EIE326
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE326 Design/Construct 168 Person Dormitory, Eielson AFB, Alaska
PROPOSAL DUE DATE remains 3 FEBRUARY 2014, 2:00 PM Alaska Time. Proposals shall be submitted in accordance w ith Section 00 21 00 Paragraph 1.10 Proposal Submittals.
This Amendment provides changes to the solicitation as indicated on page 2 of this document.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 21 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jan-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-14-R-0017
X 9B. DATED (SEE ITEM 11)
02-Jan-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jan-2014
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-14-R-0017
SECTION SF 30 – BLOCK 14 MODIFICATION CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
AMENDMENT #0001
• The following drawings are substituted for the superseded drawings:
NONE
• The following revised documents are substituted for the superseded documents. The identifier “AM#01” appears before and after new and/or revised material and replacement pages are provided, except as noted:
- Section 00 22 10 Paragraph 2.1
- Section 00 22 10 Paragraph 7.1.1, 7.1.2, 7.1.3
- Section 00 22 10 Paragraph 8.1.1
• The following documents/drawings are deleted:
• The following documents are added:
Clause 52.232-40, Providing Accelerated Payments to Small Business Subcontractors
• The following revisions are incorporated:
• Other:
Wage Rates have been updated from General Decision Number: AK120001 12/06/ 2013 AK1 to General Decision Number: AK140001 01/17/2014 AK1
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been added by full text:
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of clause)
The following have been modified:
CLAUSE INDEX
SECTION 00 72 00 CONTRACT CLAUSES
Incorporated by Reference:
52.210-1 Market Research
Incorporated by Full Text:
52.202-1 Definitions 52.203-3 Gratuities 52.203-5 Covenant Against Contingent Fees 52.203-6 Restrictions On Subcontractor Sales To The Government 52.203-7 Anti-Kickback Procedures 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper
Activity 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity 52.203-12 Limitation On Payments To Influence Certain Federal Transactions
52.203-13 Contractor Code of Business Ethics and Conduct 52.203-14 52.203-17
Display of Hotline Poster(s) Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
52.204-4 Printed or Copied Double-Sided on Recycled Paper 52.204-7 Central Contractor Registration 52.204-9 Personal Identity Verification of Contractor Personnel 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors
Debarred, Suspended, or Proposed for Debarment 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
52.211-10 Commencement, Prosecution, and Completion of Work 52.211-12 Liquidated Damages--Construction 52.211-13 Time Extensions 52.211-15 Defense Priority And Allocation Requirements 52.211-18 Variation in Estimated Quantity 52.215-2 Audit and Records--Negotiation 52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications 52.215-13 Subcontractor Cost or Pricing Data--Modifications 52.215-21 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing
Data--Modifications 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns 52.219-8 Utilization of Small Business Concerns 52.219-9 Small Business Subcontracting Plan (Deviation) 52.219-16 Liquidated Damages-Subcontracting Plan 52.219-28 Post-Award Small Business Program Rerepresentation 52.222-3 Convict Labor 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation 52.222-6 Davis Bacon Act 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-13 Compliance with Davis-Bacon and Related Act Regulations.
52.222-14 Disputes Concerning Labor Standards 52.222-15 Certification of Eligibility 52.222-21 Prohibition Of Segregated Facilities 52.222-26 Equal Opportunity 52.222-27 Affirmative Action Compliance Requirements for Construction 52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans 52.222-36 Affirmative Action For Workers With Disabilities 52.222-37 Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam
Era, and Other Eligible Veterans 52.222-40 Notification of Employee Rights Under the National Labor Relations Act 52.222-50 Combating Trafficking in Persons 52.222-54 Employment Eligibility Verification
52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts
52.223-3 Hazardous Material Identification and Material Safety Data 52.223-5 Pollution Prevention and Right-to-Know Information 52.223-6 Drug-Free Workplace 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items 52.223-15 Energy Efficiency in Energy-Consuming Products 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction
Contracts 52.223-18 Contractor Policy to Ban Text Messaging While Driving 52.225-11 Buy American Act--Construction Materials Under Trade Agreements 52.225-13 Restrictions on Certain Foreign Purchases 52.227-1 Authorization and Consent 52.227-2 Notice And Assistance Regarding Patent And Copyright Infringement 52.227-4 Patent Indemnity-Construction Contracts 52.228-2 Additional Bond Security 52.228-5 Insurance - Work On A Government Installation 52.228-11 Pledges Of Assets 52.228-12 Prospective Subcontractor Requests for Bonds 52.228-14 Irrevocable Letter of Credit 52.228-15 Performance and Payment Bonds--Construction 52.229-3 Federal, State And Local Taxes 52.231-5000 Equipment Ownership and Operating Expense Schedule 52.232-5 Payments under Fixed-Price Construction Contracts 52.232-17 Interest 52.232-18 Availability of Funds 52.232-23 Assignment Of Claims 52.232-27 Prompt Payment for Construction Contracts 52.232-33 52.232-39 52.232-40
Payment by Electronic Funds Transfer--Central Contractor Registration Unenforceability of Unauthorized Obligations Providing Accelerated Payments to Small Business Subcontractors
52.232-5000 Payment for Materials Delivered Off-Site 52.233-1 Disputes 52.233-3 Protest After Award 52.233-4 Applicable Law for Breach of Contract Claim 52.236-1 Performance of Work by the Contractor 52.236-2 Differing Site Conditions 52.236-3 Site Investigation and Conditions Affecting the Work 52.236-4 Physical Data 52.236-5 Material and Workmanship 52.236-6 Superintendence by the Contractor 52.236-7 Permits and Responsibilities 52.236-8 Other Contracts 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements 52.236-10 Operations and Storage Areas 52.236-11 Use and Possession Prior to Completion 52.236-12 Cleaning Up 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I 52.236-14 Availability and Use of Utility Services
52.236-15 Schedules for Construction Contracts 52.236-17 Layout of Work 52.236-21 Specifications and Drawings for Construction 52.236-25 Requirements for Registration of Designers 52.236-26 Preconstruction Conference 52.242-13 Bankruptcy 52.242-14 Suspension of Work 52.243-4 Changes 52.243-6 Change Order Accounting 52.244-2 Subcontracts 52.244-6 Subcontracts for Commercial Items 52.246-12 Inspection of Construction 52.246-21 Warranty of Construction 52.248-3 Value Engineering-Construction 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) - Alternate I 52.249-10 Default (Fixed-Price Construction) 52.249-5000 Basis for Settlement of Proposals 52.252-6 Authorized Deviations in Clauses 52.253-1 Computer Generated Forms 252.201-7000 Contracting Officer's Representative 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related
Felonies 252.203-7002 Requirement to Inform Employees of Whistleblower Rights 252.203-7003 Agency Office of the Inspector General 252.204-7000 Disclosure Of Information 252.204-7003 Control Of Government Personnel Work Product 252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A 252.205-7000 Provision of Information to Cooperative Agreement Holders 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country 252.215-7000 Pricing Adjustments 252.219-7003 Small Business Subcontracting Plan (DOD Contracts) (Deviation) 252.223-7001 Hazard Warning Labels 252.223-7004 Drug Free Work Force 252.223-7006 Prohibition On Storage And Disposal Of Toxic And Hazardous Materials 252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and
Native Hawaiian Small Business Concerns 252.227-7022 Government Rights (Unlimited) 252.227-7033 Rights in Shop Drawings 252.231-7000 Supplemental Cost Principles 252.232-7010 Levies on Contract Payments 252.236-7000 Modification Proposals-Price Breakdown 252.236-7001 Contract Drawings, and Specifications 252.243-7001 Pricing Of Contract Modifications 252.243-7002 Requests for Equitable Adjustment 252.244-7000 Subcontracts for Commercial Items and Commercial Components (DoD
Contracts) 252.247-7023 Transportation of Supplies by Sea
252.247-7024 Notification Of Transportation Of Supplies By Sea
UAI CLAUSES:
52.236-5000 Design-Build Contract Order of Precedence 52.236-5001 Personnel, Subcontractors and Outside Associates or Consultants 52.236-5002 Government-Furnished Specifications, Drawings, Surveys, and Specifications in the Request for Proposal 52.236-5003 Government-Furnished Specifications and Drawings for Construction 52.236-5004 Responsibility of the Contractor for Design 52.236-5005 Warranty of Design 52.236-5006 Deviating from the Accepted Design 52.236-5007 Contractor's Role During Design Process 52.236-5008 Value Engineering After Award 52.236-5009 Partnering 52.236-5010 Government Re-Use of Design
SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES
The following have been modified:
WAGE DETERMINATION
General Decision Number: AK140001 01/17/2014 AK1
Superseded General Decision Number: AK20130001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 01/03/2014 1 01/17/2014
ASBE0097-001 09/02/2013
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 34.88 18.67
ASBE0097-002 09/02/2013
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 34.88 18.67
BOIL0502-002 01/01/2013
Rates Fringes
BOILERMAKER......................$ 42.97 26.60
BRAK0001-002 07/01/2013
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 39.03 18.86 Tile & Terrazzo Finisher.........$ 33.27 18.86
CARP1501-001 09/01/2013
Rates Fringes
MILLWRIGHT.......................$ 34.99 20.54
CARP2520-003 09/01/2013
Rates Fringes
Diver Stand-by....................$ 40.90 22.59 Tender......................$ 39.90 22.59 Working.....................$ 80.70 22.59 Piledriver Carpenter...................$ 36.59 22.59 Piledriver; Skiff Operator and Rigger..................$ 36.59 22.59 Sheet Stabber...............$ 36.59 22.59 Welder......................$ 42.15 22.59
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot
101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2013
Rates Fringes
CARPENTER
Carpenter...................$ 36.59 22.59 Lather/Drywall Applicator...$ 36.59 22.59
ELEC1547-004 04/01/2013
Rates Fringes
CABLE SPLICER....................$ 39.87 3%+$22.93
Electrician;Technician...........$ 38.12 3%+$22.93
ELEC1547-005 10/01/2013
Line Construction
Rates Fringes
CABLE SPLICER....................$ 50.52 3%+26.18
Linemen (Including Equipment Operators, Technician)...........$ 48.77 3%+26.18 Powderman........................$ 46.77 3%+26.18
TREE TRIMMER.....................$ 34.12 3%+19.48
* ELEV0019-002 01/01/2014
Rates Fringes
ELEVATOR MECHANIC................$ 50.42 26.785+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
* ENGI0302-002 01/01/2014
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 39.28 20.35
GROUP 1A....................$ 41.04 20.35
GROUP 2.....................$ 38.51 20.35
GROUP 3.....................$ 37.79 20.35
GROUP 4.....................$ 31.58 20.35
TUNNEL WORK
GROUP 1....................$ 43.21 20.35
GROUP 1A...................$ 45.14 20.35
GROUP 2....................$ 42.36 20.35
GROUP 3....................$ 41.57 20.35
GROUP 4....................$ 34.74 20.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 08/01/2013
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 33.55 25.53
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 30.05 25.53
GUARDRAIL LAYOUT MAN........$ 30.79 25.53
HELICOPTER, TOWER...........$ 34.55 25.53
LABO0341-005 07/01/2013
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 29.25 22.32
GROUP 2.....................$ 30.25 22.32
GROUP 3.....................$ 31.15 22.32
GROUP 3A....................$ 34.43 22.32
GROUP 3B....................$ 35.26 22.32
GROUP 4.....................$ 18.82 22.32
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 32.18 22.32
GROUP 2....................$ 33.28 22.32
GROUP 3....................$ 34.27 22.32
GROUP 3A...................$ 37.87 22.32
GROUP 3B...................$ 38.79 22.32
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 07/01/2013
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 29.25 22.32
GROUP 2.....................$ 30.25 22.32
GROUP 3.....................$ 31.15 22.32
GROUP 3A....................$ 34.43 22.32
GROUP 3B....................$ 35.26 22.32
GROUP 4.....................$ 18.82 22.32
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 32.18 22.32
GROUP 2....................$ 33.28 22.32
GROUP 3....................$ 34.27 22.32
GROUP 3A...................$ 37.87 22.32
GROUP 3B...................$ 38.79 22.32
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 03/01/2013
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 30.15 19.10
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 30.67 19.10
PAIN1959-002 03/01/2013
SOUTH OF THE 63RD PARALLEL
Rates Fringes
Painters:
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 28.39 18.85 Machine Taper/Drywall.......$ 29.64 18.85 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 29.74 18.85
PAIN1959-003 01/01/2013
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 35.76 18.61
PAIN1959-004 07/01/2012
Rates Fringes
FLOOR LAYER: Carpet.............$ 30.09 13.02
PAIN1959-006 01/01/2013
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 35.76 17.86
PLAS0867-001 02/01/2013
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 34.94 19.56 South of the 63rd parallel..$ 34.69 19.56
PLAS0867-004 02/01/2013
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 34.69 19.56 South of the 63rd parallel..$ 34.44 19.56
PLUM0262-002 07/01/2013
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 36.02 25.62
PLUM0367-002 07/01/2013
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 38.46 20.74
PLUM0375-002 07/01/2013
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 39.96 20.85
PLUM0669-002 07/01/2013
Rates Fringes
SPRINKLER FITTER.................$ 42.05 21.67
SHEE0023-003 07/01/2012
South of the 63rd Parallel
Rates Fringes
Sheet Metal Worker...............$ 39.49 19.88
SHEE0023-004 07/01/2012
North of the 63rd Parallel
Rates Fringes
Sheet Metal Worker...............$ 44.08 19.59
TEAM0959-003 09/01/2013
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 38.89 18.57
GROUP 1A....................$ 40.16 18.57
GROUP 2.....................$ 37.63 18.57
GROUP 3.....................$ 36.81 18.57
GROUP 4.....................$ 36.23 18.57
GROUP 5.....................$ 35.47 18.57
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section 00 22 10 W911KB-14-R-0017
Section 00 22 10
SECTION 00 22 10
REV 6.9 –31 MAY 2011
PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES
1.0 OVERVIEW
2.0 GENERAL INSTRUCTIONS
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
4.0 TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET
5.0 TAB B – FACTOR 1 – SPECIALIZED EXPERIENCE
6.0 TAB C – FACTOR 2 – PAST PERFORMANCE
7.0 TAB D – FACTOR 3 – ORGANIZATION
8.0 TAB E – FACTOR 4 – TECHNICAL APPROACH
9.0 PHASE 1 OVERALL RATING
10.0 PHASE 1 EVALUATION PROCEDURES
10.1 SOURCE SELECTION EVALUATION BOARD (SSEB)
10.2 EVALUATION
10.3 DEFINITIONS
10.4 EVALUATION AND RATING SYSTEM
10.5 PAST PERFORMANCE RELEVANCY RATING AND PERFORMANCE CONFIDENCE ASSESSMENT
PHASE ONE – SECTION 00 22 10 ATTACHMENTS
1 – PROPOSAL DATA SHEET
2 – COMPANY SPECIALIZED EXPERIENCE – CONSTRUCTION OR PRIME CONTRACTOR
3 – COMPANY SPECIALIZED EXPERIENCE – DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY
4 – PAST PERFORMANCE QUESTIONNAIRE (PPQ)
5 – KEY PERSONNEL RESUME
1.0 OVERVIEW
1.1. In Phase 1 of the 2 phase design-build selection procedure, interested firms or joint venture entities (referred to as “offerors”) submit certain specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and intends to target three (3) of the Phase 1 offerors to compete for the design-build contract in Phase 2. The intent of the solicitation, however, is to obtain the best value proposal, therefore the Government reserves the right to select additional offerors to participate in Phase 2 if it is determined to be in its best interest.
1.2. In Phase 2, the short-listed offerors will submit proposals in accordance with Section 00 22 20.
1.3. The short-listed Offerors will be announced by special notice or synopsis to the Federal Business Opportunities website (https://www.fbo.gov).
2.0 GENERAL INSTRUCTIONS
2.1. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals.
Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal. To qualify for Phase 2, the Offeror or Offeror’s subcontractor has to have or will have to have professional architects and engineers, registered in the appropriate technical disciplines in compliance with the requirements specified in Contract Clause, “Requirements for Registration of Designers” and AM#1 Appendix BB, Section 01 33 16 Supplemental Data Section 01 19 20.00 29 Design After Award, 1.3 Designer of Record AM#1. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.
2.2. Submit the Phase 1 proposal in a tabbed, three-ring binder. Note that the Government will not evaluate any material that exceeds the page limits indicated in the sections below. PHASE 1 DOES NOT INVOLVE PRICING SUBMISSION.
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
Location
Factor Number
Description
Relative Importance
Tab A
SF 1442 and Proposal Data Sheet
N/A
Tab B
Factor 1
Specialized Experience
1st (Equal to Factors 2, 3 and 4)
Tab C
Factor 2
Past Performance (Confidence Assessment)
1st (Equal to Factors 1, 3 and 4)
Tab D
Factor 3
Organization
1st (Equal to Factors 1, 2 and 4)
Tab E
Factor 4
Technical Approach
1st (Equal to Factors 1, 2 and 3)
4.0 TAB A - STANDARD FORM 1442 AND PROPOSAL DATA SHEET
4.1. Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See Attachment 1, provided at the end of this Section). Also include joint venture agreement or LLC Certificate of Organization, Articles of Organization and the Operating Agreement, if applicable (see Section 00 21 00, paragraph 1.12).
https://www.fbo.gov/
5.0 TAB B – FACTOR 1 - SPECIALIZED EXPERIENCE
5.1. SUBMISSION REQUIREMENTS
The prime contractor and designer of record design firms for civil, architectural, structural, mechanical and electrical design shall each demonstrate recent, relevant experience on similar projects, using the Company Specialized Experience – Construction or Prime Contractor form (Attachment 2), and the Company Specialized Experience – Design Firm or In-House Design Capability form (Attachment 3) at the end of this Section (no more than 2 pages per project). Attachment 3 may also be used for consultants with dormitory experience if included as part of the design build team. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a joint venture, each firm of the joint venture shall provide information demonstrating experience relevant to their role on this project. Submit projects that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer than five (5) years preceding the date of this Solicitation. Project examples should be limited to those projects performed by the firm submitting an offer. The Government will only evaluate the experience of the firm submitting the offer. The requirements of this factor cannot be met through the experience of the offeror’s parent, affiliate, or separate division. An offeror may receive credit for relevant experience under a previous business arrangement (joint venture for example) if the offeror demonstrates that their role on the submitted project is relevant to their role on this project. The offeror shall select the design firm(s). Design firms may list projects of prime contractors they have worked for, or projects directly contracted with Government, private or commercial customers. If projects were design-build, so identify them. Submit no more than five (5) projects for the prime contractor for the below facility type or equivalent or similar commercial or institutional type facility. Submit no more twelve (12) projects total for the design firms and consultant, if applicable, and no more than five (5) projects for any individual design firm/consultant.
Eielson Airman Dormitory Facility
5.1.1 Provide a one page consolidated list of submitted projects for prime contractor and design firms to include a matrix that identifies the Specialized Experience projects and the firms that worked on each (teaming).
5.1.2 Provide a supplemental narrative, not to exceed two pages, to address any of the following that are applicable. The information shall be limited to projects that are well underway or that have been completed and turned over no longer than five years preceding the date of this solicitation.
(a) If submitting relevant experience under a previous business relationship, clearly describe the offeror’s role on the submitted project.
(b) Describe any previous teaming experience between current team members, if not described on the project experience forms. Identify specific projects.
(c) Describe team members’ experience with Sustainable Design and Development, if not included on the project experience forms.
(d) Describe design-build experience on other type projects. Identify specific projects.
5.2. EVALUATION CRITERIA:
5.2.1. The Government will evaluate the extent of recent, relevant experience of the prime contractor and design firms in design, construction or design-build, with regard to their role on this project. If the design will be accomplished in-house, rather than by subcontract, then the design element of Specialized Experience will still be evaluated, realizing that the work is being done in-house. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience. In assessing relevancy of Specialized Experience, the relevancy ratings included under the Past Performance evaluation factor will be utilized.
5.2.2. The Offeror must submit the requested information to demonstrate a record of recent, related experience in both design and construction, for the facility type (which may include similar state or local government or private counterparts) included in this contract, as described in Section 00 22 10. Recent experience includes projects well underway (at least 50% construction progress completed) or those completed and turned over within five (5) years preceding the date of this solicitation for design or construction experience. Partners of Joint Venture offerors shall each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.
5.2.3. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
5.2.4. To receive credit for extent (amount) of experience, the Offeror and its proposed design firm(s) shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project. Experience of a parent, affiliate or separate division will not be considered. Experience under a previous business arrangement will not be considered relevant if the offeror’s role on the project is not considered relevant.
5.2.5. The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and experience with local conditions. Some examples of relevancy to this project may include:
(1) Size, type of work and complexity.
(2) Location of work and similarity to the climate of Climate Zone 8 as defined by ANSI/ASHRAE Standard 169 climate zone map for the United States.
(3) Firm's role and extent of work self-performed (brokering out all work and simply “pouring the sidewalks” on a cited project are examples of less relevant experience).
(4) Construction on sites with known permafrost.
5.2.6. Previous design-build (D-B) experience is not necessary for an…