive stakes to a depth of 2 1/2 to 3 feet into the ground outside the plant pit. Do not injure the root ball. Use hose chafer guards where guy wire comes in contact with tree trunk.

3.4.11.2 Guying

Guy plants as indicated. Attach two strands of guying wire around the tree trunk at an angle of 45 degrees at approximately 1/2 of the trunk height. Protect tree trunks with chafing guards where guying wire contacts the tree trunk. Anchor guys to deadmen wood blocks, wood ground stakes, malleable iron anchors, or steel screw anchors. Fasten flags to each guying wire approximately 2/3 of the distance up from ground level. Provide turnbuckles as indicated.

3.4.11.3 Chafing Guards

Use hose chafing guards, as specified where guy wire will contact the plant.

3.4.11.4 Deadmen

Place deadmen minimum 18 inches below ground surface. Place equal distance from tree trunk and around the plant pit.

3.4.11.5 Wood Ground Stakes

Drive wood ground stakes into firm ground outside of plant pit with top of stake flush with ground.

Place equal distance from tree trunk and around the plant pit.

3.4.11.6 Iron Anchors

Drive malleable iron anchors into firm ground outside of plant pit a minimum 30 inches below finish grade. Place equal distance from tree trunk and around the plant pit.

3.4.11.7 Steel Screw Anchors

Insert steel screw anchors as recommended in manufacturer's data. Place equal distance from tree trunk and around the plant pit.

3.4.11.8 Flags

Securely fasten flags on each guy wire approximately two-thirds of the distance up from ground level.

SECTION 32 93 00 Page 19

3.4.12 Pruning

Prune in accordance with safety requirement of ANSI Z133.1.

3.4.12.1 Trees and Shrubs

Remove dead and broken branches. Prune to correct structural defects only. Retain typical growth shape of individual plants with as much height and spread as practical. Do not cut central leader on trees. Make cuts with sharp instruments. Do not flush cut with trunk or adjacent branches. Collars shall remain in place. Pruning shall be accomplished by trained and experienced personnel and shall be accordance with ANSI A300.

3.4.12.2 Wound Dressing

Do not apply tree wound dressing to cuts.

3.5 RESTORATION AND CLEAN UP

3.5.1 Restoration

Turf areas, pavements and facilities that have been damaged from the planting operation shall be restored to original condition at the Contractor's expense.

3.5.2 Clean Up

Excess and waste material shall be removed from the installed area and shall be disposed offsite at an approved landfill, recycling center, or composting center. Separate and recycle or reuse the following landscape waste materials: nylon straps, wire, ball wrap, burlap, and wood stakes. Adjacent paved areas shall be cleared.

-- End of Section --

SECTION 32 93 00 Page 20

PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Topsoil Composition Tests
1.4.2 Nursery Certifications
1.4.3 State Landscape Contractor's License
1.4.4 Percolation Test
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Branched Plant Delivery
1.5.1.2 Soil Amendment Delivery
1.5.1.3 Plant Labels
1.5.2 Storage
1.5.2.1 Plant Storage and Protection
1.5.2.2 Fertilizer, Gypsum, pH Adjusters and Mulch Storage
1.5.2.3 Topsoil
1.5.2.4 Root Control Barrier and Weed Control Fabric
1.5.3 Handling
1.5.4 TIME LIMITATION
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
1.7 GUARANTEE
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.8.1 Local/Regional Materials
PART 2 PRODUCTS
2.1 PLANTS
2.1.1 Regulations and Varieties
2.1.2 Shape and Condition
2.1.2.1 Deciduous Trees and Shrubs
2.1.2.2 Evergreen Trees and Shrubs
2.1.2.3 Ground Covers and Vines
2.1.3 Plant Size
2.1.4 Root Ball Size
2.1.4.1 Mycorrhizal Fungi Inoculum
2.1.5 Growth of Trunk and Crown
2.1.5.1 Deciduous Trees
2.1.5.2 Palms
2.1.5.3 Deciduous Shrubs
2.1.5.4 Coniferous Evergreen Plant Material
2.1.5.5 Broadleaf Evergreen Plant Material
2.1.5.6 Ground Cover and Vine Plant Material
2.2 TOPSOIL
2.2.1 Existing Soil
2.2.2 On-Site Topsoil
2.2.3 Off-Site Topsoil
2.2.4 Composition
2.3 SOIL CONDITIONERS
2.3.1 Lime
2.3.2 Aluminum Sulfate
2.3.3 Sulfur
2.3.4 Iron
2.3.5 Peat
2.3.6 Sand
2.3.7 Perlite
2.3.8 Composted Derivatives
2.3.8.1 Particle Size
2.3.8.2 Nitrogen Content
2.3.8.3 Biobased Content

2.3.9 Gypsum

2.4 PLANTING SOIL MIXTURES
2.5 FERTILIZER
2.5.1 Granular Fertilizer
2.5.2 Fertilizer Tablets
2.6 WEED CONTROL FABRIC
2.6.1 Roll Type Polypropylene or Polyester Mats
2.7 MULCH
2.7.1 Organic Mulch Materials
2.7.2 Recycled Organic Mulch
2.8 STAKING AND GUYING MATERIAL
2.8.1 Staking Material
2.8.1.1 Tree Support Stakes
2.8.1.2 Ground Stakes
2.8.2 Guying Material
2.8.2.1 Guying Wire
2.8.2.2 Guying Cable
2.8.3 Hose Chafing Guards
2.8.4 Flags
2.8.5 Turnbuckles
2.8.6 Deadmen
2.8.7 Metal Anchors
2.8.7.1 Driven Anchors
2.8.7.2 Screw Anchors
2.9 EDGING MATERIAL
2.9.1 Wood Edging
2.9.2 Recycled Plastic Edging
2.9.3 Concrete Edging
2.10 EROSION CONTROL MATERIALS
2.10.1 Erosion Control Blanket
2.10.2 Erosion Control Fabric
2.10.3 Erosion Control Net
2.10.4 Hydrophilic Colloids
2.10.5 Erosion Control Material Anchors
2.11 WATER
2.11.1 Hose
2.12 MYCORRHIZAL FUNGI INOCULUM
2.13 SOURCE QUALITY CONTROL
PART 3 EXECUTION
3.1 EXTENT OF WORK
3.2 PREPARATION
3.2.1 Layout
3.2.2 Soil Preparation
3.2.2.1 Fertilizer Application Rates

3.2.3 Subsoil Drainage for Plant Pits and Beds

3.3 PLANT BED PREPARATION
3.4 PLANT INSTALLATION
3.4.1 Individual Plant Pit Excavation
3.4.2 Plant Beds with Multiple Plants
3.4.3 Handling and Setting
3.4.3.1 Balled and Burlapped Stock
3.4.3.2 Bare-Root Stock
3.4.3.3 Container Grown Stock
3.4.3.4 Ground Covers and Vines
3.4.4 Earth Mounded Watering Basin for Individual Plant Pits
3.4.5 Erosion Control Material
3.4.6 Placement of Mulch Topdressing
3.4.7 Mulch Topdressing
3.4.8 Installation of Edging
3.4.9 Fertilization
3.4.9.1 Fertilizer Tablets
3.4.9.2 Granular Fertilizer
3.4.10 Watering
3.4.11 Staking and Guying
3.4.11.1 Staking
3.4.11.2 Guying
3.4.11.3 Chafing Guards
3.4.11.4 Deadmen
3.4.11.5 Wood Ground Stakes
3.4.11.6 Iron Anchors
3.4.11.7 Steel Screw Anchors
3.4.11.8 Flags
3.4.12 Pruning
3.4.12.1 Trees and Shrubs
3.4.12.2 Wound Dressing
3.5 RESTORATION AND CLEAN UP
3.5.1 Restoration
3.5.2 Clean Up

File details come from the government source that posted it. Updated .