Section 00 19 10.00 29 Para 2.10

View the file

Other files

File Type Posted
AM_7.pdf PDF
Attachement_10_Energy Sustainability_Record_Card.xlsx XLSX spreadsheet
EIE326-01_19_10_00_29-2_7_AM_6.pdf PDF
EIE326-RoomCriteria_2014-05-05_AM_6.pdf PDF
EIE326_Proosal_Schedule__AM_6.pdf PDF
EIE326_RFP_TOC_2014-05-06_AM_6.pdf PDF
A_3_6_2_J A14-38_Delta_Controls_Redacted.pdf PDF
ProjNet_Bidder_Inquiry_Report.pdf PDF
01_19_10.00_29_2.4.14-Dryers.pdf PDF
A_3_6_2_J A_14-37_Cooper_Redacted.pdf PDF
AM_6.pdf PDF
A_3_6_2_J A_14-35_Knox_Redacted.pdf PDF
A_3_6_2_J A_14-34_BasisV_card_access_Redacted.pdf PDF
A_3_6_2_J A_14-36_Monaco_Redacted.pdf PDF
01_57_20.00_10_Attachment_N_2014-05-06_AM_6.pdf PDF
A_3_6_2_J A_14-33_Best_locks_Redacted.pdf PDF
EIE326-01_19_10_00_29-2_2_AM_5_Pages.pdf PDF
EIE326-RoomCriteria_AM_5.pdf PDF
EIE326-L101_Half_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_8_AM_5_Pages.pdf PDF
AM_5.pdf PDF
APPNDX05-USGBC-CHP-Guidance-for-FTW-Project-AM_5.pdf PDF
EIE326-01_19_10_00_29-2_6.pdf PDF
EIE326-02_61_13_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_4_AM_5_Pages.pdf PDF
EIE326_D1_00_Half_AM_5.pdf PDF
EIE326-L102_Half_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_9_AM_5_Pages.pdf PDF
A.2.11.3.1_SolicAmend_EIE326-AM4.pdf PDF
A.2.11.3.1_SolicAmend_EIE326-AM3.pdf PDF
EIE326_RFP_TAB2_2014-03-24.pdf PDF
EIE326_RFP_TAB3_2014-03-24.pdf PDF
EIE326_RFP_TAB1_2014-03-19.pdf PDF
RevisedSECTION_00_22_20.pdf PDF
Amendment__2.pdf PDF
AM_1.pdf PDF
Module-Aerial.jpg JPG image
EIE326_RFP.pdf PDF
EIE326-RoomCriteria.pdf PDF
EIE326_RFP_TAB4_drawings_2013-12-24.pdf PDF
Module-Aerial-3.jpg JPG image
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DORMITORY, 168 PN EIELSON AFB, AK W911KB-17-R-0017

SECTION 01 19 10.00 29 EIE 326

2.10 SUSTAINABILE DESIGN

2.10.1 SCOPE AND OBJECTIVES

A. This project shall be executed using LEED-NC Version 3.

B. The minimum requirement for this project is to achieve LEED Silver level.

2.10.2 References:

A. UFC 1-200-02 High Performance and Sustainable Building Requirements

B. UFC 3-440-04N Solar Heating of Buildings and Domestic Hot Water

C. UFC 3-530-01 Design: Interior and Exterior Lighting and Controls, with Change 3 Revised

D. ECB 2013-25 Implementation of the Energy & Sustainability Record Card and New DD 1354 Sustainability Codes

E. ECB 2013-9 USACE Implementation of Building Energy Efficiency Tax Deduction Policy for Army Programs

F. ECB 2012-16 Building Air Tightness and Air Barrier Continuity Requirements

2.10.3 Unified Facilities Guide Specifications (UFGS)

A. UFGS 01 33 29.00 20 Sustainable Requirements

B. UFGS 01 33 29 LEED(TM) Documentation

C. UFGS 01 62 35 Recycled/Recovered/Biobased Materials

D. UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning

E. UFGS 07 24 00 Exterior Insulation and Finish Systems

F. UFGS 23 08 00.00 10 Commissioning of HVAC Systems

2.10.4 LEED Credit Validation

A. The project has been registered by the Government. LEED Certification, compiling of documentation at LEED Online and use of the LEED letter templates is required. Registration and payment of registration will be by the Government. Administration/team management of the online project will be by the Contractor. Validation of the credits will be accomplished by the Government. The Contractor will obtain LEED certification prior to project closeout.

Application, payment of certification of fees and all coordination with USGBC during the certification process will be the Contractor. GBCI interim review of design phase data is not required by the Government but is recommended. Government validation during project execution does not relieve or modify in any way the Contractor’s responsibility to satisfy all requirements for certification as defined by LEED and GBCI.

B. Credit validation documentation shall be provided as listed in the LEED Submittals, see attached.

2.10.5 LEED Documentation

A. GOVERNMENT SUBMITTALS AND LEED CERTIFICATION SUBMITTALS. In cases where the content of a LEED certification submittal to GBCI differs from what is required by the

Government (per the applicable “LEED Submittals” document), each submittal is only required to meet its individual requirement. For example, in cases where a signed declaration of compliance by a licensed professional engineer is acceptable documentation for GBCI but Government requires supporting documentation, submit to each entity what they require.

B. DESIGN DOCUMENTS. LEED credit requirements will be incorporated into drawings and specifications, including all required construction phase documentation (as defined in LEED Submittals document).

C. SUPPORTING DOCUMENTATION. Supporting documentation is a separable portion of Design Analysis provided with each required design submittal. Each design submittal will include the LEED Project Checklist identifying all credits claimed. Final design submittal for each portion of the work will include all required design documentation (as defined in LEED Submittals document) for that portion of the work (example - all site credit design documentation with final site design). For registered projects all design documentation will be uploaded to LEED OnLine when final design is submitted.

D. The LEED Submittals document, which is included in all contracts, indicates all required construction phase submittals and when they are due. The majority of the construction phase supporting documentation is a separable closeout submittal. Contractor will update the documentation (including updating at LEED OnLine for registered projects) on at least a monthly basis and make it available for review by the PM, Construction Agent and DPW (BCE for AF projects) on the jobsite at all times during construction. Monthly review of LEED documentation by Construction Agent staff is required and progress payments will be coordinated with this review.

E. FEDERAL ENERGY CONSERVATION MANDATE COMPLIANCE AND LEED OPTIMIZE

ENERGY POINTS CALCULATIONS. Army requires federal energy conservation mandate compliance to be measured as a percentage reduction in annual building energy use that excludes process loads. The LEED 2009 Minimum Energy Performance prerequisite and Optimize Energy credit are based on percentage reduction in annual building energy cost that includes process loads. Thus, separate calculations for both the federal mandate and LEED compliance are required.

F. CENTRAL ENERGY PLANTS. Follow current USGBC guidance. USGBC document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction” dated August 13, 2010, applies to v2.2 and LEED 2009 projects. AM#5… See attachments to Appendix 05 for example of “exceptional calculations” used on a Fort Wainwright design project to address the LEED computations for cogeneration of steam heat and electricity. A similar method should be used for this project. The Designer of Record (through the Contracting Officer) shall be responsible for obtaining the necessary CHPP electrical and steam generation annual data and FY14 Tenant Utility Rates required for the calculations. …AM#5

G. REQUIRED CREDITS. Include the following credits where applicable:

1. SS6 Storm water Design (Quantity and Quality)

2. WE1 Water Efficient Landscaping – no potable water used for irrigation

3. WE3 Water Use Reduction – at least 30% reduction

4. EA1 Optimize Energy – at least 40% reduction new construction, at least 35% reduction existing building renovations

5. EA3 Enhanced Commissioning

6. AM#5… Requirement Deleted …AM#5

7. MR2 Construction Waste Management

8. MR4 Recycled Content

9. IEQ3 Construction IAQ management (both During Construction and Before Occupancy)

10. IEQ7.1 Thermal Comfort Design

2.10.6 LEED REVIEW MEETINGS

A. The LEED Submittals document, which is included in all contracts, indicates all required construction phase submittals and when they are due. The majority of the construction phase supporting documentation is a separable closeout submittal. Contractor will update the documentation (including updating at LEED OnLine for registered projects) on at least a monthly basis and make it available for review by the PM, Construction Agent and DPW (BCE for AF projects) on the jobsite at all times during construction. Monthly review of LEED documentation by Construction Agent staff is required and progress payments will be coordinated with this review.

B. The LEED Submittals document, which is included in all contracts, indicates all required construction phase submittals and when they are due. The majority of the construction phase supporting documentation is a separable closeout submittal. Contractor will update the documentation (including updating at LEED OnLine for registered projects) on at least a monthly basis and make it available for review by the PM, Construction Agent and DPW (BCE for AF projects) on the jobsite at all times during construction. Monthly review of LEED documentation by Construction Agent staff is required and progress payments will be coordinated with this review.

2.10.7 GENERAL INFORMATION

A. IRRIGATION: Landscape and irrigation systems, if provided, shall comply with ASHRAE Standard 189.1, Section 6.3, Mandatory Provisions, and either Section 6.4 Prescriptive Option or Section 6.5, Performance Option. In addition, meet the requirements of Standard 10.3.2.

B. EPA WATERSENSE PRODUCTS AND CONTRACTORS: Except where precluded in this Paragraph or by other project requirements, use EPA WaterSense labeled products and irrigation contractors that are certified through a WaterSense labeled program where available.

C. COMMISSIONING: Execute total building commissioning practices in order to verify performance of building components an systems and ensure that Owner Project Requirements (OPR) are met. Adopt and follow the requirements of ASHRAE Standard 189.1 Section 10.3.1.2, ASHRAE Guideline 0, ASHRAE Guideline 1.1, LEED Energy and Atmosphere (EA) Prerequisite 1 and LEED EA Credit 3. Commission all HVAC systems and equipment, including controls, and all systems requiring commissioning for LEED Enhanced commissioning, in accordance with ASHRAE Guideline 1.1, Guideline 0 and LEED. Do not use the sampling techniques discussed in ASHRAE Guideline 1.1, and ASHRAE Guideline 0. Commission 100% of the lighting, HVAC controls and equipment. Commissioning activities shall be consistent with the Pre-Design Phase, Design Phase, Construction Phase and Occupancy and Operations Phase. Perform and Document a post occupancy system monitoring and inspection to review building operation within 12 months after beneficial occupancy. Post occupancy system monitoring and inspection results will be used to verify compliance with the OPR, to revise and update the Systems Manuals and for completion of the Final Commissioning Report.

D. Work with the Commissioning Authority (CxA) provided by the government. The CA will be certified as a CA by AABC, NEBB or TABB, as described in Guideline 1.1. The CA will communicate and report directly to the Government in execution of commissioning activities.

The Contracting Officer‟s Representative will act as the Owner‟s representative in performance of duties spelled out under OWNER in Annex F of ASHRAE Guideline 0. All buildings with minimum LEED Silver or better requirement will earn LEED credit EA3 Enhanced Commissioning.

E. The Design-Build Contractor shall provide the Commissioning Authority (CxA) to oversee the execution of the commissioning process activities. The CxA shall be certified as a CxA by AABC, NEBB, or TABB, with defined roles and responsibilities as outlined in ASHRAE 189.1 and Annex F of the ASHRAE Guideline 0. The CxA shall be an independent subcontractor and not an employee of the Contractor nor an employee or subcontractor of any other construction subcontractor on this project. The CxA shall be independent of the design. The CxA will provide for and execute LEED Enhanced Commissioning. The CxA will communicate and report directly to the Government in execution of commissioning activities.

F. CONSTRUCTION WASTE MANAGEMENT: a minimum of 60% of nonhazardous construction and demolition waste material generated piror to the issuance of the final certificate of occupancy shall be diverted from disposal in landfills and incinerateors by recycling and/or reuse. Reuse includes the donation of materials to charitable organization, salvage of existing materials onsite, and packaging materials returned to manufacturer, shipper, or other source that will reuse the packaging in the future shipments. Diversion efforts shall be tracked throughout the construction process.

2.10.8 IMPLEMENTATION

A. USGBC Certification. The Contractor shall obtain USGBC LEED Silver certification for this project. The Contractor is responsible for validating sufficient credits with USGBC to achieve LEED Silver certification. Validation of credits by the Government does not meet the requirement for USGBC validation of credits. The contractor shall obtain USGBC certification prior to end of project/contract close out. Application and payment of all fees associated with obtaining certification shall be contractor's responsibility. All coordination with GBCI during certification process shall be done by contractor. The Government will withhold the amount of $50,000, or 1% of the present construction value, whichever is greater, until GBCI LEED Silver certification is obtained and submitted to the Government. The Contractor shall purchase and install a 16” diameter sand blasted clear glass or brass USGBC building plaque

B. LEED Implementation Plan. LEED Implementation Plan shall be submitted within 30 days after notice to proceed. The plan, when completed, shall provide a detailed description of all activities that relate to accomplishing project LEED requirements, including construction practices, procurement practices, and proposed submittals and documentation for each LEED credit. Plan shall also include the following

1. Name of LEED Accredited Professional (AP). An overall responsible LEED AP shall be identified. The LEED AP is responsible from design through construction closeout. During the construction phase, the LEED AP shall review the LEED documentation prior to each monthly pay request and provide confirmation to the Government Representative that credits being pursued are being performed and documented.

2. Name and role of individual(s) on the Contractor's staff responsible for ensuring LEED credits and prerequisites are earned and responsible for assembling documentation. Clearly identify the credits and prerequisite for which each individual is responsible.

3. Name of Commissioning Authority and company, contact information, and commissioning authority certifications.

4. Templates to be used for tracking LEED credits. USGBC templates are not required to be included in LEED Implementation Plan, only additional templates if any.

5. List of all plans required for LEED credit (e.g. waste management plan, commissioning plan). Proposed submittal date of each plan.

6. Implementation plan for cumulative materials credits. Use applicable template with proposed materials, associated estimated costs, and details necessary for LEED Calculations in order to determine if the listed materials can be expected to achieve the project goal. Submit cumulative materials implementation plans before materials purchasing begins.

7. Implementation strategy plan for waste management credit. Provide estimated spreadsheet calculations indicating material description, disposal/diversion location or recycling hauler, weight, total waste generated, total waste diverted, diversion percentages. Estimated calculations are necessary to determine if the estimated quantities are expected to achieve the project goal of 50% waste diversion.

C. Energy and Sustainability (E&S) Report Card. The Contractor shall complete and submit an E&S Report Card with project specific design and construction information for this project. This E&S Report Card shall be submitted and updated with Design Complete, with the Interim DD Form 1354, and at BOD. The Report Card format is available through the following http://www.wbdg.org/ccb/ARMYCOE/COEECB/ecb_2013_25.pdf as an attachment to the PDF.