This is a summary of solicitation W56HZV-20-R-0025 for two ship-to-shore container cranes. The U.S. Army Contracting Command - Detroit Arsenal is seeking proposals for two STS container cranes to be delivered to the Military Ocean Terminal Concord in California within 36 months of award. The cranes must be equipped with spreaders capable of lifting single and twin twenty-foot containers, single forty-foot containers, and single forty-five foot containers. Additionally, the cranes must be able to service a Panamax vessel with thirteen containers abeam. Offerors must acknowledge all amendments to the solicitation. Questions must be submitted in writing to the identified Contract Specialist. The resulting contract will be a single-award firm fixed price agreement.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2021APR09
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
TYLER WONSOWICZ
EMAIL: TYLER.J.WONSOWICZ.CIV@MAIL.MIL
W56HZV-20-R-0025
2021MAR01
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 10
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: TYLER WONSOWICZ
Buyer Office Symbol/Telephone Number: CCTA-HTB-C/(586)282-4010
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0002 to W56HZV-20-R-0025 is to make the following changes:
- Updated Attachment 0001 - STS Crane Specification (changes have no bearing on technical requirement):
- Page numbering in the Table of Contents
- Section 1.1 (Contractor's EOR)
- Section 1.1 (MOTCO Facility)
- Section 2.2.14
- Section 2.2.20.1
- Section 2.2.23.4.3
- Section 2.5.15
- Section 3.9.3
- Section 3.9.9
- Incorporated Attachment 0016 - Structural Drawings
- Revised Section H.3.8 of the Solicitation
- Revised Appendix E
- Power Supply changed to UPS 120V-2000VA
- Festoon cable roller wheels and side wheels requirement removed
All other terms and conditions except those addressed in Amendment 0002 remain in full force and effect.
*** END OF NARRATIVE A0003 ***
2 10
W56HZV-20-R-0025
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 DELIVERY INFORMATION________________________
H.1.1 Notice to Offerors_________________________
The Government does NOT anticipate the 12kV power to be available at the wharf crane vault until Q3 FY2024 (June 2024) and is providing this information to industry for planning purposes. The STS Crane warranty (one year, see FAR 52.246-18) will not start until the STS
Cranes are erected, operational, passed all acceptance testing, and turned over to the Government IAW Section F.1.
H.2 Contractor Performance___________________________
Contractor's performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/ . Prior to commencement of work the contractor is required to provide the government with the name, phone number and email address of the "Contractor's Representative" that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor's responsibility to keep this contact information current.
H.3 SPECIAL CONTRACT REQUIREMENTS at MOTCO__________________________________________
H.3.1 Operations Affecting Existing Work________________________________________
Operations affecting existing facilities at the construction sites shall be conducted with care not to damage facilities that are to remain in place in accordance with FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegatation. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractors failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
H.3.2 Work Outside Regular Hours________________________________
If the Contractor identifies a need to conduct work outside regular hours or on Saturdays, Sundays, or holidays, the contractor shall submit a written request to the COR and the Contracting Officer a minimum of five regular work days prior in advance of desired work period. Such requests, if authorized, shall allow ample time to enable satisfactory arrangements to be made by the Government to authorize such work and for inspecting the work in progress. At night, the contractor shall light the different parts of the work in an approved manner. No additional costs shall be authorized for such work.
H.3.3 Working Hours___________________
H.3.3.1 Regular Working Hours. Unless otherwise indicated, all work is to be performed during the Command's regular work hours from 7:30 a.m. to 1600 (4:00 p.m.) on regular work days of Monday through Friday except for Federal holidays. Recognized Federal holidays include
New Year's Day, Martin Luther King's Birthday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day. When a holiday falls on a Saturday, the holiday will be observed on the preceding Friday. When a holiday falls on a Sunday, the holiday will be observed on the following Monday.
H.3.3.2 Extended Holiday periods. Christmas holidays will include a work curtailment from close of the business on 23 December through 3
January. Thanksgiving holidays will include a work curtailment from close of the business on Tuesday prior to Thanksgiving through the following Sunday.
H.3.4 Security Requirements___________________________
H.3.4.1 The Contractor shall, a minimum of fourteen (14) working days prior to beginning on-site work, provide the NAVCRANECEN, a list of all employees who will perform under the contract. The list shall be provided on MOTCO Form 190-3-R (Attachment D). Every employee requesting access is required to sign the NCIC Consent Form (Attachment E) indicating consent for the Government to conduct a criminal background check. The background check is conducted utilizing the National Crime Information Center (NCIC).
H.3.4.2 Each Contractor employee shall wear a visible Government furnished identification badge when performing work under the contract.
Contractor employees shall be badged at MOTCO. These badges will be issued at the MOTCO visitor center during normal business hours. For personnel/companies with current MOTCO access rights, Visit Requests should be done through JPAS/JCAVS.
NOTE: Presentation of Form 1-9 will not be required; however, employers are to ensure their workers are valid workers and are subject to verification checks. In other words, the prime contractor must check their sub-contractors and employees to ensure they comply with federal requirements and have no illegal workers.
H.3.4.2.1 Foreign nationals: Approval of access by foreign nationals requires a significant amount of time. The visit information must be provided to the delivery site representative a minimum of 30 calendar days before a visit. The following apply:
3 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
H.3.4.2.1(a) Foreign nationals who represent their nation's military or government who request access to US military facilities are covered by AR 380-10, Foreign Disclosure and Contacts with Foreign Representatives. They are required to follow the official visit request process via their embassy in Washington, DC. This request must be submitted 30 days in advance of their requested visit.
Disclosure of CLASSIFIED or controlled unclassified information must be cleared with Department of the Army, through the chain of command.
H.3.4.2.1(b) Foreign nationals who work for an authorized contractor (not an official representative of their nation's military or government), who request access to MOTCO will not require a formal request from their embassy. Disclosure of CLASSIFIED or controlled unclassified information IS NOT AUTHORIZED. However, requests for special exceptions can be submitted on a case-by-case basis through the chain of command to the Department of the Army.
H.3.4.2.1(c) ALL foreign nationals shall be RESTRICTED only to areas required to support their official business and MUST be escorted at all times. The 834th TB point of contact or member of that Directorate/Division will escort the visitor at all times. At no time will they be left unaccompanied.
H.3.4.2.1(d) The Visit Request and Clearance/Access Certification, MOTCO Form 190-3-R, will be provided to NAVCRANECEN for forwarding to the 834th TB Director of Emergency Services Personnel Security Officer for approval.
H.3.4.2.1(e) Foreign national visitors will be limited to a maximum often visitors at any given time due to escort requirements.
H.3.4.4 Disqualifying and temporarily disqualifying criminal offenses used to determine suitability to gain access to MOTCO are located in 49 CFR (Code of Federal Regulations), Part 1572.103.
H.3.4.5 All vehicles entering MOTCO will be required to receive a visitor vehicle pass and be subjected to an entry search. These vehicle passes will be issued at the MOTCO visitor center during normal business hours. The Contractor shall provide a vehicle list at least ten (10) days prior to mobilization. This shall include make, model, year and license plate number. Contractor shall provide registration and proof of insurance.
H.3.4.5(a) The Company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible.
H.3.4.5(b) The vehicle must have the following:
(1) Proof of ownership (valid state registration), rental agreement or proof of dispatch (trip ticket).
(2) Valid state license plate.
(3) Evidence of current vehicle safety/ emissions inspection, if applicable.
(4) Operator has a valid license
H.3.4.5(c) All contractor vehicles and equipment, when not in use, shall be locked or removed from the facility or otherwise disabled so that operation by unauthorized personnel will be prohibited. See Appendix D for mobile crane entry requirements.
H.3.4.6 The Contracting Officer may require the Contractor to remove from the job site any employee for misconduct or security reasons.
The removal from the job site of such person shall not relieve the Contractor of the requirement to perform.
H.3.4.7 Cameras/cell phones: No cameras, including cell phone cameras, or recording devices are allowed inside the activity premises.
Cell phone operation while driving must be hands free.
H.3.4.8 No firearms or controlled substances are allowed on base.
H.3.4.9 Emergency services:
1) Call (925) 246 -3911 for fire.
2) Call (925) 246 -3911 for security.
3) Call (925) 246 -3911 for a hazardous spill.
4) Call (925) 246 -3911 for a medical emergency. If care is rendered by a government facility, the contractor may be billed at prevailing rates.
5) Smoking is only permitted in areas posted for smoking.
H.3.5 Military Activity Regulations___________________________________
The contractor, employees and subcontractors shall become familiar with and obey all MOTCO regulations including fire, traffic and security regulations. All personnel employed on the work site shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry. The contractor's equipment shall be conspicuously marked for identification.
H.3.6 Work Schedule___________________
4 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The Contractor shall submit a work schedule as required to the Contracting Officer and the appropriate activity personnel prior to commencing work since circumstances at any particular site may dictate the need to modify the contractor's work schedule. Attention is invited to the fact that other Contractors may be engaged in work at each site and there may be the need for close cooperation in order to avoid conflicts. The Contractor shall cooperate and schedule work to avoid such conflicts with and interruption of the work of others insofar as practicable. In the case of conflicts with other Contractors that cannot be resolved satisfactorily, the matter shall be referred to the Contracting Officer for resolution.
H.3.7 Government Activities___________________________
The Government will continue its normal activities during the contractor's work at each site, and the contractor shall carry on work with the least possible interference to Government activities. The contractor shall schedule work as to cause the least amount of interference with facility operations. Work schedules shall be discussed with activity personnel as required. Permission to connect or interrupt any roads, railroads and/or utility service shall be requested in writing to Contracting Officer a minimum of 15 calendar days prior to the desired date of interruption. The contractor shall provide secure boundaries and sign postings around the designated work site to prevent entry of unauthorized personnel and vehicles.
H.3.8 Government Work and Material__________________________________
The Contractor will perform the final acceptance tests of the crane as described in the contract. The Government will provide the power to perform the tests at no cost to the Contractor.
H.3.9 Safety____________
The Contractor shall submit an Accident Prevention Plan in accordance with Appendix D IAW CDRL A011.
H.3.10 Crane Mobilization, Assembly, Installation and Testing Plan__________________________________________________________________
H.3.10(a) The Contractor is required to submit Contractor Mobile crane entry package a minimum of seven days prior to desired entry date
IAW CDRL A011.
H.3.10(b) The following documentation shall be submitted in the Contractor Mobile crane entry package.
(1) Crane annual and quadrennial inspection.
(2) Copies of operator's medical certificate and qualifications by a source that qualifies Crane Operators.
(3) Personnel designated and qualified by the Crane Contractor conducting weight handling operations to perform rigger in charge duties as identified in NAVFAC P-307. The personnel designated to perform as the rigger in charge shall be qualified as defined per 29 CFR
1926.32(m).
(4) Copy of the load chart for the specific crane.
(5) Crane Data sheet
(6) Job site ground loading condition evaluations.
(7) Crane Certificate of Compliance of Appendix D.
(8) Major crane component lift plan required by Appendix D.
H.3.10(c) After the Contracting Officer provides approval of the submitted Contractor Mobile crane entry package, the Contractor must submit the request for mobile crane entry at least 48 hours prior to desired entry.
H.3.10(d) The Contractor shall comply with the following requirements pertaining to crane safety and operations:
(1) The crane operator will not leave the crane cab with a load suspended.
(2) The crane hook must be positioned directly over the load. Side loading of the crane is prohibited.
(3) A barricade must be positioned to prevent personnel from entering the tail swing area.
(4) "Lift-off' of tires when working on rubber or lift off of outriggers when used will not be permitted.
(5) Ground loading limitations must be adhered to at all times.
H.3.10(e) Critical lifts require plans as defined in Appendix D shall be submitted for approval. (Submittal)
H.3.10(f) The Contractor's mobile crane will only be operated after lift plan approval and a successful equipment inspection.
H.3.11 Storm Protection_______________________
Should warnings of wind of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize danger to persons, to the cranes and to adjacent property. These precautions shall include closing all openings as appropriate, removing all loose materials, tools and equipment from exposed locations and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby Government property.
5 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
H.3.12 Sanitation_________________
If adequate sanitary conveniences are not available at the site, the contractor shall be responsible for such conveniences of any approved type for the use of persons employed on the work and properly secluded from public observation and shall be constructed and maintained by the contractor in such a manner and at such points as shall be required or approved by the appropriate authority at the
Government facility. These conveniences shall be maintained at all times without nuisance and their use shall be strictly enforced. Upon completion of the work, they shall be removed from the premises, leaving the premises clean and free from nuisance.
H.3.13 Environmental Protection_______________________________
H.3.13.1 No waste hazardous material or hazardous waste shall be disposed of on government property. No hazardous material shall be brought onto government property that does not directly relate to requirements for the performance of this contract. The government is not responsible for disposal of Contractor's waste material brought on the job site and not required in the performance of this contract. The intent of this provision is to dispose of that waste identified as waste hazardous material/hazardous waste as defined herein that was generated as part of this contract and existed within the boundary of the Contract limits and not brought in from offsite by the Contractor. Incidental materials used to support the contract including, but not limited to aerosol cans, waste paint, cleaning solvents, contaminated brushes, rags, clothing, etc. are the responsibility of the Contractor. The list is illustrative rather than inclusive. The Contractor is not authorized to discharge any materials to sanitary sewer, storm drain, or to the river or conduct waste treatment or disposal on government property without written approval of the Contracting Officer.
H.3.13.2 The Contractor is advised that this project and the station are subject to Federal, State, and local regulatory agency inspections to review compliance with environmental laws and regulations. The Contractor will fully cooperate with any representative from any Federal, State or local regulatory agency who may visit the job site and will provide immediate notification to the Contracting
Officer, who will accompany them on any subsequent site inspections. The Contractor will complete, maintain, and make available to the
Contracting Officer, station, or regulatory agency personnel all documentation relating to environmental compliance under applicable
Federal, State and local laws and regulations. The Contractor will immediately notify the Contracting Officer if a Notice of Violation
(NOV) is issued to the Contractor. The Contractor shall comply with the instructions of the cognizant MOTCO Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel.
H.3.13.3 The Contractor will be responsible for all damages to persons or property resulting from Contractor fault or negligence as well as for the payment of any civil fines or penalties which may be assessed by any Federal, State or local regulatory agency as a result of the Contractor's or any subcontractor's violation of any applicable Federal, State or local environmental law or regulation. Should a Notice of Violation (NOV), Notice of Noncompliance (NON), Notice of Deficiency
(NOD), or similar regulatory agency notice be issued to the Government as facility owner/operator on account of the actions or inactions of the Contractor or one of its subcontractors in the performance of work under this contract, the Contractor will fully cooperate with the Government in defending against regulatory assessment of any civil fines or penalties arising out of such actions or inactions.
H.3.13.4 Any on site fuel tanks must be over drip pans, which can contain 110% of the tank's volume. The tanks and drip pans must be covered during inclement weather and when work is not in progress on the site.
H.3.14 Public Release of Information____________________________________
There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this contract or other documents resulting there from without the prior written approval of the Contracting Officer. The Contractor shall insert the substance of this paragraph in each subcontract and purchase order.
H.3.15 Services of a Manufacturer's Representative at Site of Delivery______________________________________________________________________
The prime contractor shall provide a representative at the site specified in the contract who shall coordinate all work during the entire period of delivery, erection, field testing and Government inspection. This representative shall have the technical expertise and authority to resolve problems in a timely manner, and shall be an employee of the prime contractor whether the site work is performed by the prime or by subcontractor(s).
H.3.16 RESERVED_______________
H.3.17 Radio Transmitter Restrictions_____________________________________
To preclude accidental actuation of sensitive electronic equipment, the Contractor shall conform to the restrictions and procedures for the use ofradio transmitting equipment as delineated by MOTCO. Under no circumstances shall transmitters be used without prior approval of the appropriate MOTCO authorities.
H.3.18 Utilities Services_________________________
6 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
H.3.18.1 Installation Support Power: The contractor shall make arrangements for any and all utility services required. The contractor shall be responsible for providing utility services for the installation. Crane checkout and testing should utilize electricity through normal crane power supply circuits.
H.3.18.1 Telephone Service: The contractor shall make arrangements for telephone services. The facility will not provide telephone access.
H.3.18.2 Water: The location of temporary tie-ins will be as approved by the Contracting Officer and at the expense of the Contractor.
All temporary tie-ins to the facility water system require meters, low-pressure back-flow preventors and shut off valves. Fire hydrants shall not be used for water supply.
H.3.18.3 Solid Waste: Contractor will provide all required waste disposal services necessary in execution of this contract.
H.3.19 GENERAL INFORMATION__________________________
H.3.19(a) The Contractor shall provide a Contract Manager who shall be responsible for performance of the work. The name of this person, and an alternate or alternates, who shall act for the Contractor when the manager is absent, shall be designated in writing to the
Contracting Officer .
(1) The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract and be responsible for prompt action on matters pertaining to Contractor administration of the contract.
(2) The contract manager or alternate shall be available during normal duty hours within 30-60 minutes to meet on the installation with
Government personnel (designated by the CO) to discuss problem areas. After normal duty hours, the manager or alternate shall be available within two (2) hours.
(3) The project manager and alternate or alternates must be able to read, write, speak, and understand English.
H.3.19(b) Cutting, burning, grinding, and welding within the confines of the complex requires special permission and a hot work permit from the fire department which must be obtained in advance. The contractor will be required to post a fire watch for any such activities.
H.3.19(c) The Contracting Officer may require the Contractor to remove from the job site any employee for misconduct or security reasons.
H.3.19(d) Contractor employees shall not loiter in or around place of duty during off-duty hours.
H.3.19(e) All Contractor employees performing work under the contract shall be physically able to do their assigned work. The Contractor shall not allow any employee(s) to perform any work that is under the influence of alcohol or is incapacitated by restricted substances.
H.3.19(f) The contractor is advised that at times they will be working within an explosive clear zone. The clear zone consists of an area where explosives or explosive operations are present at nearby sites. The potential for a mishap is unlikely. However, if a mishap were to occur, personnel would be exposed to effects such as blast, fragmentation and fire brands that could result in serious injury or fatality.
H.3.19(g) The contractor will be requested to evacuate the work site during a lightning storm if within ten miles when explosive operations are in process.
H.3.19(h) The contractor will follow emergency procedures for fire and ambulance in coordination with the MOTCO fire department
H.3.19(i) Contractor trailers or storage buildings will be permitted in the vicinity of the job site, when space is available, subject to the approval of the Contracting Officer. The trailers or buildings shall be in good condition, free from visible damage rust and deterioration, and meet all applicable safety requirements. Trailers shall be roadworthy and comply with all appropriate state and local vehicle requirements. Failure to maintain storage trailers or buildings to these standards shall result in the removal of non\-complying units at the Contractor's expense. A sign not smaller than 24 by 24 inches shall be conspicuously placed on the trailer depicting the company name, business phone number, and emergency phone number. Trailers shall be anchored to resist high winds and must meet applicable state of local standards for anchoring mobile trailers. Connection of utility services could require using specific contractors that provide that utility service and repairs at MOTCO.
H.3.20 The contractor shall procure and maintain during the entire period of performance under this contract the following minimum insurance:
COVERAGE________
Type of Insurance: General Liability Automobile Liability
Per Person
7 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
$200,000.00
Per Accident Property
$ 500,000.00
$ 500,000.00 $ 20,000.00
Workmen's Compensation
As Required Under FAR 28.307-2
(Other as required by State Law)
A Certificate of Insurance shall be submitted to the Contracting Officer for review and approval. No work shall commence until this notice has been presented to the Contracting Officer.
The only wording that is acceptable to the Government in the Cancellation section of the Certificate of Insurance is the endorsement stating:
"ANY CANCELLATION OR MATERIAL CHANGE IN THE COVERAGE ADVERSELY AFFECTING THE GOVERNMENT'S INTEREST SHALL NOT BE EFFECTIVE FOR SUCH
PERIOD AS THE LAWS OF THE STATE IN WHICH THIS CONTRACT IS TO BE PERFORMED PRESCRIBE; OR UNTIL 30 DAYS AFTER THE INSURER OR THE
CONTRACTOR GIVES WRITTEN NOTICE TO THE CONTRACTING OFFICER, WHICHEVER PERIOD IS LONGER."
The Certificate Holder will be Commander, NAVFAC Atlantic, Navy Crane Center, Norfolk Naval Shipyard, Building 491, Portsmouth, VA 23709-
5000.
See FAR 52.228-5 for additional requirements with regard to insurance.
H.4 ANTITERRORISM/OPSEC_______________________
H.4.1 AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT
Level I awareness training is available at https://jkodirect.jten.mil .
H.4.2 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. The contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation
Provost Marshal Office, Director of Emergency Services, or Security office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.20
4-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the change clause of this contract, should the
Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-
05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center interstate identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
H.4.3 Impact on contractor performance during increased FPCON during periods of increased threat (contractor personnel working on an installation). During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat. Services will resume when
8 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
FPCON level is reduced to level Bravo or lower.
*** END OF NARRATIVE H0001 ***
9 10
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0016 STRUCTURAL DRAWINGS 118
10 10
| SECTION A |
| SECTION H |
| SECTION J |