EIE326_Proosal_Schedule__AM_6.pdf

PDF 15 KB Posted

Attached to
Design/Construct 168 Person Dormitory (EIE326), Eielson AFB, Alaska
Solicitation number
W911KB-14-R-0017
Issued by

About this file

Proposal Schedule

View the file

Other files

File Type Posted
AM_7.pdf PDF
Attachement_10_Energy Sustainability_Record_Card.xlsx XLSX spreadsheet
EIE326-01_19_10_00_29-2_7_AM_6.pdf PDF
EIE326-RoomCriteria_2014-05-05_AM_6.pdf PDF
EIE326_RFP_TOC_2014-05-06_AM_6.pdf PDF
A_3_6_2_J A14-38_Delta_Controls_Redacted.pdf PDF
ProjNet_Bidder_Inquiry_Report.pdf PDF
01_19_10.00_29_2.4.14-Dryers.pdf PDF
A_3_6_2_J A_14-37_Cooper_Redacted.pdf PDF
AM_6.pdf PDF
A_3_6_2_J A_14-35_Knox_Redacted.pdf PDF
A_3_6_2_J A_14-34_BasisV_card_access_Redacted.pdf PDF
A_3_6_2_J A_14-36_Monaco_Redacted.pdf PDF
01_57_20.00_10_Attachment_N_2014-05-06_AM_6.pdf PDF
A_3_6_2_J A_14-33_Best_locks_Redacted.pdf PDF
EIE326-01_19_10_00_29-2_2_AM_5_Pages.pdf PDF
EIE326-RoomCriteria_AM_5.pdf PDF
EIE326-L101_Half_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_8_AM_5_Pages.pdf PDF
AM_5.pdf PDF
APPNDX05-USGBC-CHP-Guidance-for-FTW-Project-AM_5.pdf PDF
EIE326-01_19_10_00_29-2_6.pdf PDF
EIE326-02_61_13_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_4_AM_5_Pages.pdf PDF
EIE326-01_19_10_00_29-2_10_AM_5.pdf PDF
EIE326_D1_00_Half_AM_5.pdf PDF
EIE326-L102_Half_AM_5.pdf PDF
EIE326-01_19_10_00_29-2_9_AM_5_Pages.pdf PDF
A.2.11.3.1_SolicAmend_EIE326-AM4.pdf PDF
A.2.11.3.1_SolicAmend_EIE326-AM3.pdf PDF
EIE326_RFP_TAB2_2014-03-24.pdf PDF
EIE326_RFP_TAB3_2014-03-24.pdf PDF
EIE326_RFP_TAB1_2014-03-19.pdf PDF
RevisedSECTION_00_22_20.pdf PDF
Amendment__2.pdf PDF
AM_1.pdf PDF
Module-Aerial.jpg JPG image
EIE326_RFP.pdf PDF
EIE326-RoomCriteria.pdf PDF
EIE326_RFP_TAB4_drawings_2013-12-24.pdf PDF
Module-Aerial-3.jpg JPG image
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911KB-14-R-0017

PROPOSAL SCHEDULE

CONSTRUCT 168 PERSON DORMITORY

EIELSON AFB, ALASKA

Item Estimated No. Description Quantity Unit Unit Price Amount

BASE ITEMS (Design and Construct)

0001. Design Dormitory and Site Work, complete. 1 Lump sum $ $

0002. Construct 144 Person Dormitory (36 modules) within the building 5-foot lines, complete. 1 Lump sum $ $

0003. Construct Dormitory site work and utilities beyond the building 5-foot lines, complete. 1 Lump sum $ $

0004. Demolish Buildings 2206 and 2208, complete. 1 Lump sum $ $

Total of Items 001 thru 004: $

OPTIONAL ITEMS (Design and Construct)

0005. (Option 1) Design and construct Additional Two modules with 4 people/module To total 38 modules 1 Lump sum $ $

0006. (Option 2) Design and construct Additional Two modules with 4 people/module To total 40 modules 1 Lump sum $ $

0007. (Option 3) Design and construct Additional Two modules with 4 people/module To total 42 modules 1 Lump sum $ $

0008. (Option 4) Enhanced Landscaping 1 Lump sum $ $

0009. (Option 5) Add 136 Headbolt Heaters 1 Lump sum $ $

0010. (Option 6) Upgrade Parking Lot Lighting 1 Lump sum $ $

0011. (Option 7) Underground Power Distribution Inside Project Boundary 1 Lump sum $ $

AM#4…

0012. (Option 8) Exterior LED Site Lighting Deleted in its entirety.

0013 0012. (Option 9) BBQ Shelter 1 Lump sum $ $

0014 0013. (Option 10) Reconfigure Kobuk Loop Traffic Flow 1 Lump sum $ $

0015 0014. (Option 11) Smoking Shelter 1 Lump sum $ $

0016 0015. (Option 12) Remove, Sample and Stockpile 100 cubic yards of Potentially POL Contaminated Soil (PID readings of 20 ppm and above), including construction of ADEC-compliant temporary holding cells, complete. AM#6… Soils found to be contaminated shall be remediated in accordance with 01 57 20.00 10 Environmental Protection, Appendix N – EAFB Environmental Work Plan for Projects with No Known Contamination.

100 Cubic Yards $ $ 0016. (Option 12) Remove, Sample and Stockpile 100 cubic yards of Potentially POL Contaminated Soil (PID readings of 20 ppm and above), including construction of ADEC-compliant temporary holding cells, complete. Soils found to be contaminated shall be remediated in accordance with 01 57 20.00 10 Environmental Protection, Appendix N – EAFB Environmental Work Plan for Projects with No Known Contamination.

100 Cubic Yards $ $

Total of Items 0005 and through 0016 0015 0016: $

…AM#4…AM#6

Total of Base and Options Items: $

EVALUATION OF OFFERS.

1. AWARD: Award will be made in accordance with Section 00 22 20 – Phase 2 Design-Build Selection

Procedures and Basis of Award.

2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

4. SPECIAL CONDITION: If a modification to an offer based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.

5. EVALUATION OF OPTIONS: The Government will evaluate offers for award purposes by adding the total price of all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Options may be awarded in any order; the Contractor will be notified in writing of the Government’s intent to exercise an option. Options may be awarded up to 60 calendar days from date of award.

--END OF PROPOSAL SCHEDULE –