DORMITORY, 168 PN EIELSON AFB, AK W911KB-14-R-0017
EIE 326
DESIGN-BUILD RFP i
TABLE OF CONTENTS 19MAR2014
DESIGN-BUILD RFP
TABLE OF CONTENTS
PROVIDED WITH PHASE II OF RFP
DIVISION 00 – PROPOSAL REQUIREMENTS, CONTRACT FORMS AND CONDITIONS ...... Tab 1 Section 00 11 00 ................................................................................................. SF1442/CLIN Schedule Section 00 21 00 .................................................................................................. Instructions to Offerors Section 00 22 10 ........................................... Phase 1 of 2 Phase Design-Build Selection Procedures Section 00 22 20 ............................. Phase 2 Design-Build Selection Procedures and Basis of Award Section 00 45 00 ............................................................................... Representations and Certifications Section 00 72 00 ........................................................................................................... Contract Clauses Section 00 73 00.00 29 ...........................................................................Special Contract Requirements Section 00 73 46 ......................................................................................Wage Determination Schedule
DIVISION 01 - GENERAL REQUIREMENTS ................................................................................ Tab 2 Section 01 19 10.00 29 ....................... Project Description / Minimum Design and Construction Criteria Section 01 19 20.00 29 ............................................................................................. Design After Award Section 01 19 30.00 29 ....................................................................................................... Special Items Section 01 22 00.00 10 ................................................................................ Measurement and Payment Section 01 32 01.00 29 .............................................................................................. Project Schedule Section 01 33 00 .................................................................................................... Submittal Procedures Section 01 33 29 ................................................................................................ LEED™ Documentation Section 01 35 26 ............................................................................. Governmental Safety Requirements Section 01 36 00.00 29 ...................................................................... Radioactive Materials Procedures Section 01 42 00 ............................................................................. Sources for Reference Publications Section 01 45 00.10 10 ............................................................................ Quality Control System (QCS) Section 01 45 04.00 29 ................................................................................... Contractor Quality Control Section 01 50 00 ................................................................................. Temporary Construction Facilities Section 01 57 20.00 10 .................................................................................... Environmental Protection Section 01 57 34.00 29 ...................................................... Storm Water Pollution Prevention Measures Section 01 58 00 ...................................................................................................... Project Identification Section 01 62 35 ..................................................................................... Recycled/Recovered Materials Section 01 74 19.01 29 .............................................. Construction and Demolition Waste Management Section 01 78 00 .................................................................................................... Close-Out Submittals
DIVISION 02 ................................................................................................................................ Tab 3 Section 02 41 00 ..................................................................................................................... Demolition AM#6… Section 02 61 13….………………Excavation and Handling of Contaminated Material …AM#6 Section 02 82 14.00 10 ..................................................................... Asbestos Hazard Control Activities Section 02 83 13.00 20 ........................................................................................... Lead in Construction Section 02 84 16 ........................................ Handling of Lighting Ballasts and Lamps Containing PCBs
DIVISION 31 ................................................................................................................................ Tab 3 Section 31 09 20.00 29 ........................................ Field Screen Testing of Soils for POL Contamination
DIVISION 33 ................................................................................................................................ Tab 3 Section 33 71 02 ................................................................................... Underground Utility Distribution
DORMITORY, 168 PN EIELSON AFB, AK W911KB-14-R-0017
EIE 326
DESIGN-BUILD RFP ii
TABLE OF CONTENTS 19MAR2014
APPENDICES ................................................................................................................................. Tab 4 Appendix 01 ..................................................................................................... Conceptual Drawings Appendix 02 ............................................................................................................. Exhibit Drawings Appendix 03 .............................................................. USAF Unaccompanied Housing Design Guide Appendix 04 ......................................................................... Eielson Architectural Compatibility Plan Appendix 05 .............................................................................................................. LEED Checklist Appendix 06 ............................................ Geotechnical Findings Report and Chemical Data Report Appendix 07 ....................................................................................................... Topographic Survey Appendix 08 .............................................................................................. Hydrant Flow Test Report Appendix 09 .................................................................... Fire Alarm Sequence of Operations Matrix Appendix 10 ............................................................. Eielson AFB Utility Standards & Requirements Appendix 11 ......................................................... EPAct 2005 Title I Subtitle A – Federal Programs Appendix 12 ................................................................................................................ DD Form 1354 Appendix 13 .............................................................................................................. AT/FP checklist Appendix 14 ..................................................... Hazardous Materials Surveys Bldgs 2206 and 2208 Appendix 15 ........................................................................... Furniture, Finishes & Equipment Data Appendix 16 ........................................................................... Electronic Deliverables Requirements Appendix 17 .................................................................................................. Existing Utility As-Builts Appendix 18 .................................................................................. Architectural Aesthetic Reference
Note: Items in RED indicate that information is pending and not available at the time of solicitation.