Attachment 0001 - STS Crane Specification.DOCX
DOCX document 763 KB Posted
- Attached to
- Ship-To-Shore Container Cranes
- Solicitation number
- W56HZV-20-R-0025
About this file
This is a solicitation for two ship-to-shore container cranes. The U.S. Army Contracting Command - Detroit Arsenal is seeking proposals for two cranes to be delivered to the Military Ocean Terminal Concord in California within 36 months of award. The cranes must be equipped to lift single and twin twenty-foot and single forty-foot and forty-five-foot containers, and service a Panamax vessel with thirteen containers abeam. Proposers must acknowledge any amendments to the solicitation. All questions must be submitted in writing to the identified Contract Specialist. Evaluation will result in a single-award firm fixed price contract.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TWO SHIP-TO-SHORE CONTAINER CRANES
for
MILITARY OCEAN TERMINAL CONCORD
at
CONCORD, CALIFORNIA
| APPENDICES | 1 | |
| PART 1.0 GENERAL | 2 | |
| 1.1 Definitions | 2 | |
| 1.2 Specifications and Standards | 2 | |
| 1.2.1 General | 2 | |
| 1.2.2 US Domestic Codes and Standards and Specifications | 3 | |
| 1.2.3 International Codes and Standards | 8 | |
| 1.2.4 Substitution of Codes | 9 | |
| 1.2.5 Example of List of Codes Used in Industry Procurement Specifications | 10 | |
| 1.3 System Description and Scope of Supply | 11 | |
| 1.3.1 Reference Section C of the contract | 11 | |
| 1.3.2 Minimum Criteria | 11 | |
| 1.3.3 Safety Design Criteria | 12 | |
| 1.3.4 Design Requirements | 12 | |
| 1.3.5 Performance Requirements | 14 | |
| 1.3.6 Unique Identifier Tags | 14 | |
| 1.3.7 Essential Repair Parts | 14 | |
| 1.3.8 RESERVED | 14 | |
| 1.4 RESERVED | 34 | |
| 1.5 RESERVED | 35 | |
| 1.6 RESERVED | 40 | |
| 1.7 Existing Conditions | 40 | |
| 1.8 Contractor Requested Engineering Changes | 40 | |
| 1.9 Warranty | 40 | |
| 1.10 RESERVED | 41 | |
| 1.11 Design Life | 41 | |
| 1.11.1 Minimum Support Period | 41 | |
| 1.12 Duty Cycles and Load Spectra | 41 | |
| 1.12.1 Main Hoist and Trolley Design Duty Cycle | 42 | |
| 1.12.2 Gantry Drive Design Duty Cycle | 42 | |
| 1.12.3 Boom Hoist Design Duty Cycle | 42 | |
| 1.12.4 Rope Inspection Duty Cycles | 43 | |
| 1.12.5 Main Hoist Load Spectrum | 43 | |
| 1.12.6 Trolley Load Spectrum | 43 | |
| 1.12.7 Gantry Drive Load Spectrum | 44 | |
| 1.12.8 Boom Hoist Load Spectrum | 44 | |
| 1.12.9 Other Duty Cycles and Load Spectra | 44 | |
| 1.12.10 Duty Cycle Analysis Requirements | 45 | |
| 1.12.11 Load Spectra and Design Life Analysis Requirements | 45 | |
| 1.13 Crane Modes | 45 | |
| 1.13.1 Primary Operating Mode | 45 | |
| 1.13.2 Semi-Automated Operating Mode | 45 | |
| 1.13.3 Passing Mode | 45 | |
| 1.13.4 Stowed Mode | 46 | |
| 1.13.5 Cargo Beam Mode | 46 | |
| 1.13.6 Maintenance Mode | 46 | |
| 1.13.7 Limping Mode(s) | 46 | |
| PART 2.0 PRODUCTS | 47 | |
| 2.1 | Materials | 47 |
| 2.1.1 Ductile Materials | 47 | |
| 2.1.2 Structural Steel | 47 | |
| 2.1.3 Structural Pipes and Tubes | 48 | |
| 2.1.4 High Strength Bolts, Nuts, and Washers | 48 | |
| 2.1.5 Aluminum Castings | 49 | |
| 2.1.6 Iron Castings | 49 | |
| 2.1.7 Steel Castings | 49 | |
| 2.1.8 Steel Forgings | 49 | |
| 2.1.9 Bronze Bushings and Thrust Washers | 49 | |
| 2.1.10 Steel Bars of Special Quality | 49 | |
| 2.1.11 Steel Bars of Standard Quality | 49 | |
| 2.1.12 Alloy Steel Bars | 49 | |
| 2.1.13 Welding Materials | 49 | |
| 2.1.14 Charpy V-Notch Impact Requirements | 50 | |
| 2.1.15 Plate Through-Thickness Requirements | 51 | |
| 2.1.16 Material Traceability | 53 | |
| 2.1.17 Mechanical Material | 54 | |
| 2.2 Structural Design | 55 | |
| 2.2.1 General Requirements | 55 | |
| 2.2.2 Fracture Critical Members | 56 | |
| 2.2.3 Access for Inspection | 57 | |
| 2.2.4 Members Subject to Buckling | 57 | |
| 2.2.5 Welding | 57 | |
| 2.2.6 Crane Structure | 58 | |
| 2.2.7 Trolley Girder | 58 | |
| 2.2.8 Boom | 58 | |
| 2.2.9 Connections | 59 | |
| 2.2.10 Trolley Structure | 61 | |
| 2.2.11 Trolley Rails, Clips, and Pads | 62 | |
| 2.2.12 Machinery House | 63 | |
| 2.2.13 Boom Control Station | 64 | |
| 2.2.14 Access Structures | 64 | |
| 2.2.15 Counter Weight (Ballast) | 64 | |
| 2.2.16 Equalizer Girders and Travel Trucks | 64 | |
| 2.2.17 Stowed Wind Condition Securing Devices | 65 | |
| 2.2.18 Hatchcover Support Structure | 66 | |
| 2.2.19 Boom Hoist Failure Prevention | 66 | |
| 2.2.20 Gantry Frame Deflections and Stiffness | 67 | |
| 2.2.21 Camber | 67 | |
| 2.2.22 Design Loads | 68 | |
| 2.2.23 Seismic Design | 72 | |
| 2.2.24 Design Loading Conditions | 77 | |
| 2.2.25 Fatigue Design | 78 | |
| 2.2.26 Allowable Design Stresses | 85 | |
| 2.2.27 Calculations | 87 | |
| 2.2.28 Stability | 92 | |
| 2.2.29 Wheel Loads | 93 | |
| 2.2.30 Structural Maintenance Program | 96 | |
| 2.2.31 Voyage Criteria | 99 | |
| 2.3 Mechanical Design | 101 | |
| 2.3.1 General Requirements | 101 | |
| 2.3.2 Safety Factors | 102 | |
| 2.3.3 Machinery Mounting, Installation, and Alignment | 102 | |
| 2.3.4 Drive Mechanisms | 102 | |
| 2.3.5 Shafts, Axles, and Pins | 105 | |
| 2.3.6 Gear Reducers | 106 | |
| 2.3.7 Bearings | 109 | |
| 2.3.8 Drums | 111 | |
| 2.3.9 Wire Ropes | 112 | |
| 2.3.10 Reeving | 114 | |
| 2.3.11 Fleet Angles | 116 | |
| 2.3.12 Catenary Rope Support System | 116 | |
| 2.3.13 List, Trim and Skew Adjustment | 117 | |
| 2.3.14 Headblock | 117 | |
| 2.3.15 Sheaves | 119 | |
| 2.3.16 Wheels and Guide Rollers | 120 | |
| 2.3.17 Couplings | 121 | |
| 2.3.18 Keys and Keyseats | 122 | |
| 2.3.19 Bumpers and End Stops | 122 | |
| 2.3.20 Snag Control | 123 | |
| 2.3.21 Slap Blocks and Deflector Rollers | 124 | |
| 2.3.22 Drip pans | 124 | |
| 2.3.23 Surface Finishes | 125 | |
| 2.3.24 Seals | 125 | |
| 2.3.25 Lubrication | 125 | |
| 2.3.26 Fits | 126 | |
| 2.3.27 Hydraulic Systems | 126 | |
| 2.3.28 Brakes | 133 | |
| 2.3.29 Boom Latch Mechanism | 138 | |
| 2.3.30 Bushings and Thrust Washers | 139 | |
| 2.4 Electrical Design | 140 | |
| 2.4.1 General Requirements | 140 | |
| 2.4.2 Main and Shore Power Supply | 140 | |
| 2.4.3 Medium Voltage Switchgear | 141 | |
| 2.4.4 Power Quality Meter (PQM) | 142 | |
| 2.4.5 Surge Protection Devices (SPD) | 143 | |
| 2.4.6 Medium Voltage Transformers | 143 | |
| 2.4.7 Low Voltage Transformers | 144 | |
| 2.4.8 Drive Control Systems | 145 | |
| 2.4.9 Converters | 145 | |
| 2.4.10 Inverters | 145 | |
| 2.4.11 Power Factor | 145 | |
| 2.4.12 Motors for the Major Motions | 146 | |
| 2.4.13 Enclosures | 146 | |
| 2.4.14 Conduits, Cable Trays, and Fittings | 147 | |
| 2.4.15 Cables | 148 | |
| 2.4.16 Terminations and Routing | 150 | |
| 2.4.17 Cable Reels | 151 | |
| 2.4.18 Trolley Cable Chain (Energy Chain) | 152 | |
| 2.4.19 Closed Circuit Television (CCTV) | 152 | |
| 2.4.20 Marking and Identification | 153 | |
| 2.4.21 Emergency Modes and Emergency Drives | 154 | |
| 2.4.22 Controls, Interlocks, and Indicating Devices | 154 | |
| 2.4.23 Programmable Logic Control (PLC) | 157 | |
| 2.4.24 PLC Program | 159 | |
| 2.4.25 Software Version Verification | 159 | |
| 2.4.26 Control Power Indicator | 159 | |
| 2.4.27 Anemometer | 159 | |
| 2.4.28 Emergency Stop Push Buttons | 160 | |
| 2.4.29 Crane Management System (CMS) | 160 | |
| 2.4.30 Control System and Network | 163 | |
| 2.4.31 Remote Crane Management System (RCMS) | 166 | |
| 2.4.32 Lighting | 166 | |
| 2.4.33 Convenience Outlets | 169 | |
| 2.4.34 Space Heaters | 169 | |
| 2.4.35 Lightning Protection | 170 | |
| 2.4.36 Intercom | 170 | |
| 2.4.37 Local Control Stations | 171 | |
| 2.4.38 Safety Equipment | 173 | |
| 2.5 Other Equipment Design | 174 | |
| 2.5.1 Operator's Cab | 174 | |
| 2.5.2 Spreader | 178 | |
| 2.5.3 Heavy Lift Cargo Beam | 182 | |
| 2.5.4 Machinery House and Electrical Room | 183 | |
| 2.5.5 In House Service Cranes | 189 | |
| 2.5.6 Outside the Machinery House Jib Structure or Monorail | 191 | |
| 2.5.7 Personnel Elevator | 191 | |
| 2.5.8 Safety Features | 192 | |
| 2.5.9 Wire Rope ReReeving | 193 | |
| 2.5.10 Load Weighing System | 193 | |
| 2.5.11 Wharf Level Cab | 194 | |
| 2.5.12 Crane Nameplates and Markings | 194 | |
| 2.5.13 Warning Signs | 194 | |
| 2.5.14 Test Weight System | 196 | |
| 2.5.15 Scale Models | 197 | |
| 2.5.16 Stairs, Ladders, Platforms, and Walkways | 197 | |
| 2.5.17 Fall Arrest Anchor Points | 200 | |
| 2.5.18 Automated Brake Tests | 200 | |
| 2.5.19 Stack Profiling System (SPS) | 201 | |
| 2.5.20 Air Compressor and Air Distribution System | 201 | |
| 2.6 Manufacture / Erection / Assembly | 202 | |
| 2.6.1 Corrosion Resistance | 202 | |
| 2.6.2 Surface Preparation | 203 | |
| 2.6.3 Paint Application | 204 | |
| 2.6.4 Faying Surfaces | 208 | |
| 2.6.5 Galvanizing | 209 | |
| 2.7 Workmanship | 209 | |
| 2.7.1 Structural Workmanship | 210 | |
| 2.7.2 Mechanical Workmanship | 213 | |
| 2.7.3 Electrical Workmanship | 215 | |
| 2.7.4 Coating | 216 | |
| 2.7.5 Software and Controls | 216 | |
| PART 3.0 EXECUTION | 219 | |
| 3.1 Assembly and Erection | 219 | |
| 3.1.1 Erection Workmanship | 219 | |
| 3.1.2 Erection Program | 219 | |
| 3.1.3 Lubrication | 220 | |
| 3.1.4 Boom Alignment | 220 | |
| 3.1.5 Crane Weighing | 220 | |
| 3.2 Factory Inspection and Testing | 220 | |
| 3.2.1 Builder’s Test and Inspection | 220 | |
| 3.2.2 Government Drawing Verification | 221 | |
| 3.2.3 Factory Testing | 221 | |
| 3.3 Delivery | 221 | |
| 3.4 Installation and Inspection | 222 | |
| 3.5 Acceptance Test | 222 | |
| 3.5.1 Final Government Inspection | 222 | |
| 3.6 Acceptance | 222 | |
| 3.7 Training | 223 | |
| 3.7.1 Operator Training | 223 | |
| 3.7.2 Maintenance Training | 223 | |
| 3.8 Reliability and Maintenance Requirements | 224 | |
| 3.8.1 General | 224 | |
| 3.8.2 Minimum Reliability | 224 | |
| 3.8.3 Maintainability | 224 | |
| 3.8.4 Computerized Maintenance Management System | 225 | |
| 3.8.5 Special Tools | 226 | |
| 3.8.6 Spare Parts | 226 | |
| 3.9 Documentation | 230 | |
| 3.9.1 Operating Instructions | 230 | |
| 3.9.2 Maintenance Instructions and Manuals | 231 | |
| 3.9.3 Mechanical Maintenance Manuals | 232 | |
| 3.9.4 Electrical Maintenance Instructions - Drive System Supplier | 233 | |
| 3.9.5 Electrical Maintenance Manuals - Non-Drive Components | 234 | |
| 3.9.6 Structural Inspection Manual | 234 | |
| 3.9.7 As-Built Calculations | 234 | |
| 3.9.8 As-Built Drawings | 234 | |
| 3.9.9 Certificates | 235 | |
| 3.9.10 Test Documentation | 235 |
GENERAL
Definitions Contractor – the Contractor supplying the Cranes and the Contractor’s representatives, subcontractors, and independent engineers retained by the Contractor.
Contractor’s Engineer of Record (Contractor’s EOR) – the Contractor’s professional engineers, for the design of the structure, ancillary structures, mechanical systems, and electrical systems, who shall be responsible for ensuring that the technical requirements of these Specifications are met. See Section 1.3.8 for other requirements, including for signing and sealing design drawings and calculations.
Crane, Cranes, or STS Cranes – the ship-to-shore, rail mounted, container handling gantry Cranes as described in these Specifications, including the structure, trolley, headblock, spreader, all attached and ancillary components, all control systems and components, all monitoring and maintenance systems and components, special tools, spare parts, and all other items defined in these Specifications.
Global Axis – Crane orientation and analysis axis system referenced in the Specification: X axis parallel to trolley travel, Y axis vertical, Z axis parallel to gantry travel.
MOTCO Facility – to be located at Military Ocean Terminal, Concord (MOTCO), Concord, California, USA. See Appendix A for site plan. See Section 3.4 for restrictions at the MOTCO Facility after delivery.
Point of Common Coupling (PCC) – The location where the Crane electrical system is connected to the wharf electrical system, defined as the end of the reeling cable where it terminates on the wharf furthest from the gantry cable reel on the Crane.
Specifications – This Specification, including appendices, and any clarifications, deviations, or other addenda agreed upon between the Government and the Contractor and incorporated into the Contract. The intent of these Specifications is to provide structural, mechanical, electrical, and functional criteria, dimensions, operating speeds and accelerations, and pertinent details for the design, construction, and installation of reliable and efficiently functioning Cranes with accessories. Unless specifically stated otherwise, the Specification requirements apply to all Cranes and all components, even if the requirement is stated in the singular. One gender means both genders.
Will and Shall – These Specifications are written to the Contractor. When a provision of this Specification requires action by the Contractor, the verb “shall” is used. If the Contractor is allowed to exercise an option when limited alternatives are available, the phrasing “either … or …” is used. However, where the words “or approved equivalent” are used, the Government reserves the option of rejecting the proposed equivalent. Statements provided in the Specification as information to the Contractor use the verbs “may” or “will.” Informational statements typically identify activities or options that “will be taken” or “may be taken” by the Government.
Specifications and Standards General The documents below form a part of this Specification to the extent specified herein. In case of difference between the following documents and this Specification, this Specification shall govern to the extent of such difference. In case of material specifications (ASTM), the design shall be based on the issue in effect at the time of bid, but material may be procured in accordance with the issue in effect at the date of manufacture.
Where reference is made to a standard specification, e.g., AWS D1.1, the latest edition in effect on the date of invitation for bids or request for proposal shall apply. If, however, the edition is stated, e.g., ISO 4628/3-1982(E), the stated edition shall apply.
US Domestic Codes and Standards and Specifications
FEDERAL
W-C-375 Circuit Breakers, Molded Case; Branch Circuit and Service
MILITARY
| MILF3541 | Fittings, Lubrication |
| FED-STD-595C | Color Used in Government Procurement |
NAVY SEA SYSTEMS COMMAND (NAVSEA)
| OP 3565 Vol. 1 | Electromagnetic Radiation Hazards (U) (Hazards to Personnel, Fuel and Other Flammable Materials) (U) |
| OP 3565 Vol. 2 | Electromagnetic Radiation Hazards (U) (Hazards to Ordnance) (U) |
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
360 Specification for Structural Steel Buildings
ASSOCIATION FOR IRON AND STEEL TECHNOLOGY (AIST)
TR-06 Technical Report No. 6, Specification for Electric Overhead Traveling Cranes for Steel Mill Service
AMERICAN GEAR MANUFACTURERS' ASSOCIATION (ANSI/AGMA)
| 908 | Geometry Factors for Determining the Pitting Resistance and Bending Strength of Spur, Helical and Herringbone Gear Teeth |
| 2015 | Gear Classification and Inspection Handbook – Tolerances and Measuring Methods for Unassembled Spur and Helical Gears (Including Metric Equivalents) |
| 2001 | Fundamental Rating Factors and Calculation Methods for Involute Spur and Helical Gear Teeth |
| 2003 | Rating the Pitting Resistance and Bending Strength of Generated Straight Bevel, Zerol Bevel and Spiral Bevel Gear Teeth. |
| 2009 | Bevel Gear Classification, Tolerances and Measuring Methods |
| 6013 | Spur, Helical, Herringbone, and Bevel Enclosed Drives |
| 6109 | For Shaft Mounted and Screw Conveyor Drives Using Spur, Helical and Herringbone Gears |
AMERICAN IRON and STEEL INSTITUTE (AISI)
| AISI 4320 | Properties of alloy steel |
| AISI 4820 | Properties of alloy steel |
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
| ABMA 7 | Shaft and Housing Fits for Metric Radial Ball and Roller Bearings (Except Tapered Roller Bearings) |
| A14.3 | Ladders - Fixed - Safety |
| A17.1 | Safety Code for Elevators and Escalators |
| A17.2 | Inspectors Manual for Elevators and Escalators |
| A64.1 | Walking and Working Surfaces, Personal Protective Equipment (Fall Protection Systems) |
| B4.1 | Preferred Limits and Fits for Cylindrical Parts |
| B17.1 | Keys and Keyseats |
| B30.10 | Hooks |
| S1.13 | Measurement of Sound Pressure Levels in Air |
| Z535 | Product Safety Signs and Labels |
| Z26.1 | Safety Code for Safety Glazing Materials for Glazing Motor Vehicles Operating on Land Highways |
AMERICAN PETROLEUM INSTITUTE (API)
5LX Line Pipe
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
| 7-16 | Minimum Design Loads and Associated Criteria for Buildings and Other Structures |
| 49 | Wind Tunnel Testing for Buildings and Other Structures |
| Paper # 3269 | Wind Forces on Structures |
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
| B30.24 | Container Cranes |
| B46.1 | Surface Texture, Surface Roughness, Waviness, and Ly |
| HST-4 | Performance Standard for Overhead Electric Wire Rope Hoist |
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
TC1A How to Qualify and Certify NDT Personnel
ASTM INTERNATIONAL (ASTM)
| A6/6M | General Requirements for Rolled Steel Plates, Shapes, Sheet Piling and Bars for Structural Use |
| A27 | Mild to Medium Strength Carbon Steel Castings for General Application |
| A36 | Structural Steel |
| A53 | Welded and Seamless Steel Pipe |
| A106 | Seamless Carbon Steel Pipe for HighTemperature Service |
| A108 | ColdFinished Carbon Steel Bars and Shafting |
| A123 | Zinc Coating (Hot-Dip Galvanized) Coatings on Iron and Steel Products |
| A148 | High-Strength Steel Castings for Structural Purposes |
| A153 | Zinc Coating (Hot-Dip) on Iron and Steel Hardware |
| A159 | Automotive Gray Iron Castings |
| A242 | High-Strength, Low-Alloy Structural Steel |
| A275 | Magnetic Particle Exam of Steel Forgings |
| A370 | Mechanical Testing of Steel Products, Methods and Definitions |
| A434 | Quenched and Tempered Alloy Steel Bars, HotRolled or ColdFinished |
| A500 | Cold-Formed Welded and Seamless Carbon Steel Structural Tubing |
| A501 | Hot-Formed Welded and Seamless Carbon Steel Structural Tubing |
| A504 | Wrought Carbon Steel Wheels |
| A536 | Ductile Iron Castings |
| A563 | Carbon and Alloy Steel Nuts |
| A572 | High-Strength Low-Alloy ColumbiumVanadium Steels of Structural Quality |
| A576 | Special Quality HotRolled Carbon Steel Bars |
| A588 | HighStrength LowAlloy Structural Steel |
| A618 | Hot-Formed Welded and Seamless High-Strength Low-Alloy Structural Tubing |
| A666 | Austenitic Stainless-steel, Sheet, Strip, Plate and Flat Bar for Structural Applications |
| A668 | Alloy Steel Forgings for General Industrial Use |
| A673 | Sampling Procedure for Impact Testing of Structural Steel |
| A709 | Structural Steel for Bridges |
| A759 | Carbon Steel Crane Rails |
| A1085 | Cold-Formed Welded Carbon Steel Hollow Structural Sections (HSS) |
| B6 | Zinc (Slab Zinc) |
| B148 | Aluminum Bronze Sand Castings |
| B271 | Copper-Base Alloy Centrifugal Castings |
| B505 | Copper-Base Alloy Continuous Castings |
| B584 | Copper Alloy Sand Casings for General Applications |
| A1023/A | Standard Specification for Stranded Carbon Steel Wire Ropes for General Purposes |
| C1036 | Flat Glass |
| D4020-96 | Ultra-High-Molecular-Weight Polyethylene Molding and Extrusion Materials |
| E23 | Test Methods for Notched Bar Impact Testing of Metallic Materials |
| F436 | Hardened Steel Washers |
| E543 | Standard Specification for agencies performing Nondestructive Testing |
| F593 | Stainless-steel Bolts, Hex Cap Screws, and Studs |
| F594 | Stainless-steel Nuts |
| F3125 | High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength |
AMERICAN WELDING SOCIETY (AWS)
| A2.4 | Welding Symbols |
| A4.3 | Determination of the Diffusible Hydrogen Content of Martensitic, Bainitic, and Ferritic Steel Weld Metal Produced by Arc Welding |
| A5.1 | Carbon Steel Electrodes for Shielded Metal Arc Welding |
| A5.5 | LowAlloy Steel Covered ArcWelding Electrodes |
| A5.20 | Mild Steel Electrodes for FluxCored Arc-Welding |
| C4.1 | Oxygen-Cut Surfaces and Oxygen Cutting Surface Roughness Gauge |
| D1.1 | Structural Welding Code |
| D1.3 | Structural Welding Code-Sheet Steel |
| D1.5 | Bridge Welding Code |
ASSOCIATION OF IRON AND STEEL ENGINEERS (AISE)
No. 11 Brake Standards for Mill Motors
CRANE MANUFACTURERS' ASSOCIATION OF AMERICA, INC. (CMAA)
No. 70 Specifications for Electric Overhead Traveling Cranes
DEFENSE FEDERAL ACQUISITION REGULATIONS (DFAR)
DFARS 252.211-7003 Item Identification and Valuation
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
| C37.20.1 | IEEE Standard for Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear |
| C62.11 | IEEE Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits |
JOINT INDUSTRIAL COUNCIL (JIC)
H-1-1973 Hydraulic Systems
NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA)
| ICS 1 | Industrial Control and Systems |
| ICS 1.1 | Application, Installation and Maintenance of Solid State Control |
| ICS 2 | Industrial Control Devices, Controllers and Assemblies |
| ICS 3 | Industrial Systems |
| ICS 6 | Enclosures for Industrial Control and Systems |
| ICS 9 | Industrial Control and Systems Power Circuit Accessories |
| LI 1 | Industrial Laminated Thermosetting Products |
| LS 1 | Low Voltage Surge Protective Devices |
| MG1 | Motors and Generators |
| 250 | Enclosures for Electrical Equipment (1000 Volts Maximum) |
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
| NFPA 70 | National Electrical Code |
| NFPA 70E | Standard for Electrical Safety in the Workplace |
| NFPA 780 | Standard for the Installation of Lightning Protection Systems |
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
Title 29 CFR, Part 1910
PACIFIC COAST MARINE SAFETY CODE (PCMSC)
RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC)
RCSC Specification for Structural Joints Using High-Strength Bolts
STATE OF CALIFORNIA THE DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (DOSH)
Title 8 Regulations/Inspections for Cranes and Elevators
SOCIETY OF AUTOMOTIVE ENGINEERS, INC. (SAE)
| J386 | Operator Restraint System for Off-Road Work Machines |
| J429 | Mechanical and Material Requirements for Externally Threaded Fasteners |
| J995 | Steel Nuts |
STEEL STRUCTURES PAINTING COUNCIL (SSPC)
| SP | Surface Preparation |
| SP 1 | Solvent Cleaning |
| SP 2 | Hand Tool Cleaning |
| SP 3 | Power Tool Cleaning |
| SP 6 | Commercial Blast Cleaning |
| SP 10 | Near-White Metal Blast Cleaning |
| PA | Paint Application |
| PA 2 | Conformance to Coating Thickness Requirements |
STRUCTURAL STABILITY RESEARCH COUNCIL (SSRC)
SSRC Guide to the Stability Design Criteria for Metal Structures
UNDERWRITERS LABORATORIES (UL)
595 Marine-Type Electric Fixtures
WIRE ROPE TECHNICAL BOARD
Wire Rope User’s Manual International Codes and Standards
BRITISH STANDARDS (BS)
7608 Guide to fatigue design and assessment of steel products, 2014 edition
CONFORMITE EUORPEENE (CE)
| 2006/42/EC | Machinery Directive |
| 73/23/EC | Low Voltage Directive |
| 89/336/EC | EMC Directive |
DEUTSCHES INSTITUT fur NORMBURG (DIN)
| DIN 15072 | Crane, tread profile of crane rail wheels and table of rails for different wheel diameters |
| DIN 536 | Crane Rails |
| DIN 16783 | Ultra-high molecular weight polyethylene moulding materials |
| DIN 6914 | High-strength hexagon head bolts with large widths across flats for structural steel bolting |
| DIN 17200 | Carbon Steel Grades |
| DIN 18800 | Structural Steelwork |
| DIN 15018 | Crane, steel structures, verification and analysis |
FEDERATION of EUROPEAN MATERIAL HANDLING (FEM)
| FEM 1.001 | Rules for the design of hoisting appliances |
| FEM 1.004 | Recommendation for the calculation of wind loads on crane structures |
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
| ISO 7778 | Steel plate with specified through-thickness characteristics |
| ISO 9001 | Quality Systems-Model for Quality Assurance in Design, Development, Production, Installation, and Servicing |
INTERNATIONAL SOCIETY of AUTOMATION (ISA) ISA Hydraulic Systems
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
| 60204-32 | Safety of Machinery – Electrical Equipment of Machines, Part 32 |
| 60034-14 | Rotating Electrical Machines |
Substitution of Codes The Crane Contractor may select other DIN, FEM, JIS, ISO or BSI codes as applicable as the basis of Crane design in lieu of the referenced codes, provided the Contractor can show, by certification or industry publications, that these codes are equivalent to (meets or exceeds) the codes, with the exception of AISC, ASTM, AWS, NEMA, NFPA, and OSHA which shall govern in any case. If the Contractor selects one of these codes for design of the Cranes, the Contractor shall provide three current English language copies of the code, within 30 days after contract award IAW CDRL A019. Once a code is selected for design, it shall be used for all portions of the Cranes.
Example of List of Codes Used in Industry Procurement Specifications Unless otherwise noted, the applicable recommendations of the following organizations shall be used. Unless otherwise noted, ‘National’ means USA.
| Abbreviation |
| Standard |
| ABMA |
| American Bearing Manufacturers Association |
| AGMA |
| American Gear Manufacturers Association |
| AISC |
| American Institute of Steel Construction - ASD |
| AISI |
| American Iron and Steel Institute |
| AIST |
| Association of Iron and Steel Technology (formerly AISE) |
| ANSI |
| American National Standards Institute |
| ASA |
| Acoustical Society of America |
| ASCE |
| American Society of Civil Engineers |
| ASM |
| American Society for Metals |
| ASME |
| American Society of Mechanical Engineers |
| ASNT |
| American Society for Nondestructive Testing |
| ASTM |
| American Society for Testing and Materials |
| AWS |
| American Welding Society - Bridges and Dynamically Loaded Structures |
| BSI |
| British Standards Institute |
| CMAA |
| Crane Manufacturer’s Association of America |
| DIN |
| Deutsche Industrie Normen |
| DOSH |
| Division of Occupational Safety and Health |
| EN |
| European Standards |
| FEM |
| Federation Europeene de la Manutention |
| IEC |
| International Electrotechnical Commission |
| IEEE |
| Institute of Electrical and Electronic Engineers |
| ISA |
| Instrument Society of America |
| ISO |
| International Standards Organization |
| NAAMM |
| National Association of Architectural Metal Manufacturers |
| NEMA |
| National Electrical Manufacturer’s Association |
| NFPA |
| National Fire Protection Association |
| NFPA |
| National Fluid Power Association |
| OSHA |
| Occupational Safety and Health Administration of the United States Department of Labor |
| PCMSC |
| Pacific Coast Marine Safety Code |
| SAE |
| Society of Automotive Engineers |
| SSPC |
| Steel Structures Painting Council |
| SSRC |
| Structural Stability Research Council |
| UL |
| Underwriters Laboratory |
System Description and Scope of Supply Reference Section C of the contract.
Minimum Criteria The criteria specified herein shall be considered the minimum acceptable. If, in the Contractor’s opinion, any of the criteria specified herein or in the referenced standards is in any way inadequate or insufficient for the intended use, it shall be the Contractor’s responsibility to use more stringent criteria.
Except where otherwise specified, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to fully and completely finish the project according to the true intent and meaning of this Specification and drawings, even though every item or activity is not particularly mentioned or shown in this Specification or drawings.
The Contractor shall remain responsible for adequacy and safety of the design, fabrication, supply, installation, transportation, commissioning, and testing of the equipment specified herein while adhering to the minimum criteria set forth in the Specifications.
Safety Design Criteria A single electric (power or control) or hydraulic component failure or malfunction shall not damage the Crane or injure personnel.
Where possible, component failure or malfunction shall safely stop the Crane operation. Where this is not possible, a redundant system shall be supplied. The redundant system shall both safely stop the Crane and prevent operation until maintenance personnel make corrections.
A means shall be provided so maintenance personnel may routinely check each redundant or backup system. The checking procedure shall be included in the maintenance manual.
No Crane component shall change state as a result of a power failure. Powering or repowering the Crane or any system within the Crane shall not result in any unanticipated or potentially unsafe motion or condition.
Design Requirements The Cranes shall, as a minimum, conform to the requirements of the Machinery Directive 2006/42/EC, the Low Voltage Directive 73/23/EC and the EMC Directive 89/336/EC.
Basic Crane design shall be a twin-box girder with a rope-towed trolley, catenary trolleys, and fleet-through main hoist. The trolley, boom, and main hoist machinery shall be enclosed in a separate machinery house. The machinery house shall include separate rooms for the hoist machinery and all electronic equipment. The electronic control room shall be separately climate controlled. Entrance and egress to the Cranes shall be via both a combination of ladders and stairways, and an elevator on the same landside leg as the cable reel, unless approved otherwise by the Government.
The Cranes shall be equipped with a spreader capable of lifting a single 20-foot container, twin-20-foot containers, single 40-foot container, and a single 45-foot container. Crane shall have a means of stowing hatches on the landside of the Crane within the backreach of the trolley girder, so as not to infringe on the operating area between the Crane legs. Provisions also shall be made to lift other cargo using temporary slings.
The Crane shall be designed to operate in an outdoor, corrosive marine environment with an ambient temperature range of 20 °F to 110 °F (-7 °C to 43 °C).
Each Crane shall have a Crane number independent of the manufacturer’s serial number. The Crane numbers format shall be the year of manufacture-001 and -002, e.g. 2020-001 and 2020002 if the Cranes are built in 2020.
The main characteristics of the Cranes are as follows. See the Appendix A2, Crane and Ship Clearance Drawing, for additional requirements.
Capacity Capacity below the spreader
| Twin-twenty | 89,600 lb (40 LT, 44.8 t) |
| Single lift | 67,200 lb (30 LT, 33.6 t) |
| Capacity below the heavy lift cargo beam | 89,600 lb (40 LT, 44.8 t) |
Principal Dimensions
| Gantry rail gauge | 80 ft (21.384 m) |
| Outreach, minimum | 127 ft (38.7 m) |
| Backreach, minimum | 35 ft (10.7 m)135 ft (41.2 m) total lift |
| Lift height, clear under spreader above WS rail | 100 ft (30.5 m) |
| Lift below waterside rail | 35 ft (10.7 m) |
| Gantry out-to-out width (bumpers uncompressed) | 88 ft 6 in (27.0 m) |
| Minimum clearance inside legs | 60 ft (18.3 m) |
| Clearance under portal tie beam | 50 ft (15.2 m) |
| Waterside rail setback from fender face | 12.75 ft (3.9 m) |
| Boom stowage angle | 45° (80° for maintenance only) |
| Rail elevation, waterside vs. landside | Same elevation |
Allowable Crane Loads on Wharf Maximum Allowable Service (ASD) Level Wheel Loads
| Seaside Operating | 30,000 lb/ft (44.7 t/m) |
| Landside Operating | 31,000 lb/ft (46.1 t/m) |
| Seaside Non-Operating | 30,000 lb/ft (44.7 t/m) |
| Landside Non-Operating | 39,000 lb/ft (58.1 t/m) |
Maximum Allowable Strength (LRFD) Level Wheel Loads
| Seaside Operating | 39,000 lb/ft (58.1 t/m) |
| Landside Operating | 40,000 lb/ft (59.5 t/m) |
| Seaside Non-Operating | 39,000 lb/ft (58.1 t/m) |
| Landside Non-Operating | 52,000 lb/ft (77.4 t/m) |
Refer to Appendix A4, drawing S-002 for additional maximum crane loads to the wharf, including crane rail lateral loads, crane stowage pin, and crane stop loads.
Performance Requirements Performance requirements for the Cranes shall be as follows:
Minimum Hoist High Speeds:
| No Load under spreader | 490 ft/min (150 m/min) | |
| Rated Load under spreader | 250 ft/min (76 m/min) |
Hoist Acceleration/Deceleration
| No Load | 4 s |
| Rated Load | 2 s |
Minimum Trolley Speed:
With Rated Load 600 ft/min (180 m/min) Trolley Acceleration/Deceleration
| With Rated Load | 5 s | |
| Maximum Boom Hoisting Time | 5 min | |
| Minimum Gantry Travel High Speed | 150 ft/min (45 m/min) | |
| Minimum Gantry Acceleration | 6 s |
Unique Identifier Tags The Contractor shall assign unique identifiers to the container Crane and the in-house service cranes in accordance with DFARS 252.211-7003. The Unique Identification Tags shall be attached to the outside of the main electrical disconnect panel of the respective Crane.
Essential Repair Parts The Contractor shall provide the parts defined in Section 3.8.6.3 and those listed in the Appendix E, Essential Repair Part Stockage List IAW CDRL A020.
After the completion of the design, the Contractor shall provide a list of any additional spare parts with prices for the Government’s consideration and potential purchase.
RESERVED
RESERVED
RESERVED
RESERVED
Existing Conditions Prior to installation, the MOTCO pier shall be inspected by the Contractor the Contracting Officer Representative (COR) to document the condition of all existing crane installation and record any existing damage. Upon completion of the work, the Contractor COR shall again inspect the MOTCO pier to determine the extent of any damage that may have occurred as a result of work performed under this contract. Any damage to the MOTCO pier as a result of either Crane installation and/or testing shall be the responsibility of the Crane Contractor for repair of any damage under this contract. If the Contractor fails or refuses to repair the damage promptly, the Government may have the necessary work performed and charge the cost to the Contractor.
Contractor Requested Engineering Changes All Contractor requested engineering changes must be submitted to the Government on the “Contractor Change Request Form” .
Warranty See Section I of the contract for warranty information.
RESERVED
Design Life A design life of 40 years (2,000,000 trolley single cycles) and 5,000 hours of operation per year shall be used. This does not necessarily mean that the Crane will no longer be fit for its purpose at the end of that period or that it will continue to be serviceable for that length of time without adequate and regular inspection and maintenance.
Components in the systems for the major Crane motions shall be designed for at least the following minimum design lives, and utilization, loading, and mechanism classifications according to the latest edition of FEM 1.001 as shown in the table below. Design lives shown are in operating hours of motion for the components in question.
| Mechanism |
| Minimum Design Life |
| Utilization Class |
| Loading Spectrum |
| Classification |
| Main Hoist |
| 50,000 hr |
| T8 |
| L2 |
| M8 |
| Trolley |
| 50,000 hr |
| T8 |
| L2 |
| M8 |
| Gantry Travel |
| 6,300 hr |
| T5 |
| L2 |
| M5 |
| Boom Hoist |
| 6,300 hr |
| T5 |
| L3 |
| M6 |
Minimum Design Life and Mechanism Classifications The design life requirements are not intended to preclude the use of certain wearing components, such as seals, twistlocks, or wire rope, which as part of normal maintenance may require replacement prior to the expiration of the Crane design life. Wearing components, along with their associated design life and maintenance intervals, shall be suggested by the Contractor and are subject to the Government’s approval. Wearing parts are not intended to cover items such as gears, bearings, sheaves, drums, shafts, and other mechanical components which shall be designed to last the design life of the Crane.
Minimum Support Period All components, including electrical components such as, but not limited to, inverters, convertors, PLCs, I/O components, and control software, used on the Crane shall be supported by the component or software manufacturer for a period of at least five (5) years after delivery of the Crane unless otherwise specifically approved in writing by the Government.
Computer components and supporting software not required for the Crane control system shall be supported by the component or software manufacturer for a period of at least five (5) years after delivery of the Crane unless otherwise specifically approved in writing by the Government.
The Contractor shall present to the Government upon request certification from the component or software manufacturer, that the component or software will be supported by the manufacturer for these minimum periods.
Duty Cycles and Load Spectra The duty cycles and load spectra described in this section shall be the minimum applied to all mechanical and electrical systems. Where the use of a particular system or supporting system warrants the use of more stringent criteria, those criteria shall be used.
Main Hoist and Trolley Design Duty Cycle The main hoist and trolley design duty cycle shall be used for the purpose of calculating times and equipment designs for the main hoist and trolley drives and shall be based on the following:
Handling the rated Duty Cycle (DC) container(s) Each motion accelerates, runs, and decelerates at the maximum rates and speeds for which it is designed Main hoist and trolley travel motions occur simultaneously without regard to Crane or ship clearances Ambient temperature is the maximum value defined in Section 2.7.6 The cycle is repeated indefinitely The wind load is 50% of the operating wind load (WLO) in the trolley travel direction The sequence of operations for the main hoist and trolley design duty cycle shall consist of the following steps repeated indefinitely:
Engage container for 2 s Hoist 15 m and travel 45 m waterside Lower 2 m to cell guides Enter cell guides for 2 s Lower 12 m Disengage container for 2 s Hoist 14 m Travel 3 m waterside Lower 2 m to cell guides Enter cell guides for 2 s Lower 12 m Engage container for 2 s Hoist 14 m Travel 43 m landside and lower 13 m Lower 2 m to chassis Disengage container for 2 s Hoist 1 m Travel 5 m landside Lower 1 m to container Where times are shown for operations, these are theoretical dwell times and shall be the only dwell times considered in calculating the design duty cycle.
Gantry Drive Design Duty Cycle The gantry design duty cycle shall be used for the purpose of calculating times and equipment designs for the gantry drive and shall consist of accelerating, traveling a total of 275 m (900 ft) along the wharf, and decelerating, all against the operating wind load (WLO) without intermediate stops. The cycle shall be performed once.
Boom Hoist Design Duty Cycle The boom hoist theoretical duty cycle shall be used for the purpose of calculating times and equipment designs for the boom hoist drive and shall be based on the following steps which shall be repeated twice in immediate succession with no dwell time:
Step 1: Raise the boom from horizontal to the ship clearance position (45 degrees) Step 2: Lower the boom to the horizontal position Rope Inspection Duty Cycles To allow for the requirements of rope inspection and lubrication at slow speeds, all systems with wire rope reeving shall be subject to an additional duty cycle where the full range of motion will be traveled in the least favorable empty spreader condition at a speed not exceeding 15% of the maximum rated speed uninterrupted for a period of at least 15 minutes. Breaks between each 15minute period of motion shall not exceed 5 minutes in duration.
Main Hoist Load Spectrum Components in the main hoist system, including reducers, bearings, shafts, reeving, etc., shall be designed using a load spectrum at least as severe as defined in the table below.
Speeds shall be based on the appropriate main hoist speed for the defined load.
| Load Case |
| Load |
| Hours |
| Cycle Ratio |
| 1 |
| CBRL + CBLS |
| 500 |
| 0.01 |
| 2 |
| LLE + LS |
| 7,500 |
| 0.15 |
| 3 |
| 0.67 LLE + LS |
| 7,500 |
| 0.15 |
| 4 |
| 0.33 LLE + LS |
| 10,000 |
| 0.20 |
| 5 |
| LS |
| 24,500 |
| 0.49 |
Total
| 50,000 |
| 1.00 |
Table—Main Hoist Load Spectrum Trolley Load Spectrum Components in the trolley system, including reducers, bearings, shafts, reeving, etc., shall be designed using a load spectrum at least as severe as defined in the table below.
Maximum motor torque below means the maximum torque the motors develop when accelerating the trolley with the maximum rated load against WLO.
Rated motor torque below means the highest torque the motors develop when the trolley travels steadily at rated speed with the maximum rated load against 50% WLO.
Speeds shall be based on the trolley rated top speed.
| Load Case |
| Load |
| Hours |
| Cycle Ratio |
| 1 |
| Maximum Motor Torque |
| 7,500 |
| 0.15 |
| 2 |
| Rated Motor Torque |
| 7,500 |
| 0.15 |
| 3 |
| 0.67 Rated Motor Torque |
| 10,000 |
| 0.20 |
| 4 |
| 0.33 Rated Motor Torque |
| 25,000 |
| 0.50 |
Total
| 50,000 |
| 1.00 |
Table—Trolley Load Spectrum Gantry Drive Load Spectrum Components in the gantry drive system, including reducers, bearings, shafts, etc., shall be designed using a load spectrum at least as severe as defined in the table below.
Maximum motor torque below means the maximum torque the motors develop when accelerating the gantry with the maximum rated load against WLO.
Rated motor torque below means the highest torque the motors develop when the gantry travels steadily at rated speed with the maximum rated load against 50% WLO.
Speeds shall be based on the gantry rated top speed.
| Load Case |
| Load |
| Hours |
| Cycle Ratio |
| 1 |
| Maximum Motor Torque |
| 945 |
| 0.15 |
| 2 |
| Rated Motor Torque |
| 945 |
| 0.15 |
| 3 |
| 0.67 Rated Motor Torque |
| 1,260 |
| 0.20 |
| 4 |
| 0.33 Rated Motor Torque |
| 3,150 |
| 0.50 |
Total
| 6,300 |
| 1.00 |
Table—Gantry Drive Load Spectrum Boom Hoist Load Spectrum Components in the boom hoist system, including reducers, bearings, shafts, reeving, etc., shall be designed using a load spectrum at least as severe as defined in the table below.
Maximum motor torque below means the maximum hoisting torque the motors develop when lifting the boom from the level position.
Minimum motor torque below means the torque the motors develop when hoisting the boom steadily at rated speed at the ship passing angle (45 degrees).
Speeds shall be based on the boom hoist motor design speed.
| Load Case |
| Load |
| Hours |
| Cycle Ratio |
| 1 |
| Maximum Raising Torque (Tmax) |
| 945 |
| 0.15 |
| 2 |
| 0.67 Tmax + 0.33 Tmin |
| 1,890 |
| 0.30 |
| 3 |
| 0.33 Tmax + 0.67 Tmin |
| 1,890 |
| 0.30 |
| 4 |
| Minimum Raising Torque (Tmin) |
| 1,575 |
| 0.25 |
Total
| 6,300 |
| 1.00 |
Table—Boom Hoist Load Spectrum Other Duty Cycles and Load Spectra Where components or systems support a primary system with a duty cycle and/or load spectrum listed above, those components or systems shall have a duty cycle and/or load spectrum at least as severe as the same duty cycle and/or load spectrum as their primary system where applicable.
The duty cycle for the trolley cable reel shall be at least as severe as for the main hoist.
The duty cycle for the gantry cable reel shall be at least as severe as the gantry drive.
The duty cycle for the hoist micro-motions shall be at least such that the system is moved through half of the full range of motion and back to the home position twice during each cycle of the hoist and trolley; once with the load and once with an empty spreader. The loads and cycle ratios shall be the same as defined in the main hoist load spectrum; see Section 1.12.1.
Duty Cycle Analysis Requirements The Contractor shall submit a duty cycle analysis for each duty cycle defined above IAW CDRL A021. Where motors or drives for a given motion are to be supplied by the electrical drive vendor, the analysis for those duty cycles shall be prepared by the Crane control supplier and shall verify the adequacy of the selected equipment for the specified cycles.
The Contractor shall provide an analysis showing the peak Crane power demand and RMS power demand, including lighting, ventilation, air-conditioning, and all other house loads, for the design duty cycle described in Section 1.12.1.
Each analysis shall be performed on a computer. Each submittal shall include, but not be limited to, the computer input and output, the program logic and complete documentation, and catalog information which substantiates the equipment design.
Load Spectra and Design Life Analysis Requirements Where component design lives are analyzed using a defined load spectrum, Miner’s rule shall be used to combine the lives of the load cases and develop the overall design life Crane Modes Primary Operating Mode The primary operating mode of the Crane shall be under the manual control of the operator located in the operator’s cabin on the main trolley.
The primary operational function of the crane will be to load and discharge container ships. The boom will be in the fully lowered position. The crane will handle containers, hatch covers, and lashing gear. A secondary function will be the handling of non-containerized cargo. For these functions, the main hoist and trolley drives shall be fully operational simultaneously.
Semi-Automated Operating Mode In the semi-automated operating mode, the main hoist and trolley will move containers between designated truck lanes and a designated position over the vessel automatically using the optimum clear path. Landing of the lifting system and operation in the ship’s cell guides shall be manual.
Once the lifting system arrives at the designated position over the vessel, the crane operator will control the trolley and main hoist. The operator will also have manual control of the spreader functions and the hoist micro-motions; however, these functions shall be automated to the extent possible.
Once clear of the vessel, the operator may signal the Crane to take automatic control in which case the trolley and main hoist will automatically perform all motions to an adjustable distance above the designated truck lane.
When the operator maintains manual control, he shall be able to place the trolley and hoist at any operating location. Interlocks shall prevent the hoist or trolley moving such that the lifting system or its load will collide with the Crane structure, the vessel, or the vessel stacks.
The Crane operator will use manual control to handle hatch covers, cargo beam loads, and oversize or over-height container loads.
Passing Mode The Crane shall have a passing mode to allow the Crane to gantry past obstructions on the vessel such as the ship superstructure or ship’s gear. In the passing mode, the trolley will be in the stowed position. The main hoist lifting system will be stowed above the portal tie beam level. The boom will be raised to the passing position.
Stowed Mode The Crane shall have a stowed mode in which the trolley will be in the stowed position. The main hoist lifting system will be stowed above the portal tie beam level. The boom will be raised to the stowed position. The gantry stowage pins may or may not be engaged into stowage pin pockets on the wharf.
In the stowed mode, the boom will be partially raised to about 45 degrees, for ship clearance. The trolley will be at the stowed position. Trolley drive shall not be operational. The main hoist shall be operations with an unloaded spreader only. The gantry shall be fully operational.
Cargo Beam Mode The Crane shall have a cargo beam mode in which the main hoist is used with the cargo beam.
Speeds and accelerations in the cargo beam mode will be limited to an adjustable setting.
Maintenance Mode The Crane shall have a maintenance mode of operation. The Crane shall be fully operational in maintenance mode but shall implement features that warn and protect maintenance personnel who may be working in diverse and/or hazardous areas of the Crane. The intent is to warn personnel who may not be otherwise aware of impending crane motion and provide time for the personnel to get safely clear of the machinery.
A keyed switch in the primary operator’s cabin and the electric room shall turn this maintenance mode on or off.
While in maintenance mode, the request for any Crane motion (hoist, trolley, boom, or gantry) shall be followed by an adjustable time delay before any motion takes place. The delay is to be initially set at 15 s.
During this time delay period, audio and visual alarms shall warn of pending motion. As a minimum, the public-address system shall produce a unique continuous warning tone for 3 s and a brief audio alarm (chirp) every 3 s thereafter, and red strobe lights shall be energized in the electric room, the machinery house, and under the operator’s cab.
During motion and for an adjustable period, initially set to 15 s, after the cessation of motion in maintenance mode, the visual alarms shall continue and brief audio alarm (chirp) shall sound every 3 s. During this period after the cessation of motion, motion can resume again without delay or further warning. After this period expires, the audio and visual alarms will cease and any subsequent motion in maintenance mode will be subject to the time delay and alarms described above.
Motion commands from any maintenance station, including the gantry control station, shall at all times be subject to these warnings and delays, regardless of the position of the maintenance mode switch.
Limping Mode(s) In addition to the modes described above, the Crane shall be designed to continue container handling operations in a reduced manner should one or more systems not work as intended. These reduced functioning modes are referred to as limping modes and shall allow a Crane to continue operations or move to a clear position under its own power in as safe and efficient a manner as possible until the problem is repaired.
The Crane shall enter the appropriate limping mode automatically and both the operator and maintenance personnel shall be notified that the Crane has entered a limping mode and the applicable restrictions.
The Crane shall communicate this reduced functionality to the CMS.
PRODUCTS
Materials Materials shall be as specified herein. Materials not specified shall be suitable for the service intended only after review and approval by the Engineer of Record (EOR). Use of international equivalent to the specified materials shall require approval from the Government. All materials shall be new and unused and shall be suitable for exposure to the marine environment and the temperatures defined in this Specification. Materials shall be free from all defects and imperfections that might affect the serviceability or appearance of the finished product. Finished materials shall, at all times, be kept clean, protected from damage, and free from scale, rust, and contamination. Cast or wrought aluminum shall not be permitted for structural or machinery applications.
Ductile Materials Unless where specifically required, all nonredundant components directly supporting the load shall be of ductile materials. These components include, but are not limited to, all hoist drive gear reducer housings, motor frames and end bells, flanged adapters, and brake wheels and discs. For the purposes of this Specification ductile is defined as having a minimum elongation of 5% in 2 in (50 mm). Furthermore, all shafts, keys, gears, torque carrying coupling components, and wire rope drum shall be steel.
Structural Steel Structural steel shall conform to material requirements, section A3, of the AISC Specification, except as modified in this section.
(a) Structural steel subjected to a calculated tensile stress, except stairs, ladders, platforms and walkways, and pipes and tubes, shall conform to ASTM A709/A709M, including supplementary requirements:
- S60, Frequency of Tension Tests
- S93, Limitation on Weld Repair and to ASTM A6/6M, including supplementary requirements:
- S18, Maximum Tensile Strength (Grades 50 and 50W).
| (b) | Charpy V-Notch impact requirements shall meet the requirements of ASTM A 709/A 709M. Test temperature shall be in accordance with ASTM A 709/A 709M, Table 8, based on the Zone corresponding to the lowest ambient temperature listed in these Specifications; see Section 1.3.4. |
| (c) | Rolled shapes, plates, and bars shall be tested in accordance with ASTM A673. |
| (d) | Structural steel conforming to ASTM A36, A242, A572 (Grades 42, 50, and 60), and A588 is acceptable for non-fracture critical members if it meets the requirements of items (b) and (e). |
| (e) | Structural steels shall be selected, to the greatest extent possible, which can be welded using E70XX electrodes and the shielded metal-arc process. Drawings shall clearly identify all welds. |
Structural steel made to another specification may be substituted for ASTM A709 providing it conforms to the specified requirements of ASTM A 709 and the other requirements of these Specifications.
Structural steel for the Crane primary structure, including plates, rolled sections, and rolled shapes and tubes shall have a minimum thickness of 5/16 in (8 mm) unless otherwise noted.
The critical end properties of parts requiring heat treatment by other than the prime mill source and the method and basis for acceptance or rejection of parts requiring non-destructive testing shall be shown on the drawings.
All fracture critical members (FCMs) material, plates, and sections shall comply with AWS D1.5, Section 12. The term "Engineer" in the code shall mean the Contractor's responsible Structural Engineer.
Structural Pipes and Tubes Primary structure pipes and tubes shall meet the requirements of one of the following:
API 5L, PSL2 — For line pipe (such as spiral welded pipes), which shall comply with the material toughness requirements of the API 5L specification, section 9.8, “CVN impact test for PSL 2 pipe;” test temperature shall be 0° C (32° F).
ASTM A1085 — For round HSS, including requirements for CVN testing.
ASTM A500 Grade B — For rectangular HSS or round ancillary (non-primary-structure) components.
High Strength Bolts, Nuts, and Washers Structural Connections Structural connections shall be designed in accordance with AISC-360.
Welding procedures and qualifications shall be in accordance with the requirements of AWS D1.3 and D1.1 as required by SD-06.8.
Structural bolted connections shall be designed and installed in accordance with RCSC Specification for Structural Joints Using High-Strength Bolts.
Mechanical Bolted Fasteners All high strength bolts, nuts, and washers shall be of U. S. manufacture, shall be plain (non-coated), and shall be permanently marked (by embossing or indentation) with the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .