MOTCO STS Container Crane QA Log 3-18-21.pdf

PDF 105 KB Posted

Attached to
Ship-To-Shore Container Cranes
Solicitation number
W56HZV-20-R-0025
Issued by

About this file

This document contains a question and answer log regarding a federal solicitation for two ship-to-shore container cranes. The log addresses nine questions from potential offerors relating to the solicitation requirements, specifications, and an upcoming site visit. Key details include that the solicitation is for the delivery of two container cranes to the Military Ocean Terminal Concord in California within 36 months of award, with payments allowed throughout the period of performance. The cranes must be able to lift various sized containers and service Panamax vessels with thirteen containers abeam. Questions addressed certification requirements, payment terms, and clarified that scale models are no longer required and face coverings will be needed for any upcoming site visit.

View the file

Other files

File Type Posted
Attachment 0002 - Pricing Workbook (revised 06 JUN 2021).xlsx XLSX spreadsheet
W56HZV-20-R-0025 0006.pdf PDF
Attachment 0001 - STS Crane Specification (revised 26 MAY 2021).DOCX DOCX document
MOTCO STS Container Crane QA Log 5-26-21.pdf PDF
W56HZV-20-R-0025 0005.pdf PDF
W56HZV-20-R-0025 0004.pdf PDF
MOTCO STS Container Crane QA Log 5-14-21.pdf PDF
Attachment 0013 Site Visit Information (revised 29 APR 2021).docx DOCX document
W56HZV-20-R-0025 0004.pdf PDF
MOTCO STS Container Crane QA Log 4-29-21.xlsx XLSX spreadsheet
Attachment 0001 - STS Crane Specification (revised 26 APR 2021).DOCX DOCX document
MOTCO Crane Site Visit Sign-in Sheet (beta.sam).pdf PDF
W56HZV-20-R-0025 0003.pdf PDF
Attachment 0013 Site Visit Information (revised 26 APR 2021).docx DOCX document
Attachment 0016 - Structural Drawings.pdf PDF
Attachment 0011 - Appendix E (Revised 09 APR 2021).pdf PDF
W56HZV-20-R-0025 0002.pdf PDF
Attachment 0001 - STS Crane Specification (revised 09 APR 2021).DOCX DOCX document
MOTCO STS Container Crane QA Log 4-8-21.pdf PDF
MOTCO STS Container Crane QA Log 3-25-21.pdf PDF
Attachment 0013 - Site Visit Information (revised 23 MAR 2021).docx DOCX document
W56HZV-20-R-0025 0001.pdf PDF
MOTCO STS Container Crane QA Log 3-11-21.pdf PDF
MOTCO STS Container Crane QA Log 3-4-21.pdf PDF
Attachment 0013 - Site Visit Information.docx DOCX document
Attachment 0007 - Appendix A.pdf PDF
Attachment 0011 - Appendix E.pdf PDF
Attachment 0010 - Appendix D.pdf PDF
Attachment 0001 - STS Crane Specification.DOCX DOCX document
Attachment 0014 - NCIC CONSENT FORM.pdf PDF
Attachment 0008 - Appendix B.pdf PDF
Attachment 0002 - Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0005 - SBP Certification - Subcontractor.docx DOCX document
W56HZV20R0025.pdf PDF
Attachment 0006 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Attachment 0015 - MOTCO SITE VISIT SPREADSHEET.xlsx XLSX spreadsheet
Attachment 0003 - SBP Workbook.xlsx XLSX spreadsheet
Attachment 0012 - Appendix F.pdf PDF
Attachment 0009 - Appendix C.pdf PDF
Attachment 0004 - SBP Workbook Instructions.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number Document Question/Comments Answer/Response Date Received Date Posted

1 Solicitation Do you have any update on the pre‐meeting (site visit)? Please review Attachment 0013 of the solicitation in regards to information on the site visit. 1‐Mar‐21 4‐Mar‐21

2 Solicitation Where specifications revised from the tender documents in 2019. Will you please provide a list of the changes, if a list is available?

Some of the specifications have changed from the National Crane Center’s (NCC) solicitation, however, the Government does not have a complete list of those changes to provide with the solicitation.

2‐Mar‐21 4‐Mar‐21

3 Solicitation Will a proposal with a mono‐girder, instead of a twin box girder, be accepted? A twin box girder is the Government's requirement, and as a result, is the only version that will be accepted.

9‐Mar‐21 11‐Mar‐21

4 Solicitation Is there a bond requirement? No, no bonding will be required. 9‐Mar‐21 11‐Mar‐21

5 Solicitation

The solicitation makes various references to mechanisms of application for payment, and of issuing payment. However there does not seem to be a reference to schedule (frequency) of payments but for 52.212‐4 for Items Accepted. Is the Government considering allowing Installment Payments, Progress Payments, or another means of financing throughout the 36 months project schedule?

The CLIN structure established in Section B allows for payments throughout the period of performance.

5‐Mar‐21 18‐Mar‐21

6 Specification

Technical Specification item 3.9.9 Certificates – CDRL A010 states, in part:

“The Crane shall be certified in accordance with the regulations of the U.S.

Bureau of Labor Standards under Title 29, Subtitle B Part 1919 (latest edition) and any local codes as applicable” Is it correct to understand that even though located in a military facility, these cranes will not be subject to any particular certification program (such as the Navy’s P‐307) but instead a commercial certification as above required?

That is correct, the NAVFAC P‐307 is a Navy requirement. This requirement is now an Army requirement.

10‐Mar‐21 18‐Mar‐21

7 Solicitation

Solicitation paragraph C.1.2 item 5) states “Scale model and souvenir models;

refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.5.15”.

Attachment 0001, while showing an item 2.5.15 Scale Models in its index, when searching for it, it does not exist. Instead, item 2.5.15 refers to Stairs, Ladders, Platforms, and Walkways (page 170 of 204). The Scale Models paragraph seems to have been deleted from Attachment 0001. Are the scale model and souvenir models actually a requirement in this solicitation? If so, please provide the details of scale desired and materials to be used.

The scale and souvenir requirement has been removed from the solicitation and an amendment is forthcoming to remove the language in C.1.2.

12‐Mar‐21 18‐Mar‐21

8 Site Visit Attachment 0013 does not mention any PPE. Besides sturdy shoes, are there any other protective items we need to bring with us?

Attendees will need closed toe shoes and face coverings (i.e. masks) in order to gain access to MOTCO. An amendment is forthcoming to update Attachment 0013. 17‐Mar‐21 18‐Mar‐21

9 Site Visit Will there also be a sit‐down meeting / discussion regarding any aspects of the solicitation during this visit – in addition to visiting Wharf 2?

No, there will be a virtual Q&A Session where questions can be asked, that will take place a few weeks after the site visit. An amendment is forthcoming to update Attachment 0013. 17‐Mar‐21 18‐Mar‐21

Military Ocean Terminal Concord, CA (MOTCO) Ship‐to‐Shore Container Cranes

W56HZV‐20‐R‐0025

Question and Answer Log

File details come from the government source that posted it. Updated .