This is a sources sought notice from the Department of the Army Materiel Command Contracting Command Orlando Contracting Center regarding the Huachuca Training and Support Contract (HTASC). The notice seeks industry responses to 10 questions in order to finalize requirements and acquisition strategy for HTASC, a single-award, indefinite delivery/indefinite quantity contract vehicle with a seven year ordering period and estimated value over $11 million. Responses are due by December 28, 2016. HTASC will provide over 500 contractor man-year equivalents of professional and management development training support services under NAICS code 611430. The notice provides assumptions regarding applicable regulations and requests information on a firm's ability to perform as prime contractor while meeting small business goals, accounting systems, financial position, adequacy of requirements, and concerns regarding transition from the incumbent contract.

NSTID Prophet Lesson Plan

Text of this file

Prophet Control Overview PCS8L301 / Version 409 1 Mar 2011

SECTION I. ADMINISTRATIVE DATA

All Courses Including This Lesson Course Number Version Course Title

Task(s) Taught(*) or Supported Task Number Task Title

Individual

301-PCS-6500L3 (*)Identify Prophet Control System Characteristics
301-PCS-6501L3 (*)Dismount the Prophet Control Transit Case
301-PCS-6502L3 (*)Operate Prophet Control Under Unusual Conditions
301-PCS-6503L3 (*)Setup AN/VRC-99A/B Antenna Mast on the Prophet Control
301-PCS-6505L3 (*)Prepare Prophet Control for Transport
301-PCS-6508L3 (*)Power-on Prophet Control
301-PCS-6509L3 (*)Power-off Prophet Control
301-PCS-6510L3 (*)Set-up Prophet Control in the Dismounted Configuration
301-PCS-6511L3 (*)Teardown Prophet Control from the Dismounted Configuration
301-PCS-6513L3 (*)Teardown Prophet Control from Shore Power Operations
301-PCS-6516L3 (*)Set-up Prophet Control for Shore Power Operations
301-PCS-6519L3 (*)Identify Components of the Prophet Control Transit Case
301-PCS-6521L3 (*)Install Prophet Control Mission Equipment
301-PCS-6522L3 (*)Mount the Prophet Control Transit Case
301-PCS-6539L3 (*)Teardown AN/VRC-99A/B Antenna Mast from the Prophet Control
301-PCS-6710L3 (*)Connect AN/TSQ-248 PT-LITE to the Prophet Control for Operations.
301-PCS-6712L3 (*)Disconnect AN/TSQ-248 PT-LITE from the Prophet Control
301-PRM-6531L3 (*)Perform Preventive Maintenance Checks and Service (PMCS) on the Prophet Control AN/VRC-99 Antenna
301-PRM-6537L3 (*)Perform Prophet Control Preventive Maintenance Checks and Services (PMCS)
301-PRM-6540L3 (*)Perform Preventive Maintenance Checks and Services (PMCS) on the Prophet Control Transit Case
301-PRM-6576L3 (*)Perform Preventive Maintenance Checks and Service (PMCS) for the AN/VRC-99A/B
301-PRM-6577L3 (*)Perform Preventive Maintenance Checks and Service (PMCS) for the KG-250
301-PRO-6523L3 (*)Replace the Battery Pack of the AN/VRC-99A/B
301-PRO-6824L3 (*)Describe System Data Flow

Reinforced Task(s) Task Number Task Title

Academic Hours The academic hours required to teach this lesson are as follows:

Resident
Hours/Methods
0 hrs/ Conference / Discussion
Test0 hrs
Test Review0 hrs
Total Hours:0 hrs

Test Lesson Number

HoursLesson No.
Testing
(to include test review)N/A

Prerequisite Lesson(s) Lesson Number Lesson Title None Clearance Access

Security Level: Unclassified Requirements: There are no clearance or access requirements for the lesson.

Foreign Disclosure Restrictions

FD7. This product/publication has been reviewed by the product developers in coordination with the Fort Huachuca, AZ foreign disclosure authority. This product is NOT releasable to students from foreign countries.

References

Number

Title

Date Additional Information

Student Study Assignments None Instructor Requirements

1 x Primary Instructor 1 x Assistant Instructor

Instructors must have Prophet Spiral I experience and be familiar with the Prophet Control System.

Additional Support

Name Stu Ratio

Qty

Man Hours Personnel Requirements

Equipment Required Id Name Stu Ratio Instr Ratio

Spt

Qty

Exp for Instruction

* Before Id indicates a TADSS Materials Required Instructor Materials:

TM 32-5895-1828-13

TB 32-5895-1828-10-1

Projector Laptop with Microsoft PowerPoint PCS8L301-PC Overview-Data Flow VG Prophet Control

AN/TSQ-248 PT-LITE

PT-LITE TM

JTK-17 toolkit Flashlight

Student Materials:

TM 32-5895-1828-13

TB 32-5895-1828-10-1

PCS8L301-HO01-Prophet Control Overview PCS8L301-HO02-Prophet Control Overview Quiz Student guide Pen/Pencil Notebook Prophet Control

AN/TSQ-248 PT-LITE

PT-LITE TM

JTK-17 toolkit Flashlight

Classroom, Training Area, and Range Requirements

Ammunition Requirements

Id Name

Exp Stu Ratio Instr Ratio Spt Qty

Instructional Guidance NOTE: Before presenting this lesson, instructors must thoroughly prepare by studying this lesson and identified reference material.

1. Verify each classroom contains all necessary equipment for lesson.

2. Verify all systems function correctly.

3. Discuss relevant safety requirements where appropriate throughout the lesson -stress any equipment WARNING and CAUTION indications.

4. Verify students have notebooks and pencils.

5. Encourage questions and emphasize referral to system manuals.

6. Ask questions using the ask-pause-call method.

Proponent Lesson Plan Approvals Name

Rank

Position

Date

Section II Introduction SECTION II. INTRODUCTION Method of Instruction: Conference / Discussion Instructor to Student Ratio is:

Time of Instruction: 0 hrs Media: -None- Motivator

The Prophet system consists of the Control and the issued number of Sensors. This class will give you a general understanding of the system, its components, and the required PMCS. This general knowledge will be built upon as the course progresses.

Terminal Learning Objective - Identify capabilities of the Prophet Control. Terminal Learning Objective

NOTE: Inform the students of the following Terminal Learning Objective requirements.

At the completion of this lesson, you [the student] will:

Action:

Identify capabilities of the Prophet Control.

Conditions:

Given access to the Prophet Control mission equipment, student guide, JTK17 toolkit, AN/TSQ-248 PT LITE, PT LITE TM, TM 32-5895-1828-13, TB 32-5895-1828-23-1 and TB 32-5895-1828-10-1.

Standards:

All subsystems of Prophet Control are identified.

Safety Requirements

1. Issue safety warnings on the whip antennas.

a. Never erect SINCCARS antenna directly under power lines.
b. Do not erect SINCGARS antenna in winds over 30 knots.
c. AN/VRC-99A/B antennas must be separated by a horizontal distance of at least 10 meters.
d. Use caution when handling the whip antenna.

2. Issue safety warnings on RF radiation. SINCGARS emit high frequency electromagnetic radiation. Do not stand near or touch the antenna when transmitting.

3. Issue safety warnings on electrical systems.

a. Ensure equipment power is off prior to disconnecting/reconnecting any power, ground, or signal cables to avoid shock hazard.
b. High voltage may remain in capacitors after power has been removed.
c. Ensure cables are aligned with connectors to avoid damage to connector pins.
d. Do not switch SEP breaker to ON until W28 AC power cable is connected to J1 port.

4. Do not wear loose clothing or jewelry while near the Prophet Control vehicle.

5. Handling the Transit Case is a lifting hazard. The Transit Case requires a three-man lift outside and a two-man lift inside the vehicle.

6. WARNING: The fire suppression system can cause frostbite, and hearing damage. Always wear protective gear including hearing and eye protection, helmet, and protective clothing to minimize exposure of bare skin during operation if the fire suppression system is activated. The fire suppression system should only be activated in combat situations. When in a non-combat situation, the system power must be off, the distribution nozzles removed, and the protective caps emplaced. The fire suppression system may not protect against all types of fires.

Risk Assessment Level

Low

Environmental Considerations

NOTE: It is the responsibility of all Soldiers and DA civilians to protect the environment from damage.

No adverse environmental impacts have been determined.

Evaluation

The terminal learning objective will be measured through the successful completion of the practical exercises in this lesson.

Instructional Lead-In

In this lesson, we will discuss the primary functions and capabilities of the Prophet Control system. You will soon be able to identify all subsystems including the transit case. Let’s get started.

Section III PresentationSECTION III. PRESENTATION

NOTE:Inform the students of the Enabling Learning Objective requirements.
Enabling Learning Objective A - 301-PCS-6500L3 / Identify Prophet Control System Characteristics A.ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6500L3 / Identify Prophet Control System Characteristics

CONDITIONS:

Given Prophet Control, AN/TSQ-248 PT-LITE, PT-LITE TM and TM 32-5895-1828-13.

STANDARDS:

Identify all system characteristics, subsystems, and modes of operation of Prophet Control.

1.Learning Step / Activity 1. Identify the Prophet Control mission.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.The mission of Prophet Control is to coordinate and manage the collection efforts of the Prophet Sensors.
b.Analyzes and correlates all information received from Prophet Sensor vehicles.
c.Prophet Control tasks the Prophet Sensors via digital reporting and then combines the data received.

NOTE:

Conduct a check on learning and summarize the learning activity.

2.Learning Step / Activity 2. Identify Prophet Control system capabilities.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Prophet Control system provides support to Prophet Sensor platforms with voice and digital reporting.
b.Provides direct digital link to supported units.
c.Capable of disseminating reports to higher echelons and outside elements.
d.Operates via two possible power sources.
(1)Vehicle battery power (24V)
(2)Shore power (commercial power - 28V).
e.Operates from inside the vehicle or remotely (up to 200 feet).
f.Sends, receives, and updates mission tasking received from outside elements.
g.Communicates with supported units and outside elements using Beyond Line of Sight (BLOS) capability via the AN/TSQ-248 PT-LITE.
(1)Installed on an M1102 Light Tactical Trailer Heavy (LTT-H).
(2)Towed behind Prophet Control 2.
(3)Provides SATCOM connection to NSANET, SIPRNET and JWICS.
3.Learning Step / Activity 3. Identify Prophet Control Equipment for each vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Prophet Control 1.
(1)M1165A1 B3 Armored HMMWV.

WARNING: Ensure antennas are retracted, tied down, or removed before transporting.

(2) Prophet Control Transit Case.

WARNING: Some components exceed the established weight limits for a single person lift. Do not attempt to lift these components alone.

( a)Located between the two rear seats.
( b)AN/VRC-99A/B.
( c)KG-250 COMSEC Assembly.
( d)Crystal Server.
( e)SIXNET Ethernet Switch
( f)AC/DC Power subsystem.
( g)DIGIPORT
(3)Shore Power Signal Entry Panel (SEP).
( a)Located rear of the vehicle.
( b)Connects the Control Transit Case to shore power input.
(4)AN/VRC-90 SINCGARS rack assembly.
(5)Four (4) laptops.
(6)AN/VRC-90 SINCGARS antenna.

WARNING: SINCGARS antennas emit high frequency electromagnetic radiation that can cause fatal burns. Do not stand near or touch the antenna when transmitting.

(7) AN/VRC-99A/B antenna.

WARNING: AN/VRC-99A/B antennas must be separated by a horizontal distance of at least 10 meters. This provides at least 50 DB and keeps the AN/VRC-99A/B from being damaged.

(8)DAGR antenna.
b.Prophet Control 2.
(1)M1165A1 B3 Armored HMMWV.
(2)AN/TSQ-248 PT-LITE trailer.
(3)AN/VRC-90 SINCGARS rack assembly.
4.Learning Step / Activity 4. Identify the subsystems of the Prophet Control.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Vehicle - Two (2) Heavy Variant High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) M1165A1 B(3).
b.Power distribution.
(1)Wide-range AC to DC Converters housed in the Transit Case
(2)Shore Power SEP.
(3)Capable of utilizing external 110/220 VAC, 50/60 Hz worldwide shore power or four (4)-wire for operating the system.
c.Data.
(1)Four (4) laptops.
( a)Ruggedized laptops.
( b)Two (2) networked (NSANET) and two (2) standalone (JWICS, SIPRNET). One (1) laptop mounted at each non-driver seat in the vehicle and one (1) stowed, floating laptop.
(2)Ethernet SEP.
( a)Located at the rear of the vehicle.
( b)Provides connection for NSANET, JWICS and SIPRNET via the PT-LITE.
(3)Crystal Server.
( a)Two (2) removable hard drives.
( b)Housed in the Transit Case.
( c)Accessible via the laptop computers.
d.AN/PSN-13 Defense Advanced Global Positioning System Receiver (DAGR).
(1)The DAGR is the primary navigation element used for time sync.
(2)Needs a minimum of three (3) satellites for proper heading.
(3)The DAGR is mounted in front of the front curbside seat.
(4)Time base capability integrated electronically into the server.
e.Communications.
(1)The AN/VRC-99A/B radio is used for data communications.
(2)The KG-250 is the external encryption device for the AN/VRC-99A/B.
(3)SINCGARS Radio.
( a)Provides secure voice communications.
( b)LS-671 Remote speaker box gives the capability to listen to communications inside the vehicle and to remote voice communications up to 200 feet away from the vehicle.
( c)The SINCGARS is mounted in the standard radio rack.
(4)AN/VRC-99A/B antenna mounted on the rear of the vehicle.
(5)SINCGARS whip mounted on the rear of the vehicle.
f.AN/TSQ-248 PT-LITE.
(1)Installed on an M1102 Light Tactical Trailer Heavy (LTT-H).
(2)Towed behind Prophet Control 2.
(3)Provides SATCOM connection to NSANET, SIPRNET and JWICS.
5.Learning Step / Activity 5. Identify the two (2) modes of operation.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Mounted.
(1)Operate inside the vehicle.
(2)Vehicle engine or shore power operations are possible.
(3)Connect to a LAN data link of an outside unit.
(4)Operations up to 200 feet from the outside unit and external power source are possible.
(5)Transmit data via Prophet T-LITE.
b.Dismounted.
(1)Operate outside the vehicle either with a supported unit or in some type of shelter.
(2)Operate with shore power.
(3)Operations up to 100 feet from the vehicle are possible.
(4)Connect to a supported LAN or other communication support.
(5)Transmit data via Prophet T-LITE.

CHECK ON LEARNING: Conduct a check on learning and summarize the ELO.

Enabling Learning Objective B - 301-PCS-6519L3 / Identify Components of the Prophet Control Transit Case B. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6519L3 / Identify Components of the Prophet Control Transit Case

CONDITIONS:

Given the Prophet Control Transit Case and TM 32-5895-1828-13.

STANDARDS:

Identify all components of the Transit Case.

1.Learning Step / Activity 1. Identify components on the front of the Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Identify Crystal server.
(1)Two removable hard drives.
(2)CD-ROM R/W and DVD device.
(3)USB port.
(4)Power switch.
(5)Rear server ports:
( a)Power input
( b)Serial port - AN/PSN-13 Defense Advanced GPS Receiver input for time sync.
( c)Ethernet port - cable connection to Sixnet switch.
b.Identify AN/VRC-99A/B radio.
(1)IOP Maint port - connects to Digiport.
(2)J6 ANT port - connects to antenna cable.
(3)802.3 port - connects to COMSEC J3 output port.
(4)J7 DC power port on rear.
c.Identify KG-250 COMSEC Assembly.
(1)J1 port - input from Sixnet switch.
(2)J2 port - test point for voltage.
(3)J3 port - output to the AN/VRC-99A/B radio.
(4)J4 port - KG-250 power.
d.Identify circuit breakers.
(1)CB1 - DC power.
(2)CB2 - AC power.
(3)CB3 - 28V DC reserve power.
e.Identify the In/Out (I/O) Panel.
(1)J5 port - DC reserve.
(2)J6 port - NSANET laptops #2 and #3 shared power.
(3)J7 port - JWICS laptop #1 and SIPRNET laptop #4 shared power.
(4)J10 port - COMSEC power.
(5)J11 port - AN/VRC-99A/B power.
2.Learning Step / Activity 2. Identify components on the rear of the Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Identify Digiport.
(1)Y-off to serial connection and attached converter to Ethernet.
(2)Ethernet connection to Sixnet switch.
b.Identify AC Input Assembly.
(1)J20 port - AC out.
(2)J21 port - AC in.
c.Identify the 5 ports on the rear of the In/Out (I/O) Panel.
(1)J13 port - Ethernet switch power.
(2)J14 port - RS232 power.
(3)J15 port - Server power.
(4)J16 port - VDC power in.
(5)J17 port - AC/DC power supply in.
d.Identify Sixnet switch.
(1)Crystal server Ethernet connection.
(2)NSANET laptop Ethernet cable.
(3)NSANET laptop Ethernet connection.
(4)Cable connection to KG-250 J1 input port.
(5)Digiport Ethernet connection.
(6)Power cable connection from rear of I/O panel.
(7)Uplink port.

Enabling Learning Objective C - 301-PCS-6508L3 / Power-on Prophet Control C. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6508L3 / Power-on Prophet Control

CONDITIONS:

Given the Prophet Control and TM 32-5895-1828-13.

STANDARDS:

Prophet Control is powered on.

1.Learning Step / Activity 1. Check pre-operational settings.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Verify the DC power cable W26 is connected to the J17 port on rear of I/O panel.
b.Set SINCGARS to standby.
2.Learning Step / Activity 2. Start the vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

CAUTION: To reduce under hood heat while idling in a static condition you should increase the engine RPMs until the ammeter goes into the green zone and lock the throttle at that position. Do not move the steering wheel, even slightly, while stationary and idling. Spike in pressure coupled with the super-heated fluid will blow the seals. Also, ensure you use the combat locks or door latch will break.

3.Learning Step / Activity 3. Set SINCGARS to ON.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
4.Learning Step / Activity 4. Press PWR/QUIT to power-on the DAGR.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

NOTE: Functional DAGR batteries are essential for mission capability. Ensure you configure DAGR COM PORT before powering on COMSEC Assembly. Failure to do so will result in incorrect Network Protocol Timing on the server.

a.Ensure DAGR has obtained a good current position.
b.Acquire a Figure of Merit (FOM) of 3 or less.
5.Learning Step / Activity 5. Power-on Transit Case components.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Flip the DC circuit breaker (CB1) to ON.
b.Press and release POWER button on Server.

NOTE: Wait two (2) to three (3) minutes for Server to complete initializations. A blue illuminated Light Emitting Diode (LED) indicates the Server power is ON. The illuminated LED does not indicate the Server has initialized completely.

c. Verify KG-250 Power Indicator illuminates.

6.Learning Step / Activity 6. Power-on laptop computers.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

NOTE: Power-on one laptop at a time and allow it to fully boot. This allows the first laptop to have direct connections to all serial devices. The second laptop has to communicate with the first laptop to update all information from serial devices.

a.Press and release power on the laptop.
b.Wait while boot-up sequence finishes.
c.Log on to laptop.
7.Learning Step / Activity 7. Power-on the AN/VRC-99A/B.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

a. Flip AN/VRC-99A/B POWER switch to ON.

NOTE: If the red ALARM indicator remains illuminated after one (1) minute, switch AN/VRC-99A/B power switch to OFF position and wait 15 to 30 seconds then move switch back to ON position. If any alarm condition persists, contact field maintenance for corrective action.

b. Set the AN/VRC-99A/B from STBY to T/R.

Enabling Learning Objective D - 301-PCS-6509L3 / Power-off Prophet Control D. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6509L3 / Power-off Prophet Control

CONDITIONS:

Given the Prophet Control configured for mounted operations, AN/TSQ-248 PT-LITE, a four person crew, PT-LITE TM, and TM 32-5895-1828-13.

STANDARDS:

Prophet Control is powered-off.

1.Learning Step / Activity 1. Power-off SINCGARS radio.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Set switch to Standby.
b.Flip power switch to OFF.
2.Learning Step / Activity 2. Power off Server.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.On either LT1 or LT2 select START | PROGRAMS | ACCESSORIES | COMMUNICATIONS | REMOTE DESKTOP CONNECTION to open Remote Desktop Connection.
b.For the Computer Name, type Server's IP address.
c.Select CONNECT to open the Notice and Consent logon prompt.

d.

e.

NOTE: Logon ID and password may have been changed by the network administrator. Use logon ID and password assigned by the network administrator.

NOTE: If server HDDs are setup in JBOD configuration, proceed to 'step o', otherwise continue with 'step f'.

f.Select START | PROGRAMS | Adaptec | Adaptec Raid Manager to open Adaptec Storage Manager.
g.At logon prompt, enter network Logon ID and no password.
h.When prompted to Register, select Register Later.
i.Select Controller 1 icon.
j.Under Logical Device, mouse-over Logical Device Raid 1 (HDD icon) to display status of HDD.
k.If the HDD is identified as Optimal, exit Adaptec Storage Manager and proceed to step o.

CAUTION: Do not power off Server before HDD Build/Verify process is complete or terminated according to procedure. Failure to follow procedure will result in damage to, and require replacement of, the HDD.

NOTE: The build/verify process may take several hours to complete before Server is able to shutdown.

l.If the HDD is identified as Build/Verify and the Server must be powered off, right click Logical Device Raid 1 (HDD icon) and select Stop Current Task.
m.Select Yes to end Build/Verify process when a message window displays asking for confirmation.
n.When HDD is identified as either Optimal or Degraded, exit Adaptec Storage Manager.
o.Select START | SHUTDOWN to open Remote Desktop Shut Down prompt.
p.Select OK to confirm Server shutdown. Shutdown is complete when the Blue Server Power LED is extinguished (approximately 2-3 minutes).
3.Learning Step / Activity 3. Power-off AN/VRC-99A/B.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Set TR/STBY knob to STBY.
b.Set the AN/VRC-99A/B power switch to OFF.
4.Learning Step / Activity 4. Power-off DAGR. Press and hold PWR/QUIT.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
5.Learning Step / Activity 5. Power-off the Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Set the DC power switch to OFF.
b.Verify all equipment in transit case powers down.
6.Learning Step / Activity 6. Power-off the vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
7.Learning Step / Activity 7. Disconnect PT-LITE from Prophet Control #1.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
8.Learning Step / Activity 8. Inspect the vehicle and surrounding area for any remaining equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

Enabling Learning Objective E - 301-PCS-6710L3 / Connect AN/TSQ-248 PT-LITE to the Prophet Control for Operations. E. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6710L3 / Connect AN/TSQ-248 PT-LITE to the Prophet Control for Operations.

CONDITIONS:

Given AN/TSQ-248 PT-LITE, data cables, Prophet Control, PT-LITE TM, and TM 32-5895-1828-13.

STANDARDS:

Connect PT-LITE to Prophet Control via the Signal Entry Panel (SEP).

1.Learning Step / Activity 1. Disconnect PT-LITE trailer from Prophet Control #2.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
2.Learning Step / Activity 2. Remove data cables from PT-LITE trailer.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
3.Learning Step / Activity 3. Power-on the PT-LITE.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
4.Learning Step / Activity 4. Connect the signal interfaces from the PT-LITE to the SEP.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Connect the NSANET cable from PT-LITE port JX1 to SEP port J1 (orange cable).
b.Connect the JWICS cable from PT-LITE port JX2 to SEP port J2 (yellow cable).
c.Connect the SIPRNET cable from PT-LITE port JX3 to SEP port J3 (red cable).
5.Learning Step / Activity 5. Perform a ping test to verify connectivity.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Log on to the laptop.
b.Go to Start | Programs | Accessories | Command Prompt.
c.Type "Ping XXX.XXX.XXX.XXX". Connection message displays.
d.Repeat for all PT-LITE router IPs from each laptop.

Enabling Learning Objective F - 301-PCS-6712L3 / Disconnect AN/TSQ-248 PT-LITE from the Prophet Control F. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6712L3 / Disconnect AN/TSQ-248 PT-LITE from the Prophet Control

CONDITIONS:

Given AN/TSQ-248 PT-LITE, data cables, Prophet Sensor, PT-LITE TM, and TM 32-5895-1828-13.

STANDARDS:

PT-LITE is disconnected from the Prophet Control Signal Entry Panel (SEP).

1.Learning Step / Activity 1. Power-off PT-LITE.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
2.Learning Step / Activity 2. Store PT-LITE.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Disconnect the signal interfaces between PT-LITE and the SEP.
(1)Disconnect the SIPRNET cable between PT-LITE port JX3 and SEP port J3 (red cable).
(2)Disconnect the JWICS cable between PT-LITE port JX2 and SEP port J2 (yellow cable).
(3)Disconnect the NSANET cable between PT-LITE port JX1 and SEP port J1 (orange cable).
b.Replace the data cables to the PT-LITE trailer.
c.Connect PT-LITE and Prophet Control #2.

Enabling Learning Objective G - 301-PCS-6501L3 / Dismount the Prophet Control Transit Case G. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6501L3 / Dismount the Prophet Control Transit Case

CONDITIONS:

Given the Prophet Control, a three man crew, and TM 325895-1828-13.

STANDARDS:

Remove all necessary equipment and disconnect cables to dismount the transit case.

1.Learning Step / Activity 1. Prepare for Transit Case removal.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Remove LAN cable W22 P1 from LAN port and remove W21 P2 from the power port.
b.Remove the laptop from the mount and set aside.
c.Loosen top binding knob on rear roadside computer mount, lift up on mounting tray and remove from mount bracket.
d.Set Mounting tray aside.
e.Flip the DC circuit breaker switch OFF.
f.Remove COMSEC power tray.
(1)Disconnect W56 P2 COMSEC power cable from J4.
(2)Disconnect 802.3 cable W61 from J3.
(3)Disconnect W60 from J1 input port.
(4)Remove W62 P1 from J1 on the KG-250.
(5)Loosen four (4) thumbscrews.
(6)Slide the COMSEC power tray out of the Transit Case.
g.Remove the AN/VRC-99A/B.
(1)Power-off AN/VRC-99A/B.
(2)Disconnect W3 P1 from VRC-99A/B J6 ANT.
(3)Disconnect W59 P2 from IOP maintenance port.
(4)Disconnect W61 P2 from 802.3 port.
(5)Disconnect W55 P1 power cable from the rear of the AN/VRC-99A/B, port J7.
(6)Loosen two (2) hold down thumbscrews.
(7)Slide the AN/VRC-99A/B out of the Transit Case.
h.Remove cables from the DC Power Conditioning Assembly.
(1)Disconnect W20 P1 from J6.
(2)Disconnect W13 P1 from J7.
i.Remove securing straps from transit case.
j.Flip rear set pins up to retract.
k.Unscrew and slide away front set pins.
l.Slide Transit Case forward to allow access to rear of case.
m.Remove cables from the rear of the Transit Case.
(1)Disconnect W26 P2 from J16.
(2)Disconnect GPS Time Sync cable W7 from the rear of the server.
(3)Disconnect NSANET Ethernet cable W29 from the Ethernet switch (SIXNET).
(5)Disconnect AC shore power cable W27 from port J21.
(6)Disconnect laptop 1 Ethernet cable W22 from the Ethernet switch (SIXNET).
(7)Disconnect laptop 2 Ethernet cable W25 from the Ethernet switch (SIXNET).
n.Verify all internal cables are inside the Transit Case to avoid damage.
2.Learning Step / Activity 2. Remove Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

CAUTION: This is a three (3) person lift. One crew member is located in the driver's seat and one is located at the road side door, and one is in the curbside rear seat.

a.Slide the driver's seat completely forward.
b.Push and rotate the Transit Case up and out of the securing holes until the front of the case faces the rear, roadside doorway.
c.Lift to the rear, roadside seat.
d.Crew member located in the driver's seat now meets the other soldiers at the rear roadside doorway.
e.Lift the case up and out of the vehicle.
f.Install covers on the Transit Case.

Enabling Learning Objective H - 301-PCS-6510L3 / Set-up Prophet Control in the Dismounted Configuration H. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6510L3 / Set-up Prophet Control in the Dismounted Configuration

CONDITIONS:

Given the Prophet Control, Prophet Sensor, AN/TSQ-248 PT-LITE, a three person crew, PT-LITE TM, dismount kit and TM 32-5895-1828-13.

STANDARDS:

Set-up Prophet Control in the dismounted configuration IAW TM 32-5895-1828-13 and is operational within 20 minutes.

1.Learning Step / Activity 1. Dismount the Prophet Control Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
2.Learning Step / Activity 2. Remove the AN/PSN-13 Defense Advanced GPS Receiver (DAGR) from Prophet Control.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
3.Learning Step / Activity 3. Remove the laptops from the vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Disconnect power cable W21 from laptop 1.
b.Disconnect Ethernet cable W22 from laptop 1.
c.Disconnect power cable W24 from laptop 2.
d.Disconnect Ethernet cable W25 from laptop 2.
e.Disconnect Ethernet cable W17 from laptop 3.
f.Disconnect power cable W15 from laptop 3.
g.Turn lock to horizontal position and pull out brackets.
h.Remove laptops from the RAM mounts.
i.Replace the two (2) port protective covers.
j.Remove laptop 4 from bracket behind the Transit Case.
4.Learning Step / Activity 4. Set-up the dismounted Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Position the transit case for ease of access to both front and back openings.
b.Connect W32 P2 to J21 AC Input Assembly and P1 to AC Power Source.
c.Connect W7 P1 to J1 on the DAGR.
d.Connect W37 P2 to J4 on the DAGR.
e.Install COMSEC Power Assembly.
(1)Slide COMSEC in to the Transit Case.
(2)Tighten the four securing pins.
(3)Connect W60 to J1 input port.
(4)Connect 802.3 cable W61 to J3.
(5)Connect W56 from the COMSEC device to J4.
(6)Connect W62 P1 to KG-250 J1.
f.Connect W56 P2 to COMSEC Assembly J4.
g.Connect W60 P2 to COMSEC Assembly J1.
h.Connect W62 P1 to KG-250 J1.
i.Connect W61 P1/P2 to COMSEC Assembly J3.
j.Install the AN/VRC-99A/B Radio.
(1)Slide the AN/VRC-99A/B into the Transit Case.
(2)Tighten two securing pins.
(3)Connect power cable to the rear of the AN/VRC-99A/B port J7.
(4)Connect W61 to 802.3 port.
(5)Connect the IOP maintenance cable.
(6)Connect W3 antenna cable to ANT port.
k.Connect W55 P2 to AN/VRC-99A/B J7.
l.Connect W61 P1/P2 to AN/VRC-99A/B 802.3 Port.
m.Connect W59 P2 to AN/VRC-99A/B IOP Port.
n.Connect W34 P1 to J6 Antenna on the AN/VRC-99A/B.
o.Connect W25 P2 to the Ethernet port of Laptop #2 and P1 to the Ethernet switch (SIXNET).
p.Connect W22 P2 to the Ethernet port of Laptop #1 and P1 to the Ethernet switch (SIXNET).
q.Connect all AC laptop power adaptors to any available 120 VAC power source.
r.Connect NSANET LAN cable from PT-LITE to the Ethernet switch (SIXNET).
s.Connect JWICS LAN cable from PT-LITE to the JWICS Laptop.
t.Connect SIPRNET LAN cable from PT-LITE to the SIPRNET Laptop.

NOTE: If using the supported element LAN for SIPRNET connection, a data cable can be run directly. The laptop will need to be configured with IPs for LAN.

5.Learning Step / Activity 5. Set-up AN/VRC-99A/B antenna mast on Prophet Control.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

NOTE: Ensure AN/VRC-99A/B is in Stand-by or OFF when connecting and raising antenna. Use spare LPU from dismount kit between antenna cable and radio cable.

CAUTION: Do not move or otherwise reposition the vehicle with the mast extended. Overhead obstruction may destroy the antenna mast.

6.Learning Step / Activity 6. Power-on equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Set AC Input Assembly CB1 to ON.
b.Set DC Power Conditioning Assembly CB1 and CB3 to ON.
c.Power on the DAGR.
d.Set Power switch on AN/VRC-99A/B to ON.
e.Set Server power switch to ON.
f.Power-on Laptops.
g.Log in to Laptop computers.
7.Learning Step / Activity 7. Perform a ping test to verify connectivity.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Log on to the laptop.
b.Go to Start | Programs | Accessories | Command Prompt.
c.Type "Ping XXX.XXX.XXX.XXX". Connection message displays.

Note: Repeat for each connected laptop.

8.Learning Step / Activity 8. Establish radio communications.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.SINCGARS.
(1)Power up the LS-671 remote speaker.
(2)Conduct a communications check.
b.AN/VRC-99A/B.
(1)Initiate Radio Manager on laptop.
(2)Ensure the Radio Manager shows AN/VRC-99A/B icons for all systems on network.
9.Learning Step / Activity 9. Perform final check.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Inspect the vehicle and surrounding area for any equipment.
b.Secure vehicle.

Enabling Learning Objective I - 301-PCS-6513L3 / Teardown Prophet Control from Shore Power Operations I. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6513L3 / Teardown Prophet Control from Shore Power Operations

CONDITIONS:

Given the Prophet Control configured for shore power operations, a four person crew and TM 32-5895-1828-13.

STANDARDS:

Toredown the Prophet Control from Shore Power Operations and returned to DC vehicle power within 20 minutes.

1.Learning Step / Activity 1. Switch over the Transit Case to DC vehicle power.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

NOTE: Ensure vehicle is running.

a.Set the DC Power switch on the I/O panel to ON.
b.Set the AC power main circuit breaker (CB2) to OFF.
2.Learning Step / Activity 2. Disconnect AC power cable.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

WARNING: Shock hazard. Always disconnect from the power source prior to disconnecting cable from vehicle port.

a.Set the Signal Entry Panel (SEP) circuit breaker to OFF.
b.Disconnect AC power cable W28 P2 from the power source.
c.Disconnect the AC power cable W28 P1 from the SEP port J1.
d.Replace SEP port J1 cover.
3.Learning Step / Activity 3. Stow AC power cable.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

Enabling Learning Objective J - 301-PCS-6511L3 / Teardown Prophet Control from the Dismounted Configuration 0003J. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6511L3 / Teardown Prophet Control from the Dismounted Configuration

CONDITIONS:

Given the Prophet Control configured for dismounted operations, AN/PSN-13 Defense Advanced Global Positioning System Receiver (DAGR), AN/TSQ-248 PT-LITE, a four person crew, PT-LITE TM, and TM 32-5895-1828-13.

STANDARDS:

Teardown Prophet Conrol to on-the-move configuration with equipment secured within 20 minutes.

1.Learning Step / Activity 1. Power-off equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Shutdown all open software applications on the laptops.
b.Shutdown Crystal Server via the laptop.
c.Power-off the laptops via Start | Shut Down.
d.Set AN/VRC-99A/B CB to OFF.
e.Power-off the DAGR.
f.Set DC Power Conditioning Assembly CB1 and CB3 to OFF.
g.Set AC Input Assembly CB1 to OFF.
2.Learning Step / Activity 2. Teardown the AN/VRC-99A/B antenna mast from Prophet Control.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
3.Learning Step / Activity 3. Secure SINCGARS radio.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Power-off the radio.
b.Secure SINCGARS radio antennas.
c.Stow in vehicle.
d.Turn off the LS-671 remote speaker.
e.Disconnect the remote handset from the LS-671 remote speaker.
f.Disconnect the speaker end of the radio cable from the LS-671 remote speaker.
g.Disconnect radio cables from the SINCGARS junction box if used.
4.Learning Step / Activity 4. Teardown dismounted equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Disconnect SIPRNET LAN cable connected to PT Lite from the SIPRNET Laptop.
b.Disconnect JWICS LAN cable connected to PT Lite from the JWICS Laptop.
c.Disconnect data cable from the laptop to the remote SEP NSANET port J1.
d.Disconnect all AC Laptop power adaptors from 120 VAC power source.
e.Disconnect W22 P2 from the Ethernet port of Laptop #1, and P1 from the Ethernet Switch (SIXNET).
f.Disconnect W25 P2 from the Ethernet port of Laptop #2 and P1 from the Ethernet Switch (SIXNET).
g.Disconnect W34 P1 from J6 Antenna on the AN/VRC-99A/B.
h.Disconnect W59 P2 from AN/VRC-99A/B IOP Port.
i.Disconnect W61 P1/P2 from AN/VRC-99A/B 802.3 Port.
j.Disconnect W55 P2 from AN/VRC-99A/B J7.
k.Remove the AN/VRC-99A/B Radio.
(1)Disconnect W3 P1 from AN/VRC-99A/B J6 ANT.
(2)Disconnect W59 P2 from IOP maintenance cable.
(3)Disconnect W61 P2 from 802.3 port.
(4)Disconnect W55 P1 power cable from AN/VRC-99A/B J7.
(5)Unscrew the two (2) securing pins.
(6)Slide the AN/VRC-99A/B out of the Transit Case.
l.Disconnect W61 P1/P2 from COMSEC Assembly J3.
m.Disconnect W62 P1from KG-250 J1.
n.Disconnect W60 P2 from COMSEC Assembly J1.
o.Disconnect W56 P2 from COMSEC Assembly J4.
p.Remove COMSEC Power Assembly.
(1)Disconnect W56 P2 from J4.
(2)Disconnect 802.3 cable W61 from J3.
(3)Disconnect W60 from J1 input port.
(4)Disconnect W62 P1 from KG-250 J1.
(5)Unscrew four (4) securing pins.
(6)Slide the COMSEC out of the Transit Case.
q.Disconnect W37 P2 from J4 on the DAGR.
r.Disconnect W7 P1 from J1 on the DAGR.
s.Disconnect W32 P2 from J21 AC Assembly and P1 from AC Power Source.
5.Learning Step / Activity 5. Mount the Prophet Control Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
6.Learning Step / Activity 6. Replace laptops in the vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Replace laptop 4 in bracket behind the Transit Case.
b.Open the two (2) port protective covers on each laptop.
c.Open laptops.
d.Mount laptops in RAM mounts.
e.Slide in brackets and turn lock to vertical position to secure.
f.Connect power cable W21 to laptop 1.
g.Connect Ethernet cable W22 to laptop 1.
h.Connect power cable W24 to laptop 2.
i.Connect Ethernet cable W25 to laptop 2.
j.Connect power cable W15 to laptop 3.
k.Connect Ethernet cable W17 to laptop 3.
7.Learning Step / Activity 7. Install the DAGR in Prophet Control.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
8.Learning Step / Activity 8. Perform final check.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Stow dismount kit.
b.Inspect the vehicle and surrounding area for any equipment.
c.Secure vehicle.

Enabling Learning Objective K - 301-PCS-6522L3 / Mount the Prophet Control Transit Case K. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6522L3 / Mount the Prophet Control Transit Case

CONDITIONS:

Given the Prophet Control, a three person crew, and TM 32-5895-1828-13.

STANDARDS:

All transit case equipment powers on.

1.Learning Step / Activity 1. Mount the Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

CAUTION: This is a three (3) person lift. When the case is resting on the seat, the third crew member will move to the front curbside seat to assist with lifting and positioning the transit case.

a.Remove covers from the Transit Case.
b.Slide the driver's seat completely forward.
c.Remove laptop mount.
d.Clear all cables from platform area to avoid damage.
e.Lift the Transit Case to the rear, roadside seat, then up to the platform.
f.Push and rotate the Transit Case on to the platform.
g.Connect cables to the rear of the Transit Case.
(1)Connect laptop 1 Ethernet cable W22 to the Ethernet switch (SIXNET).
(2)Connect laptop 2 Ethernet cable W25 to the Ethernet switch (SIXNET).
(3)Connect DC vehicle power cable W26 to port J16.
(4)Connect AC shore power cable W27 to port J21.
(5)Connect NSANET Ethernet cable W29 to the Ethernet switch (SIXNET).
(6)Connect GPS Time Sync cable W7 to the rear of the server serial port.
h.Slide Transit Case to the rear and lock into position.
i.Slide in front set pins and tighten to secure.
j.Flip rear set pins down to secure.
k.Tighten four (4) securing straps.
l.Reset Mounting tray in alignment with top binding knob on rear roadside computer mount.
m.Tighten top binding knob on rear roadside computer mount.
n.Replace the laptop on mount.
o.Reconnect LAN cable W22 P1 to LAN port and reconnect W21 P2 to the power port.
p.Slide the driver's seat back into place.
2.Learning Step / Activity 2. Make connections to the Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Connect cables to the DC Power Conditioning Assembly.
(1)Connect W13 P1 from J7.
(2)Connect W20 P1 from J6.
b.Install AN/VRC-99A/B.

NOTE: Ensure the power switch is set to OFF and the T/R STBY knob is set to STBY.

(1)Slide the AN/VRC-99A/B into the Transit Case.
(2)Tighten two (2) thumbscrews.
(3)Connect W55 P1 power cable to the rear of the AN/VRC-99A/B port J7.
(4)Connect W61 to 802.3 port.
(5)Connect W59 P2 to IOP maintenance port.
(6)Connect W3 P1 antenna cable to ANT port.
c.Install COMSEC power Assembly.
(1)Slide COMSEC Assembly in to the Transit Case.
(2)Tighten the four (4) thumb screws.
(3)Connect W60 to J1 input port.
(4)Connect 802.3 cable W61 to J3.
(5)Connect W56 P2 to J4.
(6)Connect W62 P1 to KG-250 J1.
3.Learning Step / Activity 3. Power-on the Transit Case
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Flip the DC circuit breaker switch ON.
b.Power-on the server
c.Power-on the AN/VRC-99A/B
d.Verify Transit Case powers-on.

Enabling Learning Objective L - 301-PCS-6516L3 / Set-up Prophet Control for Shore Power Operations L. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6516L3 / Set-up Prophet Control for Shore Power Operations

CONDITIONS:

Given the Prophet Control configured for vehicle engine power operations, a two person crew and TM 32-5895-1828-13.

STANDARDS:

Set-up Prophet Control for shore power operations IAW TM 32-5895-1828-13 and bring to an operational state within 20 minutes.

1.Learning Step / Activity 1. Connect the AC power cable.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Ensure SEP breaker is in the OFF position.
b.Remove AC power cable from trailer.
c.Unscrew Signal Entry Panel (SEP) Curbside Shore Power Input cover.
d.Connect the AC power cable W28 P1 to the SEP Curbside Shore Power Input port J1.
e.Connect the AC power cable W28 P2 to the power source.
f.Turn SEP Breaker switch to ON.

WARNING: Shock hazard. Do not switch SEP breaker to ON until W28 AC power cable is connected to J1 port.

2.Learning Step / Activity 2. Power-on AN/PSN-13 DAGR; press and hold PWR/QUIT.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Set the power switch to ON.
b.Set T/R STBY knob to T/R.
3.Learning Step / Activity 3. Power-on the Transit Case.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Set the AC Power Main Circuit Breaker (CB2) to ON.
b.Verify the Transit Case and internal equipment powers on.
4.Learning Step / Activity 4. Power-on Crystal Server.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
5.Learning Step / Activity 5. Power-on laptops.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
6.Learning Step / Activity 6. Power-on AN/VRC-99A/B.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

Enabling Learning Objective M - 301-PCS-6505L3 / Prepare Prophet Control for Transport M. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6505L3 / Prepare Prophet Control for Transport

CONDITIONS:

Given a powered-on Prophet Control, AN/TSQ-248 PT-LITE, secured location for TS/SCI and COMSEC equipment, PT-LITE TM, and TM 32-5895-1828-13.

STANDARDS:

Teardown Prophet Control to a transportable configuration with equipment secured.

1.Learning Step / Activity 1. Zeroize equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.KG-250 COMSEC device.
b.AN/PSN-13 Defense Advanced GPS Receiver (DAGR).
c.SINCGARS voice radio.
2.Learning Step / Activity 2. Power-off mission equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

NOTE: Ensure Crystal Server is shutdown from laptop before manually powering-off.

a.Laptops.
b.DAGR.
c.SINCGARS.
d.Transit Case.
(1)VRC-99A/B.
(2)Crystal Server.
(3)CB1, CB2, CB3
3.Learning Step / Activity 3. Power-off vehicle engine.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
4.Learning Step / Activity 4. Remove mission equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Laptops.
b.DAGR.
c.Two (2) Crystal server hard drives.
(1)Remove 2 screws securing the hard drive into the server.
(2)Gently, pull hard drive out of the server.
d.KG-250 COMSEC Assembly from the Transit Case.
e.AN/VRC-99A/B.
f.SINCGARS.
5.Learning Step / Activity 5. Remove external antennas and stow in vehicle trailer.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.AN/VRC-99A/B.
b.SINCGARS whip.
6.Learning Step / Activity 6. Prepare AN/TSQ-248 PT-LITE for transport.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
7.Learning Step / Activity 7. Stow mission equipment in appropriate location for TS/SCI and COMSEC devices.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Laptops.
b.DAGR.
c.Crystal server hard drives.
d.KG-250 COMSEC Assembly.
e.AN/VRC-99A/B.
f.SINCGARS.

Enabling Learning Objective N - 301-PCS-6521L3 / Install Prophet Control Mission Equipment N. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6521L3 / Install Prophet Control Mission Equipment

CONDITIONS:

Given a powered-off Prophet Control in transportable configuration, mission equipment, AN/TSQ-248 PT-LITE network IPs, TB 32-5865-1027-23-2, and TM 32-5895-1828-13.

STANDARDS:

All equipment is powered-on and configured.

1.Learning Step / Activity 1. Install mission equipment in the Prophet Control vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.AN/PSN-13 Defense Advanced GPS Receiver (DAGR).
b.Two (2) Crystal server hard drives.
(1)Gently, slide hard drive into server.
(2)Replace and tighten two screws to secure hard drive into server.
c.KG-250 COMSEC Assembly.
d.AN/VRC-99A/B data radio.
e.SINGCARS voice radio.
f.Laptops.
2.Learning Step / Activity 2. Install external antennas on vehicle.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.SINCGARS whip.
b.AN/VRC-99A/B.
3.Learning Step / Activity 3. Power-on vehicle equipment.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.AN/PSN-13 DAGR.
b.Power-on vehicle engine.

NOTE: Vehicle can power transit case and peripheral equipment using battery power whether or not the vehicle engine is running. It is recommended that the vehicle be idling to prevent complete discharge of the vehicle batteries.

c.Transit Case via DC power source.
(1)AN/VRC-99A/B.
(2)KG-250 COMSEC Assembly.
(3)Crystal server.
(4)CB1, CB2, CB3.
d.SINCGARS.
e.Laptops.
4.Learning Step / Activity 4. Configure network with new PT-LITE IP addresses.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-

NOTE: Must reconfigure network after vehicle transport.

Enabling Learning Objective O - 301-PCS-6502L3 / Operate Prophet Control Under Unusual Conditions O. ENABLING LEARNING OBJECTIVE

ACTION:

301-PCS-6502L3 / Operate Prophet Control Under Unusual Conditions

CONDITIONS:

Given Prophet Control and TM 32-5895-1828-13.

STANDARDS:

Identify precautions and startup procedures while operating Prophet Control in extreme heat, cold or humidity.

1.Learning Step / Activity 1. Identify precautions for operating under extreme heat or desert conditions.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Protect the equipment, connectors, and receptacles which may become damaged from windblown sand and dust.
b.Cover any receptacles.
c.Close the laptop display cover when not in use.
d.Provide protection before opening the laptop drive compartment cover.
e.Close the equipment covers.
f.Close any cable connectors.
g.Reduce heat by providing shade or locate the equipment to take advantage of the natural airflow and wind.
2.Learning Step / Activity 2. Identify precautions for operating under extreme cold conditions.
Method of Instruction:Conference / Discussion
Time of Instruction:0 hrs
Media:-None-
a.Allow equipment to warm up before turning it on.

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
HTASC_HistoricalManpowerData.docx DOCX document
03_HTASC_TO_PWS_NSTID_07Dec16.docx DOCX document
Policy 36 - Energy.pdf PDF
FH Reg 190-11.pdf PDF
111th MI BDE ORG.pptx PPTX presentation
OSOP_Command Supply Discipline w_Checklist-Draft2.pdf PDF
Policy 19 - Encl 2_ J2X MTT Request Form.pdf PDF
OSOP_Key and Lock Control.pdf PDF
FH Policy 16-47.pdf PDF
Policy 22 - Student Leaves and Passes.pdf PDF
FH Policy 16-37.pdf PDF
FH Policy 15-46.pdf PDF
1100th Signed Course Management Plan for 301-35F10.pdf PDF
Policy 31 - Command Supply Discipline Program.pdf PDF
FH Policy 13-14.pdf PDF
02_HTASC_TO_PWS_HTJCOE_07Dec16.docx DOCX document
05_HTASC_TO_PWS_TDS_07Dec16.docx DOCX document
FH Reg 710-1.pdf PDF
TCC Instructor Certification.pdf PDF
FH Policy 15-49.pdf PDF
OSOP_Cellular Device Accountability.pdf PDF
06_HTASC_TO_PWS_TCC_07Dec16.docx DOCX document
Policy 5 - Military Wear and Appearance.pdf PDF
Policy 19 - Encl 3_JSVC MTT Request.pdf PDF
Policy 35 - Procurement and Acquisition.pdf PDF
Policy 29 - Badges and Credentials.pdf PDF
HT-JCOE Instructor Performance Evaluation.pdf PDF
Policy 2 - Open Door.pdf PDF
FH Policy 15-23.pdf PDF
OSOP_Instructor Certification and Evaluation w_Appendices.pdf PDF
Policy 26 - Sponsorship Program and Departing Procedures.pdf PDF
01_HTASC_IDIQ_PWS_07Dec16.docx DOCX document
Policy 24 - Travel Voucher Process and Timelines.pdf PDF
NSTID Prophet POI.xlsx XLSX spreadsheet
FH Policy 15-44.pdf PDF
Policy 6 - Safety.pdf PDF
Policy 19 - Encl 1_ JARMSC MTT Request.pdf PDF
Policy 33 - Hazing and Bullying.pdf PDF
Policy 37 - Equal Opportunity.pdf PDF
Policy 1 - Commander's Policy Memo Guidance.pdf PDF
TCC Capability Identification Planning and Sourcing.pdf PDF
FH Reg 190-5.pdf PDF
FH Policy 15-07.pdf PDF
07_HTASC_TO_PWS_1100MIBDE_07Dec16.docx DOCX document
Policy 17 - Release of Information.pdf PDF
Policy 32 - SHARP.pdf PDF
OSOP_J3 Registrar.pdf PDF
1100th Course Admin Data —
111th MI BDE and NCOA Key Policies References.pptx PPTX presentation
Policy 4 - Wear and Appearance.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .