Design/Construct 168 Person Dormitory (EIE326), Eielson AFB, Alaska
Solicitation number
W911KB-14-R-0017
Issued by

View the file

Other files

File Type Posted
AM_7.pdf PDF
Attachement_10_Energy Sustainability_Record_Card.xlsx XLSX spreadsheet
EIE326-01_19_10_00_29-2_7_AM_6.pdf PDF
EIE326-RoomCriteria_2014-05-05_AM_6.pdf PDF
EIE326_Proosal_Schedule__AM_6.pdf PDF
EIE326_RFP_TOC_2014-05-06_AM_6.pdf PDF
A_3_6_2_J A14-38_Delta_Controls_Redacted.pdf PDF
ProjNet_Bidder_Inquiry_Report.pdf PDF
01_19_10.00_29_2.4.14-Dryers.pdf PDF
A_3_6_2_J A_14-37_Cooper_Redacted.pdf PDF
A_3_6_2_J A_14-35_Knox_Redacted.pdf PDF
A_3_6_2_J A_14-34_BasisV_card_access_Redacted.pdf PDF
A_3_6_2_J A_14-36_Monaco_Redacted.pdf PDF
01_57_20.00_10_Attachment_N_2014-05-06_AM_6.pdf PDF
A_3_6_2_J A_14-33_Best_locks_Redacted.pdf PDF
EIE326-01_19_10_00_29-2_2_AM_5_Pages.pdf PDF
EIE326-RoomCriteria_AM_5.pdf PDF
EIE326-L101_Half_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_8_AM_5_Pages.pdf PDF
AM_5.pdf PDF
APPNDX05-USGBC-CHP-Guidance-for-FTW-Project-AM_5.pdf PDF
EIE326-01_19_10_00_29-2_6.pdf PDF
EIE326-02_61_13_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_4_AM_5_Pages.pdf PDF
EIE326-01_19_10_00_29-2_10_AM_5.pdf PDF
EIE326_D1_00_Half_AM_5.pdf PDF
EIE326-L102_Half_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_9_AM_5_Pages.pdf PDF
A.2.11.3.1_SolicAmend_EIE326-AM4.pdf PDF
A.2.11.3.1_SolicAmend_EIE326-AM3.pdf PDF
EIE326_RFP_TAB2_2014-03-24.pdf PDF
EIE326_RFP_TAB3_2014-03-24.pdf PDF
EIE326_RFP_TAB1_2014-03-19.pdf PDF
RevisedSECTION_00_22_20.pdf PDF
Amendment__2.pdf PDF
AM_1.pdf PDF
Module-Aerial.jpg JPG image
EIE326_RFP.pdf PDF
EIE326-RoomCriteria.pdf PDF
EIE326_RFP_TAB4_drawings_2013-12-24.pdf PDF
Module-Aerial-3.jpg JPG image
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIE326

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: EIE326 Design/Construct 168 Person Dormitory, Eielson AFB, Alaska

PROPOSAL DUE DATE remains 12 May 2014, 2:00 PM Alaska time. Proposals shall be submitted in accordance w ith Section 00 21 00 Paragraph 1.10 Proposal Submittals.

This amendment provides changes to the solicitation as indicated on page 2 of this document.

YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-May-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-14-R-0017

X 9B. DATED (SEE ITEM 11)

02-Jan-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-May-2014

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-14-R-0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #0006

The following drawings are substituted for the superseded drawings:

NONE

The following revised documents are substituted for the superseded documents. The identifier “AM#06” appears before and after new and/or revised material and replacement pages are provided, except as noted:

o EIE326 Proposal Schedule o Design-Build RFP Table of Contents o Section 01 19 10.00 29 Room Criteria Sheets o Section 01 19 10.00 29 Paragraph 2.4.14 o Section 01 19 10.00 29 Paragraph 2.7

The following documents/drawings are deleted:

The following documents are added:

Appendix N – Environmental Work Plan for Projects With No Known Contamination

The following revisions are incorporated:

Other:

ProjNet Inquiry Report with Questions and Answers is attached.

W911KB-14-R-0017

(End of Summary of Changes)