01 33 29-SUSTAINABLILITY REPORTING.pdf

PDF 47 KB Posted

Attached to
Joint Base Lewis-McChord PAVEMENT IDIQ
Solicitation number
W911S8-17-R-0001
Issued by

About this file

01 33 29-SUSTAINABLILITY REPORTING.pdf

View the file

Other files

File Type Posted
SF1442_W911S8-17-R-0001_0002.pdf PDF
4. Technical Exbhibit C Statement of Work 19 Dec 2016.pdf PDF
JBLM Paving W911S8-17-R-0001 Contractor QUESTIONS 22 Dec16.pdf PDF
Pre-Proposal Conference Contractor Attendees.pdf PDF
33 71 02UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
SF30 W911S8-17-R-0001 0002.pdf PDF
Attachment 1- Sample Project 19 December 2016.pdf PDF
32 12 21-BITUMINOUS ROAD-MIX SURFACE COURSE.pdf PDF
01_45_00_10_Quality_Control_19_Dec.pdf PDF
33 71 02 JBLM DESIGN STANDARDS-UNDERGROUND ELECTRICAL DISTRIBUTION.pdf PDF
Site Visit Briefing W911S8-17-R-0001 JBLM Paving -29 Nov 2016.pdf PDF
SF30 W911S8-17-R-0001 0001.pdf PDF
W911S8-17-R-0001_Amendment_0001.pdf PDF
01 57 19-TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
01 42 00-SOURCES FOR REFERENCE PUBLICATIONS.pdf PDF
13. Attachment 5 - Past Performance Questionaire.docx DOCX document
32_84_24_(Irrigation_Sprinkles).pdf PDF
26_56_13.00_40_Lighting_Poles_and_Standards.pdf PDF
14. Attachment 6 Insurance Certificate of Compliance.docx DOCX document
01 78 23-OPERATION AND MAINTENANCE DATA.pdf PDF
32_17_24.00_10_(Pavement_Markings).pdf PDF
1. RFP W911S8-17-R-0001 Paving IDC.pdf PDF
01 50 00-TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
01 32 01 00 10 Project Schedule.pdf PDF
7. TE F General Decision Number WA160001 Dtd 19 Aug 16.pdf PDF
31_11_00_Clearing_ _Grubbing.pdf PDF
5. TE D-Table of Contents.pdf PDF
3. TE B Proposal Item Descriptions(09-27-16).pdf PDF
10. Attachment 2-Experience Document.docx DOCX document
6. TE E Standards Plans Drawings 25Aug16.pdf PDF
31_23_00.00_20_Excavation_ _Fill.pdf PDF
01 35 29.13 Contaminated Site.pdf PDF
32_11_24_CSBC_for_Flexible_Pavement.pdf PDF
32_31_26_(Wire_Fence_ _Gate).pdf PDF
32_31_13.53_(High_Security_Fence).pdf PDF
26_56_19.00_40_Roadway_Lighting.pdf PDF
32_93_00_(Exterior_Plants).pdf PDF
31_00_00_Earthwork.pdf PDF
2. TE A ELIN Proposal Schedule 11 Oct 16.xlsx XLSX spreadsheet
33_11_00-WATER_DISTRIBUTION.pdf PDF
01 45 00 10 Quality Control.pdf PDF
01 30 00 Administrative Requirements.pdf PDF
33_30_00-SANITARY_SEWERS.pdf PDF
01 78 00- CLOSEOUT SUBMITTALS.pdf PDF
32_01_13_BITUMINOUS_SEAL_AND_FOG_COATS.pdf PDF
16. Attachment 8-JBLM Installation Access Information.docx DOCX document
32_92_19_(Seeding).pdf PDF
32_12_10_(Tack_Coat).pdf PDF
12. Attachment 4 - Relevant Contract Reference Sheet.docx DOCX document
00 10 01 - Supplementary Requirements.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 33 29

SUSTAINABLILITY REPORTING

02/15

PART 1 GENERAL

1.1 REFERENCES

1.2 OBJECTIVES

1.3 EPA DESIGNATED ITEMS INCORPORATED IN THE WORK

1.4 EPA PROPOSED ITEMS INCORPORATED IN THE WORK

1.5 EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN

THE WORK

PART 2 & 3: NOT USED

PART 1 GENERAL

This section is part of the implementation of RCRA of 1976 as amended (42 USC 6901) which requires that EPA designated items be used to the maximum extent practicable.

Additional information is available at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products

Containing Recovered Materials

1.2 OBJECTIVES

Government procurement policy is to acquire, in a cost effective manner, items containing the highest percentage of recycled and recovered materials practicable consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing suppliers' employees to undue hazards from the recovered materials. The Environmental Protection Agency (EPA) has designated certain items which must contain a specified percent range of recovered or recycled materials. EPA designated products specified in this contract comply with the stated policy and with the EPA guidelines. The Contractor shall make all reasonable efforts to use recycled and recovered materials in providing the EPA designated products and in otherwise utilizing recycled and recovered materials in the execution of the work.

1.3 EPA DESIGNATED ITEMS INCORPORATED IN THE WORK

http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm

Various sections of the specifications contain requirements for materials that have been designated by EPA as being products which are or can be made with recovered or recycled materials. These items, when incorporated into the work under this contract, shall contain at least the percentage of recycled/recovered materials and postconsumer content specified in the corresponding EPA Recovered Materials Advisory Notice (RMAN) unless adequate justification (non-availability) for non-use is provided. Questions may be directed to the JBLM Sustainable procurement Program Coordinator via the Contracting Officer's Representative. Questions may be directed to the JBLM Sustainable procurement Program Coordinator (Building 1210) via your Contracting Officer or their representative.

When a designated item is specified as an option to a non-designated item, the designated item requirements apply only if the designated item is used in the work.

When claiming a justification for non-use as noted above, the contractor shall complete and submit the JOINT BASE LEWIS-MCCHORD SUSTAINABLE ACQUISITION EXCEPTION FORM (including copies of all supporting evidence) to the Contracting Officer or their representative. This form is available from the contracting official or the JBLM Sustainable procurement Program Coordinator (Building 1210, (253) 966-6466, usarmy.jblm.imcom.dpw-green-procurement@mail.mil).

The contractor shall submit the completed form via email (with copies of supporting documents attached) and include the following address in the carbon copy (“cc”) line of the email:

usarmy.jblm.imcom.dpw-green-procurement@mail.mil. The contractor shall keep attached file sizes to a minimum to avoid transmission errors associated with JBLM security. If use of email is not possible, the contractor shall coordinate the submission of these documents with the Contracting Officer’s Representative and ask that they forward copies to the JBLM Sustainable procurement Coordinator (Bldg 1210, 966-6466).

When specifying non-compliant products, the designer or requirements generator shall submit a justification of non-use as described below using the JOINT BASE LEWIS-MCCHORD SUSTAINABLE PROCUREMENT EXCEPTION FORM. This justification shall specify the reason for non-use (price, performance, or availability) and include all supporting evidence. The completed form shall be sent via email (with copies of supporting documents included) to the Contracting Officer’s Representative. Be sure to include the following address in the carbon copy (“cc”) line of the email: usarmy.jblm.imcom.dpw-green-procurement@mail.mil. Keep attached file sizes to a minimum to avoid transmission errors associated with JBLM security. If use of email is not possible, coordinate the submission of these documents with the Contracting Officer’s Representative and ask that they forward copies to the JBLM Sustainable procurement Coordinator (Bldg 1210, 966-6466).

1.4 EPA PROPOSED ITEMS INCORPORATED IN THE WORK

Products other than those designated by EPA are still being researched and are being considered for future Comprehensive Procurement Guideline (CPG) designation. It is recommended that these items, when incorporated in the work under this contract, contain the highest practicable percentage of recycled or recovered materials, provided specified requirements are also met.

1.5 EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN

THE WORK

There are many products listed in 40 CFR 247 which have been designated or proposed by EPA to include recycled or recovered materials that may be used by the Contractor in performing the work but will not be incorporated into the work. These products include office products, temporary traffic mailto:usarmy.jblm.imcom.dpw-green-procurement@mail.mil mailto:usarmy.jblm.imcom.dpw-green-procurement@mail.mil mailto:usarmy.jblm.imcom.dpw-green-procurement@mail.mil mailto:usarmy.jblm.imcom.dpw-green-procurement@mail.mil control products, and pallets. It is recommended that these non-construction products, when used in the conduct of the work, contain the highest practicable percentage of recycled or recovered materials and that these products be recycled when no longer needed.

-- END OF SECTION -

File details come from the government source that posted it. Updated .