SECTION 32 92 19 Page 1
SECTION 32 92 19
SEEDING
10/06
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 RELATED REQUIREMENTS
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.7 TIME LIMITATIONS
PART 2 PRODUCTS
2.1 SEED
2.2 TOPSOIL
2.3 SOIL CONDITIONERS
2.4 FERTILIZER
2.5 MULCH
2.6 WATER
2.7 EROSION CONTROL MATERIALS
PART 3 EXECUTION
3.1 PREPARATION
3.2 SEEDING
3.3 PROTECTION OF TURF AREAS
3.4 RENOVATION OF EXISTING TURF AREA
3.5 RESTORATION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (2013a) Agricultural Liming Materials
ASTM D 4427 (2013) Peat Samples by Laboratory Testing
ASTM D 4972 (2013) pH of Soils
U.S. DEPARTMENT OF AGRICULTURE (USDA)
SECTION 32 92 19 Page 2
AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act
DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0
1.2 DEFINITIONS
1.2.1 Stand of Turf
95 percent ground cover of the established species.
1.3 RELATED REQUIREMENTS
Section 31 00 00 EARTHWORK, Section 32 84 24 IRRIGATION SPRINKLER SYSTEMS,Section 32 92 23 SODDING, Section 32 93 00 EXTERIOR PLANTS, and Section 32 05 33 LANDSCAPE ESTABLISHMENT applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Wood cellulose fiber mulch
Submit manufacturer documentation indicating type of recovered materials and the percentage of such material that is (1) recovered and (2) postconsumer recycled content.
Alternately, submit written justification of non-use per Section 01 62 35 RECYCLED /
RECOVERED MATERIALS.
Fertilizer
Include physical characteristics, and recommendations.
Submit manufacturer documentation indicating type and percentage of biobased content or written justification of non-use per paragraph 2.4.
SD-06 Test Reports
Topsoil composition tests (reports and recommendations).
SD-07 Certificates
State certification and approval for seed
SD-08 Manufacturer's Instructions
SECTION 32 92 19 Page 3
Erosion Control Materials
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Seed Protection
Protect from drying out and from contamination during delivery, on-site storage, and handling.
1.5.1.2 Fertilizer, Gypsum, Sulfur, Iron, and Lime Delivery
Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum, sulphur, iron, and lime may be furnished in bulk with certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Seed, Fertilizer, Gypsum, Sulfur, Iron, and Lime Storage
Store in cool, dry locations away from contaminants.
1.5.2.2 Topsoil
Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.
1.5.2.3 Handling
Do not drop or dump materials from vehicles.
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit.
1.7 TIME LIMITATIONS
1.7.1 Seed
Apply seed within twenty four hours after seed bed preparation.
PART 2 PRODUCTS
2.1 SEED
2.1.1 Classification
SECTION 32 92 19 Page 4
Provide State-certified seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes will be acceptable when field mix is performed on site in the presence of the Contracting Officer.
2.1.2 Planting Dates
See description in plans.
2.1.3 Seed Purity
2.1.4 Seed Mixture by Weight
2.2 TOPSOIL
2.2.1 On-Site Topsoil
Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 00 00 EARTHWORK.
2.2.2 Off-Site Topsoil
Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the Contractor.
2.2.3 Composition
Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits:
Silt 25-50 percent Clay 10-30 percent Sand 20-35 percent pH 5.5 to 7.0 Soluble Salts 600 ppm maximum
2.3 SOIL CONDITIONERS
Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein.
SECTION 32 92 19 Page 5
2.3.1 Lime
Commercial grade burnt limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602 of not less than 80 percent.
2.3.2 Aluminum Sulfate
Commercial grade.
2.3.3 Sulfur
100 percent elemental
2.3.4 Iron
100 percent elemental
2.3.5 Peat
Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427 as modified herein. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation.
2.3.6 Sand
Clean and free of materials harmful to plants.
2.3.7 Perlite
Horticultural grade.
2.3.8 Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:
2.3.8.1 Particle Size
Minimum percent by weight passing:
No. 4 mesh screen 95 No. 8 mesh screen 80
2.3.8.2 Nitrogen Content
Minimum percent based on dry weight:
Fir Sawdust 0.7 Fir or Pine Bark 1.0
SECTION 32 92 19 Page 6
2.3.9 Gypsum
Coarsely ground gypsum comprised of calcium sulfate dihydrate 61 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.
2.3.10 Calcined Clay
Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No.
100 sieve. Bulk density: A maximum 40 pounds per cubic foot.
2.4 FERTILIZER
Fertilizer shall conform to EPA requirements in accordance with Section 01 62 35 RECYCLED / RECOVERED MATERIALS. In addition, fertilizer shall meet the minimum biobased content requirement established by the USDA's BioPreferred program (2002 Farm Bill) unless the designer, Contractor, or Task or Delivery Order determines that no biobased product can be obtained within the cost, performance, or availability requirements of the contract. If such determination of non-use is made, the Contractor or subcontractor shall complete and submit the JBLM Construction Green Procurement Exception Form. Using this form, the Contractor shall specify the reason for exception (unreasonable price, inadequate performance, non-availability) and provide all associated information (including copies of all supporting evidence). This form is available from the Contracting Official or the JBLM Green Procurement Program Coordinator (Building 1210, (253) 966-6466, LEWISPWGreenProcurement@conus.army.mil). The Contractor shall submit the completed form via email (with copies of supporting documents included) to the Contracting Officer's Representative. The Contractor shall include the following address in the carbon copy ("cc") line of the email:
LEWISPWGreenProcurement@conus.army.mil. The Contractor shall keep attached file sizes to a minimum to avoid transmission errors associated with JBLM security. If use of email is not possible, the Contractor shall coordinate the submission of these documents with the Contracting Officer's Representative and ask that they forward copies to the JBLM Green Procurement Coordinator (Bldg 1210, 966-6466). More information can be found at http://www.biopreferred.gov/ProposedAndFinalRegulations.aspx.
2.4.1 Granular Fertilizer
Synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
As stated in the Delivery or Task Order.
2.4.2 Hydroseeding Fertilizer
Controlled release fertilizer, to use with hydroseeding and composed of pills coated with plastic resin to provide a continuous release of nutrients for at least 6 months and containing the following minimum percentages, by weight, of plant food nutrients.
As stated in the Delivery or Task Order.
SECTION 32 92 19 Page 7
2.5 MULCH
Mulch shall be free from noxious weeds, mold, and other deleterious materials.
2.5.1 Straw
Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contain no fertile seed.
2.5.2 Hay
Air-dry condition and of proper consistency for placing with commercial mulch blowing equipment.
Hay shall be sterile, containing no fertile seed.
2.5.3 Wood Cellulose Fiber Mulch
Use recovered materials of either paper-based (100 percent) or wood-based (100 percent) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2. Use with hydraulic application of grass seed and fertilizer.
Mulch shall conform to EPA requirements in accordance with Section 01 62 35 RECYCLED /
RECOVERED MATERIALS.
2.6 WATER
Source of water shall be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life.
2.7 EROSION CONTROL MATERIALS
Erosion control material shall conform to the following:
2.7.1 Erosion Control Blanket
70 percent agricultural straw/30 percent coconut fiber matrix stitched with a degradable nettings, designed to degrade within 12 months.
2.7.2 Erosion Control Fabric
Fabric shall be knitted construction of polypropylene yarn with uniform mesh openings 3/4 to 1 inch square with strips of biodegradable paper. Filler paper strips shall have a minimum life of 6 months.
2.7.3 Erosion Control Net
Net shall be heavy, twisted jute mesh, weighing approximately 1.22 pounds per linear yard and 4 feet wide with mesh openings of approximately 1 inch square.
2.7.4 Hydrophilic Colloids
SECTION 32 92 19 Page 8
Hydrophilic colloids shall be physiologically harmless to plant and animal life without phytotoxic agents. Colloids shall be naturally occurring, silicate powder based, and shall form a water insoluble membrane after curing. Colloids shall resist mold growth.
2.7.5 Erosion Control Material Anchors
Erosion control anchors shall be as recommended by the manufacturer.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 EXTENT OF WORK
Provide soil preparation (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.
3.1.1.1 Topsoil
Provide 4 inches of on-site topsoil to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer, pH adjusters, into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.
3.1.1.2 Fertilizer Application Rates
Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site. For bidding purposes only apply at rates for the following:
Synthetic Fertilizer 100 pounds per acre.
3.2 SEEDING
3.2.1 Seed Application Seasons and Conditions
Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy, frozen, snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance. Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.
3.2.2 Seed Application Method
Seeding method shall be broadcasted and drop seeding or hydroseeding.
3.2.2.1 Broadcast and Drop Seeding
SECTION 32 92 19 Page 9
Seed shall be uniformly broadcast at the rate of 2.5 pounds per 1000 square feet. Use broadcast or drop seeders. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.
Cover seed uniformly to a maximum depth of 1/4 inch in clay soils and 1/2 inch in sandy soils by means of spike-tooth harrow, cultipacker, raking or other approved devices.
3.2.2.2 Hydroseeding
First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. Fiber shall be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate of 2.5 pounds per 1000 square feet. When hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch.
3.2.3 Mulching
3.2.3.1 Hay or Straw Mulch
Hay or straw mulch shall be spread uniformly at the rate of 2 tons per acre. Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading.
3.2.3.2 Non-Asphaltic Tackifier
Hydrophilic colloid shall be applied at the rate recommended by the manufacturer, using hydraulic equipment suitable for thoroughly mixing with water. A uniform mixture shall be applied over the area.
3.2.4 Rolling
Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated.
3.2.5 Erosion Control Material
Install in accordance with manufacturer's instructions, where indicated or as directed by the Contracting Officer.
3.2.6 Watering
Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.
3.3 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
SECTION 32 92 19 Page 10
3.4 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
-- End of Section --
SECTION 32 92 19 Page 11
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Stand of Turf |
| 1.3 RELATED REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Delivery |
| 1.5.1.1 Seed Protection |
| 1.5.1.2 Fertilizer, Gypsum, Sulfur, Iron, and Lime Delivery |
| 1.5.2 Storage |
| 1.5.2.1 Seed, Fertilizer, Gypsum, Sulfur, Iron, and Lime Storage |
| 1.5.2.2 Topsoil |
| 1.5.2.3 Handling |
| 1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS |
| 1.6.1 Restrictions |
| 1.7 TIME LIMITATIONS |
| 1.7.1 Seed |
| PART 2 PRODUCTS |
| 2.1 SEED |
| 2.1.1 Classification |
| 2.1.2 Planting Dates |
| 2.1.3 Seed Purity |
| 2.1.4 Seed Mixture by Weight |
| 2.2 TOPSOIL |
| 2.2.1 On-Site Topsoil |
| 2.2.2 Off-Site Topsoil |
| 2.2.3 Composition |
| 2.3 SOIL CONDITIONERS |
| 2.3.1 Lime |
| 2.3.2 Aluminum Sulfate |
| 2.3.3 Sulfur |
| 2.3.4 Iron |
| 2.3.5 Peat |
| 2.3.6 Sand |
| 2.3.7 Perlite |
| 2.3.8 Composted Derivatives |
| 2.3.8.1 Particle Size |
| 2.3.8.2 Nitrogen Content |
| 2.3.9 Gypsum |
| 2.3.10 Calcined Clay |
| 2.4 FERTILIZER |
| 2.4.1 Granular Fertilizer |
| 2.4.2 Hydroseeding Fertilizer |
| 2.5 MULCH |
| 2.5.1 Straw |
| 2.5.2 Hay |
| 2.5.3 Wood Cellulose Fiber Mulch |
| 2.6 WATER |
| 2.7 EROSION CONTROL MATERIALS |
| 2.7.1 Erosion Control Blanket |
| 2.7.2 Erosion Control Fabric |
| 2.7.3 Erosion Control Net |
| 2.7.4 Hydrophilic Colloids |
| 2.7.5 Erosion Control Material Anchors |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 EXTENT OF WORK |
| 3.1.1.1 Topsoil |
| 3.1.1.2 Fertilizer Application Rates |
| 3.2 SEEDING |
| 3.2.1 Seed Application Seasons and Conditions |
| 3.2.2 Seed Application Method |
| 3.2.2.1 Broadcast and Drop Seeding |
| 3.2.2.2 Hydroseeding |
| 3.2.3 Mulching |
| 3.2.3.1 Hay or Straw Mulch |
| 3.2.3.2 Non-Asphaltic Tackifier |
| 3.2.4 Rolling |
| 3.2.5 Erosion Control Material |
| 3.2.6 Watering |
| 3.3 PROTECTION OF TURF AREAS |
| 3.4 RESTORATION |