This document contains a question and answer log for solicitation number W56HZV-20-R-0025 from the Department of the Army Materiel Command TACOM Life Cycle Management Command. The solicitation seeks two ship-to-shore container cranes to be delivered to the Military Ocean Terminal Concord in California within 36 months of contract award. The cranes must be equipped to lift single and twin 20-foot containers as well as single 40-foot and 45-foot containers, and service a Panamax vessel with 13 containers abeam. Bidders must acknowledge any amendments to the solicitation. Questions are to be submitted in writing to the identified contracting specialist. The log provides answers to vendor questions on topics such as site visits, payment terms, and certification requirements.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Number Document Question/Comments Answer/Response Date Received Date Posted
1 Solicitation Do you have any update on the pre‐meeting (site visit)? Please review Attachment 0013 of the solicitation in regards to information on the site visit. 1‐Mar‐21 4‐Mar‐21
2 Solicitation Where specifications revised from the tender documents in 2019. Will you please provide a list of the changes, if a list is available?
Some of the specifications have changed from the National Crane Center’s (NCC) solicitation, however, the Government does not have a complete list of those changes to provide with the solicitation.
2‐Mar‐21 4‐Mar‐21
3 Solicitation Will a proposal with a mono‐girder, instead of a twin box girder, be accepted? A twin box girder is the Government's requirement, and as a result, is the only version that will be accepted.
9‐Mar‐21 11‐Mar‐21
4 Solicitation Is there a bond requirement? No, no bonding will be required. 9‐Mar‐21 11‐Mar‐21
5 Solicitation
The solicitation makes various references to mechanisms of application for payment, and of issuing payment. However there does not seem to be a reference to schedule (frequency) of payments but for 52.212‐4 for Items Accepted. Is the Government considering allowing Installment Payments, Progress Payments, or another means of financing throughout the 36 months project schedule?
The CLIN structure established in Section B allows for payments throughout the period of performance.
5‐Mar‐21 18‐Mar‐21
6 Specification
Technical Specification item 3.9.9 Certificates – CDRL A010 states, in part:
“The Crane shall be certified in accordance with the regulations of the U.S.
Bureau of Labor Standards under Title 29, Subtitle B Part 1919 (latest edition) and any local codes as applicable” Is it correct to understand that even though located in a military facility, these cranes will not be subject to any particular certification program (such as the Navy’s P‐307) but instead a commercial certification as above required?
That is correct, the NAVFAC P‐307 is a Navy requirement. This requirement is now an Army requirement.
10‐Mar‐21 18‐Mar‐21
7 Solicitation
Solicitation paragraph C.1.2 item 5) states “Scale model and souvenir models;
refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.5.15”.
Attachment 0001, while showing an item 2.5.15 Scale Models in its index, when searching for it, it does not exist. Instead, item 2.5.15 refers to Stairs, Ladders, Platforms, and Walkways (page 170 of 204). The Scale Models paragraph seems to have been deleted from Attachment 0001. Are the scale model and souvenir models actually a requirement in this solicitation? If so, please provide the details of scale desired and materials to be used.
The scale and souvenir requirement has been removed from the solicitation and an amendment is forthcoming to remove the language in C.1.2.
12‐Mar‐21 18‐Mar‐21
8 Site Visit Attachment 0013 does not mention any PPE. Besides sturdy shoes, are there any other protective items we need to bring with us?
Attendees will need closed toe shoes and face coverings (i.e. masks) in order to gain access to MOTCO. An amendment is forthcoming to update Attachment 0013. 17‐Mar‐21 18‐Mar‐21
9 Site Visit Will there also be a sit‐down meeting / discussion regarding any aspects of the solicitation during this visit – in addition to visiting Wharf 2?
No, there will be a virtual Q&A Session where questions can be asked, that will take place a few weeks after the site visit. An amendment is forthcoming to update Attachment 0013. 17‐Mar‐21 18‐Mar‐21
10 Solicitation Please advise where Section B, referred to in Answer #5, is located in the Solicitation.
Section B begins on page 4 and goes through page 24 of the solicitation. 18‐Mar‐21 25‐Mar‐21
11 Site Visit Due to the change of date for the Site Visit (Amendment 0001), are the visitors passes already approved for access still valid?
Yes, the visitor passes are still valid. 23‐Mar‐21 25‐Mar‐21
Military Ocean Terminal Concord, CA (MOTCO) Ship‐to‐Shore Container Cranes
W56HZV‐20‐R‐0025