01_33_29.02_00.pdf
PDF 38 KB Posted
- Attached to
- CLR039b Long Range Discrimination Radar Construction Package #2 ECF, Clear AFS, AK Federal contract opportunity
- Solicitation number
- W911KB18R0006
About this file
01 33 29.02 00
View the file
Other files for this federal contract opportunity
Show all 50
CLR039b Long Range Discrimination Radar Construction Package #2 ECF, Clear AFS, AK has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP#2 Long Range Di scr i mi nat i on Radar ( LRDR) CLR039b FRDR Compl ex Secur i t y - Cl ear AFS, Al aska AM#3
SECTI ON 01 33 29. 02 00
SUSTAI NABI LI TY REPORTI NG
02/15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG
ENGI NEERS ( ASHRAE)
ASHRAE 189. 1 ( 2014; Er r at a 1- 2 2015) St andar d f or t he Desi gn of Hi gh- Per f or mance Gr een Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs
U. S. DEPARTMENT OF ENERGY ( DOE)
I SWG Gui di ng Pr i nci pl es ( 2008) Hi gh Per f or mance and Sust ai nabl e Bui l di ngs Gui dance
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
40 CFR 247 Compr ehensi ve Pr ocur ement Gui del i ne f or Pr oduct s Cont ai ni ng Recover ed Mat er i al s
1. 2 SUMMARY
Thi s speci f i cat i on i ncl udes gener al r equi r ement s and pr ocedur es f or t hi s pr oj ect t o be const r uct ed and document ed per t he f eder al l y mandat ed " Gui di ng Pr i nci pl es" ( GP) , UFC 1- 200- 02, Hi gh Per f or mance and Sust ai nabl e Bui l di ng Requi r ement s, and ot her r equi r ement s i dent i f i ed i n t hi s specification.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, t he " LD" desi gnat i on f ol l owi ng t he " G" i dent i f i es t hat t he gover nment pr ovi ded LEED Coor di nat or wi l l r evi ew t he submi t t al . When used, t he " LD" desi gnat i on f ol l owi ng t he " G" i dent i f i es t hat a Gover nment - pr ovi ded LEED Coor di nat or wi l l r evi ew t he submi t t al . Submi t t al s wi t h an " S" desi gnat e t hose t o be r evi ewed and document ed f or I SWG Gui di ng Pr i nci pl es Val i dat i on ( GPV) i n conf or mance t o t hi s sect i on. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00. 02 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Sust ai nabi l i t y Act i on Pl an; G, S
Const r uct i on Wast e Management Pl an; G, S
Pr el i mi nar y Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st ; G
SECTI ON 01 33 29. 02 00 Page 1
I ndoor Ai r Qual i t y Pl an; G, S
SD- 03 Pr oduct Dat a
Ener gy Ef f i c i ent Equi pment ; G, S
Wat er Conser vi ng Fi xt ur es; G, S
Reduce Vol at i l e Or gani c Compounds; G, S
SD- 08 Manuf act ur er ' s I nst r uct i ons
MSDS Sheet s; G, S
SD- 11 Cl oseout Submi t t al s
Envi r onment al Pr ef er r ed Pr oduct s; G, S
Pr ef i nal Per f or mance Repor t ; G, S
Fi nal Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st ; G, S
Amended Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Bui l di ng Checkl i st ; G, S
Recycl ed Cont ent ; G, S
Bi o- Based Pr oduct s; G, SWast e Haul i ng Document at i on; G, S
Summar y Commi ssi oni ng Repor t ; G, S
1. 4 GUI DI NG PRI NCI PLES VALI DATI ON ( GPV)
Pr ovi de const r uct i on r el at ed sust ai nabi l i t y document at i on t o ver i f y achi evement of I SWG Gui di ng Pr i nci pl es Val i dat i on ( GPV) . Pr ovi de t he f ol l owi ng f or GPV:
a. Ref er t o At t achment 1, HPSB Checkl i st at t he end of t hi s speci f i cat i on section.
b. Obt ai n appr oval of any changes t o t he HPSB Checkl i st f r om t he Cont r act i ng Of f i cer at t he Pr econst r uct i on Conf er ence. Cont r act i ng Of f i cer ' s appr oval est abl i shes i dent i f i ed I SWG Gui di ng Pr i nci pl es Requi r ement s as t he pr oj ect ' s sust ai nabi l i t y goal s.
No var i at i ons or subst i t ut i ons t o t he HPSB Checkl i st ar e al l owed wi t hout wr i t t en consent f r om t he Cont r act i ng Of f i cer . I mmedi at el y br i ng t o t he at t ent i on of t he Cont r act i ng Of f i cer any changes t hat i mpact meet i ng t he appr oved I SWG Gui di ng Pr i nci pl es Requi r ement s f or t hi s pr oj ect and demonst r at e t hat change wi l l not i ncur addi t i onal const r uct i on cost or i ncr ease t he l i f e cycl e cost .
c. I ncl ude al l wor k r equi r ed t o i ncor por at e t he appl i cabl e I SWG Gui di ng Pr i nci pl es Requi r ement s i ndi cat ed on t he HPSB Checkl i st and i n t hi s cont r act .
d. I ncl ude const r uct i on r el at ed document at i on. Suppl ement const r uct i on r el at ed document at i on cont ai ni ng t he f ol l owi ng component s;
SECTI ON 01 33 29. 02 00 Page 2
( 1) HPSB Checkl i st
( 2) Sust ai nabi l i t y Act i on Pl an
( 3) Document at i on i l l ust r at i ng Gui di ng Pr i nci pl e ( GP) Requi r ement s compliance
( 4) Commi ssi oni ng Pl an and Repor t s
1. 4. 1 Sust ai nabi l i t y Act i on Pl an
I ncl ude t he f ol l owi ng i nf or mat i on i n t he Sust ai nabi l i t y Act i on Pl an:
a. Cont r act or ' s pl anned met hod t o achi eve each const r uct i on r el at ed GP r equi r ement , as f ound i n At t achment 1.
b. For each desi gnat ed const r uct i on r el at ed I SWG Gui di ng Pr i nci pl es Requi r ement s t hat i s not achi eved, pr ovi de nar r at i ve expl ai ni ng how mi ssi on or act i v i t y pr ecl udes achi evi ng speci f i c sust ai nabi l i t y r equi r ement or goal . Pr ovi de anal ysi s of par t i cul ar r equi r ement and l evel t o whi ch pr oj ect i s abl e t o comply.
c. Name and cont act i nf or mat i on f or : Cont r act or ' s POC r esponsi bl e f or ensur i ng sust ai nabi l i t y goal s ar e accompl i shed and document at i on i s assembl ed.
1. 4. 2 Costs
Cont r act or i s r esponsi bl e f or al l cost s associ at ed wi t h const r uct i ng and demonst r at i ng t hat pr oj ect compl i es wi t h appr oved I SWG Gui di ng Pr i nci pl es Requirements.
1. 4. 3 Calculations
Pr ovi de cal cul at i ons, pr oduct dat a, and cer t i f i cat i ons r equi r ed i n t hi s sect i on t o demonst r at e compl i ance wi t h t he I SWG Gui di ng Pr i nci pl es Requirements.
1. 5 SUSTAI NABI LI TY SUBMI TTALS
Pr ovi de HPSB Checkl i st and ot her document at i on t o i ndi cat e compl i ance wi t h t he sust ai nabi l i t y r equi r ement s of t he pr oj ect .
1. 5. 1 Hi gh Per f or mance Sust ai nabl e Bui l di ng ( HPSB) Checkl i st
Pr ovi de const r uct i on document at i on t hat pr ovi des pr oof of and suppor t s compl i ance wi t h t he compl et ed HBSP Checkl i st .
1. 5. 1. 1 HPSB Checkl i st Submi t t al s
Submi t updat ed HPSB Checkl i st wi t h each Sust ai nabi l i t y submi t t al . At t ach f i nal HPSB Checkl i st t o DD1354 Real Pr oper t y Recor d Submi t t al .
1. 5. 2 " S" Submi t t al s f or Sust ai nabi l i t y Document at i on
Submi t t he GPV sust ai nabi l i t y document at i on r equi r ed i n t hi s speci f i cat i on as " S" submi t t al s. Hi ghl i ght GPV compl i ance dat a i n " S" submi t t al .
SECTI ON 01 33 29. 02 00 Page 3
1. 5. 3 SUSTAINABILITY
1. 5. 3. 1 Sust ai nabi l i t y Submi t t al Schedul e
Pr ovi de Sust ai nabi l i t y Submi t t al s at t he f ol l owi ng mi l est ones of t he project:
a. Pr el i mi nar y Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st
Submi t pr el i mi nar y Hi gh Per f or mance and Sust ai nabi l i t y Checkl i s t f or appr oval at t he Pr e- const r uct i on conf er ence.
b. Fi nal Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st
Submi t updat ed Hi gh Per f or mance and Sust ai nabi l i t y Bui l di ng Checkl i st wi t hi n 60 days af t er t he Benef i c i al Occupancy Dat e ( BOD) . Fi nal pr ogr ess payment r et ai nage may be hel d by Cont r act i ng Of f i cer unt i l f i nal sust ai nabi l i t y document at i on i s compl et e. Submi t t hr ee ( 3) el ect r oni c copi es of t he Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Bui l di ng Checkl i st t o t he Gover nment .
d. Amended Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Bui l di ng Checkl i st
Amend and r esubmi t t he Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Bui l di ng Checkl i st t o i ncl ude commi ssi oni ng, t est i ng and bal anci ng, and col l ect i on of per f or mance r equi r ement s. Submi t t hr ee ( 3) f i nal el ect r oni c copi es of t he Amended Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Bui l di ng Checkl i st t o t he Gover nment no l onger t han 30 days af t er t he GP and Cx desi gnat ed dat a col l ect i on per i od.
1. 6 DOCUMENTATI ON REQUI REMENTS
I ncor por at e each of t he f ol l owi ng I SWG Gui di ng Pr i nci pl es Requi r ement s i nt o pr oj ect const r uct i on; and pr ovi de document at i on t hat pr oves compl i ance wi t h each l i s t ed r equi r ement . I t ems bel ow ar e or gani zed accor di ng t o t he I SWG Gui di ng Pr i nci pl es.
1. 6. 1 Commissioning
Wor k wi t h t he Commi ssi oni ng Aut hor i t y ( CxA) t o achi eve r equi r ement s of t he Commi ssi oni ng pl an and ot her cont r act document r equi r ement s at each st age of commi ssi oni ng. Mai nt ai n up- t o- dat e r ecor ds of commi ssi oni ng act i v i t i es t o i ncl ude commi ssi oni ng pl an and Summar y Commi ssi oni ng Repor t .
1. 6. 2 Ener gy Ef f i c i ent Equi pment
Pr ovi de onl y ener gy- usi ng equi pment t hat i s Ener gy St ar r at ed, or has t he Feder al Ener gy Management Pr ogr am ( FEMP) r ecommended ef f i c i ency. Wher e Ener gy St ar or FEMP r ecommendat i ons have not been est abl i shed, pr ovi de most ef f i c i ent equi pment avai l abl e. Pr ovi de onl y ener gy usi ng equi pment t hat meet s FEMP r equi r ement s f or l ow st andby power consumpt i on. Ener gy ef f i c i ent equi pment can be f ound at : ht t p: / / www1. eer e. ener gy. gov/ f emp/ and http://www.energystar.gov/ . Pr ovi de t he f ol l owi ng document at i on:
Pr oof t hat equi pment i s l abel ed ener gy ef f i c i ent and compl i es wi t h t he c i t ed r equi r ement s.
SECTI ON 01 33 29. 02 00 Page 4
1. 6. 3 Benchmarking
Pr ovi de r epor t of i ni t i al act ual ener gy per f or mance wi t h t he ener gy desi gn t ar get s. Pr ovi de t he f ol l owi ng document at i on:
Pr ef i nal Per f or mance Repor t wi t h dat a col l ect ed f r om t he f i r st 60 days of oper at i on of t he f aci l i t y af t er Benef i c i al Occupancy Dat e ( BOD) . Submi t t hi s i nf or mat i on wi t h t he Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Checklist.
1. 6. 4 Wat er Conser vi ng Fi xt ur es
Pr ovi de onl y wat er - consumi ng pr oduct s t hat ar e EPA Wat er Sense l abel ed, or t he most ef f i c i ent wat er f i x t ur es avai l abl e when EPA Wat er sense pr oduct s ar e not avai l abl e. Pr ovi de t he f ol l owi ng document at i on:
Pr oof t hat wat er f i x t ur es ar e ef f i c i ent and compl y wi t h t he c i t ed requirements.
1. 6. 5 Reduce Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s)
Pr ovi de mat er i al s and pr oduct s wi t h l ow pol l ut ant emi ssi ons, i ncl udi ng composi t e wood pr oduct s, adhesi ves, seal ant s, i nt er i or pai nt s and f i ni shes, car pet syst ems, and f ur ni shi ngs. Meet i ng t he r equi r ement s of ASHRAE 189. 1 Sect i ons 8. 4. 2 ( Pr escr i pt i ve Opt i on: Mat er i al s) or Sect i on 8. 5. 2 ( Per f or mance Opt i on: Mat er i al s) demonst r at es compl i ance. I nsul at i on pr oduct s must meet t he r equi r ement s of Sect i on 8. 5. 2 ( Per f or mance Opt i on:
Mat er i al s) . Pr ovi de t he f ol l owi ng document at i on:
a. Demonst r at e t hat mat er i al s do not exceed maxi mum VOC emi ssi ons of c i t ed st andar ds. VOC aver agi ng i s al l owed wher e coat i ngs ar e subj ect t o human cont act or har sh envi r onment al condi t i ons.
b. Demonst r at e t hat f l oor i ng mat er i al s compl y wi t h VOC emi ssi ons of c i t ed standards.
c. Demonst r at e t hat composi t e wood and agr i f i ber pr oduct s and associ at ed l ami nat i ng adhesi ves cont ai n no added ur ea- f or mal dehyde.
d. Cr eat e and mai nt ai n a l i s t of above l i s t ed pr oduct s used on t he pr oj ect wi t hi n t he bui l di ng vapor bar r i er . Demonst r at e how pr oduct meet s c i t ed standards.
1. 6. 6 I ndoor Ai r Qual i t y Dur i ng Const r uct i on
Pr i or t o const r uct i on, cr eat e I ndoor Ai r Qual i t y Pl an. I mpl ement I AQ pl an dur i ng const r uct i on and f l ush bui l di ng ai r bef or e occupancy.
a. Const r uct i on submi t t al document at i on r equi r ed:
( 1) For new const r uct i on, compl y wi t h ASHRAE 189. 1 Sect i on 10. 3. 1. 4.
( I ndoor Ai r Qual i t y ( I AQ) Const r uct i on Management ) , wi t h maxi mum out door ai r consi st ent wi t h achi evi ng r el at i ve humi di t y no gr eat er t han 60 per cent .
( 2) Pr ovi de r equi r ed document at i on showi ng t hat af t er const r uct i on ends and pr i or t o occupancy, new HVAC f i l t er s wer e i nst al l ed, and bui l di ng ai r was f l ushed out i n accor dance wi t h UFC 1- 200- 02.
SECTI ON 01 33 29. 02 00 Page 5
1. 6. 7 Envi r onment al Pr ef er r ed Pr oduct s
Use pr oduct s desi gnat ed f or Feder al pr ocur ement t o meet envi r onment al l y pr ef er r ed r equi r ement s. Pr ovi de t he f ol l owi ng document at i on:
Pr ovi de l i s t of envi r onment al l y pr ef er abl e pr oduct s used on t hi s pr oj ect t hat meet t he r equi r ement s of UFC 1- 200- 02.
1. 6. 8 Recycl ed Cont ent
AM#3... Pr ovi de mat er i al s on t hi s pr oj ect wi t h aggr egat ed t ot al r ecycl ed cont ent equal t o or gr eat er t han 10 per cent . I n addi t i on, compl yComply ...AM#3 wi t h 40 CFR 247. Ref er t o f or assi st ance i dent i f y i ng pr oduct s c i t ed i n 40 CFR 247. Pr ovi de t he f ol l owi ng document at i on:
AM#3... a. Tot al amount of r ecycl ed cont ent cont ai ned i n bui l di ng mat er i al s as a per cent age of t ot al cost of al l bui l di ng mat er i al s on t he pr oj ect ( mechani cal , el ect r i cal , and pl umbi ng component s, f i r e pr ot ect i on equi pment and t r anspor t at i on ar e excl uded) . a. Not Used. ...AM#3
b. Manuf act ur er s document s st at i ng t he r ecycl ed cont ent by mat er i al , or wr i t t en j ust i f i cat i on f or c l ai mi ng one of t he except i ons al l owed under
RCRA 6002.
c. Pr ovi de mat er i al s meet i ng EPA' s r ecycl ed cont ent , f or EPA- desi gnat ed pr oduct s. EPA' s r ecycl ed cont ent pr oduct desi gnat i ons and r ecycl ed cont ent r ecommendat i ons ar e avai l abl e on EPA' s Compr ehensi ve Pr ocur ement Gui del i ne web si t e at AM#3... http://www.epa.gov /epawaste/conserve/tools/cpg/index.htm. ...AM#3
d. Subst i t ut i ons: Cont r act or may submi t f or Gover nment appr oval , pr oposed al t er nat i ve pr oduct s or syst ems t hat pr ovi de equi val ent per f or mance and appear ance and have gr eat er cont r i but i on t o pr oj ect r ecycl ed cont ent r equi r ement s. For al l such pr oposed subst i t ut i ons, submi t wi t h t he Sust ai nabi l i t y Act i on Pl an accompani ed by pr oduct dat a demonst r at i ng equivalence.
1. 6. 9 Bi o- Based Pr oduct s
Ut i l i ze pr oduct s and mat er i al made f r om bi obased mat er i al s t o t he maxi mum ext ent possi bl e wi t hout j eopar di z i ng t he i nt ended end use or det r act i ng f r om t he over al l qual i t y del i ver ed t o t he end user . Use onl y suppl i es and mat er i al s of a t ype and qual i t y t hat conf or m t o appl i cabl e speci f i cat i ons and st andar ds.
Bi obased pr oduct s t hat ar e desi gnat ed f or pr ef er r ed pr ocur ement under t he USDA Bi oPr ef er r ed Pr ogr am must meet t he r equi r ed mi ni mum bi obased cont ent .
Ref er t o http://www.biopreferred.gov f or t he pr oduct cat egor i es and Bi oPr ef er r ed Cat al og. Pr ovi de t he f ol l owi ng document at i on:
a. For bi obased pr oduct s used on t hi s pr oj ect , pr ovi de bi obased pr oduct cont ent per cent age and bi obased sour ce of mat er i al . I ndi cat e name of t he manuf act ur er , cost of each pr oduct and t he use of each pr oduct on t hi s pr oj ect .
b. For pr oduct s t hat meet USDA Bi opr ef er r ed Pr ogr am, pr ovi de document at i on of USDA Bi opr ef er r ed l abel .
c. Pr ovi de pr oduct dat a, i nvoi ces, and chai n- of - cust ody cer t i f i cat es f or
SECTI ON 01 33 29. 02 00 Page 6 pr oduct s cont ai ni ng cer t i f i ed wood. I ncl ude st at ement i ndi cat i ng cost f or each cer t i f i ed wood pr oduct . Qual i f i ed cer t i f i ed wood i s l abel ed as " FSC Pur e" or " FSC Mi xed Cr edi t " or " FSC Mi xed %" .
1. 6. 10 Wast e Mat er i al Management ( Recycl i ng - Const r uct i on)
Di ver t const r uct i on debr i s f r om l andf i l l di sposal wher e mar ket s or on- si t e r ecycl i ng exi st s i n accor dance wi t h Sect i on 01 74 19. 02 29 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT. Pr ovi de t he f ol l owi ng document at i on:
a. Document at i on showi ng t ot al amount of const r uct i on debr i s di ver t ed f r om l andf i l l as a per cent age of al l const r uct i on debr i s on t he pr oj ect .
b. I ncl ude pr oj ect ' s Const r uct i on Wast e Management Pl an and Wast e Haul i ng Documentation.
1. 6. 11 Ozone Depl et i ng Subst ances
The use of CFC- based r ef r i ger ant s i n HVAC&R syst ems i s pr ohi bi t ed.
El i mi nat e t he use of ozone depl et i ng subst ances ( CFC' s, HCFCs, or Hal ons) dur i ng and af t er const r uct i on wher e al t er nat i ve Envi r onment al Pr ef er r ed Pr oduct s ar e avai l abl e, t aki ng i nt o account l i f ecycl e i mpact s. Meet t he r equi r ement s of ASHRAE 189. 1 Sect i on 9. 3. 3 Ref r i ger ant s f or no CFC- based r ef r i ger ant s i n heat i ng vent i l at i on, ai r condi t i oni ng and r ef r i ger at i on syst ems ( except f or f i r e suppr essi on syst em r equi r ement s, cover ed el sewher e i n t hi s speci f i cat i on) . Pr ovi de t he f ol l owi ng document at i on:
a. MSDS sheet s f or al l r ef r i ger ant s pr ovi ded
b. Pr oduct s t hat meet t he cr i t er i a of U. S. EPA Si gni f i cant New Al t er nat i ves Pol i cy, avai l abl e at http://www.epa.gov/ozone/snap/index.html .
1. 6. 12 Val i dat i on and Cer t i f i cat i on Rest r i ct i ons
The Cont r act or ' s pur chase of r enewabl e ener gy cer t i f i cat es ( RECs) speci f i cal l y t o meet pr oj ect sust ai nabi l i t y goal s i s pr ohi bi t ed.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
3. 1 SUSTAI NABI LI TY COORDI NATI ON
3. 1. 1 Coor di nat i ng Sust ai nabi l i t y Document at i on Pr ogr ess
Pr ovi de sust ai nabi l i t y f ocus and coor di nat i on at t he f ol l owi ng meet i ngs t o achi eve sust ai nabi l i t y goal s. Cont r act or ' s desi gnat ed TPC accr edi t ed sust ai nabi l i t y pr of essi onal r esponsi bl e f or GP document at i on must par t i c i pat e i n t he f ol l owi ng meet i ngs t o coor di nat e document at i on completion.
a. Pr e- Const r uct i on Conf er ence: Di scuss t he f ol l owi ng: HPSB Checkl i st s, Sust ai nabi l i t y Act i on Pl an, I ndoor Ai r Qual i t y Pl an, Const r uct i on Wast e Management Pl an, Const r uct i on submi t t al r equi r ement s and schedul e, i ndi v i dual s r esponsi bl e f or achi evi ng each Gui di ng Pr i nci pl e Requi r ement and TPC pr er equi s i t e and cr edi t .
SECTI ON 01 33 29. 02 00 Page 7
b. Const r uct i on Pr ogr ess Meet i ngs: Revi ew GP sust ai nabi l i t y r equi r ement s wi t h pr oj ect t eam i ncl udi ng cont r act or and sub- cont r act or r epr esent at i ves. Demonst r at e GP document at i on i s bei ng col l ect ed and updated.
( 1) Faci l i t y Tur nover Meet i ngs: Revi ew Hi gh Per f omance and Sust ai nabi l i t y Checkl i st f or compl et eness and i dent i f y any out st andi ng i ssues r el at i ng t o f i nal document at i on r equi r ement s.
( 2) Fi nal Hi gh Per f or mance and Sust ai nabi l i t y Checkl i st Revi ew
3. 2 CONSTRUCTI ON PACKAGE COORDI NATI ON
Ther e i s wor k t o be compl et ed under Const r uct i on Package #2 t hat i s r equi r ed t o achi eve Thi r d- Par t y Cer t i f i cat i on. The Const r uct i on Package #1 cont r act or i s r esponsi bl e f or coor di nat i ng and submi t t i ng t he pr oj ect f or Thi r d- Par t y Cer t i f i cat i on.
- - End of Sect i on - -
SECTI ON 01 33 29. 02 00 Page 8
File details come from the government source that posted it.