This federal solicitation requests proposals for two ship-to-shore container cranes to be delivered to the Military Ocean Terminal Concord in California. The cranes must be able to lift single and twin twenty-foot and forty-foot containers as well as single forty-five foot containers, and service a Panamax vessel with thirteen containers abeam. Proposals are due by the date specified in the solicitation. The contract will have a firm fixed price and 36-month period of performance for crane delivery. The solicitation is seeking full and open competition, and the award will be a single-award contract issued by the U.S. Army Contracting Command - Detroit Arsenal.

View the file

Other files

File Type Posted
Attachment 0002 - Pricing Workbook (revised 06 JUN 2021).xlsx XLSX spreadsheet
W56HZV-20-R-0025 0006.pdf PDF
MOTCO STS Container Crane QA Log 5-26-21.pdf PDF
W56HZV-20-R-0025 0005.pdf PDF
W56HZV-20-R-0025 0004.pdf PDF
MOTCO STS Container Crane QA Log 5-14-21.pdf PDF
Attachment 0013 Site Visit Information (revised 29 APR 2021).docx DOCX document
W56HZV-20-R-0025 0004.pdf PDF
MOTCO STS Container Crane QA Log 4-29-21.xlsx XLSX spreadsheet
Attachment 0001 - STS Crane Specification (revised 26 APR 2021).DOCX DOCX document
MOTCO Crane Site Visit Sign-in Sheet (beta.sam).pdf PDF
W56HZV-20-R-0025 0003.pdf PDF
Attachment 0013 Site Visit Information (revised 26 APR 2021).docx DOCX document
Attachment 0016 - Structural Drawings.pdf PDF
Attachment 0011 - Appendix E (Revised 09 APR 2021).pdf PDF
W56HZV-20-R-0025 0002.pdf PDF
Attachment 0001 - STS Crane Specification (revised 09 APR 2021).DOCX DOCX document
MOTCO STS Container Crane QA Log 4-8-21.pdf PDF
MOTCO STS Container Crane QA Log 3-25-21.pdf PDF
Attachment 0013 - Site Visit Information (revised 23 MAR 2021).docx DOCX document
W56HZV-20-R-0025 0001.pdf PDF
MOTCO STS Container Crane QA Log 3-18-21.pdf PDF
MOTCO STS Container Crane QA Log 3-11-21.pdf PDF
MOTCO STS Container Crane QA Log 3-4-21.pdf PDF
Attachment 0013 - Site Visit Information.docx DOCX document
Attachment 0007 - Appendix A.pdf PDF
Attachment 0011 - Appendix E.pdf PDF
Attachment 0010 - Appendix D.pdf PDF
Attachment 0001 - STS Crane Specification.DOCX DOCX document
Attachment 0014 - NCIC CONSENT FORM.pdf PDF
Attachment 0008 - Appendix B.pdf PDF
Attachment 0002 - Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0005 - SBP Certification - Subcontractor.docx DOCX document
W56HZV20R0025.pdf PDF
Attachment 0006 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Attachment 0015 - MOTCO SITE VISIT SPREADSHEET.xlsx XLSX spreadsheet
Attachment 0003 - SBP Workbook.xlsx XLSX spreadsheet
Attachment 0012 - Appendix F.pdf PDF
Attachment 0009 - Appendix C.pdf PDF
Attachment 0004 - SBP Workbook Instructions.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TWO SHIP-TO-SHORE CONTAINER CRANES

for

MILITARY OCEAN TERMINAL CONCORD

at

CONCORD, CALIFORNIA

PART 1.0 GENERAL10
1.1 Definitions10
1.2 Specifications and Standards10
1.2.1 General10
1.2.2 US Domestic Codes and Standards and Specifications11
1.2.3 International Codes and Standards16
1.2.4 Substitution of Codes17
1.2.5 Example of List of Codes Used in Industry Procurement Specifications18
1.3 System Description and Scope of Supply19
1.3.1 Reference Section C of the contract.19
1.3.2 Minimum Criteria19
1.3.3 Safety Design Criteria19
1.3.4 Design Requirements19
1.3.5 Performance Requirements21
1.3.6 Unique Identifier Tags21
1.3.7 Essential Repair Parts21
1.3.8 RESERVED21
1.4 RESERVED21
1.5 RESERVED21
1.6 RESERVED21
1.7 Existing Conditions21
1.8 Contractor Requested Engineering Changes22
1.9 Warranty22
1.10 RESERVED22
1.11 Design Life22
1.11.1 Minimum Support Period22
1.12 Duty Cycles and Load Spectra23
1.12.1 Main Hoist and Trolley Design Duty Cycle23
1.12.2 Gantry Drive Design Duty Cycle24
1.12.3 Boom Hoist Design Duty Cycle24
1.12.4 Rope Inspection Duty Cycles24
1.12.5 Main Hoist Load Spectrum24
1.12.6 Trolley Load Spectrum24
1.12.7 Gantry Drive Load Spectrum25
1.12.8 Boom Hoist Load Spectrum25
1.12.9 Other Duty Cycles and Load Spectra26
1.12.10 Duty Cycle Analysis Requirements26
1.12.11 Load Spectra and Design Life Analysis Requirements26
1.13 Crane Modes26
1.13.1 Primary Operating Mode26
1.13.2 Semi-Automated Operating Mode27
1.13.3 Passing Mode27
1.13.4 Stowed Mode27
1.13.5 Cargo Beam Mode27
1.13.6 Maintenance Mode27
1.13.7 Limping Mode(s)28
PART 2.0 PRODUCTS28
2.1 Materials28
2.1.1 Ductile Materials28
2.1.2 Structural Steel29
2.1.3 Structural Pipes and Tubes29
2.1.4 High Strength Bolts, Nuts, and Washers30
2.1.5 Aluminum Castings30
2.1.6 Iron Castings30
2.1.7 Steel Castings31
2.1.8 Steel Forgings31
2.1.9 Bronze Bushings and Thrust Washers31
2.1.10 Steel Bars of Special Quality31
2.1.11 Steel Bars of Standard Quality31
2.1.12 Alloy Steel Bars31
2.1.13 Welding Materials31
2.1.14 Charpy V-Notch Impact Requirements32
2.1.15 Plate Through-Thickness Requirements33
2.1.16 Material Traceability35
2.1.17 Mechanical Material36
2.2 Structural Design37
2.2.1 General Requirements37
2.2.2 Fracture Critical Members38
2.2.3 Access for Inspection39
2.2.4 Members Subject to Buckling39
2.2.5 Welding39
2.2.6 Crane Structure40
2.2.7 Trolley Girder40
2.2.8 Boom40
2.2.9 Connections41
2.2.10 Trolley Structure43
2.2.11 Trolley Rails, Clips, and Pads44
2.2.12 Machinery House45
2.2.13 Boom Control Station46
2.2.14 Access Structures46
2.2.15 Counter Weight (Ballast)46
2.2.16 Equalizer Girders and Travel Trucks46
2.2.17 Stowed Wind Condition Securing Devices47
2.2.18 Hatch Cover Support Structure48
2.2.19 Boom Hoist Failure Prevention48
2.2.20 Gantry Frame Deflections and Stiffness49
2.2.21 Camber50
2.2.22 Design Loads51
2.2.23 Seismic Design55
2.2.24 Design Loading Conditions60
2.2.25 Fatigue Design61
2.2.26 Allowable Design Stresses68
2.2.27 Calculations70
2.2.28 Stability75
2.2.29 Wheel Loads76
2.2.30 Structural Maintenance Program79
2.2.31 Voyage Criteria82
2.3 Mechanical Design84
2.3.1 General Requirements84
2.3.2 Safety Factors85
2.3.3 Machinery Mounting, Installation, and Alignment85
2.3.4 Drive Mechanisms85
2.3.5 Shafts, Axles, and Pins88
2.3.6 Gear Reducers89
2.3.7 Bearings92
2.3.8 Drums93
2.3.9 Wire Ropes95
2.3.10 Reeving96
2.3.11 Fleet Angles97
2.3.12 Catenary Rope Support System97
2.3.13 List, Trim and Skew Adjustment98
2.3.14 Headblock98
2.3.15 Sheaves100
2.3.16 Wheels and Guide Rollers100
2.3.17 Couplings101
2.3.18 Keys and Keyseats102
2.3.19 Bumpers and End Stops102
2.3.20 Snag Control102
2.3.21 Slap Blocks and Rollers103
2.3.22 Drip Pans and Catch Basins104
2.3.23 Surface Finishes104
2.3.24 Seals104
2.3.25 Lubrication104
2.3.26 Fits105
2.3.27 Hydraulic Systems105
2.3.28 Brakes108
2.3.29 Boom Latch Mechanism113
2.3.30 Bushings and Thrust Washers113
2.4 Electrical Design115
2.4.1 General Requirements115
2.4.2 Main and Shore Power Supply115
2.4.3 Medium Voltage Switchgear116
2.4.4 Power Quality Meter (PQM)117
2.4.5 Surge Protection Devices (SPD)118
2.4.6 Medium Voltage Transformers118
2.4.7 Low Voltage Transformers119
2.4.8 Drive Control Systems120
2.4.9 Converters120
2.4.10 Inverters120
2.4.11 Power Factor120
2.4.12 Motors for the Major Motions121
2.4.13 Enclosures121
2.4.14 Conduits, Cable Trays, and Fittings122
2.4.15 Cables122
2.4.16 Terminations and Routing125
2.4.17 Cable Reels125
2.4.18 Trolley Cable Chain (Energy Chain)127
2.4.19 Closed Circuit Television (CCTV)127
2.4.20 Marking and Identification128
2.4.21 Emergency Modes and Emergency Drives128
2.4.22 Controls, Interlocks, and Indicating Devices129
2.4.23 Programmable Logic Control (PLC)132
2.4.24 PLC Program133
2.4.25 Software Version Verification134
2.4.26 Control Power Indicator134
2.4.27 Anemometer134
2.4.28 Emergency Stop Push Buttons135
2.4.29 Crane Management System (CMS)135
2.4.30 Control System and Network138
2.4.31 Remote Crane Management System (RCMS)141
2.4.32 Lighting141
2.4.33 Convenience Outlets143
2.4.34 Space Heaters144
2.4.35 Lightning Protection144
2.4.36 Intercom144
2.4.37 Local Control Stations145
2.4.38 Safety Equipment147
2.5 Other Equipment Design148
2.5.1 Operator's Cab148
2.5.2 Spreader151
2.5.3 Heavy Lift Cargo Beam155
2.5.4 Machinery House and Electrical Room156
2.5.5 In House Service Cranes162
2.5.6 Outside the Machinery House Jib Structure or Monorail164
2.5.7 Personnel Elevator164
2.5.8 Safety Features166
2.5.9 Wire Rope ReReeving166
2.5.10 Load Weighing System167
2.5.11 Wharf Level Cab167
2.5.12 Crane Nameplates and Markings167
2.5.13 Warning Signs168
2.5.14 Test Weight System169
2.5.15 Stairs, Ladders, Platforms, and Walkways170
2.5.16 Fall Arrest Anchor Points172
2.5.17 Automated Brake Tests173
2.5.18 Stack Profiling System (SPS)174
2.5.19 Air Compressor and Air Distribution System174
2.6 Manufacture / Erection / Assembly175
2.6.1 Corrosion Resistance175
2.6.2 Surface Preparation176
2.6.3 Paint Application177
2.6.4 Faying Surfaces181
2.6.5 Galvanizing181
2.7 Workmanship181
2.7.1 Structural Workmanship182
2.7.2 Mechanical Workmanship185
2.7.3 Electrical Workmanship187
2.7.4 Software and Controls188
PART 3.0 EXECUTION191
3.1 Assembly and Erection191
3.1.1 Erection Workmanship191
3.1.2 Erection Program191
3.1.3 Lubrication192
3.1.4 Boom Alignment192
3.1.5 Crane Weighing192
3.2 Factory Inspection and Testing192
3.2.1 Builder’s Test and Inspection192
3.2.2 Government Drawing Verification193
3.2.3 Factory Testing193
3.3 Delivery193
3.4 Installation and Inspection194
3.5 Acceptance Test194
3.5.1 Final Government Inspection194
3.6 Acceptance195
3.7 Training195
3.7.1 Operator Training195
3.7.2 Maintenance Training195
3.8 Reliability and Maintenance Requirements196
3.8.1 General196
3.8.2 Minimum Reliability196
3.8.3 Maintainability196
3.8.4 Computerized Maintenance Management System197
3.8.5 Special Tools198
3.8.6 Spare Parts198
3.9 Documentation199
3.9.1 Operating Instructions IAW CDRL A013200
3.9.2 Maintenance Instructions and Manuals IAW CDRL A013200
3.9.3 Mechanical Maintenance Manuals – CDRL A013201
3.9.4 Electrical Maintenance Instructions - Drive System Supplier203
3.9.5 Electrical Maintenance Manuals - Non-Drive Components203
3.9.6 Structural Inspection Manual203
3.9.7 As-Built Calculations – CDRL A008203
3.9.8 As-Built Drawings – CDRL A004203
3.9.9 Certificates – CDRL A010204
3.9.10 Test Documentation – IAW CDRL A009204

GENERAL

Definitions Contractor – the Contractor supplying the Cranes and the Contractor’s representatives, subcontractors, and independent engineers retained by the Contractor.

Contractor’s Engineer of Record (Contractor’s EOR) – the Contractor’s professional engineers, for the design of the structure, ancillary structures, mechanical systems, and electrical systems, who shall be responsible for ensuring that the technical requirements of these Specifications are met. See Section C.2.1.1 of the Solicitation for other requirements, including for signing and sealing design drawings and calculations.

Crane, Cranes, or STS Cranes – the ship-to-shore, rail mounted, container handling gantry Cranes as described in these Specifications, including the structure, trolley, headblock, spreader, all attached and ancillary components, all control systems and components, all monitoring and maintenance systems and components, special tools, spare parts, and all other items defined in these Specifications.

Global Axis – Crane orientation and analysis axis system referenced in the Specification: X axis parallel to trolley travel, Y axis vertical, Z axis parallel to gantry travel.

MOTCO Facility – to be located at Military Ocean Terminal, Concord (MOTCO), Concord, California, USA. See Appendix A for site plan. See Section 3.4 for restrictions at the MOTCO Facility after delivery.

Point of Common Coupling (PCC) – The location where the Crane electrical system is connected to the wharf electrical system, defined as the end of the reeling cable where it terminates on the wharf furthest from the gantry cable reel on the Crane.

Specifications – This Specification, including appendices, and any clarifications, deviations, or other addenda agreed upon between the Government and the Contractor and incorporated into the Contract. The intent of these Specifications is to provide structural, mechanical, electrical, and functional criteria, dimensions, operating speeds and accelerations, and pertinent details for the design, construction, and installation of reliable and efficiently functioning Cranes with accessories. Unless specifically stated otherwise, the Specification requirements apply to all Cranes and all components, even if the requirement is stated in the singular. One gender means both genders.

Will and Shall – These Specifications are written to the Contractor. When a provision of this Specification requires action by the Contractor, the verb “shall” is used. If the Contractor is allowed to exercise an option when limited alternatives are available, the phrasing “either … or …” is used. However, where the words “or approved equivalent” are used, the Government reserves the option of rejecting the proposed equivalent. Statements provided in the Specification as information to the Contractor use the verbs “may” or “will.” Informational statements typically identify activities or options that “will be taken” or “may be taken” by the Government.

Specifications and Standards General The documents below form a part of this Specification to the extent specified herein. In case of difference between the following documents and this Specification, this Specification shall govern to the extent of such difference. In case of material specifications (ASTM), the design shall be based on the issue in effect at the time of bid, but material may be procured in accordance with the issue in effect at the date of manufacture.

Where reference is made to a standard specification, e.g., AWS D1.1, the latest edition in effect on the date of invitation for bids or request for proposal shall apply. If, however, the edition is stated, e.g., ISO 4628/3-1982(E), the stated edition shall apply.

US Domestic Codes and Standards and Specifications

FEDERAL

W-C-375 Circuit Breakers, Molded Case; Branch Circuit and Service

MILITARY

MILF3541Fittings, Lubrication
FED-STD-595CColor Used in Government Procurement

NAVY SEA SYSTEMS COMMAND (NAVSEA)

OP 3565 Vol. 1Electromagnetic Radiation Hazards (U) (Hazards to Personnel, Fuel and Other Flammable Materials) (U)
OP 3565 Vol. 2Electromagnetic Radiation Hazards (U) (Hazards to Ordnance) (U)

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

360 Specification for Structural Steel Buildings

ASSOCIATION FOR IRON AND STEEL TECHNOLOGY (AIST)

TR-06 Technical Report No. 6, Specification for Electric Overhead Traveling Cranes for Steel Mill Service

AMERICAN GEAR MANUFACTURERS' ASSOCIATION (ANSI/AGMA)

908Geometry Factors for Determining the Pitting Resistance and Bending Strength of Spur, Helical and Herringbone Gear Teeth
2015Gear Classification and Inspection Handbook – Tolerances and Measuring Methods for Unassembled Spur and Helical Gears (Including Metric Equivalents)
2001Fundamental Rating Factors and Calculation Methods for Involute Spur and Helical Gear Teeth
2003Rating the Pitting Resistance and Bending Strength of Generated Straight Bevel, Zerol Bevel and Spiral Bevel Gear Teeth.
2009Bevel Gear Classification, Tolerances and Measuring Methods
6013Spur, Helical, Herringbone, and Bevel Enclosed Drives
6109For Shaft Mounted and Screw Conveyor Drives Using Spur, Helical and Herringbone Gears

AMERICAN IRON and STEEL INSTITUTE (AISI)

AISI 4320Properties of alloy steel
AISI 4820Properties of alloy steel

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ABMA 7Shaft and Housing Fits for Metric Radial Ball and Roller Bearings (Except Tapered Roller Bearings)
A14.3Ladders - Fixed - Safety
A17.1Safety Code for Elevators and Escalators
A17.2Inspectors Manual for Elevators and Escalators
A64.1Walking and Working Surfaces, Personal Protective Equipment (Fall Protection Systems)
B4.1Preferred Limits and Fits for Cylindrical Parts
B17.1Keys and Keyseats
B30.10Hooks
S1.13Measurement of Sound Pressure Levels in Air
Z535Product Safety Signs and Labels
Z26.1Safety Code for Safety Glazing Materials for Glazing Motor Vehicles Operating on Land Highways

AMERICAN PETROLEUM INSTITUTE (API)

5LX Line Pipe

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

7-16Minimum Design Loads and Associated Criteria for Buildings and Other Structures
49Wind Tunnel Testing for Buildings and Other Structures
Paper # 3269Wind Forces on Structures

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

B30.24Container Cranes
B46.1Surface Texture, Surface Roughness, Waviness, and Ly
HST-4Performance Standard for Overhead Electric Wire Rope Hoist

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

TC1A How to Qualify and Certify NDT Personnel

ASTM INTERNATIONAL (ASTM)

A6/6MGeneral Requirements for Rolled Steel Plates, Shapes, Sheet Piling and Bars for Structural Use
A27Mild to Medium Strength Carbon Steel Castings for General Application
A36Structural Steel
A53Welded and Seamless Steel Pipe
A106Seamless Carbon Steel Pipe for HighTemperature Service
A108ColdFinished Carbon Steel Bars and Shafting
A123Zinc Coating (Hot-Dip Galvanized) Coatings on Iron and Steel Products
A148High-Strength Steel Castings for Structural Purposes
A153Zinc Coating (Hot-Dip) on Iron and Steel Hardware
A159Automotive Gray Iron Castings
A242High-Strength, Low-Alloy Structural Steel
A275Magnetic Particle Exam of Steel Forgings
A370Mechanical Testing of Steel Products, Methods and Definitions
A434Quenched and Tempered Alloy Steel Bars, HotRolled or ColdFinished
A500Cold-Formed Welded and Seamless Carbon Steel Structural Tubing
A501Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
A504Wrought Carbon Steel Wheels
A536Ductile Iron Castings
A563Carbon and Alloy Steel Nuts
A572High-Strength Low-Alloy ColumbiumVanadium Steels of Structural Quality
A576Special Quality HotRolled Carbon Steel Bars
A588HighStrength LowAlloy Structural Steel
A618Hot-Formed Welded and Seamless High-Strength Low-Alloy Structural Tubing
A666Austenitic Stainless-steel, Sheet, Strip, Plate and Flat Bar for Structural Applications
A668Alloy Steel Forgings for General Industrial Use
A673Sampling Procedure for Impact Testing of Structural Steel
A709Structural Steel for Bridges
A759Carbon Steel Crane Rails
A1085Cold-Formed Welded Carbon Steel Hollow Structural Sections (HSS)
B6Zinc (Slab Zinc)
B148Aluminum Bronze Sand Castings
B271Copper-Base Alloy Centrifugal Castings
B505Copper-Base Alloy Continuous Castings
B584Copper Alloy Sand Casings for General Applications
A1023/AStandard Specification for Stranded Carbon Steel Wire Ropes for General Purposes
C1036Flat Glass
D4020-96Ultra-High-Molecular-Weight Polyethylene Molding and Extrusion Materials
E23Test Methods for Notched Bar Impact Testing of Metallic Materials
F436Hardened Steel Washers
E543Standard Specification for agencies performing Nondestructive Testing
F593Stainless-steel Bolts, Hex Cap Screws, and Studs
F594Stainless-steel Nuts
F3125High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength

AMERICAN WELDING SOCIETY (AWS)

A2.4Welding Symbols
A4.3Determination of the Diffusible Hydrogen Content of Martensitic, Bainitic, and Ferritic Steel Weld Metal Produced by Arc Welding
A5.1Carbon Steel Electrodes for Shielded Metal Arc Welding
A5.5LowAlloy Steel Covered ArcWelding Electrodes
A5.20Mild Steel Electrodes for FluxCored Arc-Welding
C4.1Oxygen-Cut Surfaces and Oxygen Cutting Surface Roughness Gauge
D1.1Structural Welding Code
D1.3Structural Welding Code-Sheet Steel
D1.5Bridge Welding Code

ASSOCIATION OF IRON AND STEEL ENGINEERS (AISE)

No. 11 Brake Standards for Mill Motors

CRANE MANUFACTURERS' ASSOCIATION OF AMERICA, INC. (CMAA)

No. 70 Specifications for Electric Overhead Traveling Cranes

DEFENSE FEDERAL ACQUISITION REGULATIONS (DFAR)

DFARS 252.211-7003 Item Identification and Valuation

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

C37.20.1IEEE Standard for Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear
C62.11IEEE Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits

JOINT INDUSTRIAL COUNCIL (JIC)

H-1-1973 Hydraulic Systems

NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA)

ICS 1Industrial Control and Systems
ICS 1.1Application, Installation and Maintenance of Solid State Control
ICS 2Industrial Control Devices, Controllers and Assemblies
ICS 3Industrial Systems
ICS 6Enclosures for Industrial Control and Systems
ICS 9Industrial Control and Systems Power Circuit Accessories
LI 1Industrial Laminated Thermosetting Products
LS 1Low Voltage Surge Protective Devices
MG1Motors and Generators
250Enclosures for Electrical Equipment (1000 Volts Maximum)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70National Electrical Code
NFPA 70EStandard for Electrical Safety in the Workplace
NFPA 780Standard for the Installation of Lightning Protection Systems

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)

Title 29 CFR, Part 1910

PACIFIC COAST MARINE SAFETY CODE (PCMSC)

RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC)

RCSC Specification for Structural Joints Using High-Strength Bolts

STATE OF CALIFORNIA THE DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (DOSH)

Title 8 Regulations/Inspections for Cranes and Elevators

SOCIETY OF AUTOMOTIVE ENGINEERS, INC. (SAE)

J386Operator Restraint System for Off-Road Work Machines
J429Mechanical and Material Requirements for Externally Threaded Fasteners
J995Steel Nuts

STEEL STRUCTURES PAINTING COUNCIL (SSPC)

SPSurface Preparation
SP 1Solvent Cleaning
SP 2Hand Tool Cleaning
SP 3Power Tool Cleaning
SP 6Commercial Blast Cleaning
SP 10Near-White Metal Blast Cleaning
PAPaint Application
PA 2Conformance to Coating Thickness Requirements

STRUCTURAL STABILITY RESEARCH COUNCIL (SSRC)

SSRC Guide to the Stability Design Criteria for Metal Structures

UNDERWRITERS LABORATORIES (UL)

595 Marine-Type Electric Fixtures

WIRE ROPE TECHNICAL BOARD

Wire Rope User’s Manual International Codes and Standards

BRITISH STANDARDS (BS)

7608 Guide to fatigue design and assessment of steel products, 2014 edition DEUTSCHES INSTITUT fur NORMBURG (DIN)

DIN 15072Crane, tread profile of crane rail wheels and table of rails for different wheel diameters
DIN 536Crane Rails
DIN 16783Ultra-high molecular weight polyethylene moulding materials
DIN 6914High-strength hexagon head bolts with large widths across flats for structural steel bolting
DIN 17200Carbon Steel Grades
DIN 18800Structural Steelwork
DIN 15018Crane, steel structures, verification and analysis

FEDERATION of EUROPEAN MATERIAL HANDLING (FEM)

FEM 1.001Rules for the design of hoisting appliances
FEM 1.004Recommendation for the calculation of wind loads on crane structures

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO 7778Steel plate with specified through-thickness characteristics
ISO 9001Quality Systems-Model for Quality Assurance in Design, Development, Production, Installation, and Servicing

INTERNATIONAL SOCIETY of AUTOMATION (ISA) ISA Hydraulic Systems

INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)

60204-32Safety of Machinery – Electrical Equipment of Machines, Part 32
60034-14Rotating Electrical Machines

Substitution of Codes The Crane Contractor may select other DIN, FEM, JIS, ISO or BSI codes as applicable as the basis of Crane design in lieu of the referenced codes, provided the Contractor can show, by certification or industry publications, that these codes are equivalent to (meets or exceeds) the codes, with the exception of AISC, ASTM, AWS, NEMA, NFPA, and OSHA which shall govern in any case. If the Contractor selects one of these codes for design of the Cranes, the Contractor shall provide three current English language copies of the code, within 30 days after contract award IAW CDRL A019. Once a code is selected for design, it shall be used for all portions of the Cranes.

Example of List of Codes Used in Industry Procurement Specifications Unless otherwise noted, the applicable recommendations of the following organizations shall be used. Unless otherwise noted, ‘National’ means USA.

Abbreviation
Standard
ABMA
American Bearing Manufacturers Association
AGMA
American Gear Manufacturers Association
AISC
American Institute of Steel Construction - ASD
AISI
American Iron and Steel Institute
AIST
Association of Iron and Steel Technology (formerly AISE)
ANSI
American National Standards Institute
ASA
Acoustical Society of America
ASCE
American Society of Civil Engineers
ASM
American Society for Metals
ASME
American Society of Mechanical Engineers
ASNT
American Society for Nondestructive Testing
ASTM
American Society for Testing and Materials
AWS
American Welding Society - Bridges and Dynamically Loaded Structures
BSI
British Standards Institute
CMAA
Crane Manufacturer’s Association of America
DIN
Deutsche Industrie Normen
DOSH
Division of Occupational Safety and Health
EN
European Standards
FEM
Federation Europeene de la Manutention
IEC
International Electrotechnical Commission
IEEE
Institute of Electrical and Electronic Engineers
ISA
Instrument Society of America
ISO
International Standards Organization
NAAMM
National Association of Architectural Metal Manufacturers
NEMA
National Electrical Manufacturer’s Association
NFPA
National Fire Protection Association
NFPA
National Fluid Power Association
OSHA
Occupational Safety and Health Administration of the United States Department of Labor
PCMSC
Pacific Coast Marine Safety Code
SAE
Society of Automotive Engineers
SSPC
Steel Structures Painting Council
SSRC
Structural Stability Research Council
UL
Underwriters Laboratory

System Description and Scope of Supply Reference Section C of the contract.

Minimum Criteria The criteria specified herein shall be considered the minimum acceptable. If, in the Contractor’s opinion, any of the criteria specified herein or in the referenced standards is in any way inadequate or insufficient for the intended use, it shall be the Contractor’s responsibility to use more stringent criteria.

Except where otherwise specified, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to fully and completely finish the project according to the true intent and meaning of this Specification and drawings, even though every item or activity is not particularly mentioned or shown in this Specification or drawings.

The Contractor shall remain responsible for adequacy and safety of the design, fabrication, supply, installation, transportation, commissioning, and testing of the equipment specified herein while adhering to the minimum criteria set forth in the Specifications.

Safety Design Criteria A single electric (power or control) or hydraulic component failure or malfunction shall not damage the Crane or injure personnel.

Where possible, component failure or malfunction shall safely stop the Crane operation. Where this is not possible, a redundant system shall be supplied. The redundant system shall both safely stop the Crane and prevent operation until maintenance personnel make corrections.

A means shall be provided so maintenance personnel may routinely check each redundant or backup system. The checking procedure shall be included in the maintenance manual.

No Crane component shall change state as a result of a power failure. Powering or repowering the Crane or any system within the Crane shall not result in any unanticipated or potentially unsafe motion or condition.

Design Requirements Basic Crane design shall be a twin-box girder with a rope-towed trolley, catenary trolleys, and fleet-through main hoist. The trolley, boom, and main hoist machinery shall be enclosed in a separate machinery house. The machinery house shall include separate rooms for the hoist machinery and all electronic equipment. The electronic control room shall be separately climate controlled. Entrance and egress to the Cranes shall be via both a combination of ladders and stairways, and an elevator on the same landside leg as the cable reel, unless approved otherwise by the Government.

The Cranes shall be equipped with a spreader capable of lifting a single 20-foot container, twin-20-foot containers, single 40-foot container, and a single 45-foot container. Crane shall have a means of stowing hatches on the landside of the Crane within the backreach of the trolley girder, so as not to infringe on the operating area between the Crane legs. Provisions also shall be made to lift other cargo using temporary slings.

The Crane shall be designed to operate in an outdoor, corrosive marine environment with an ambient temperature range of 20 °F to 110 °F (-7 °C to 43 °C).

Each Crane shall have a Crane number independent of the manufacturer’s serial number. The Crane numbers format shall be the year of manufacture-001 and -002, e.g. 2020-001 and 2020002 if the Cranes are built in 2020.

The main characteristics of the Cranes are as follows. See the Appendix A2, Crane and Ship Clearance Drawing, for additional requirements.

Capacity Capacity below the spreader

Twin-twenty89,600 lb (40 LT, 44.8 t)
Single lift67,200 lb (30 LT, 33.6 t)
Capacity below the heavy lift cargo beam89,600 lb (40 LT, 44.8 t)

Principal Dimensions

Gantry rail gauge80 ft (21.384 m)
Outreach, minimum127 ft (38.7 m)
Backreach, minimum35 ft (10.7 m)135 ft (41.2 m) total lift
Lift height, clear under spreader above WS rail100 ft (30.5 m)
Lift below waterside rail35 ft (10.7 m)
Gantry out-to-out width (bumpers uncompressed)88 ft 6 in (27.0 m)
Minimum clearance inside legs60 ft (18.3 m)
Clearance under portal tie beam50 ft (15.2 m)
Waterside rail setback from fender face12.75 ft (3.9 m)
Boom stowage angle45° (80° for maintenance only)
Rail elevation, waterside vs. landsideSame elevation

Allowable Crane Loads on Wharf Maximum Allowable Service (ASD) Level Wheel Loads

Seaside Operating30,000 lb/ft (44.7 t/m)
Landside Operating31,000 lb/ft (46.1 t/m)
Seaside Non-Operating30,000 lb/ft (44.7 t/m)
Landside Non-Operating39,000 lb/ft (58.1 t/m)

Maximum Allowable Strength (LRFD) Level Wheel Loads

Seaside Operating39,000 lb/ft (58.1 t/m)
Landside Operating40,000 lb/ft (59.5 t/m)
Seaside Non-Operating39,000 lb/ft (58.1 t/m)
Landside Non-Operating52,000 lb/ft (77.4 t/m)

Refer to Appendix A4, drawing S-002 for additional maximum crane loads to the wharf, including crane rail lateral loads, crane stowage pin, and crane stop loads.

Performance Requirements Performance requirements for the Cranes shall be as follows:

Minimum Hoist High Speeds:

No Load under spreader490 ft/min (150 m/min)
Rated Load under spreader250 ft/min (76 m/min)

Hoist Acceleration/Deceleration

No Load4 s
Rated Load2 s

Minimum Trolley Speed:

With Rated Load 600 ft/min (180 m/min) Trolley Acceleration/Deceleration

With Rated Load5 s
Maximum Boom Hoisting Time5 min
Minimum Gantry Travel High Speed150 ft/min (45 m/min)
Minimum Gantry Acceleration6 s

Unique Identifier Tags The Contractor shall assign unique identifiers to the container Crane and the in-house service cranes in accordance with DFARS 252.211-7003. The Unique Identification Tags shall be attached to the outside of the main electrical disconnect panel of the respective Crane.

Essential Repair Parts The Contractor shall provide the parts defined in Section 3.8.6.3 and those listed in the Appendix E, Essential Repair Part Stockage List IAW CDRL A020.

After the completion of the design, the Contractor shall provide a list of any additional spare parts with prices for the Government’s consideration and potential purchase.

RESERVED

RESERVED

RESERVED

RESERVED

Existing Conditions Prior to installation, the MOTCO pier shall be inspected by the Contractor the Contracting Officer Representative (COR) to document the condition of all existing crane installation and record any existing damage. Upon completion of the work, the Contractor COR shall again inspect the MOTCO pier to determine the extent of any damage that may have occurred as a result of work performed under this contract. Any damage to the MOTCO pier as a result of either Crane installation and/or testing shall be the responsibility of the Crane Contractor for repair of any damage under this contract. If the Contractor fails or refuses to repair the damage promptly, the Government may have the necessary work performed and charge the cost to the Contractor.

Contractor Requested Engineering Changes All Contractor requested engineering changes must be submitted to the Government on the “Contractor Change Request Form” .

Warranty See Section I of the contract for warranty information.

RESERVED

Design Life A design life of 40 years (2,000,000 trolley single cycles) and 5,000 hours of operation per year shall be used. This does not necessarily mean that the Crane will no longer be fit for its purpose at the end of that period or that it will continue to be serviceable for that length of time without adequate and regular inspection and maintenance.

Components in the systems for the major Crane motions shall be designed for at least the following minimum design lives, and utilization, loading, and mechanism classifications according to the latest edition of FEM 1.001 as shown in the table below. Design lives shown are in operating hours of motion for the components in question.

Mechanism
Minimum Design Life
Utilization Class
Loading Spectrum
Classification
Main Hoist
50,000 hr
T8
L2
M8
Trolley
50,000 hr
T8
L2
M8
Gantry Travel
6,300 hr
T5
L2
M5
Boom Hoist
6,300 hr
T5
L3
M6

Minimum Design Life and Mechanism Classifications The design life requirements are not intended to preclude the use of certain wearing components, such as seals, twistlocks, or wire rope, which as part of normal maintenance may require replacement prior to the expiration of the Crane design life. Wearing components, along with their associated design life and maintenance intervals, shall be suggested by the Contractor and are subject to the Government’s approval. Wearing parts are not intended to cover items such as gears, bearings, sheaves, drums, shafts, and other mechanical components which shall be designed to last the design life of the Crane.

Minimum Support Period All components, including electrical components such as, but not limited to, inverters, convertors, PLCs, I/O components, and control software, used on the Crane shall be supported by the component or software manufacturer for a period of at least five (5) years after delivery of the Crane unless otherwise specifically approved in writing by the Government.

Computer components and supporting software not required for the Crane control system shall be supported by the component or software manufacturer for a period of at least five (5) years after delivery of the Crane unless otherwise specifically approved in writing by the Government.

The Contractor shall present to the Government upon request certification from the component or software manufacturer, that the component or software will be supported by the manufacturer for these minimum periods.

Duty Cycles and Load Spectra The duty cycles and load spectra described in this section shall be the minimum applied to all mechanical and electrical systems. Where the use of a particular system or supporting system warrants the use of more stringent criteria, those criteria shall be used.

Main Hoist and Trolley Design Duty Cycle The main hoist and trolley design duty cycle shall be used for the purpose of calculating times and equipment designs for the main hoist and trolley drives and shall be based on the following:

Handling the rated Duty Cycle (DC) container(s) Each motion accelerates, runs, and decelerates at the maximum rates and speeds for which it is designed Main hoist and trolley travel motions occur simultaneously without regard to Crane or ship clearances Ambient temperature is the maximum value defined in Section 2.7.6 The cycle is repeated indefinitely The wind load is 50% of the operating wind load (WLO) in the trolley travel direction The sequence of operations for the main hoist and trolley design duty cycle shall consist of the following steps repeated indefinitely:

Engage container for 2 s Hoist 15 m and travel 45 m waterside Lower 2 m to cell guides Enter cell guides for 2 s Lower 12 m Disengage container for 2 s Hoist 14 m Travel 3 m waterside Lower 2 m to cell guides Enter cell guides for 2 s Lower 12 m Engage container for 2 s Hoist 14 m Travel 43 m landside and lower 13 m Lower 2 m to chassis Disengage container for 2 s Hoist 1 m Travel 5 m landside Lower 1 m to container Where times are shown for operations, these are theoretical dwell times and shall be the only dwell times considered in calculating the design duty cycle.

Gantry Drive Design Duty Cycle The gantry design duty cycle shall be used for the purpose of calculating times and equipment designs for the gantry drive and shall consist of accelerating, traveling a total of 275 m (900 ft) along the wharf, and decelerating, all against the operating wind load (WLO) without intermediate stops. The cycle shall be performed once.

Boom Hoist Design Duty Cycle The boom hoist theoretical duty cycle shall be used for the purpose of calculating times and equipment designs for the boom hoist drive and shall be based on the following steps which shall be repeated twice in immediate succession with no dwell time:

Step 1: Raise the boom from horizontal to the ship clearance position (45 degrees) Step 2: Lower the boom to the horizontal position Rope Inspection Duty Cycles To allow for the requirements of rope inspection and lubrication at slow speeds, all systems with wire rope reeving shall be subject to an additional duty cycle where the full range of motion will be traveled in the least favorable empty spreader condition at a speed not exceeding 15% of the maximum rated speed uninterrupted for a period of at least 15 minutes. Breaks between each 15minute period of motion shall not exceed 5 minutes in duration.

Main Hoist Load Spectrum Components in the main hoist system, including reducers, bearings, shafts, reeving, etc., shall be designed using a load spectrum at least as severe as defined in the table below.

Speeds shall be based on the appropriate main hoist speed for the defined load.

Load Case
Load
Hours
Cycle Ratio
1
CBRL + CBLS
500
0.01
2
LLE + LS
7,500
0.15
3
0.67 LLE + LS
7,500
0.15
4
0.33 LLE + LS
10,000
0.20
5
LS
24,500
0.49

Total

50,000
1.00

Table—Main Hoist Load Spectrum Trolley Load Spectrum Components in the trolley system, including reducers, bearings, shafts, reeving, etc., shall be designed using a load spectrum at least as severe as defined in the table below.

Maximum motor torque below means the maximum torque the motors develop when accelerating the trolley with the maximum rated load against WLO.

Rated motor torque below means the highest torque the motors develop when the trolley travels steadily at rated speed with the maximum rated load against 50% WLO.

Speeds shall be based on the trolley rated top speed.

Load Case
Load
Hours
Cycle Ratio
1
Maximum Motor Torque
7,500
0.15
2
Rated Motor Torque
7,500
0.15
3
0.67 Rated Motor Torque
10,000
0.20
4
0.33 Rated Motor Torque
25,000
0.50

Total

50,000
1.00

Table—Trolley Load Spectrum Gantry Drive Load Spectrum Components in the gantry drive system, including reducers, bearings, shafts, etc., shall be designed using a load spectrum at least as severe as defined in the table below.

Maximum motor torque below means the maximum torque the motors develop when accelerating the gantry with the maximum rated load against WLO.

Rated motor torque below means the highest torque the motors develop when the gantry travels steadily at rated speed with the maximum rated load against 50% WLO.

Speeds shall be based on the gantry rated top speed.

Load Case
Load
Hours
Cycle Ratio
1
Maximum Motor Torque
945
0.15
2
Rated Motor Torque
945
0.15
3
0.67 Rated Motor Torque
1,260
0.20
4
0.33 Rated Motor Torque
3,150
0.50

Total

6,300
1.00

Table—Gantry Drive Load Spectrum Boom Hoist Load Spectrum Components in the boom hoist system, including reducers, bearings, shafts, reeving, etc., shall be designed using a load spectrum at least as severe as defined in the table below.

Maximum motor torque below means the maximum hoisting torque the motors develop when lifting the boom from the level position.

Minimum motor torque below means the torque the motors develop when hoisting the boom steadily at rated speed at the ship passing angle (45 degrees).

Speeds shall be based on the boom hoist motor design speed.

Load Case
Load
Hours
Cycle Ratio
1
Maximum Raising Torque (Tmax)
945
0.15
2
0.67 Tmax + 0.33 Tmin
1,890
0.30
3
0.33 Tmax + 0.67 Tmin
1,890
0.30
4
Minimum Raising Torque (Tmin)
1,575
0.25

Total

6,300
1.00

Table—Boom Hoist Load Spectrum Other Duty Cycles and Load Spectra Where components or systems support a primary system with a duty cycle and/or load spectrum listed above, those components or systems shall have a duty cycle and/or load spectrum at least as severe as the same duty cycle and/or load spectrum as their primary system where applicable.

The duty cycle for the trolley cable reel shall be at least as severe as for the main hoist.

The duty cycle for the gantry cable reel shall be at least as severe as the gantry drive.

The duty cycle for the hoist micro-motions shall be at least such that the system is moved through half of the full range of motion and back to the home position twice during each cycle of the hoist and trolley; once with the load and once with an empty spreader. The loads and cycle ratios shall be the same as defined in the main hoist load spectrum; see Section 1.12.1.

Duty Cycle Analysis Requirements The Contractor shall submit a duty cycle analysis for each duty cycle defined above IAW CDRL A021. Where motors or drives for a given motion are to be supplied by the electrical drive vendor, the analysis for those duty cycles shall be prepared by the Crane control supplier and shall verify the adequacy of the selected equipment for the specified cycles.

The Contractor shall provide an analysis showing the peak Crane power demand and RMS power demand, including lighting, ventilation, air-conditioning, and all other house loads, for the design duty cycle described in Section 1.12.1.

Each analysis shall be performed on a computer. Each submittal shall include, but not be limited to, the computer input and output, the program logic and complete documentation, and catalog information which substantiates the equipment design.

Load Spectra and Design Life Analysis Requirements Where component design lives are analyzed using a defined load spectrum, Miner’s rule shall be used to combine the lives of the load cases and develop the overall design life Crane Modes Primary Operating Mode The primary operating mode of the Crane shall be under the manual control of the operator located in the operator’s cabin on the main trolley.

The primary operational function of the crane will be to load and discharge container ships. The boom will be in the fully lowered position. The crane will handle containers, hatch covers, and lashing gear. A secondary function will be the handling of non-containerized cargo. For these functions, the main hoist and trolley drives shall be fully operational simultaneously.

Semi-Automated Operating Mode In the semi-automated operating mode, the main hoist and trolley will move containers between designated truck lanes and a designated position over the vessel automatically using the optimum clear path. Landing of the lifting system and operation in the ship’s cell guides shall be manual.

Once the lifting system arrives at the designated position over the vessel, the crane operator will control the trolley and main hoist. The operator will also have manual control of the spreader functions and the hoist micro-motions; however, these functions shall be automated to the extent possible.

Once clear of the vessel, the operator may signal the Crane to take automatic control in which case the trolley and main hoist will automatically perform all motions to an adjustable distance above the designated truck lane.

When the operator maintains manual control, he shall be able to place the trolley and hoist at any operating location. Interlocks shall prevent the hoist or trolley moving such that the lifting system or its load will collide with the Crane structure, the vessel, or the vessel stacks.

The Crane operator will use manual control to handle hatch covers, cargo beam loads, and oversize or over-height container loads.

Passing Mode The Crane shall have a passing mode to allow the Crane to gantry past obstructions on the vessel such as the ship superstructure or ship’s gear. In the passing mode, the trolley will be in the stowed position. The main hoist lifting system will be stowed above the portal tie beam level. The boom will be raised to the passing position.

Stowed Mode The Crane shall have a stowed mode in which the trolley will be in the stowed position. The main hoist lifting system will be stowed above the portal tie beam level. The boom will be raised to the stowed position. The gantry stowage pins may or may not be engaged into stowage pin pockets on the wharf.

In the stowed mode, the boom will be partially raised to about 45 degrees, for ship clearance. The trolley will be at the stowed position. Trolley drive shall not be operational. The main hoist shall be operations with an unloaded spreader only. The gantry shall be fully operational.

Cargo Beam Mode The Crane shall have a cargo beam mode in which the main hoist is used with the cargo beam.

Speeds and accelerations in the cargo beam mode will be limited to an adjustable setting.

Maintenance Mode The Crane shall have a maintenance mode of operation. The Crane shall be fully operational in maintenance mode but shall implement features that warn and protect maintenance personnel who may be working in diverse and/or hazardous areas of the Crane. The intent is to warn personnel who may not be otherwise aware of impending crane motion and provide time for the personnel to get safely clear of the machinery.

A keyed switch in the primary operator’s cabin and the electric room shall turn this maintenance mode on or off.

While in maintenance mode, the request for any Crane motion (hoist, trolley, boom, or gantry) shall be followed by an adjustable time delay before any motion takes place. The delay is to be initially set at 15 s.

During this time delay period, audio and visual alarms shall warn of pending motion. As a minimum, the public-address system shall produce a unique continuous warning tone for 3 s and a brief audio alarm (chirp) every 3 s thereafter, and red strobe lights shall be energized in the electric room, the machinery house, and under the operator’s cab.

During motion and for an adjustable period, initially set to 15 s, after the cessation of motion in maintenance mode, the visual alarms shall continue and brief audio alarm (chirp) shall sound every 3 s. During this period after the cessation of motion, motion can resume again without delay or further warning. After this period expires, the audio and visual alarms will cease and any subsequent motion in maintenance mode will be subject to the time delay and alarms described above.

Motion commands from any maintenance station, including the gantry control station, shall at all times be subject to these warnings and delays, regardless of the position of the maintenance mode switch.

Limping Mode(s) In addition to the modes described above, the Crane shall be designed to continue container handling operations in a reduced manner should one or more systems not work as intended. These reduced functioning modes are referred to as limping modes and shall allow a Crane to continue operations or move to a clear position under its own power in as safe and efficient a manner as possible until the problem is repaired.

The Crane shall enter the appropriate limping mode automatically and both the operator and maintenance personnel shall be notified that the Crane has entered a limping mode and the applicable restrictions.

The Crane shall communicate this reduced functionality to the CMS.

PRODUCTS

Materials Materials shall be as specified herein. Materials not specified shall be suitable for the service intended only after review and approval by the Engineer of Record (EOR). Use of international equivalent to the specified materials shall require approval from the Government. All materials shall be new and unused and shall be suitable for exposure to the marine environment and the temperatures defined in this Specification. Materials shall be free from all defects and imperfections that might affect the serviceability or appearance of the finished product. Finished materials shall, at all times, be kept clean, protected from damage, and free from scale, rust, and contamination. Cast or wrought aluminum shall not be permitted for structural or machinery applications.

Ductile Materials Unless where specifically required, all nonredundant components directly supporting the load shall be of ductile materials. These components include, but are not limited to, all hoist drive gear reducer housings, motor frames and end bells, flanged adapters, and brake wheels and discs. For the purposes of this Specification ductile is defined as having a minimum elongation of 5% in 2 in (50 mm). Furthermore, all shafts, keys, gears, torque carrying coupling components, and wire rope drum shall be steel.

Structural Steel Structural steel shall conform to material requirements, section A3, of the AISC Specification, except as modified in this section.

(a) Structural steel subjected to a calculated tensile stress, except stairs, ladders, platforms and walkways, and pipes and tubes, shall conform to ASTM A709/A709M, including supplementary requirements:

- S60, Frequency of Tension Tests

- S93, Limitation on Weld Repair and to ASTM A6/6M, including supplementary requirements:

- S18, Maximum Tensile Strength (Grades 50 and 50W).

(b)Charpy V-Notch impact requirements shall meet the requirements of ASTM A 709/A 709M. Test temperature shall be in accordance with ASTM A 709/A 709M, Table 8, based on the Zone corresponding to the lowest ambient temperature listed in these Specifications; see Section 1.3.4.
(c)Rolled shapes, plates, and bars shall be tested in accordance with ASTM A673.
(d)Structural steel conforming to ASTM A36, A242, A572 (Grades 42, 50, and 60), and A588 is acceptable for non-fracture critical members if it meets the requirements of items (b) and (e).
(e)Structural steels shall be selected, to the greatest extent possible, which can be welded using E70XX electrodes and the shielded metal-arc process. Drawings shall clearly identify all welds.

Structural steel made to another specification may be substituted for ASTM A709 providing it conforms to the specified requirements of ASTM A 709 and the other requirements of these Specifications.

Structural steel for the Crane primary structure, including plates, rolled sections, and rolled shapes and tubes shall have a minimum thickness of 5/16 in (8 mm) unless otherwise noted.

The critical end properties of parts requiring heat treatment by other than the prime mill source and the method and basis for acceptance or rejection of parts requiring non-destructive testing shall be shown on the drawings.

All fracture critical members (FCMs) material, plates, and sections shall comply with AWS D1.5, Section 12. The term "Engineer" in the code shall mean the Contractor's responsible Structural Engineer.

Structural Pipes and Tubes Primary structure pipes and tubes shall meet the requirements of one of the following:

API 5L, PSL2 — For line pipe (such as spiral welded pipes), which shall comply with the material toughness requirements of the API 5L specification, section 9.8, “CVN impact test for PSL 2 pipe;” test temperature shall be 0° C (32° F).

ASTM A1085 — For round HSS, including requirements for CVN testing.

ASTM A500 Grade B — For rectangular HSS or round ancillary (non-primary-structure) components.

High Strength Bolts, Nuts, and Washers Structural Connections Structural connections shall be designed in accordance with AISC-360.

Welding procedures and qualifications shall be in accordance with the requirements of AWS D1.3 and D1.1 as required by SD-06.8.

Structural bolted connections shall be designed and installed in accordance with RCSC Specification for Structural Joints Using High-Strength Bolts.

Mechanical Bolted Fasteners All high strength bolts, nuts, and washers shall be of U. S. manufacture, shall be plain (non-coated), and shall be permanently marked (by embossing or indentation) with the ASTM or SAE designation, grade, and manufacturer's identification. Bolt and nut threads shall be matched (oversize tapping shall not be permitted). Hardened washers shall be used under the element being turned.

Structural bolt assemblies made with ASTM F3125 Grade A325 or A490 bolts shall be kept separated by production lot. Mixing of bolts and nuts from different production lots, even of the same diameter, grade, and length, shall not be permitted.