ATT_T__-_Electrical_GIS_SOP.pdf
PDF 904 KB Posted
- Attached to
- Open End Electrical Requirements Contract Federal contract opportunity
- Solicitation number
- W91151-16-B-0021
About this file
Exhibit T - Electrical GIS SOP
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDING OPERATING Directorate of Public Works
PROCEDURES 1Il Corps and Fort Hood, TX
NO. QAOOI Fort Hood, TX 76544-5028
Electrical Geographic Information System
1. PURPOSE: To outline the responsibilities for collecting, updating, and maintaining data required for key electrical point of interest in electric distribution system.
2. OBJECTIVE:
a. To keep GIS electrical data Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE) compliant, accurate, and up to date to allow for inventory tracking and modeling purpose.
b. To provide worksheets and responsibilities for collecting data to be in stored in GIS SDSFIE tables.
3. APPLICABILITY: This Standard Operating Procedure (SOP) is applicable to Contractors, Contracting Officer Representatives (COR), Engineering & Services Division, and any and all entities making changes or additions to Fort Hood's electrical distribution system. The SOP applies to all facilities. Directorate ofPublic Works (DPW) Engineering has oversight of all contracts and work being executed that impacts the electric distribution system.
4. RESPONSIBILITY:
| A. | Contractor Responsibility |
| 1. | Shall gather all data required in worksheet to include a profile picture Gpg) |
on all key electrical points of interest after installation.
11. All data shall be gathered for existing, altered, and new electrical points of interest.
lll. Shall verify all existing worksheet data provided by the government.
| IV. | New install worksheets shall be complete and accurate. |
| v. | Shall ensure data is accurate and complete prior to final as-builts being |
turned- in. Applicable information and identified procedures by Government shall be included on as-built drawings.
VI. All worksheets and other required information shall be turned-in to Electrical Champion through COR or Government Project Manager.
VII. Install labels on point of interests.
B. Government Project Manager Responsibilities
1. Shall provide ID for all new and replacements electrical points.
11. Shall provide current data on all existing electrical points.
1l1. Shall identify all new electrical points of interests.
| C. | Government Exterior Electrical Maintenance Shop |
| 1. | . Shall inform Electrical Champion of all repairs, demo, modifications, and |
additions, made to system via emaiL
Attachment T - Electrical GIS SOP For Bidding Purposes Only
ATT T - 1 02.01.2016
STANDING OPERATING Directorate of Public Works PROCEDURES III Corps and Fort Hood, TX NO. QA 001 Fort Hood, TX 76544-5028
11. Shall complete worksheets with basic data (model, manufacture, KV A, type, wattage, date of installation, describe of repair, class, height) on all repairs, new installations, and modifications made to system and turn worksheets in to Electrical Champion via email.
| 111. | Ensure all data in worksheets are correct and accurate. |
| IV. | Shall include a sketch oflocation ofthe key element and electrical points of |
interest and turn worksheets in to Electrical Champion.
D. Government Electrical Champion responsibilities
1. Shall assign ID's to all points of interest.
| 11. | Maintain the master number tracking system. |
| 111. | Shall field verify all data supplied by Maintenance shop and other entities. |
| IV. | Shall get coordinates and profile picture (jpg) ofkey element supplied by |
government Maintenance shop.
v. Shall be technical adviser for all worksheets
5. ELECTRICAL POINTS OF INTEREST:
| A. | Capacitor Banks |
| B. | Lights |
| C. | Meters |
| D. | Poles |
| E. | Regulators |
| F. | Primary Switch |
| G. | Transformers |
| H. | Riser |
| I. | Man Holes |
6. ATTACHMENTS
| A. | Worksheet for Capacitor Banks |
| B. | Worksheet for Exterior Lights |
| C. | Worksheet for Meter |
| D. | Worksheet for Poles |
Worksheet for Regulators
| F. | Worksheet for Switches |
| G. | Worksheet for Transformer and Transformer Banks |
H. Worksheet for Risers
L Worksheet for Man Holes
It.( 0~l ~
M~
ROBERT D. ERWIN
Chief, Engineering and Services Division
Attachment T - Electrical GIS SOP
ATT T - 2 02.01.2016
SOP NO. QA 001 - Attachment 6.A.
Capacitor Banks Worksheet (For new and existing capacitor banks)
Contractor shall fill in the following data on all capacitors on project
1. Capacitor ID ________________________
2. Disposition ________________________
3. Type of Installation ________________________
4. Switch ________________________
5. Voltage ________________________
6. Capacitor KV rating ________________________
7. Unit of Measure for Capacitor ________________________
8. Letter phase Connected ________________________
9. Number of Phases ________________________
10. Control Type ________________________
11. Manufacture ________________________
12. Model Number ________________________
13. Grid Value ________________________
14. Coordinate X ________________________
15. Coordinate Y ________________________
16. Coordinate Z ________________________
17. Substation ID ________________________
18. Facility ID ________________________
19. Date of Installation ________________________
20. Narrative ________________________
Attachment T - Electrical GIS SOP
ATT T - 3 02.01.2016
SOP NO. QA 001 - Attachment 6.A.
Instructions for Capacitor Banks Worksheet (For new and existing capacitor banks)
1. Capacitor ID – First digits will reference 1 to 100 gird Fort Hood ID. Followed by CB000#. The capacitor bank ID shall be assigned by Project Manager of the project.
2. Disposition – The status of the subject item (e.g., permanent, temporary, proposed, abandoned, etc.), from lists or entered from field inspections.
3. Type of Installation - The type installation of the subject item.
4. Switch - This indicates whether the capacitor is presently in the circuit or is not presently in the circuit.
5. Voltage - The system voltage across the capacitor.
6. Capacitor KV Rating - The rating of the capacitor's ability to provide reactive power to a circuit.
7. Unit of Measure for Capacitor - The unit of measure for the electrical capacitor.
8. Letter phase Connected - The letter(s) of the phase(s) for the subject item.
9. Number of Phases - The number of phases to which this device provides reactive power.
10. Control Type - The method of adjusting the kilovar output of the capacitor.
11. Manufacture - The name of the manufacture.
12. Model Number - The Model, Product, Catalog, or Item Number of subject item.
13. Grid Value – Grid number based on one to 100 grid system.
14. Coordinate X - The x component of individual coordinate point.
15. Coordinate Y - The y component of individual coordinate point.
16. Coordinate Z - The z component of individual coordinate point.
17. Substation ID - An operator generated identifier locally used to identify the substation feeding this bus group. MF – Main Fort Hood Substation, WF – West Fort Hood Substation, CR- Clark Road Substation, NF – North Fort Hood Substation
18. Facility ID – Facility the it may be associated with
19. Date of Installation – The date on which the subject item was installed. Format for date is
YYYYMMDD
20. Narrative – A description or other unique information concerning the subject item, limited to 240 characters.
ATT T - 4 02.01.2016
SOP NO. QA 001 - Attachment 6.B.
Exterior Lights Worksheet (For new and existing Exterior Lights)
Contractor shall fill in the following data on all Exterior Lights detached from the building on project
1. Exterior Light ID ________________________
2. Light Type ________________________
3. Number of Lamps ________________________
4. Watts ________________________
5. Voltage ________________________
6. Pole ID attached ________________________
7. Grid Value ________________________
8. Coordinate X ________________________
9. Coordinate Y ________________________
10. Coordinate Z ________________________
11. Mounted Height ________________________
12. Date of Installation ________________________
13. Narrative ________________________
ATT T - 5 02.01.2016
SOP NO. QA 001 - Attachment 6.B.
Instructions for Exterior Lights Worksheet (For new and existing Exterior Lights)
1. Exterior Light ID – First digits will reference 1 to 100 grid Fort Hood ID. Followed by LE1000#.
Each ID shall be assigned by Project Manager of the project.
2. Light Type - Various kinds of mounts for external lights – LED, MH, LPS
3. Number of Lamps - The total number of lamps in fixture.
4. Watts - The light fixture wattage specification.
5. Voltage - The system voltage applied to the light fixture.
6. Pole ID – Pole ID Light attached to, if applicable
7. Grid Value - A numeric identification of a raster element in an image or grid that represents the feature.
8. Coordinate X - The x component of individual coordinate point. Format (WGS_1984_UTM_Zone 14N)
9. Coordinate Y - The y component of individual coordinate point. Format (WGS_1984_UTM_Zone 14N)
10. Coordinate z - The z component of individual coordinate point. Format (WGS_1984_UTM_Zone 14N)
11. Mount Height - The fixture mounting height in feet
12. Date of Installation – The date on which the subject item was installed. Format for date is
YYYYMMDD
13. Narrative – additional info on light
ATT T - 6 02.01.2016
SOP NO. QA 001 - Attachment 6.C.
Meter Worksheet (For new and existing meters)
Contractor shall fill in the following data on all meters on project
1. Meter ID ________________________
3. Manufacture ________________________
4. Model ________________________
5. Meter Type ________________________
6. Watt Node Meter ________________________
7. Serial Number ________________________
8. Voltage ________________________
9. Capacity of KVA ________________________
10. Frequency of system ________________________
11. KW Rate ________________________
12. Facility Number ________________________
13. AMP Rate ________________________
14. Multiplication Factor ________________________
15. Number of phase ________________________
16. Phases ________________________
17. Grid Value ________________________
18. Coordinate X ________________________
19. Coordinate Y ________________________
20. Coordinate Z ________________________
21. Narrative ________________________
ATT T - 7 02.01.2016
Instructions for Meter Worksheet (For new and existing meters)
1. Meter ID – First digits will reference 1 to 100 grid Fort Hood ID. Followed by MR000# each meter number shall be assigned by Project Manager of the project.
2. Disposition – The status of the subject item (e.g., permanent, temporary, proposed, abandoned, etc.), from lists or entered from field inspections.
3. Manufacture - Manufacture name
4. Model - The Model, Product, Catalog, or Item Number of subject item.
5. Meter Type - A label describing the features of the electrical system that the meter is measuring.
6. Watt Node Meter – Is Watt node meter part of the system. yes/ no
7. Serial Number - The manufacturer's serial or unique identification number of the subject item.
8. Voltage - The potential of the electrical system on which the meter may be used.
9. Capacity of KVA - The limit of the complex power which the demand meter can record.
10. Frequency of system - The frequency of the electrical system on which the meter should be used.
11. KW Rate - The power rating on the meter based on the current and potential transformer ratios.
12. Facility Number – Facility Meter is measuring service
13. AMP rate - The maximum continuous current rating of the meter.
14. Multiplication Factor - The multiplication factor by which one must multiply the difference in present and previous meter readings to determine actual power consumed.
15. Number of phase - The number of phases that the meter monitors.
16. Phases - The letter(s) of the phase(s) for the subject item.
17. Grid Value - Grid number based on one to 100 grid system for Fort Hood
18. Coordinate X - The x component of individual coordinate point. Format (WGS_1984_
UTM_Zone14N)
19. Coordinate Y - The Y component of individual coordinate point. Format (WGS_1984_
UTM_Zone14N)
ATT T - 8 02.01.2016
20. Coordinate Z - The Z component of individual coordinate point. Format (WGS_1984_ UTM_Zone14N)
21. Narrative - A description or other unique information concerning the subject item.
ATT T - 9 02.01.2016
SOP NO. QA 001 - Attachment 6.D.
Pole Worksheet (For new and existing poles)
Contractor shall fill in the following data on all poles on project
1. Pole (User) ID ________________________
2. Pole Height ________________________
3. Class of Pole ________________________
4. Type of Pole ________________________
5. Material Composition ________________________
6. Treatment Type ________________________
7. Grid Value ________________________
8. Coordinate X ________________________
9. Coordinate Y ________________________
10. Coordinate Z ________________________
11. Date Acquired ________________________
12. Date Treated ________________________
13. Manufacture ________________________
14. Grounded ________________________
15. Condition ________________________
16. Capped ________________________
17. Narrative ________________________
ATT T - 10 02.01.2016
SOP NO. QA 001 - Attachment 6.D.
Instructions for Pole Worksheet (For new and existing poles)
1. Pole (User) ID - A unique, user defined identifier for each record or instance of an entity. Shall be given by DPW Project Manager.
2. Pole Height – The height of the pole measured from the ground surface to the top. (ft)
3. Class of pole - A classification of the pole diameter, and consequently the breaking strength, of wooden poles.
4. Type of Pole – A field indicating the kind, class, or group of the subject item.
5. Material Composition - The material composition of the subject item, such as wood, concrete, steel, cast iron, plastic, etc to include type of wood.
6. Treatment Type - Defines any treatment applied to the pole to improve its life.
7. Grid Value – Based on Fort Hoods 1 to 100 Grid system
8. Coordinate X - The x component of individual coordinate point. Format
(WGS_1984_UTM_ZONE14N)
9. Coordinate Y - The y component of individual coordinate point. Format
10. Coordinate Z - The z component of individual coordinate point. Format
11. Date Acquired - The date on which the subject item was installed. Format for date is YYYYMMDD (i.e., September 15, 1994 = 19940915).
12. Date Treated - The date that the pole was last treated/ born on date. Format for date is YYYYMMDD (i.e. September 15, 1994 = 19940915).
13. Manufacture – Name of manufacture
14. Grounded - An indicator as to whether or not the pole is grounded. (yes or no)
15. Condition - Indicates a state of being, or readiness for use of the subject item (e.g., good, fair, poor), from lists or field inspections.
16. Capped - Indicates whether or not the pole is capped (yes/no).
17. Narrative - A description or other unique information concerning the subject item, limited to 240
ATT T - 11 02.01.2016
SOP NO. QA 001 - Attachment 6.E.
Regulator Worksheet (For new and existing regulators)
Contractor shall fill in the following data on all regulators on the project
1. Regulator ID ________________________
3. Regulator Type ________________________
4. Regulator Usage ________________________
5. Installation Type _________________________
6. Regulator Weigh ________________________
7. Phase Letters ________________________
8. Number of Phases ________________________
9. Primary Voltage ________________________
10. Percentage of tap ________________________
11. Number of Taps ________________________
12. KVA Rating ________________________
13. Fuse Type ________________________
14. Fuse Rating ________________________
15. Cooling Type ________________________
16. Oil Capacity ________________________
17. Manufacture ________________________
18. Model Number ________________________
19. Serial Number ________________________
20. Narrative ________________________
21. Substation ID _________________________
ATT T - 12 02.01.2016
Regulator Worksheet – cont.
22. Secondary Voltage _________________________
23. Date of Manufacture _________________________
24. Grid Value _________________________
25. Coordinate X _________________________
26. Coordinate Y _________________________
27. Coordinate Z _________________________
28. Date installed/inspected _________________________
ATT T - 13 02.01.2016
Instructions for Regulator Worksheet
1. Regulator ID – First digits will reference 1 to 100 grid Fort Hood ID. Followed by R10# Each
Regulator ID shall be assigned by Project Manager of the project.
Abandoned Permanent Temporary
3. Regulator type - The type of voltage regulator.
4. Regulator Usage - An indication of whether the regulator is on a line or in a substation.
5. Installation type - The type installation of the subject item.
6. Regulator Weight - The force of the regulator toward the center of the earth due to the regulator's mass. (lbs)
7. Phase Letters - The letter(s) of the phase(s) for the subject item.
8. Number of phases - The number of phases regulated by this device.
9. Primary Voltage - The voltage on the source side of the regulator with the associated units given.
10. Percentage of Tap - The percentage of the voltage that will be changed by moving the connection up or down one tap.
11. Number of Taps - The number of available points of connection on the regulator which may be used to change the voltage.
12. KVA Rating - The maximum continuous complex power rating of the regulator.
13. Fuse Type - A label chosen from a standard list of labels describing the characteristics of the fuse.
14. Fuse Rating - The current rating of the fuse protecting the regulator. This will be on the primary side.
15. Cooling Type - The method of controlling the temperature of the regulator.
16. Oil Capacity - The manufacturer suggested volume of oil that should be maintained inside the regulator to assure safe and efficient operation. (gallon)
17. Manufacture – Name of the manufacture
18. Model Number - The Model, Product, Catalog, or Item Number of subject item.
19. Serial Number - The manufacturer's serial or unique identification number of the subject item.
20. Narrative - A description or other unique information concerning the subject item, limited to 240
ATT T - 14 02.01.2016
21. Substation ID - Substation ID - An operator generated identifier locally used to identify the substation feeding this bus group. MF – Main Fort Hood Substation, WF – West Fort Hood Substation, CR- Clark Road Substation, NF – North Fort Hood Substation
22. Secondary voltage - The voltage on the load side of the regulator with the associated units given.
23. Date of Manufacture - The date of manufacturer for the subject item. Format for date is
YYYYMMDD (i.e., September 15, 1994 = 19940915)
24. Grid Value - Grid number based on one to 100 grid system for Fort Hood
25. Coordinate X - The x component of individual coordinate point.
26. Coordinate Y - The y component of individual coordinate point.
27. Coordinate Z - Height
ATT T - 15 02.01.2016
SOP NO. QA 001 – Attachment 6.F.
Switch Worksheet (For new and existing switches)
Contractor shall fill in the following data on switches on project
1. Switch ID ________________________
3. Installation Type ________________________
4. Switch Type ________________________
5. Switch Rating ________________________
6. Voltage ________________________
7. Number of Switches ________________________
8. Number of Phases ________________________
9. Phase Letter ________________________
10. Serial numbers ________________________
11. Switch Position Condition ________________________
12. Switch Weight ________________________
13. Switch Dimension ________________________
14. Substation ID ________________________
15. Manufacture ID ________________________
16. Circuit ID ________________________
17. Grid Value ________________________
18. Coordinate X ________________________
19. Coordinate Y ________________________
20. Coordinate Z ________________________
21. Narrative ________________________
ATT T - 16 02.01.2016
Instructions for Switch Worksheet
1. Switch ID – First digits will reference 1 to 100 grid Fort Hood ID. Followed by SW10# each switch shall be assigned by Project Manager of the project.
3. Installation Type - The installation type code.
Circuit breaker Cubicle Fuse Cutout Gang Operated disconnect Pad Mounted Pole Mounted Recloser
4. Switch Type - A label chosen from a standard list of labels indicating the characteristics of a switch.
5. Switch Rating - The maximum continuous amount of current to which the switch should be subjected.
6. Voltage - The system voltage of the electrical line at the point in which the switch is inserted.
7. Number of Switches - The number of phases opened by the switch
8. Number of Phases - The number of phases opened by the switch
9. Phase letter - The letter(s) of the phase(s) for the subject item.
10. Serial Number - The manufacturer's serial, or unique identification number of the subject item.
11. Switch Position Condition - The positional condition of a switch during normal circuit conditions (e.g., normally-open, normally closed).
12. Switch Weight - The force of the switch toward the center of the earth due to the switch's mass.
13. Switch Dimension - A three dimensional description of the amount of space which a switch occupies (e.g., 2’ x 1’ x 4”).
14. Substation ID - An operator generated identifier locally used to identify the substation feeding this
Substation, NF – North Fort Hood Substation.
15. Manufacture ID – Manufacture name
16. Circuit ID – Feeder number switch is connected to
17. Grid Value - Grid number based on one to 100 grid system for Fort Hood
18. Coordinate X - The x component of individual GPS coordinate point.
ATT T - 17 02.01.2016
Instructions for Switch Worksheet-cont.
19. Coordinate Y - The Y component of individual GPS coordinate point.
20. Coordinate Z - The Z component of individual GPS coordinate point.
21. Narrative - A description or other unique information concerning the subject item, limited to 240
ATT T - 18 02.01.2016
SOP NO. QA 001 - Attachment 6.G.
Transformer and Transformer Bank Worksheet (For new and existing transformers)
Contractor shall fill in the following data on all transformers on project
1. Transformer ID ________________________
3. Type of Mounting (pole or pad mount) ________________________
4. Primary Voltage ________________________
5. Secondary Voltage ________________________
6. Number of Transformers ________________________
7. Number of Phases ________________________
8. KVA transformer ________________________
9. Total KVA (if banked or 30 pad mount) ________________________
10. Substation ID (Main, Clark, WFH, NFH) ________________________
11. Date of Installation ________________________
12. Date of Inspection ________________________
13. Condition (Red, Amber, Green) ________________________
14. Feeder Number ________________________
15. Grid Value ________________________
16. Coordinate X ________________________
17. Coordinate Y ________________________
18. Coordinate Z ________________________
19. Narrative ________________________
ATT T - 19 02.01.2016
Instructions for Transformer and Transformer Bank Worksheet
(For new and existing transformers)
1. Transformer ID – First digits will reference 1 to 100 grid Fort Hood ID. Followed by T10# for pad mounted transformer bank and T20# for a pole mounted transformer bank. Each transformer bank ID shall be assigned by Project Manager of the project.
Abandoned Permanent Temporary
3. Type of mounting - The type of mounting for the transformer bank.
Pole mounted Pad mounted Wall mounted Ceiling mounted
4. Primary Voltage - The line-to-line voltage of the electrical system that serves as the source for the transformer bank.
5. Secondary Voltage - The line-to-line voltage of the electrical system that the transformer bank serves.
6. Number of Transformers - The number of transformers in the transformer bank.
7. Total number of Phases - The number of phases of transformer group.
8. KVA - The capacity of each transformer in a group. (i.e. 2-50kva / 1-25kva, 50 is the capacity of each transformer in the first group - 25 is the capacity of each transformer in the second group.)
There can be no more than two groups in a bank.
9. Total KVA - The total KVA rate for all transformers attached to the transformer bank.
10. Substation ID - An operator generated identifier locally used to identify the substation feeding this
Substation, NF – North Fort Hood Substation
11. Date of installation - The date on which the subject item was originally installed. Format for date is
YYYYMMDD (i.e., September 15, 1994 = 19940915).
12. Date of Inspection – The last visual inspection date of the subject item. Format for date is YYYYMMDD (i.e., September 15, 1994 = 19940915)
13. Condition - The condition of the subject item when last inspected (Red, Amber, Green).
14. Feeder Number - An operator generated identifier locally used to identify the feeder to the transformer bank.
15. Grid Value – Grid number based on one to 100 grid system.
Attachment T - Electrical GIS SOP
ATT T - 20 02.01.2016
Instructions for Transformer and Transformer Bank Worksheet – cont.
(For new and existing transformers)
16. Coordinate X - The x component of individual GPS coordinate point.
17. Coordinate Y - The y component of individual GPS coordinate point.
18. Coordinate Z - The z component of individual GPS coordinate point.
19. Narrative - A description or other unique information concerning the subject item to include manufacture, model number and serial numbers.
ATT T - 21 02.01.2016
SOP NO. QA 001 – Attachment 6.H.
Riser Worksheet (For new and existing risers)
Contractor shall fill in the following data on all risers on the project
1. Riser ID ________________________
2. Narrative ________________________
3. Pole ID ________________________
4. Grid ID ________________________
5. Coordinate X ________________________
6. Coordinate Y ________________________
7. Coordinate Z ________________________
8. Voltage ________________________
9. Date of Installation ________________________
10. Length of Riser ________________________
11. Spare ________________________
12. Conductor size, number and type ________________________
ATT T - 22 02.01.2016
SOP NO. QA 001 – Attachment 6.H.
Instructions for Riser Worksheet (For new and existing risers)
1. Riser ID – First digits will reference 1 to 100 grid Fort Hood ID. Followed by RP#### Riser ID shall be assigned by Project Manager of the project.
2. Narrative - A description or other unique information concerning the subject item, limited to 240 characters. Required will be size of conduit and conductor wire.
3. Pole ID – Pole ID that riser is attached to
4. Grid ID - Grid number based on one to 100 grid system for Fort Hood
5. Coordinate X - The x component of individual coordinate point.
6. Coordinate Y - The y component of individual coordinate point.
7. Coordinate Z - The z component of individual coordinate point.
8. Voltage - The voltage associated with the riser.
9. Date of Installation - The date of Installation for the subject item. Format for date is YYYYMMDD
(i.e., September 15, 1994 = 19940915)
ATT T - 23 02.01.2016
SOP NO. QA 001 - Attachment 6.I.
Manholes / Hand holes Worksheet (For new and existing manholes/hand holes)
Contractor shall fill in the following data on all manholes and hand holes on the project
1. Type ________________________
2. Material Type ________________________
3. Disposition ________________________
4. Narrative ________________________
5. Grid ID ________________________
6. Coordinate X ________________________
7. Coordinate Y ________________________
8. Coordinate Z ________________________
9. Manufacture ________________________
10. Manhole Diameter ________________________
11. Number Cables ________________________
12. Date of Installation _________________________
ATT T - 24 02.01.2016
SOP NO. QA 001 - Attachment 6.I.
Instructions for Manholes/Hand holes Worksheet (For new and existing manholes/hand holes)
1. Type – A field indicating the kind, class, or group of manhole for the subject utility. Hand hole or Manhole
2. Material type - The material composition of the subject item, such as wood, concrete, steel, cast iron, plastic, etc
3. Disposition - The status of the subject item (e.g., permanent, temporary, proposed, abandoned, etc.), from lists or entered from field inspections.
4. Narrative - A description or other unique information concerning the subject item, limited to 240 characters. To include model number and dimensions.
5. Grid ID - Grid number based on one to 100 grid system for Fort Hood
6. Coordinate X - The x component of individual coordinate point.
7. Coordinate Y - The y component of individual coordinate point.
8. Coordinate Z - The z component of individual coordinate point.
9. Manufacture – Manufacture of Manhole
10. Manhole Diameter - The maximum linear distance measured horizontally across a manhole lid.
11. Number of Cables - A number representing the total number of cables in the manhole. A cable passing through the manhole counts as one cable and a cable tying into another cable inside the manhole counts as one cable
12. Date of Installation - The date of Installation for the subject item. Format for date is YYYYMMDD
(i.e., September 15, 1994 = 19940915)
ATT T - 25 02.01.2016