W56HZV20R0025.pdf
PDF 274 KB Posted
- Attached to
- Ship-To-Shore Container Cranes
- Solicitation number
- W56HZV-20-R-0025
About this file
This is a solicitation for two ship-to-shore container cranes. The U.S. Army Contracting Command - Detroit Arsenal is seeking proposals for two cranes to be delivered to the Military Ocean Terminal Concord in California within 36 months of award. The cranes must be capable of lifting single and twin twenty-foot containers as well as single forty- and forty-five-foot containers, and service a Panamax vessel with thirteen containers abeam. The resulting contract will be a single-award, firm fixed-price agreement. Offerors must acknowledge any amendments to the solicitation. Questions must be submitted in writing by the specified date.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W56HZV-20-R-0025 2021MAR01
TYLER WONSOWICZ (586)282-4010
TYLER.J.WONSOWICZ.CIV@MAIL.MIL
2021MAY17 01:00pm
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
X
333923
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 109
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: TYLER WONSOWICZ
Buyer Office Symbol/Telephone Number: CCTA-HTB-C/(586)282-4010
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
REQUIREMENT: Army Contracting Command Detroit Arsenal (ACC-DTA) releases Solicitation W56HZV-20-R-0025 with a three year period of_____________ performance for the delivery of two Ship-to-Shore (STS) Container Cranes to Military Ocean Terminal, Concord, CA (MOTCO) that will result in a single-award Firm- Fixed-Price (FFP) contract.
TYPE OF CONTRACT: The resulting contract will be Firm-Fixed-Price (FFP).__________________
INCONSISTENCIES: This Executive Summary has been prepared as an aid for potential offeror(s). ACC-DTA has made every attempt to_________________ accurately reflect the requirements and information contained in the balance of this solicitation. However, if an offeror finds any inconsistency between this Executive Summary and the solicitation, the solicitation takes precedence.
QUESTION / ANSWERS: A question and answer period will be open for 30 days from release of the solicitation. All questions and comments____________________ on this solicitation shall be submitted in writing via email to usarmy.detroit.acc.mbx.sts-crane-rfi-responses@mail.mil. Questions and answers will be posted publicly to the STS Container Crane Solicitation posting on beta.SAM at the following website:
https://beta.sam.gov/ . Questions and comments that are received after the deadline will be considered late and may not be answered. ___
MOTCO SITE VISIT: Offerors interested in a site visit at MOTCO, prior to the close of this solicitation shall reference Attachment 0013 -_________________
Site Visit Information, Attachment 0014 - NCIC Consent Form and Attachment 0015 - MOTCO Site Visit Spreadsheet.
TRADE AGREEMENT NOTE: This acquisitions is for an end product in product service group Materials handling equipment and is subject to______________________ the trade agreements in accordance with DFARS 225.401-70. The Government will consider only offers of end products that are U.S.-made, qualifying country, or designated country end products unless (i) There are no offers of such end products, (ii) The offers of such end products are insufficient to fulfill the Governments requirements, or (iii) A national interest waiver has been granted in accordance with DFARS 225.403.
AVAILABILITY OF FUNDS: This acquisition is subject to the availability of funds and the Government's obligation under this contract is_______________________ contingent upon the availability of appropriated funds. This is in accordance with FAR 52.232-18, Availability of Funds.
ALL OR NONE-COMMERCIAL ITEM ACQUISITION:_______________________________________
(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL
ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON: Information regarding the Ombudsperson for this contract is located at the___________________________________________________ following website: http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
ACKNOWLEDGEMENT OF AMENDMENTS: Offerors submitting a proposal in response to this solicitation shall acknowledge all the amendments_______________________________ received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date: _________________ _____
2 109
W56HZV-20-R-0025
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
3 109
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 STS CRANE DESIGN $ $ ________________ ______________ __________________
COMMODITY NAME: DESIGN
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0001 is in accordance with Attachment 0001 - STS
Container Crane Specifications Sections 1.3.4, 2.2, 2.3, 2.4, 2.5 and Section C.2.3.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
4 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 FABRICATION OF TWO STS CRANES $ $ _____________________________ ______________ __________________
COMMODITY NAME: FABRICATION
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0002 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 3.0.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
5 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 TRANSPORTATION OF TWO STS CRANES $ $ ________________________________ ______________ __________________
COMMODITY NAME: TRANSPORTATION
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0003 is in accordance with Attachment 0001 - STS
Container Crane Specifications Sections 2.2.31 and
3.3.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
6 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004 FIELD ERECTION AND ACCEPTANCE $ $ _____________________________ ______________ __________________
COMMODITY NAME: ACCEPTANCE
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0004 is in accordance with Attachment 0001 - STS
Container Crane Specifications Sections 3.4, 3.5 and
3.6.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
7 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 CRANE OPERATION AND MAINTENANCE TRAINING $ $ ________________________________________ ______________ __________________
COMMODITY NAME: TRAINING
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0005 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 3.7.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
8 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0006 ESSENTIAL SPARE PARTS $ $ _____________________ ______________ __________________
COMMODITY NAME: SPARE PARTS
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0006 is in accordance with Attachment 0001 - STS
Container Crane Specifications Sections 1.3.7,
3.8.6.3 and Appendix E.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
9 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1001 CONTRACT DATA REQUIREMENTS LIST _______________________________
A001 BUILD SCHEDULE $ ** NSP ** $ ** NSP ** ______________ ______________ __________________
COMMODITY NAME: BUILD SCHEDULE
CDRL A001 is in accordance with Section C.2.2.1.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A002 QUALITY CONTROL PLAN $ ** NSP ** $ ** NSP ** ____________________ ______________ __________________
COMMODITY NAME: QUALITY CONTROL PLAN
CDRL A002 is in accordance with Section C.2.2.2.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
10 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A003 INSPECTION PROCEDURES, SPECIFICATIONS AND RESULTS $ ** NSP ** $ ** NSP ** _________________________________________________ ______________ __________________
COMMODITY NAME: INSPECTION PROCEDURES
CDRL A003 is in accordance with Section C.2.2.3, C.2.6, and Attachment 0001 - STS Container Crane
Specifications Section 2.7.1.4 and 3.2.1.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A004 DRAWINGS $ ** NSP ** $ ** NSP ** ________ ______________ __________________
COMMODITY NAME: DRAWINGS
CDRL A004 is in accordance with Section C.2.3, C.2.10.1, and Attachment 0001 - STS Container Crane
Specifications Section 2.3.6, 2.5.14, 3.2.2 and 3.9.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A005 SCOPE OF SUPPLY $ ** NSP ** $ ** NSP ** _______________ ______________ __________________
11 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
COMMODITY NAME: SCOPE OF SUPPLY
CDRL A005 is in accordance with Section C.2.3.4.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A006 FIELD NOTIFICATION OF REVISION (FNR) REPORT $ ** NSP ** $ ** NSP ** ___________________________________________ ______________ __________________
COMMODITY NAME: FNR REPORT
CDRL A006 is in accordance with Section C.2.3.10.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A007 PRODUCT DATA REPORT $ ** NSP ** $ ** NSP ** ___________________ ______________ __________________
COMMODITY NAME: PRODUCT DATA REPORT
CDRL A007 is in accordance with Section C.2.4 and
C.2.10.4.
12 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A008 DESIGN DATA AND CALCULATIONS $ ** NSP ** $ ** NSP ** ____________________________ ______________ __________________
COMMODITY NAME: DESIGN DATA AND CALCULATIONS
CDRL A008 is in accordance with Section C.2.5 and
Attachment 0001 - STS Container Crane Specifications
Section 2.2 and 3.9.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A009 TEST REPORTS $ ** NSP ** $ ** NSP ** ____________ ______________ __________________
COMMODITY NAME: TEST REPORTS
CDRL A009 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.1.16, 2.3.28.4, 2.5.4.5, 3.2, 3.5 and 3.9.10.
(End of narrative B001)
13 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A010 CERTIFICATES $ ** NSP ** $ ** NSP ** ____________ ______________ __________________
COMMODITY NAME: CERTIFICATES
CDRL A010 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.5.4.5, 3.7.2 and 3.9.9.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A011 PLANS AND PROCEDURES $ ** NSP ** $ ** NSP ** ____________________ ______________ __________________
COMMODITY NAME: PLANS AND PROCEDURES
CDRL A011 is in accordance with Section C.2.6, H.3.9, H.3.10 and Attachment 0001 - STS Container Crane
Specifications Section 3.3.
(End of narrative B001)
Packaging and Marking _____________________
14 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A012 MANUFACTURER FIELD REPORTS $ ** NSP ** $ ** NSP ** __________________________ ______________ __________________
COMMODITY NAME: MANUFACTURER FIELD REPORTS
CDRL A012 is in accordance with Section C.2.7.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A013 OPERATION AND MAINTENANCE INSTRUCTIONS, MANUALS _______________________________________________
AND DATA $ ** NSP ** $ ** NSP ** ________ ______________ __________________
COMMODITY NAME: O&M INSTRUCTION, MANUAL, DATA
CDRL A013 is in accordance with Section C.2.8, C.2.10.2, and Attachment 0001 - STS Container Crane
Specifications Section 2.7.4.2, 3.7, 3.8.3 and 3.9.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
15 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A014 STRUCTURAL MAINTENANCE MANUALS $ ** NSP ** $ ** NSP ** ______________________________ ______________ __________________
COMMODITY NAME: MAINTENANCE MANUALS
CDRL A014 is in accordance with Section C.2.9 and
Attachment 0001 - STS Container Crane Specifications
Section 2.2.30.1.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A015 CONTROL SYSTEM CONFIGURATION RECORD $ ** NSP ** $ ** NSP ** ___________________________________ ______________ __________________
COMMODITY NAME: SYSTEM CONFIGURATION RECORD
CDRL A015 is in accordance with Section C.2.10.3.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
16 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A016 AGENDA & MEETING MINUTES $ ** NSP ** $ ** NSP ** ________________________ ______________ __________________
COMMODITY NAME: AGENDA & MEETING MINUTES
CDRL A016 is in accordance with Section C.4.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A017 FUNCTIONAL DESCRIPTION $ ** NSP ** $ ** NSP ** ______________________ ______________ __________________
COMMODITY NAME: FUNCTIONAL DESCRIPTION
CDRL A017 is in accordance with Section C.4.3.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A018 FABRICATION DOCUMENTATION $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
17 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
COMMODITY NAME: FABRICATION DOCUMENTATION
CDRL A018 is in accordance with Section C.4.4.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A019 SUBSTITUTION OF CODES $ ** NSP ** $ ** NSP ** _____________________ ______________ __________________
COMMODITY NAME: SUBSTITUTION OF CODES
CDRL A019 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 1.2.4.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A020 REPAIR PARTS LIST $ ** NSP ** $ ** NSP ** _________________ ______________ __________________
COMMODITY NAME: REPAIR PARTS LIST
CDRL A020 is in accordance with Attachment 0001 - STS
18 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Container Crane Specifications Section 1.3.7, 3.8.6 and 3.9.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A021 DUTY CYCLE ANALYSIS $ ** NSP ** $ ** NSP ** ___________________ ______________ __________________
COMMODITY NAME: DUTY CYCLE ANALYSIS
CDRL A021 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 1.12.10.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A022 REPAIR TO DEFECTS REPORT $ ** NSP ** $ ** NSP ** ________________________ ______________ __________________
COMMODITY NAME: REPAIR TO DEFECTS REPORT
CDRL A022 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.2.30.9.
(End of narrative B001)
19 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A023 FEDERATION OF EUROPEAN MATERIAL HANDLING ________________________________________
(FEM)CLASSIFICATION $ ** NSP ** $ ** NSP ** ___________________ ______________ __________________
COMMODITY NAME: FEM CLASSIFICATION
CDRL A023 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.3.1.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A024 ROPE GROOVE SHEAVE MATERIAL AND HARDENING PROCESS _________________________________________________
REPORT $ ** NSP ** $ ** NSP ** ______ ______________ __________________
COMMODITY NAME: PROCESS REPORT
CDRL A024 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.3.15.
(End of narrative B001)
Packaging and Marking _____________________
20 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A025 SAFETY WARNINGS AND INSTRUCTIONS $ ** NSP ** $ ** NSP ** ________________________________ ______________ __________________
COMMODITY NAME: SAFETY INSTRUCTIONS
CDRL A025 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.5.1.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A026 STACK PROFILING SYSTEM (SPS) SPECIFICATIONS $ ** NSP ** $ ** NSP ** ___________________________________________ ______________ __________________
COMMODITY NAME: SPS SPECIFICATIONS
CDRL A026 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.5.19.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
21 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A027 PAINT PROCEDURES AND SPECIFICATIONS $ ** NSP ** $ ** NSP ** ___________________________________ ______________ __________________
COMMODITY NAME: PAINT PROCEDURES
CDRL A027 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.6.3.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A028 WELDING PROCEDURES $ ** NSP ** $ ** NSP ** __________________ ______________ __________________
COMMODITY NAME: WELDING PROCEDURES
CDRL A028 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 2.7.1.4.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
22 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DETROIT ARSENAL,MI,48397-5000
A029 BOOM ALIGNMENT PROCEDURES $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: BOOM ALIGNMENT PROCEDURES
CDRL A029 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 3.1.4.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A030 CRANE WEIGHTING PROCEDURES $ ** NSP ** $ ** NSP ** __________________________ ______________ __________________
COMMODITY NAME: CRANE WEIGHTING PROCEDURES
CDRL A030 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 3.1.5.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
23 109
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A031 TRAINING SCHEDULE $ ** NSP ** $ ** NSP ** _________________ ______________ __________________
COMMODITY NAME: TRAINING SCHEDULE
CDRL A031 is in accordance with Attachment 0001 - STS
Container Crane Specifications Section 3.7.2.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
A032 CLOSEOUT SUBMITTAL $ ** NSP ** $ ** NSP ** __________________ ______________ __________________
COMMODITY NAME: CLOSEOUT SUBMITTAL
CDRL A032 is in accordance with Section C.2.10.
(End of narrative B001)
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
24 109
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 General Overview_____________________
C.1.1 The intent of this effort is to procure two (2) rail-mounted Ship-to-Shore (STS) Container Cranes, to be located at Military Ocean
Terminal, Concord (MOTCO), Concord, California. Crane capacity shall be 40 long ton (LT) below the spreader, and the cranes shall be able to service a Panamax vessel with 13\~containers abeam. See Appendix A2, Crane and Wharf Clearance Drawings, the Cranes shall be equipped with a spreader capable of lifting both single and twin 20-foot containers, single 40-foot containers, and single 45-foot containers. The Cranes shall be designed, fabricated, assembled, facility tested, delivered, installed, inspected, field tested and commissioned, and made ready for use in accordance with Attachment 0001 MOTCO STS Cranes Specifications.
C.1.2 The scope of supply shall include the following, as described in Attachment 0001 MOTCO STS Cranes Specifications:
1) Two (2) ship-to-shore Cranes, including rope-towed trolleys (RTT) with main hoist fleet-through reeving and headblocks
2) Three (3) telescoping 20 ft, 40 ft, 45 ft, separating twin-20 ft spreaders; this includes one\~(1) spare; refer to Attachment 0001
MOTCO STS Crane Specifications, Section 2.5.2.5
3) One (1) heavy lift cargo beam (total for project); refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.5.3
4) Test weights; refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.5.14
5) Scale model and souvenir models; refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.5.15
6) Initial spare parts; refer to Attachment 0001 MOTCO STS Crane Specifications, Section 3.8.6
C.1.3 Significant technical features of the Crane include the following:
1) Local Crane management system (CMS) Attachment 0001 MOTCO STS Crane Specifications, Section 2.4.29
2) Closed circuit television system (CCTV), refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.4.19
3) Hatch cover storage platform on the Crane, landside of the landside rail; refer to Attachment 0001 MOTCO STS Crane Specifications, Section\~2.2.18
4) Fire detection and suppression system; refer to Attachment 0001 MOTCO STS Crane Specifications, Section 2.5.4.9
5) Vessel Profiling System, also known as stack profiling system (SPS) and Soft Landing System (part of SPS); refer to Attachment 0001
MOTCO STS Crane Specifications, Section 2.5.19
6) Detailed operation and maintenance manuals in English
7) Electronic security requirements - such as restrictions for WiFi, Bluetooth, internet, etc.; refer to Attachment 0001 MOTCO STS
Crane Specifications, Section 2.4.30
8) USA Professional Engineer as Engineer of Record; refer to Statement of Work (SOW) Section C.2
Crane structure consideration for operations on flexible wharf; refer to Attachment 0001 MOTCO STS Crane Specifications, Section
2.2.20.1
C.2 Submittals_______________
C.2.1 The Contractor shall submit to the Government all items of technical documentation listed hereinafter. The Contractor shall ensure that all submittals are entirely legible and suitable for reproduction. The content, number of copies, time of submission, and distribution shall be in accordance with Section J, Exhibit A Contract Data Requirements List and as specified below. Compliance with the requirements of these deliverables will be determined by a review of the Crane design and Crane construction submittals by the
Government and by field inspection and testing.
C.2.1.1 The Contractors EOR for each discipline shall be a professional engineer registered in the United States with at least 5 years of experience in designing or certifying crane designs. The structural analysis of the Crane and drawings for the crane and trolley primary structures shall be approved by the Contractor's responsible Professional Engineer.
C.2.1.2 Final design drawings and calculations shall be signed and sealed by the Contractors EOR. The intent is to include the structural, mechanical, and electrical systems. However, this requirement is not intended to include shop drawings, third-party vendor drawings, or ancillary drawings that have no significant impact on the project or that require no engineering. The Contractor shall
25 109
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
submit a list of components for which drawings and calculations will need seal and signaturethe Contractor shall submit a detailed list of drawings and calculations that will and will not be signed for Government review and approval.
C.2.1.2.1 All Crane documentation and submittals shall be in English. Units shall be in U. S. Standard Units or SI Units.
C.2.1.2.2 All applicable submittals shall also be provided for the machinery house service crane and any associated lifting gear.
C.2.1.2.3 The submittal transmission documents shall clearly identify CDRL Item Number, Crane number and title as a minimum.
C.2.2 Preconstruction Submittals: Prior to construction of the Crane, the Contractor shall submit the following.__________________________________
C.2.2.1 Schedule (CDRL A001). The Contractor shall submit a schedule which identifies key milestone events in the design, fabrication,______________________________ and installation of the Crane acquisition. At a minimum, the schedule shall include the following:
1 - Post Award Meeting
2 - Initial General Arrangement and Crane Design Submittals
3 - Government Review of First Design
4 - Second General Arrangement and Crane Design Submittals
5 - Government Review of Second Design
6 - Third General Arrangement and Design Submittals
7 - Government Review of Third Design
8 - Fabrication Initiation
9 - Fabrication Completion
10 - On-Site Pre-Installation Conference
11 - Government Witnessed Shop Test
12 - Contractor Site Mobilization
13 - New Crane Installation
14 - Government Crane Inspection
15 - Field Acceptance Test
16 - Crane Acceptance
17 - Contract Completion Date
18 - Receipt of Final O&M Manuals
19 - Completion of Warranty
C.2.2.2 Quality System (CDRL A002). The Contractor shall submit, prior to fabrication, the written quality control plan for review. The____________________________________ plan shall be followed throughout the contract; any changes shall be submitted to the Government. As a minimum, the plan shall include the following:
1 Incoming materials, consumables and machinery
2 - Traceability of material
3 - Lofting, cutting, fit-up, welding, forming and dimensions of structural materials
4 - Welding and inspection procedures
5 - Welding and inspection personnel qualification and certification
6 - Welding and inspection equipment maintenance and calibration
7 - Heat treating, stress relieving and other special treatments
8 - Machining, finish surfaces, painting and bolting
9 - Installation and alignment
10 - Startup and Commissioning Tests
11 - Functional Testing
C.2.2.3 Inspection Specification (CDRL A003). Prior to completing the design and before commencing fabrication of the Cranes, the______________________________________________
Contractor shall prepare, submit, and obtain the Governments approval for inspection specifications. The Contractor shall write inspection specifications for mechanical and electrical components and structural assemblies. During fabrication the approved inspection specifications shall be utilized by the Contractors QA personnel to document various measurements and inspections, the partially completed inspection specifications shall be submitted to the Government monthly for review. Submit completed inspection specifications upon completion of the contract.
C.2.3 Drawings (CDRL A004). The Contractor shall submit the drawings listed below for approval.____________________________
C.2.3.1 Initial drawing submittals (preliminary, 90%, and final) shall bear a complete title block with a permanent drawing number and a registered professional engineers original seal with a dated signature. Subsequent submittals shall bear a new revision number and engineers seal with a dated signature for each sheet that has been modified.
C.2.3.2 The Contractor shall provide design submittals in three phases throughout the process of developing the Crane design.
26 109
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2.3.2.1 The first submittal shall be a preliminary design. The preliminary design shall include the following: general arrangements, preliminary Crane stability, maximum wheel loads, selection of components for commonality, failsafe devices and features, ease of maintenance, and design factors utilized. The purpose of the initial submittal and review process is to identify and resolve problems early in the design phase.
C.2.3.2.2 The second design submittals shall be a 90% design submittal. The 90% design submittal shall include drawings required in CDRL
A004, product data required in CDRL A007, and design calculations required in CDRL A008.
C.2.3.2.3 The third design submittal shall be the final 100% design submittal.
C.2.3.2.4 The final 100% design submittal shall be approved by the Government. The Government review and approval process does not relieve the Contractor from the responsibility for all aspects of the design of the Crane. Fabrication of a specific assembly may commence after all submittal components for that assembly are Approved by the Government. This approval does not relieve the Contractor of his responsibility to comply with contract requirements. Drawings within each category (such as structural, mechanical, etc.) shall be numbered consecutively. Each assembly and subassembly drawing shall include an integral Bill of Materials or shall be followed by a consecutively numbered drawing with the applicable Bill of Materials. There shall be no proprietary notes on any drawing. An index for all drawings shall be included. Preliminary, 90%, and final design drawings shall be provided as a file viewable in Adobe Acrobat as a bookmarked portable document format (.pdf). PDF files shall be black/white with minimum resolution of 600 dpi. Filenames shall be in
English. As-built drawings shall be provided in the following formats:
1 - As an editable file in the file format of the program it was originally generated in.
2 - As a file in the file format of .dxf or .dwg editable in AutoCAD 2016.
3 - A separate copy viewable in Adobe Acrobat as a bookmarked portable document format (.pdf).
Applicable drawings listed below shall also be included for the elevator system, machinery house service crane, and all other buy-out assemblies or components as applicable.
C.2.3.3 General Arrangement Drawings (CDRL A004). The Crane assembly and each major component shall be shown in plan, elevation, and end views. All major features of the Crane shall be shown including: clearances, dimensions, lifts, speeds, maximum wheel loads and power supply. The machinery house general layout shall include general locations of major components such as: brakes, motors, speed reducers, gear boxes, walkways, and control panels (including size). The type of structural bolted connection shall be specified on the drawing.
In addition, calculated weights shall be shown for the completely assembled Crane and for each major component.
C.2.3.4 Control System Suppliers Scope of Supply (CDRL A005). The scope of supply, without pricing, from the Control System Supplier shall be provided. The scope of supply shall clearly describe all equipment and services the Control System Supplier is responsible for providing.
C.2.3.5 Structural Drawings (CDRL A004). The structural design drawings shall show the fabrication details, weldments, fastener joint details, Bill of Materials and location and size of all structural members. The fabrication details shall clearly show the size, section, material grade and location (dimensions) of all members; all geometry necessary for layout; elevations; centers and offsets;
camber requirements; and joining requirements between elements of built-up elements. Other critical information that shall be provided on the structural design drawings includes the welded-joint configuration. Fastener Joints - Structural joints designed as slip critical shall be labeled as slip critical on drawings. All other structural joints shall be labeled, and the required tensioning methods provided. All members required for fabrication shall be shown on drawings and shall be labeled to correspond with the Bill of Materials.
Structural drawings shall be provided for the following as a minimum:
1. Crane frame
2. Boom and trolley girder
3. Boom hinge
4. Boom latch
5. Trolley rail support at boom hinge
6. Forestay and backstay system
7. Gantry equalizers and trucks
8. Machinery house layout, foundation and support for all components
9. Counterweight or ballast
10. Walkway and ladder fabrication
11. Stowage pin
12. Lifting lugs
13. Trolley frame
14. Operators cab
15. Operator vision drawing
16. Quay layout including Crane interface systems layout
17. Crane stops
18. Crane transport and offload, including bracing
27 109
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2.3.6 Electrical Drawings (CDRL A004). The drawings shall at a minimum include:_________________________________________
1. Complete schematic diagram with narrative of any special description of operation. All components shown on schematics shall have labels that correspond to the nameplates that will be on the Cranes. Wiring type, size, and temperature ratings shall be included on schematic diagrams. All optional equipment not installed on the Crane shall be removed from the schematic diagrams. Locations of contacts and coils shall be cross-referenced to each other within the schematic diagrams. For components with adjustable settings, final settings shall be shown on the schematics.
2. Motor nameplate data (including all information called for in NFPA 70, Section 430.7(A) items 1 through 7)
3. Rating and types of over-current protective devices
4. Complete assembly (wiring) diagrams including a component material list showing all electrical components used on the Crane. These drawings shall show the layout of electrical equipment on the Crane, including control panel enclosures, motors, brakes, limit switches, conduits, and conductor systems.
5. Power demand, power factor and harmonics data
6. List of used symbols and designations
7. Grounding system, earthing system and lightning (SPD) protection including location of air terminals
8. Communication drawing of the Programmable Logic Control (PLC) system and the Crane Management System (CMS)
9. Electrical/PLC room layout diagrams.
10. Panel layout diagrams.
11. One-line diagram with circuit breaker sizing
12. Circuit diagram
13. Medium Voltage (MV) equipment arrangement with grounding switch
14. MV panel wiring diagram, MV & control
15. MV key interlock diagram
16. Drive and auxiliary transformer primary and secondary overcurrent protection
17. Drive and auxiliary transformer secondary short circuit and ground detection protection
18. Motor details including torque curves
19. Location and mounting of limit switches, encoders, and devices
20. Conduit & cable trays including routing, underfloor and external to machinery house
21. Layouts of all junction boxes
22. Floodlight illumination and arrangement, circuit segregation
23. Walkway lighting illumination and arrangement, emergency power light arrangement
24. Camera arrangement and layout of CCTV equipment
25. Anti-collision sensor arrangements and sensor details
26. FAA lights
27. Spare parts list, drives, motors, circuit breakers/fuses, controls, communications, PLC
C.2.3.7 Mechanical Drawings (CDRL A004). The drawings at a minimum shall include:_________________________________________
1. Drive arrangements (including assembled components)
2. Reeving diagram for hoists and trolley, including catenaries
3. Travel trucks arrangements
4. Travel wheels dimensional and assembly including wheel material, wheel tread hardness, wheel to axle fit and assembly cross section details with the end truck frames.
5. Hydraulic systems diagram and schematic
6. Air compressor system
7. Lubrication drawing showing lubrication points
8. Jacking arrangement
9. Gear documentation
10. All drums
11. Sheave dimensional and assembly for top and equalizer sheaves including sheave material, sheave groove hardness and assembly cross section details with the structure that the assembly is mounted on.
12. Trolley assembly
13. Wheel axles
14. Shafts and pins
15. Base mounted component and coupling bolt torque values. Torque values shall be tabulated on drawing and shall consider any lubrication and/or washer types used. Torque values may be on a separate drawing that includes the mechanical arrangement and location of each bolt listed, or they may be listed on the drawing where the torqued bolts are shown.
16. Coupling and brake installation including: locations, applicable shaft engagement, and bore and key details.
17. Lubrication information showing the location of lubrication points, type of lubricant to be used, quantity required and the frequency of lubrication.
C.2.3.8 Control System and Network Drawings (CDRL A004). The drawings at a minimum shall include:_________________________________________________________
1. Network diagram must show equipment locations, names, models, and IP addresses on network communications
28 109
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
schematic for all PLC, RTU, Supervisory Controller, and Other Network-Capable Devices
2. Software block, flow, and ladder diagrams
3. Layout diagrams for all operators stations and cabs showing component placement.
C.2.3.9 Detailed Shop Drawings (CDRL A004). Drawings shall show all the information necessary for the fabrication of all parts of the____________________________________________
Cranes (except for standard commercial purchased assemblies). The drawings shall specify member size, dimensions with tolerances, surface finishes (roughness symbols), complete material designations, heat treatment, material hardness, ultimate tensile strength, welding symbols, nondestructive testing symbols, complete gear data, etc., as applicable. The drawings shall specify complete information as to the location, type, and extent of all welds. In welded joints where it is important to control shrinkage stresses and distortion, the sequence and technique of the welding process shall be shown. Post-weld heat treatment (such as stress relieving) of high strength steel parts, if employed, shall be recorded on the drawings. Provide ASTM or AISI equivalent designations for non-USA products along with hardening, annealing, or quenching requirements. If Contractor has documentation of standard NDT or weld separate from the drawing(s), the Contractor may submit this to the Government for approval in lieu of showing the requirements on the drawing(s).
C.2.3.10 Field Notification of Revision (FNR) (CDRL A006). During fabrication, erection and testing, the Contractor shall maintain two___________________________________________________________ sets of prints that shall be marked to show modifications required on the drawings so that they accurately reflect the actual condition of the Crane at the time the Crane is offered for acceptance. Each modification shall be documented in an FNR report. The FNR shall list the drawing number, the department issuing the FNR, name and signature of the Contractor representative authorizing the FNR, date, Crane number, a sequential FNR number, reason for the FNR, and a description of the change. Attached to the FNR shall be the marked-up drawing or a copy of the affected area of the drawing with the changes noted. All FNRs must be submitted to the Government.
C.2.4 Product Data (CDRL A007). Manufacturers catalog data shall be provided for all purchased components of the Cranes…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .