Attachment 0016 - Structural Drawings.pdf
PDF 33 MB Posted
- Attached to
- Ship-To-Shore Container Cranes
- Solicitation number
- W56HZV-20-R-0025
About this file
This document outlines a federal solicitation for two ship-to-shore container cranes. The U.S. Army Contracting Command - Detroit Arsenal has released solicitation number W56HZV-20-R-0025 seeking a single-award firm fixed price contract for two container cranes to be delivered to the Military Ocean Terminal Concord in California within 36 months of award. The cranes must be equipped with spreaders capable of lifting single and twin twenty-foot containers as well as single forty-foot and forty-five foot containers, and able to service a Panamax vessel with thirteen containers abeam. Offerors must acknowledge any amendments to the solicitation. All questions must be submitted in writing to the identified contracting specialist by the response date.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VACANT 1 2 3 ASCE61 ASCE61
D 1.2 1.2 0.9 1.0 + K 1.0 - K
L
1.6*
1 0 0.1 -
B 1.2 1.2 0.9
Be 0 0 0 - -
C 1.2 1.2 0.9 - -
Cs 0 0 0 - -
E 1.6 0 1.6 1.0 1.0
EQ 0 0 0 1.0 1.0
W 0 1.6 1.6 - -
Ws 0 0 0 - -
RST 1.2 0 0 - -
BERTHING 1 2
D 1.2 1.2
L
1.6*
B 1.2 1.2
Be 1.6 1
C 1.2 1.2
Cs 0 0
E 1.6 0
EQ 0 0
W 0 1.6
Ws 0 0
RST 1.2 0
MOORING 1 2 3
D 1.2 1.2 0.9
L
1.6*
1 0
B 1.2 1.2 0.9
Be 0 0 0
C 1.2 1.2 0.9
Cs 1.2 1.2 0.9
E 1.6 0 1.6
EQ 0 0 0
W 0 1.6 1.6
Ws 0 1.6 1.6
RST 1.2 0 0
DESIGN EARTHQUAKE LEVEL 1 2
PROBABILITY OF EXCEEDANCE IN 50 YRS 50% 10%
RETURN PERIOD 72yrs 475yrs
DAMPING 5% 5%
PEAK GROUND ACCELERATION (PGA) 0.276g 0.590g
STRUCTURAL NOTES AND DESIGN CRITERIA
(PIER AND WEST TRESTLE ONLY, UON)
GENERAL STRUCTURAL NOTES
1. THESE NOTES CONTAIN GENERAL INFORMATION AND ARE NOT COMPLETE FOR CONSTRUCTION
PURPOSES. CONTRACTOR SHALL VERIFY INFORMATION GIVEN HERE WITH SPECIFICATIONS AND OTHER DOCUMENTS AND BRING ANY CONFLICTS TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE
BEGINNING WORK. THE CONTRACTING OFFICER WILL RESOLVE ANY SUCH CONFLICT.
2. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION: WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE CONTRACTING OFFICER.
3. FIELD VERIFY ALL FEATURES, DIMENSIONS, AND ELEVATIONS PRIOR TO FABRICATION OF ASSEMBLIES OR CONSTRUCTION. SEE THE CONTRACT DRAWINGS FOR THE SIZE AND LOCATION OF ALL OPENINGS, VERIFYING SIZE AND LOCATION OF ALL ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION OPENINGS WITH THE RESPECTIVE SUBCONTRACTOR, AS WELL AS COORDINATING ALL ATTACHMENTS FOR THE USE OF OTHER TRADES. THE CONDITIONS SHOWN ON THESE DRAWINGS ARE BASED ON AVAILABLE EXISTING DATA. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES
BEFORE BEGINNING THE AFFECTED WORK.
4. LINES AND GRADES: ELEVATION DATUM AND CONSTRUCTION BASELINE SHALL BE ESTABLISHED AND
MAINTAINED BY THE CONTRACTOR.
5. ALL SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO
FABRICATION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE WORK.
7. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ONLY ON SHOP DRAWINGS
SHALL NOT SATISFY THIS REQUIREMENT.
8. ALL STRUCTURAL SYSTEMS THAT ARE TO BE COMPOSED OF COMPONENTS TO BE FIELD ERECTED SHALL BE SUPERVISED BY THE MANUFACTURER DURING MANUFACTURING. DELIVERY, HANDLING, STORAGE AND ERECTION OF COMPONENTS SHALL BE ERECTED IN ACCORDANCE WITH INSTRUCTIONS PREPARED BY THE
MANUFACTURER.
9. CONTRACTOR SHALL TEMPORARILY BRACE INCOMPLETE PARTS OF THE STRUCTURE UNTIL SUCH TIME AS
EACH ELEMENT AS A WHOLE IS COMPLETE.
10. SHOP DRAWING REVIEW: DIMENSIONS AND QUANTITIES ARE NOT REVIEWED BY THE CONTRACTING OFFICER. THESE ITEMS SHALL FIRST BE VERIFIED, REVIEWED, AND STAMPED AS "APPROVED" BY THE CONTRACTOR PRIOR TO DELIVERY TO THE CONTRACTING OFFICER. THE CONTRACTOR SHALL REVIEW
DRAWINGS FOR CONFORMANCE WITH THE MEANS, METHODS, TECHNIQUES, SEQUENCES AND
OPERATIONS OF CONSTRUCTION, AND ALL SAFETY PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO.
PROJECT SURVEY CONTROL
1. PROJECT DATUM AND SURVEY CONTROL: REFER TO SHEET G-102. ALL SURVEYING AND STAKING
REQUIRED DURING CONSTRUCTION SHALL BE PERFORMED BY CONTRACTOR.
MATERIAL SPECIFICATIONS
1. STRUCTURAL AND MISCELLANEOUS STEEL
A. MATERIALS
a. WIDE FLANGE / WT SHAPES: ......................... ASTM A 992, GR 50
b. SHAPES, PLATES AND BARS: ........................ ASTM A 572, GR 50, UON
c. ANGLES AND CHANNELS:............................... ASTM A 36, UON
d. HOLLOW STRUCTURAL SECTIONS (HSS): ... ASTM A 500, GR B OR ASTM A 1085
e. PIPES: .............................................................. ASTM A 53, GR B
f. GRATING: ......................................................... SEE SPECIFICATIONS
g. BOLTS: ............................................................. ASTM A 307 TYP
h. RAIL CLIP BOLTS:............................................ ASTM A 325 N
i. ANCHOR BOLTS AND THREADED RODS: ..... ASTM F 1554, GRADE 36 TYPICAL, GRADE 55
AND 105 WHERE INDICATED.
j. NUTS: ................................................................ HEAVY HEX, ASTM A 563, GRADE SUITABLE FOR THE TYPE OF ROD
OR BOLT. PROVIDE DOUBLE NUTS OR A
HEAVY HEX NUT AND LOCK NUT ON NOTED
BOLTS FOR STEEL CONNECTIONS.
k. WASHERS: ....................................................... ASTM F 844 WIDE SERIES, MAXIMUM
THICKNESS FOR TYPICAL BOLTS AND
GRADE 36 ANCHOR RODS, ASTM F 436
FOR GRADE 105 ANCHOR RODS
l. HEADED ANCHOR STUDS: .............................. ASTM A 108, GRADE 1010 THROUGH 1020 MINIMUM.
m. SHACKLES: ....................................................... FED SPEC RR-C-271 SAFETY CHAIN SHACKLES
B. ALL STRUCTURAL AND MISCELLANEOUS STEEL, INCLUDING ALL FASTENERS SHALL BE HOT-DIP
GALVANIZED WITH THE EXCEPTION OF ALUMINUM AND STAINLESS STEEL
C. GALVANIZE ITEMS AFTER FABRICATION. GALVANIZING DAMAGED ACCIDENTALLY OR DUE TO
FIELD WELDING SHALL BE RESTORED WITH FIELD-APPLIED GALVANIZING COMPOUND.
D. PROVIDE 1/2" BLEED HOLES IN EMBEDDED PLATES AND SHAPES AT 2 FEET ON CENTER MAXIMUM.
2. STAINLESS STEEL
A. PLATE, SHEET AND STRIPS: ASTM A 240 OR A 793 TYPE 316 L
B. SHAPES AND BARS: ASTM A 276 TYPE 316 L
C. BOLTS AND NUTS: ASTM F 593 OR ASTM F 594, GROUP 2 (316 ALLOY)
D. WASHERS: ASTM F 844, EXCEPT FABRICATE WASHERS OF 316 ALLOY
3. STRUCTURAL CONCRETE REINFORCEMENT
A. MATERIALS
a. REINFORCING STEEL: ASTM A 615, GRADE 60 UON
b. PILE TO DECK CONNECTION DOWELS: ASTM A 706, GRADE 80
c. HEADED REINFORCEMENT: ASTM A 970
d. PRESTRESSING STRANDS: ASTM A 416, GRADE 270
e. SPIRALS: ASTM A 1064
f. HIGH STRENGTH THREADED BAR: ASTM A 722, GRADE 150
* USE A 1.3 LOAD FACTOR (WITHOUT AN IMPACT FACTOR) FOR MOBILE TRUCK
CRANE OUTRIGGER LOADS.
D = DEAD LOAD
L = LIVE LOAD
B = BUOYANCY LOAD
Be = BERTHING LOAD
C = CURRENT LOAD ON STRUCTURE
Cs = CURRENT LOAD ON SHIP
E = EARTH PRESSURE LOAD
EQ = EARTHQUAKE LOAD
W = WIND LOAD ON STRUCTURE
Ws = WIND LOAD ON SHIP
R = CREEP/RIB SHORTENING
S = SHRINKAGE
T = TEMPERATURE
K = 0.5 (PGA)
LATERAL LOADS - SEISMIC
LOAD COMBINATIONS (LRFD DESIGN)
ACCELERATION RESPONSE SPECTRA
1.600
1.400
1.200
1.000
0.800
0.600
0.400
0.200
0.000
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500
PERIOD (S)
A C
C E
L E
R A
T I O
N g
DEFLECTION RESPONSE SPECTRA
PERIOD (S)
D E
F L
E C
T I O
N
I N
30.00
25.00
20.00
15.00
10.00
0.500
0.000
0.000 0.500 1.000 1.500 2.000 2.500 3.000
LEVEL 1
LEVEL 2
LEVEL 1
LEVEL 2
3.500 4.000 4.500
3. STRUCTURAL CONCRETE REINFORCEMENT (CONTINUED)
B. REINFORCING STEEL PLACEMENT
a. SPLICING OF LONGITUDINAL REINFORCEMENT OVER 40 FEET IN LENGTH, (EXCEPT AS
SPECIFICALLY NOTED ON THE DRAWINGS) WILL BE PERMITTED. SPLICES SHALL BE
STAGGERED WITH NO MORE THAN 50% OF THE BARS BEING SPLICED AT ANY ONE LOCATION.
b. PROVIDE CORNER BARS AT ALL WALL, CURB, AND CURB WALL CORNERS. CORNER BARS
SHALL MATCH THE NUMBER/SPACING AND DIAMETER OF ALL HORIZONTAL REINFORCEMENT
AT THE CORNER. TERMINATED STRAIGHT BARS SHALL EXTEND FULL AVAILABLE LENGTH INTO
ADJOINING MEMBERS. SPLICE CORNER BAR TO TERMINATED STRAIGHT BAR WITH A MINIMUM
SPLICE LENGTH OF 60 BAR DIAMETERS.
4. CAST-IN-PLACE MARINE CONCRETE
A. MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 5000 PSI UON.
B. MINIMUM COVER FOR REINFORCING STEEL: 3", UON.
C. ALL EXPOSED CORNERS SHALL BE CHAMFERED 3/4 INCH.
D. CONSTRUCTION JOINTS SHALL BE PROVIDED ONLY AS NOTED ON THE DRAWINGS OR AS
SPECIFICALLY PERMITTED BY THE CONTRACTING OFFICER.
E. UNLESS OTHERWISE NOTED, ALL CONSTRUCTION JOINTS SHALL BE CLEANED OF SURFACE
LAITANCE , CURING COMPOUND, AND OTHER FOREIGN MATERIALS BEFORE PLACING FRESH
CONCRETE AGAINST THE SURFACE OF THE JOINT. ABRASIVE BLAST METHODS SHALL BE
USED TO CLEAN CONSTRUCTION JOINTS TO THE EXTENT THAT CLEAN AGGREGATE IS
EXPOSED. BLASTING ABRASIVE SHALL BE CONTAINED. ALL CONSTRUCTION JOINTS SHALL BE
FLUSHED WITH WATER AND ALLOWED TO DRY TO A SURFACE DRY CONDITION PRIOR TO
PLACING CONCRETE.
5. PRESTRESSED CONCRETE OCTAGONAL PILES, SEE SHEET S-501 FOR PILE NOTES.
6. PRESTRESSED CONCRETE FENDER PILES
A. THE FENDER PILES SHALL BE REMOVED FROM THE EXISTING PIER AND SALVAGED FOR RE-USE.
USE THE INFORMATION ON S-536 TO FABRICATE ADDITIONAL OR REPLACEMENT PILES.
7. PRECAST, PRESTRESSED CONCRETE VOIDED SLAB AND BEAMS.
A. PRESTRESSED PRECAST SLAB BEAMS FOR WEST TRESTLE SHALL COMPLY WITH THE DESIGN
GUIDELINES NOTED ON S-560 TO S-563.
B. PRESTRESSED PRECAST SLAB BEAMS FOR EAST TRESTLE RAMP SHALL COMPLY WITH THE
DESIGN GUIDELINES NOTED ON SR505 TO SR509.
8. GROUT
A. GROUT FOR DRILLED AND BONDED STEEL DOWELS IN PRECAST CONCRETE AND
CAST-IN-PLACE CONCRETE AND FOR FILLING MOORING FITTING COUNTERSINK AT ANCHOR
BOLTS SHALL BE EPOXY RESIN GROUT OR APPROVED EQUAL.
B. GROUT FOR PILE DOWELS SHALL BE AS INDICATED ON S-502.
C. ALL OTHER GROUT SHALL BE A CEMENTITIOUS MATERIAL IN ACCORDANCE WITH
ASTM C 1107 AND USACE CRD-C621, AND SHALL DEVELOP A MINIMUM COMPRESSIVE
STRENGTH OF 5000 PSI IN 5 DAYS AND 6000 PSI IN 28 DAYS.
9. FIBER REINFORCED POLYMER COMPOSITE (FRP) FOR EAST TRESTLE REHAB
A. COMPOSITE MATERIAL MINIMUM DESIGN PROPERTIES:
a. ULTIMATE TENSILE STRENGTH IN PRIMARY FIBER DIRECTION: ................................................. ASTM D 3039, f' fu
= 143 KSI
b. TENSILE MODULUS: .............................................. ASTM D 3039, E f
= 13.9 x 106 PSI
c. ELONGATION AT BREAK: ...................................... ASTM D 3039, ε fu
= 0.01
d. NOMINAL THICKNESS: .......................................... t f
= 0.04 IN
B. PLACEMENT:
SEE SHEETS SR502 AND SR503 FOR SPECIFIC FRP REINFORCEMENT INSTALLATION
LOCATIONS AND NOTES.
PLANES AND DATUM
SEE SHEET G-102.
CURRENT LOADS
CURRENT VELOCITY ALONG FACE OF PIER
EBB ............................................................................... 1.5 KNOTS FLOOD .......................................................................... 1.0 KNOTS
WIND LOADS
WIND VELOCITY .......................................................... 110 MPH
FOR VACANT BERTH
WIND VELOCITY .......................................................... 30 KNOTS (30 SECOND DURATION) WITH MOORED
VESSEL
WAVE FORCES
STORM WAVE Hs ............................................... 2.3 FT (100 YEAR RETURN PERIOD)
OPERATING CONDITION Hs ................................ 1.8 FT
DESIGN DREDGE DEPTH
BERTH DESIGN DREDGE ELEVATION INCLUDING OVERDREDGE ....... -40.00 FT MLLW
A
B
C
R E
P L
A C
E U
P G
R A
D E
P
I E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
P I E
R
G
E N
E R
A L
S
T R
U C
T U
R A
L
N
O T
E S
NOTE:
THESE NOTES AND ABBREVIATIONS
SUPPLEMENT THOSE ON SHEETS
G-005 AND G-006.
I. SERVICE LOAD DESIGN
THE SERVICE LOAD DESIGN APPROACH IS USED FOR DESIGNING AND CHECKING
FOUNDATION STABILITY AND LONG-TERM LOADING. MOORING HARDWARE SHALL BE
DESIGNED USING SERVICE LOAD PROCEDURES.
J. TEMPERATURE
THERMAL STRESSES IN STRUCTURAL ELEMENTS ARE DESIGNED BASED ON A CHANGE IN
TEMPERATURE RANGE OF 60°F.
G.
H.
MOORING LINE FORCES
BERTHING LOADS:
MOORING LOADS:
MOORING ANALYSIS CALCULATED BASED ON DESIGN WIND
SPEED OF 30 KNOTS (30-SECOND DURATION WITH 25 YEAR
RETURN PERIOD).
F. LOADS APPLIED DURING CONSTRUCTION
THE FOLLOWING LOADS ARE APPLIED TO THE STRUCTURE DURING CONSTRUCTION
AND MAY BE MORE CRITICAL THAN THE WORKING LOADS GIVEN IN ITEMS D AND E ABOVE.
a. CONCRETE TRUCK (MAIN PLATFORM AND WEST TRESTLE):
b. A 15% IMPACT FACTOR SHALL BE APPLIED TO ALL WHEEL LOADS.
a. BERTHING DESIGN FOR SHIPS IN COMPLIANCE WITH SECTION "5-2 BERTHING ENERGY
DETERMINATION" OF UFC 4-152-01 UNDER MODERATE CONDITIONS.
b. BERTHING VELOCITY FOR ALL BARGES SHALL NOT EXCEED 0.34FT/S.
GROUP 1
(up to 18,000 DWT)
USNS KISKA (T-AE 35)
AMERICAN TERN (T-AK 4729)
OCEAN FREEDOM
GEM STATE
GRAND CANYON STATE
GREEN POINT
KEYSTONE STATE
MAERSK ARIZONA
NOBLE STAR (T-AK 9653)
OCEAN GIANT
ERIC GIBSON
COASTAL VENTURE
SEA TAC 286 (BARGE)
NAKNEK TRADER (BARGE)
ITB SAMSON MARINER (BARGE)
THUNDER AND LIGHTNING (BARGE)
c. DESIGN VESSELS
GROUP 2
(Between 18,001 and 28,000 DWT)
OCEAN GIANT
BBC SEATTLE
ERIC GIBSON
HARRIETTE
ADVANTAGE
GLOBAL PATRIOT (T-AK 9881)
CAPE ORLANDO (T-AKR 2044)
MAERSK CONSTELLATION (T-AK 9656)
MAERSK ILLINOIS
MAJOR BERNARD FISHER
NOBLE STAR
JOHN A CHAPMAN
GROUP 3
(Between 28,001 and 53,000 DWT)
BAHRAIN
BROOKLIN BRIDGE
BLACK EAGLE (T-AK 4638)
CAPE FAREWELL (T-AK 5073)
CAPE FLATTERY (T-AK 5070)
CPT STEVEN BENNETT (T-AK 4296)
CAPE HENRY (T-AKR 5067)
MAERSK ALASKA
OCEAN RANGER
a. THE MAXIMUM BOLLARD CAPACITY (P = 100 TON) WAS USED TO DESIGN THE
ANCHORAGE OF THE BOLLARDS.
b. BOLLARD LOAD CONFIGURATIONS ARE AS FOLLOWS:
STRUCTURAL NOTES AND DESIGN CRITERIA
(PIER AND WEST TRESTLE ONLY, UON)
CODES AND STANDARDS
1. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO),
"AASHTO LRFD BRIDGE DESIGN SPECIFICATION", 6TH EDITION
2. UNIFIED FACILITIES CRITERIA (UFC) 1-200-01, "GENERAL BUILDING REQUIREMENTS", DATED JULY
2013.
3. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7-10, "MINIMUM DESIGN LOADS FOR
BUILDINGS AND OTHER STRUCTURES", 2010 FOR WIND LOADS ON STRUCTURE.
4. ASCE 61-14 FOR SEISMIC DESIGN CRITERIA.
5. INTERNATIONAL BUILDING CODE (IBC) 2012 FOR WIND LOADS ON STRUCTURE.
6. UFC 3-301-01, "STRUCTURAL ENGINEERING", 2013.
7. UFC 4-151-10, "GENERAL CRITERIA FOR WATRFRONT CONSTRUCTION", 2001.
8. UFC 4-152-01, "DESIGN: PIERS AND WHARVES", 2005.
9. UFC 4-159-03, "DESIGN: MOORINGS", DATED OCTOBER 3, 2005.
10. AMERICAN CONCRETE INSTITUTE (ACI) 318-11, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE", 2011. FOR NON-SEISMIC CONCRETE DESIGN CRITERIA.
11. ACI 301-10, "SPECIFICATIONS FOR STRUCTURAL CONCRETE", 2010.
12. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), "MANUAL OF STEEL CONSTRUCTION, FOURTEENTH EDITION. FOR NON-SEISMIC STEEL DESIGN CRITERIA.
13. AMERICAN WELDING SOCIETY (AWS), AWS D1.1, "STRUCTURAL WELDING CODE - STEEL", 2010.
14. AWS D1.4 "STRUCTURAL WELDING CODE - REINFORCING STEEL", 2005.
15. AWS D1.6, "STRUCTURAL WELDING CODE - STAINLESS STEEL", 2007.
DESIGN LOADS
A. DEAD LOADS
DEAD LOADS ARE THE SELF-WEIGHT OF THE ENTIRE STRUCTURE, INCLUDING ALL THE PERMANENT
ATTACHMENTS. CONCRETE UNIT WEIGHT IS 150 PCF. A UNIFORM LOAD OF 20 PSF WILL BE USED
FOR WEIGHT OF UTILITIES.
B. UNIFORM LIVE LOAD
1. UNIFORM LIVE LOAD ON MAIN PIER STRUCTURE IS 600 PSF, EXCEPT FOR PEDESTRIAN AREAS AT
THE OPERATIONS BUILDING.
2. WHEN COMBINED WITH CRANE LOADING, THE UNIFORM LIVE LOAD ON THE MAIN PIER STRUCTURE
IS 300 PSF WITH NO UNIFORM LOADING WITHIN 5 FT OF EITHER SIDE OF THE CRANE RAILS.
3. UNIFORM LIVE LOAD FOR THE DESIGN OF THE PILES IS REDUCED BY 20%.
C. TRUCK LOADING
AASHTO HL-93 LOADING OVER ENTIRE STRUCTURE.
D. CONTAINER CRANE LOADS
THE CRANE WHEEL LOADS ARE PROVIDED BY LIFTECH CONSULTANTS INC. REPORT, PROJECT NO.
2074, DATED DECEMBER 30, 2014.
1. CRANE RAIL VERTICAL WHEEL LOAD:
2. CRANE RAIL LATERAL LOADS:
1.5 KIPS/FT (FACTORED); 1.2 KIPS/FT (SERVICE) - OPERATING CONDITION.
3.5 KIPS/FT (FACTORED); 2.1 KIPS/FT (SERVICE) - STOWED CONDITION.
CONTAINER CRANE LOADS (cont)
3. CRANE STOWAGE PIN:
LANDSIDE: DESIGNED FOR 242 KIPS (FACTORED); 145 KIPS (SERVICE)
WATERSIDE: DESIGNED FOR 229 KIPS (FACTORED); 137 KIPS (SERVICE)
NOTE:
THE WORST CASE LOAD WAS USED FOR DESIGNING THE CRANE STOWAGE PIN AT BOTH
WATERSIDE AND LANDSIDE LOCATIONS.
4. CRANE STOP LOADS:
APPLIED AT 5.0 FEET ABOVE THE TOP OF THE RAIL, IN A DIRECTION PARALLEL TO THE RAIL
LANDSIDE: DESIGNED TO RESIST AN IMPACT LOAD OF 830 KIPS (FACTORED); 700 KIPS
(SERVICE) LOAD
WATERSIDE: DESIGNED TO RESIST AN IMPACT LOAD OF 590 KIPS (FACTORED); 490 KIPS
(SERVICE) LOAD
NOTE:
THE WORST CASE LOAD WAS USED FOR DESIGNING THE CRANE STOP AT BOTH WATERSIDE AND
LANDSIDE LOCATIONS.
E. VEHICLE LOADS: (MAIN PLATFORM AND WEST TRESTLE - UON)
a. CONTAINER LIFT TRUCK:
MAIN PLATFORM DESIGN AXLE LOADS ARE INDICATED FOR EACH AXLE. WEST TRESTLE DESIGN
AXLE LOADS ARE SHOWN IN PARENTHESIS, TYPICAL.
b. AASHTO HL-93 TRUCK:
c. TJ5000 BOMB CART:
d. 90 TON MOBILE TRUCK CRANE:
e. A 15% IMPACT FACTOR SHALL BE APPLIED TO ALL WHEEL LOADS
f. FORKLIFT:
SPACING
@ 5 FT @ 5 FT
SPACING
C
CRANE TRUCK
L L
C
L
C
L
C
46'-10"
40'-0" 40'-0"
CRANE WHEELS SPACING CRANE LOAD DISTRIBUTION
WATERSIDE
LANDSIDE
L
W
46'-10"
OPERATING WIND SPEED: 55.0 MPH
STOWED WIND SPEED: 110.0 MPH
CRANE TRUCK
CRANE TRUCK CRANE TRUCK
W
WATERSIDE LANDSIDE
39 KLF
TABLE T-1
L
UNIFORMLY DISTRIBUTED
CRANE WHEEL LOADS
NORMAL OPERATING
(SERVICE LOADS)
30 KLF 31 KLF
38 KLF
STOWED
(SERVICE LOADS)
28 KLF 39 KLF
NORMAL OPERATING
(FACTORED LOADS)
STOWED
(FACTORED LOADS)
LOAD CASE
40 KLF
52 KLF
19'-9"
66.4K
195.0K
(65.7K)
(83.3K)
MAIN PLATFORM ONLY (LOADED)
WEST TRESTLE (UNLOADED)
14'-0"
8K 32K
14'-0" TO 30'-0"
32K
9'-8"
32'-0" 4'-0"
13.2K 30K 25K 25K
13' TO 19'
48K
4' TO
5.5'
48K
20K
4' TO
5.5'
20K
18' TO 27'
T
O
CRANE OUTRIGGER
FLOAT: 160K MAX
LOAD
TRAVELING AXLE
LOADS
OPERATING LOADS AT MAIN PLATFORM ONLY
(NO OUTRIGGERS ON VAULT COVERS)
7'-4 1/2"
3.8K
31.7K
(12.0K) (8.0K)
LOADED
(UNLOADED)
20'-0" 4'-0"
14K
25K
25K
P
FACE OF
PIER
C
L RAIL
P
P
30° MAX
C
L OF 100 TON BOLLARD
C
L RAIL
PIER
DECK
135°
d. THE FENDER SYSTEM WAS DESIGNED FOR THE VESSELS LISTED ABOVE WITH VERTICAL HULL
PROFILES ONLY. SPECIAL PROVISIONS WILL BE NECESSARY FOR NON-CONFORMING VESSELS.
A
B
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
S T
R U
C T
U R
S
I G
N
C
R I T
E R
D D
D b d b d
6d (3'' MIN) b b
BAR
SIZE
D 1 1/2''
#3
2''
#4
2 1/2''
#5
4 1/2''
#6
5 1/4''
#7 #8
6''
6d (3'' MIN)
90° HOOK 135° HOOK
d
4d OR 2 1/2'' MIN
D
D
D d
D=6d FOR #3 THRU #8
D=8d FOR #9 THRU #11 b b b b d b d b
NOTES:
b
D
90° HOOK
180° HOOK
45° BEND
ABBREVIATIONS AND SYMBOLS
AB ANCHOR BOLT
ABUT ABUTMENT
ACP ASPHALTIC CONCRETE PAVING
ADDL ADDITIONAL
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
APPROX APPROXIMATE
ARCH'L ARCHITECTURAL
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BC BEGIN CURVE
BLDG BUILDING
BM BEAM
BOT BOTTOM
BTWN BETWEEN
C CENTERLINE
CCS CLOSED CORROSION SPALL
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
GROOVE WELD
CLR CLEAR
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
CONST CONSTRUCTION
CP CATHODIC PROTECTION
BAR DIAMETER
D MINIMUM BM DEPTH MEASURED
FROM TOP OF CONC ELEVATION
DIA, Ø DIAMETER
DWG DRAWING
DWT DEAD WEIGHT TONNAGE (TONS)
E EXISTING
EA EACH
EC END CURVE
EF EACH FACE
EL ELEVATION
ELEC ELECTRICAL
EMB EMBEDMENT
EQ EQUAL, EQUALLY
EXP JT EXPANSION JOINT
f'c COMPRESSIVE STRENGTH
FED FEDERAL
FH FIRE HYDRANT
FG FINISH GRADE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYMER
COMPOSITE
FT FEET
GA GAUGE
GALV GALVANIZED
GOVT GOVERNMENT
GR GRADE
HH HANDHOLE
HDPE HIGH DENSITY POLYETHYLENE
H HORIZONTAL
HSS HOLLOW STRUCTURAL SECTION
ID INSIDE DIAMETER
INFO INFORMATION
INV INVERT
J-BOX JUNCTION BOX
JT JOINT
K KIP (1000 LBS)
KLF KIPS (1000 LBS) PER LINEAL FOOT
L STEEL ANGLE
LB(S) POUND(S)
LLH LONG LEG HORIZONTAL
LRFD LOAD RESISTANCE FACTOR
DESIGN
MAINT MAINTENANCE
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MLLW MEAN LOWER LOW WATER
MPH MILES PER HOUR
OC ON CENTER
OCS OPEN CORROSION SPALL
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
P PLATE
P/C PRECAST
PGA PEAK GROUND ACCELERATION
PCF POUNDS PER CUBIC FOOT
PS, P/S PRESTRESSED
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
REINF REINFORCEMENT
REF REFERENCE
REQ'D REQUIRED
SCHED SCHEDULE
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SPA SPACES
SPEC SPECIFICATION
SS STAINLESS STEEL
STA STATION
STAGG STAGGERED
STD STANDARD
STIFF STIFFENER
STL STEEL
STIR STIRRUP
SWHV STORM WATER FILTER VAULT
SYMM SYMMETRIC
SYS SYSTEM
TEMP TEMPORARY
TG TOP OF GRADE
TN SHORT TON = 2000 LBS
TOC TOP OF CURB
TOR TOP OF RAIL
TYP TYPICAL
T&B TOP AND BOTTOM
UHMW ULTRA-HIGH MOLECULAR WEIGHT
UON UNLESS OTHERWISE NOTED
USACE U.S. ARMY CORPS OF ENGINEERS
W/ WITH
W/O WITHOUT
WP WORK POINT
W BEAM WIDTH, W-SHAPE STEEL
SECTION
YRS YEARS
# NUMBER
d b =
DIAMETER OF BAR
L
L
A
B
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
2" CLEAR MIN BTWN
PARALLEL BARS IN
UPPER AND LOWER
LEVELS, TYP
ADDL TEMPERATURE AND
SHRINKAGE REINF #4 @ 18" OC
MAX EA WAY
DECK SLAB
PER PLAN
DECK REINF
PER PLAN
3"
CLR
LAP SEE SCHED
ON SHEET S-004
STD 90°
HOOK
REINF
PER PLAN
NOTE:
FOR LAP SCHED
SEE
ADDL #5x4'-0" T&B, DIAGONAL REBARS
PIPE
PENETRATION < 12" Ø
ADDL #9x9'-0" T&B
3"
CLR
E
Q
E
Q
3"
CLR
NOTE:
ADD #4 TEMPERATURE AND
SHRINKAGE REINF WHERE COVER
OVER MAIN DECK REINF EXCEEDS
4 INCHES, TYP
PIPE, SEE MECH
1" CLEAR AROUND PIPE UON.
COORDINATE SLEEVE DIA W/
MECH DWGS PRIOR TO
FABRICATION
TOP OF
CONC
1/2" SS
PLATE
STD WEIGHT SS
PIPE SLEEVE
1/4
A1
S-003
DECK SLEEVE DETAIL
SCALE: NONE
A2
S-003, S-142, S-147, S-512, S-515, S-547
TYP ADDITIONAL CRACK CONTROL REINF
SCALE: NONE
B1
S-003
TYP REINFORCING HOOKS
SCALE: NONE
B4
S-003
AT CORNERS AND INTERSECTIONS - UON
SCALE: NONE
C1
S-003
TYP STIRRUP AND HOOKS
SCALE: NONE
B3
S-003
TYP REINF AT PIPE PENETRATION IN CONC DECK
SCALE: NONE
TYP REINF FOR CAPS, BMS, AND CURBS
PLAN VIEW
C3
S-004
S L O
P E
P E
R P
L A
N S
A B
B R
E V
I A
T I O
N
Y P
I C
T
A I L
S
L A
P
S
C H
E D
O
H E
L A
P
S
H
E D
E
DECK REINF PER
FRAMING PLAN
S L
B
R
F R
A M
I N
G
P
L A
N
3" CLR
TYP
2'-0" LAP
DECK SLAB PER
FRAMING PLAN
3" CLR
TYP
A3
S-003, S-510, S-515
TYP EDGE REINFORCEMENT
SCALE: NONE
#6, SPACING
TO MATCH
DECK REINF
EQ EQ
CONC CURB AND RAILING
(WHERE OCCURS PER
DECK PLANS)
NOTE:
THESE DETAILS AND ABBREVIATIONS
APPLY TO THE PIER, WEST TRESTLE,
AND EAST TRESTLE, UON.
E Q
E Q
2"ALL
AROUND
LAP TOP BARS IN
MIDDLE 1/3 SPAN
LAP BOT BARS IN
OUTER 1/3 SPAN
LAP BOT BARS IN
OUTER 1/3 SPAN
NOTES:
1. STAGGER SPLICE LOCATIONS PER SHEET S-001
2. FOR LAP SPLICE LENGTHS, SEE
C3
S-004
SLAB, BM OR
PILE CAP
A
B
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
S-004, S-510, S-511, S-512, S-514
TYP LAP SPLICE DETAIL IN CONC BEAMS AND PILE CAPS
SCALE: NONE
S-004
DECK CONSTRUCTION JOINT
SCALE: NONE
S-004
TYP ANCHOR BOLT INSTALLATION
SCALE: NONE
S-004
CONST JOINT IN CONC BEAMS AND PILE CAPS
SCALE: NONE
S-003, S-004
BAR SPLICE SCHEDULE
SCALE: NONE
T Y
P I C
T
A I L
S
PILE, TYP
NOTE:
THESE DETAILS AND ABBREVIATIONS
APPLY TO THE PIER, WEST TRESTLE,
AND EAST TRESTLE, UON.
A2
S-102
HOUSEKEEPING PAD DETAIL
SCALE: NONE
5" MIN (VARIES)
COORDINATE W/ ARCH
AND MECH DWGS
TOP OF DECK
HOUSEKEEPING
CONC PAD
#4 @ 16" OC EA
WAY AT SLAB C
L
TOP OF PAD ELEV
PER ARCH DWGS
2"
CLR
ROUGHEN TOP OF DECK
SURFACE TO 1/4"
AMPLITUDE PRIOR TO
PLACEMENT OF CONC
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
PIER GENERAL DECK PLAN
SCALE: 1'' = 40'-0"
OPERATIONS
BUILDING
40' 0' 40' 80'
SCALE: 1''=40'
A1 S-301
SEE SHT G-102
WEST
TRESTLE
TYP
EAST
TRESTLE
S-102 S-103 S-104 S-105 S-106 S-107
P
IE
R G
E N
E R
A L
D E
C K
P
LA
N
NOTE:
MLLW EL 0.00 FT = +1.11 FT NAVD88
WP 3 WP 4
SEE SHT G-102
SEE SHT G-102
WP 2
SEE SHT G-102
WP 1
CONC
CURB
LADDER
PERLIFE RING
PER S-547
M A
TC
H
L
IN
E
S E
E S
-1
'-0
80'-0" 45'-0"25'-0"
1107'-6" TO END OF PIER
2' -6
'-0
'-0
'-0
'-0
'-0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
CRANE STOP
SEE S-520, OH
OPERATIONS
BUILDING
20'-0"
TYP
18'-6"
5'
-0
'-0
4'-0"
CRANE CABLE
TRENCH
DECK PLAN
SCALE: 1''=10'-0"
'-0
'-0
7' -0
CRANE POWER/
CABLE VAULT
'-0
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
62'-0"
FENDER
SYSTEM
PER S-531
TRENCH DRAIN
5'-0"
CORNER
FENDER
PER
FH
CONC CURB
GUARDRAIL
SWFV
NOTES:
1. DENOTES DIRECTION OF DECK
SLOPE FROM HIGH TO LOW.
2. DENOTES FIRE HYDRANT
3. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR
STORM WATER FILTER DETAILS.
4. DENOTES SCUPPER, SEE S-547
5. DENOTES TOP OF GRATE ELEVATION
6. DENOTES TOP OF RAIL ELEVATION
7. DENOTES INVERT ELEVATION
8. MLLW EL 0.00 FT = +1.11 FT NAVD88
9. DENOTES CRANE POWER CABLE
TRENCH PER S-511. COORDINATE
DIMENSIONS AND LOCATION WITH
THE CRANE MFR PRIOR TO
CONSTRUCTION.
FH
SWFV
S
TG
INV
TOR
VAULT
COVERS
EXP JT
'-0
S
S
S
S
S
SEWER BASIN AND
EJECTOR PUMP
5' -0
EL 13.50
EL 13.50
A1 S-512
WEST TRESTLE
PER S-111
PULL BOX, SEE
ELEC DWGS AND
SHT S-515, TYP
2'-6"
8'-0"
'-0
EQ EQ
A3 S-402
GROUND TEST
WELL, TYP
11'-0"
A1 S-535
EL 13.60
CRANE STOP
SEE S-520 OH
3' -8
JO
IN
T
EL 13.25 TG
EL 12.61 INV
EL 13.25 TG
EL 12.37 INV
EL 13.43
TRENCH DRAIN
P
IE
R D
E C
K P
LA
N
A
B
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
C1 S-549
LIFE RING
PER S-547
100-TON BOLLARD
PER S-517, TYP
WP 3
EL 13.58 EL 13.58
EL 13.50
EL 13.68
EL 13.68EL 13.67EL 13.67
EL 13.62
75'-0"
EL 13.50
EL 13.70
6' -6
'-6
'-0
7' -6
155'-6"
8 1/4"
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
'-0
9'-0"
A1 S-303
B1 S-303
TRENCH DRAIN
FH
LIGHT POLE AND
BASE PLATE PER
ELEC
REMOVABLE TRAFFIC
BOLLARD (5-TOTAL)
PER
DECK STRIPING
PER
'-4
17'-0"
EL 13.55
EL 13.62
EL 13.91EL 13.73EL 13.70
EL 13.70
EL 13.81 EL 13.81
EL 13.70
EL 13.55
EL 13.50
EL 13.91
EL 13.80
EL 13.50
EL 13.91
EL 13.80
EL 13.55
EL 13.70
EL 13.55
S SS S
EL 13.50
EL 13.91
(SEE ARCH'L DWGS FOR BLDG
TOPPING SLAB EL)
EL 13.55
EL 13.55
EL 13.88 EL 13.88
EL 13.68EL 13.68
EL 13.70
SAFETY BARRIER EA
SIDE (3 TOTAL ON
WEST TRESTLE) , TYP
SEE B3
S-549
C4 S-547
C4 S-547
EL 13.75
HOUSEKEEPING PAD PER
COORDINATE THE SIZE AND LOCATION
WITH ELECTRICAL AND MECHANICAL
DRAWINGS PRIOR TO CONSTRUCTION.
SEE SHEET AB101 FOR TOP OF PAD
ELEVATION.
EL 13.73
RESTRICTED
AREA SIGN,
SEE CP111
B1 S-302
22'-0"
LADDER PER
A1 S-547
A1 S-516
WP 2
FIRE ALARM
PULL STATION
PER B3
S-516
B3
CP501
VALVE BOX PER
MECH DWGS
7'-2 3/8"
FACE OF
CRANE STOP
BUMPER, TYP
GROUND TEST WELL
PER ELEC DWGS
AND TYPA3
S-516
EL 13.30
EL 13.28
CRANE RAIL
TOR EL 13.47
CRANE RAIL
TOR EL 13.47
'-0
8'-0"±
A2 S-004
A1 S-546
SIGN
CL
D R
IN
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
CONC
CURB
'-0
100-TON BOLLARD
PER S-517, TYP
20'-0"
TYP
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
FH
A1 S-302
FENDER
SYSTEM
PER S-531
A
B
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
120 V
ELEC
TRENCH
DRAIN
208 V
ELEC
COMM PW 120 V
ELEC
208 V
ELEC
SWFV
VAULT
COVERS
'-0
'-0
S S
SS
5' -0
60'-0"
TYP
EL 13.50
EL 13.50
A1 S-512
P
IE
R D
E C
K P
LA
N
6'-6"
A3 S-402
B1 S-302
GROUND TEST
WELL, TYP
EL 13.25 TG
EL 12.92 INV
EL 13.25 TG
EL 12.37 INV
TRENCH DRAINTRENCH DRAIN
EL 13.60
LIFE RING
PER S-547
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
DECK PLAN
SCALE: 1''=10'-0"
GUARDRAIL
CONC CURB
CRANE CABLE
TRENCH 18
'-0
PULL BOX, SEE
ELEC DWGS AND
SHT S-515, TYP
EL 13.30
EL 13.28
GROUND TEST WELL
PER ELEC DWGS
AND TYPA3
S-516CRANE RAIL
TOR EL 13.47
CRANE RAIL
TOR EL 13.47
PIN SOCKET
PIN SOCKET
NOTES:
1. DENOTES DIRECTION OF DECK
SLOPE FROM HIGH TO LOW.
2. DENOTES FIRE HYDRANT
3. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR
STORM WATER FILTER DETAILS.
4. DENOTES A 120 VOLT ELECTRICAL
MOUND, SEE S-548
5. DENOTES A 208 VOLT ELECTRICAL
MOUND, SEE S-548
6. DENOTES A COMMUNICATIONS
MOUND, SEE S-548
7. DENOTES A POTABLE WATER
MOUND, SEE S-548
8. DENOTES SCUPPER, SEE S-547
9. DENOTES TOP OF GRATE ELEVATION
10. DENOTES TOP OF RAIL ELEVATION
11. DENOTES INVERT ELEVATION
12. MLLW EL 0.00 FT = +1.11 FT NAVD88
13. DENOTES CRANE PIN SOCKETS PER
S-519. COORDINATE DIMENSIONS
AND LOCATION WITH THE CRANE
MFR PRIOR TO CONSTRUCTION.
14. DENOTES CRANE POWER CABLE
TRENCH PER S-511. COORDINATE
DIMENSIONS AND LOCATION WITH
THE CRANE MFR PRIOR TO
CONSTRUCTION.
FH
120 V
ELEC
208 V
ELEC
COMM
PW
SWFV
S
TG
TOR
INV
16'-0"
D R
A
CL
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
CONC
CURB
'-0
20'-0"
TYP
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
FH
60'-0"
TYP
FENDER
SYSTEM
PER S-531
A
B
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
A1 S-302
TRENCH DRAIN
SPARE
MOUND
PW 120 V
ELEC
208 V
ELEC
SPARE
MOUND
PW
SWFV
VAULT
COVERS
'-0
'-0
S
S
5' -0
EL 13.50
EL 13.50
A1 S-512
P
IE
R D
E C
K P
LA
N
A3 S-402
1'-6"
B1 S-302
GROUND TEST
WELL, TYP
EQ EQ
80'-0"
EL 13.60
EL 13.25 TG
EL 12.92 INV
EL 13.25 TG
EL 12.37 INV
TRENCH DRAINTRENCH DRAIN
NOTES:
1. DENOTES DIRECTION OF DECK
SLOPE FROM HIGH TO LOW.
2. DENOTES FIRE HYDRANT
3. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR
STORM WATER FILTER DETAILS.
4. DENOTES A 120 VOLT ELECTRICAL
MOUND, SEE S-548
5. DENOTES A 208 VOLT ELECTRICAL
MOUND, SEE S-548
6. DENOTES A COMMUNICATIONS
MOUND, SEE S-548
7. DENOTES A POTABLE WATER
MOUND, SEE S-548
8. DENOTES SCUPPER, SEE S-547
9. DENOTES TOP OF GRATE ELEVATION
10. DENOTES TOP OF RAIL ELEVATION
11. DENOTES INVERT ELEVATION
12. MLLW EL 0.00 FT = +1.11 FT NAVD88
13. DENOTES CRANE POWER CABLE
TRENCH PER S-511. COORDINATE
DIMENSIONS AND LOCATION WITH
THE CRANE MFR PRIOR TO
CONSTRUCTION.
FH
120 V
ELEC
208 V
ELEC
COMM
PW
SWFV
S
TG
INV
TOR
100-TON BOLLARD
PER S-517, TYP
LIFE RING
PER S-547
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
DECK PLAN
SCALE: 1''=10'-0"
GUARDRAIL
CONC CURB
CRANE CABLE
TRENCH
LADDER PER
'-0
PULL BOX, SEE
ELEC DWGS AND
SHT S-515, TYP
FIRE ALARM
PULL STATION
PER B3
S-516
EL 13.30
EL 13.28
GROUND TEST WELL
PER ELEC DWGS
AND TYPA3
S-516 CRANE RAIL
TOR EL 13.47
CRANE RAIL
TOR EL 13.47
LADDER
PER A1
S-547
A1 S-546
CL
D R
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
CONC
CURB
GUARDRAIL
'-0
20'-0"
TYP
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
60'-0"
TYP
CONC CURB
CRANE CABLE
TRENCH
A1 S-302
FENDER
SYSTEM
PER S-531
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
TRENCH DRAIN
SPARE
MOUND
PW120 V
ELEC
208 V
ELEC
120 V
ELEC
208 V
ELEC
'-0
'-0
S S
S S
5' -0
EL 13.50
EL 13.50
A1 S-512
P
IE
R D
E C
K P
LA
N
NOTES:
1. DENOTES DIRECTION OF DECK
SLOPE FROM HIGH TO LOW.
2. DENOTES FIRE HYDRANT
3. DENOTES A 120 VOLT ELECTRICAL
MOUND, SEE S-548
4. DENOTES A 208 VOLT ELECTRICAL
MOUND, SEE S-548
5. DENOTES A COMMUNICATIONS
MOUND, SEE S-548
6. DENOTES A POTABLE WATER
MOUND, SEE S-548
7. DENOTES SCUPPER, SEE S-547
8. DENOTES TOP OF GRATE ELEVATION
9. DENOTES TOP OF RAIL ELEVATION
10. DENOTES INVERT ELEVATION
11. MLLW EL 0.00 FT = +1.11 FT NAVD88
12. DENOTES CRANE POWER CABLE
TRENCH PER S-511. COORDINATE
DIMENSIONS AND LOCATION WITH
THE CRANE MFR PRIOR TO
CONSTRUCTION.
FH
120 V
ELEC
208 V
ELEC
COMM
PW
S
TG
TOR
INV
A3 S-402
5'-6"
FH
B1 S-302
LIFE RING
PER S-547
EL 13.60
EL 13.25 TG
EL 12.92 INV
TRENCH DRAINTRENCH DRAIN
100-TON BOLLARD
PER S-517, TYP
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
DECK PLAN
SCALE: 1''=10'-0"
'-0
PULL BOX, SEE
ELEC DWGS AND
SHT S-515, TYP
MINI POWER ZONE,
SEE ELEC DWGS
GROUND TEST WELL
PER ELEC DWGS
AND TYPA3
S-516CRANE RAIL
TOR EL 13.47
CRANE RAIL
TOR EL 13.47
D R
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
CONC
CURB
'-0
20'-0"
TYP
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
FH
60'-0"
TYP
A1 S-302
FENDER
SYSTEM
PER S-531
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
TRENCH DRAIN
SPARE
MOUND
PW 120 V
ELEC
208 V
ELEC
COMM PW
'-0
'-0
S S
SS
5' -0
EL 13.50
EL 13.50
A1 S-512
P
IE
R D
E C
K P
LA
N
A3 S-4022'-6"
TYP
B1 S-302
B1 S-302
EL 13.60EL 13.60
8'-0"
EQ EQ
EL 13.25 TG
EL 12.92 INV
TRENCH DRAIN TRENCH DRAIN
NOTES:
1. DENOTES DIRECTION OF DECK
SLOPE FROM HIGH TO LOW.
2. DENOTES FIRE HYDRANT
3. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR
STORM WATER FILTER DETAILS.
4. DENOTES A 120 VOLT ELECTRICAL
MOUND, SEE S-548
5. DENOTES A 208 VOLT ELECTRICAL
MOUND, SEE S-548
6. DENOTES A COMMUNICATIONS
MOUND, SEE S-548
7. DENOTES A POTABLE WATER
MOUND, SEE S-548
8. DENOTES SCUPPER, SEE S-547
9. DENOTES TOP OF GRATE ELEVATION
10. DENOTES TOP OF RAIL ELEVATION
11. DENOTES INVERT ELEVATION
12. MLLW EL 0.00 FT = +1.11 FT NAVD88
13. DENOTES CRANE POWER CABLE
TRENCH PER S-511. COORDINATE
DIMENSIONS AND LOCATION WITH
THE CRANE MFR PRIOR TO
CONSTRUCTION.
FH
120 V
ELEC
208 V
ELEC
COMM
PW
SWFV
S
TG
TOR
INV
100-TON BOLLARD
PER S-517, TYPLIFE RING
PER S-547
LIFE RING
PER S-547
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
DECK PLAN
SCALE: 1''=10'-0"
GUARDRAIL
CONC CURB
CRANE CABLE
TRENCH
1'-6"
FH
CRANE RAIL
TOR EL 13.47
LIFE RING
PER S-547
LADDER PER
'-0
'-0
PULL BOX, SEE
ELEC DWGS AND
SHT S-515, TYP
FIRE ALARM
PULL STATION
PER B3
S-516
SWFV
VAULT
COVERS
EL 13.25 TG
EL 12.37 INV
EL 13.30
EL 13.28
GROUND TEST WELL
PER ELEC DWGS
AND TYPA3
S-516
CRANE RAIL
TOR EL 13.47
LADDER
PER A1
S-547
A1 S-546
D R
A
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
CONC
CURB
GUARDRAIL
20'-0"
TYP
60'-0"
TYP
CONC CURB
35'-0" 15'-0"
CRANE
STOP
SEE S-520
1107'-6" TO START OF PIER
CRANE CABLE
TRENCH
A1
S-302
CORNER FENDER
PER
FENDER
SYSTEM
PER S-531
M A
T C
H
L
I N
E
S
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
2'-6"
6'-10
B1
S-302
TRENCH
DRAIN
120 V
ELEC
208 V
ELEC
VALLEY
EXP JT
S
EL 13.50
EL 13.50
A1
S-512
EL 13.50
TOP OF CONC
EAST TRESTLE
PER SR103
P I E
R
D
E C
K
P
L A
N
EXIST FENDER
SYSTEM
EXIST TIMBER
FENDER PILES
PER SR103
FH
A3
S-402
2'-6"
GROUND TEST
WELL, TYP
LIFE RING
PER S-547
LIFE RING
PER S-547
1'-0"
EL 13.60
EQ EQ
CRANE
STOP
SEE S-520
S
2'-6
JO
IN
T
PIN SOCKET
PIN SOCKET
8'-0"
B1
S-535
EL 13.25 TG
EL 12.61 INV
TRENCH DRAIN TRENCH DRAIN
NOTES:
1. DENOTES DIRECTION OF DECK
SLOPE FROM HIGH TO LOW.
2. DENOTES FIRE HYDRANT
3. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR
STORM WATER FILTER DETAILS.
3. DENOTES A 120 VOLT ELECTRICAL
MOUND, SEE S-548
4. DENOTES A 208 VOLT ELECTRICAL
MOUND, SEE S-548
5. DENOTES SCUPPER, SEE S-547
6. DENOTES TOP OF GRATE ELEVATION
7. DENOTES TOP OF RAIL ELEVATION
8. DENOTES INVERT ELEVATION
9. MLLW EL 0.00 FT = +1.11 FT NAVD88
10. DENOTES CRANE PIN SOCKETS PER
S-519. COORDINATE DIMENSIONS
AND LOCATION WITH THE CRANE
MFR PRIOR TO CONSTRUCTION.
11. DENOTES CRANE POWER CABLE
TRENCH PER S-511. COORDINATE
DIMENSIONS AND LOCATION WITH
THE CRANE MFR PRIOR TO
CONSTRUCTION.
FH
SWFV
S
TG
TOR
120 V
ELEC
208 V
ELEC
INV
EL 13.50
TOP OF CONC
100-TON BOLLARD
PER S-517, TYP
C1
S-550
WP4
5'-6
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
DECK PLAN
SCALE: 1''=10'-0"
SAFETY BARRIER EA
SIDE (2 TOTAL ON
EAST TRESTLE)
SEE
PULL BOX, SEE
ELEC DWGS AND
SHT S-515, TYP
LADDER PER
FIRE ALARM
PULL STATION
PER
B3
S-516
C4
S-550
SWFV
VAULT
COVERS
EL 13.25 TG
EL 12.37 INV
EL 13.30
EL 13.28
GROUND TEST WELL
PER ELEC DWGS
AND TYP
A3
S-516
CRANE RAIL
TOR EL 13.47
CRANE RAIL
TOR EL 13.47
FACE OF
CRANE STOP
BUMPER
2'-9 5/8"
2'-9 5/8"
FACE OF CRANE STOP
BUMPER AND END OF
CRANE CABLE TRENCH
4'-0"
LADDER
PER
A1
S-547
A1
S-546
D R
A I N
C
L
C
L
COORDINATE W/
CRANE MFR AND
ELEC
E
E
E
E
E
E
E
A
B
C
1 2 3 4
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
10' 0 10'
20'
SCALE: 1"=10'
DECK PLAN
SCALE: 1" = 10'
(ABUTMENT)
N
W
WP 1
STA 10+00
MATCH LINE STA 11+20.00 (THIS SHEET)
1. SEE SHEET S-312 FOR PROFILE.
2. MLLW EL 0.00 FT = +1.11 FT NAVD 88.
3. STATIONS SHOWN ON THIS SHEET ARE FOR
THE WEST TRESTLE ONLY.
4. SEE SHEET G-102 FOR WORK POINT
LOCATIONS.
5. GUARDRAILS AND HANDRAILS NOT SHOWN
FOR CLARITY.
6. UTILITY PIPES NOT SHOWN FOR CLARITY. SEE
TYPICAL SECTION ON SHEET S-311.
7. PROVIDE PAVEMENT STRIPING ALONG
CENTERLINE OF ROADWAY FROM STA 10+00 TO
STA 12+75 PER "DETAIL 21" ON SHEET C-506.
SEE SHEET C-401
FOR APPROACH PLAN
B1
S-311
STRUCTURE
APPROACH SLAB,
SEE SHEET S-558
FOR DETAILS
NOTES:
TYP
UON
A
B
C
1 2 3 4
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
W
H
I
R
A
D
G A
P
FOR CONTINUATION
SEE MAIN PLATFORM
SHEET S-102
WP 2
STA 12+79.08
C
S
MATCH LINE STA 11+20.00 (THIS SHEET)
N
W
C TRESTLE
L
ANGLE POINT
STA 10+34.08
OFFSET 14.00' RT
18'-0"
A1
S-311
C TRESTLE
L
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
A B C D
A B C D
FIRE HYDRANT
PLATFORM, SEE &
40'-0"
TYP UON
44'-0"
WALKWAY
CURB
EL 12.30'
EL 13.50' , TYP UON
EL 12.22'
EL 12.21'
STA 12+72.89
EL 13.50'
STA 12+76.17
EL 13.50'
ROCK SLOPE PROTECTION
SEE SHEET C-401
LIGHT POLE, TYP
FOR LOCATION
SEE SHEET E-103
C ROADWAY, SEE NOTE 7
L
C ROADWAY, SEE NOTE 7
L
EL 13.50'
EL 13.50'
T Y
P
T Y
P
STA 10+33.08
EL 13.50'
TYP UON
EL 13.50'
TOP OF
ROADWAY,
TYP UON
EL 13.50'
TOP OF
ROADWAY,
TYP UON
EL 13.42'
TOP OF GRATE,
TYP UON
DRAIN BASIN, TYP
SEE SHEET S-581
EL 14.17' TOC
EL 14.17' TOC
EL 14.17' TOC
A3
S-578
STA 12+59.39
EL 14.17' TOC
EL 14.17' TOW
EL 13.50' TOW
EL 14.17' TOC
CURB
EL 12.96' TOW
EL 12.97' TOC
EL 13.50' , TYP UON
EL 14.17' TOW
EL 13.50'
B1
S-312
B1
S-312
A1
S-579
SEE
B1
S-572
B2
S-579
DRAINAGE PATTERN SHOWN
IS TYPICAL BETWEEN BENTS &2 9
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
PIER GENERAL PILE PLAN
SCALE: 1'' = 40'-0"
40' 0' 40'
80'
SCALE: 1''=40'
A1
S-301
PILE SCHEDULE
ROW
MIN TIP EL
(MLLW)
PILE SIZE
PB.4
PC
PB.7
PE
PF
PG
PH
PJ
-75'
-85'
-85'
-85'
-75'
-75'
-75'
-75'
-75'
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
24" OCTAGONAL
NOTES:
1. MLLW EL 0.00 FT = +1.11 FT NAV88
2. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
3. FOR PILE-TO-CAP CONNECTION
DETAILS SEE S-502
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16" SQUARE
CONC FENDER PILE PER S-536
7. DENOTES 16" ADDITIONAL SQUARE
CONC FENDER PILE PER S-536
PB -75' 24" OCTAGONAL
PA -75' 24" OCTAGONAL
WEST
TRESTLE
SEE S-131
(E) EAST
TRESTLE
S-122 S-123 S-124 S-125 S-126 S-127
TYP
P I E
R
G
E N
E R
L
E
P
L A
N
PK
PF.5
-75' 24" OCTAGONAL
ULTIMATE GEOTECHNICAL
COMPRESSIVE CAPACITY
(KIPS)
PD
-85' 24" OCTAGONAL 1200
RELOCATION OF THE TEST PILES TO ALTERNATE LOCATION IS
ACCEPTABLE, SUBJECT TO CONTRACTING OFFICER'S REVIEW AND
APPROVAL. PROPOSED ALTERNATE TEST PILE LOCATIONS SHALL
NOT BE MORE THAN 35 FT AWAY FROM THE TEST PILE LOCATIONS
SHOWN IN THE PLANS AND SHALL BE WITHIN THE FOOTPRINT OF
THE PROPOSED PIER AND TRESTLE. CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL ASSOCIATED IMPACTS, INCLUDING BUT
NOT LIMITED TO COST, SCHEDULE, AND PERMITS.
8.
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
1107'-6" TO END OF PIER
155'-6"
5'-0"
20'-0"
TYP
10'-0" 10'-0"
M A
T C
H
L
I N
E
S
10'-0"
10'-0" 10'-0" 10'-0" 10'-0"
PILES @ 16'-0" OC ON LINES AND
8'-0"
TYP
10'-0"
PE PF
WEST TRESTLE
PER S-131
P I E
R
P
I L
E
P
L A
N
NOTES:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
2. FOR PILE-TO-CAP AND
PILE-TO-SLAB CONN DETAILS
SEE S-502
3. FOR PILE TIP ELEVATIONS SEE
SCHEDULE ON S-121
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16"
SQUARE CONC FENDER PILE
PER S-536
7. DENOTES ADDITIONAL 16"
SQUARE CONC FENDER PILE
PER S-536
4'-6"
16 SPA @ 8'-0" = 128'-0" LINES TO
PILE PLAN
SCALE: 1''=10'-0"
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
A1
S-303
B1
S-303
2'-6"20'-0"5'-0"
PILES @ 8'-0" OC ON LINES TO
PD PF
PILES @ 8'-0" OC ON LINE
PD
PA PC
B1
S-302
7'-0"
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
1107'-6"
A
B
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
M A
T C
H
L
I N
E
S
M A
T C
H
L
I N
E
S
20'-0"
TYP
10'-0" 10'-0"
PILES @ 8'-0" OC ON LINES TO
PD PF
P I E
R
P
I L
E
P
L A
N
NOTES:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
2. FOR PILE-TO-CAP AND
PILE-TO-SLAB CONN DETAILS
SEE S-502
3. FOR PILE TIP ELEVATIONS SEE
SCHEDULE ON S-121
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16"
SQUARE CONC FENDER PILE
PER S-536
8'-0"
TYP
7'-0"
A1
S-302
8'-6"
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
PILE PLAN
SCALE: 1''=10'-0"
B1
S-302
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
1107'-6"
A
B
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
M A
T C
H
L
I N
E
S
M A
T C
H
L
I N
E
S
20'-0"
TYP
10'-0" 10'-0"
PILES @ 8'-0" OC ON LINES TO
PD PF
P I E
R
P
I L
E
P
L A
N
NOTES:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
2. FOR PILE-TO-CAP AND
PILE-TO-SLAB CONN DETAILS
SEE S-502
3. FOR PILE TIP ELEVATIONS SEE
SCHEDULE ON S-121
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16"
SQUARE CONC FENDER PILE
PER S-536
8'-0"
TYP
7'-0" 6"
A1
S-302
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
PILE PLAN
SCALE: 1''=10'-0"
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
1107'-6"
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
M A
T C
H
L
I N
E
S
M A
T C
H
L
I N
E
S
20'-0"
TYP
10'-0" 10'-0"
8'-0"
TYP
PILES @ 8'-0" OC ON LINES TO
PD PF
P I E
R
P
I L
E
P
L A
N
NOTES:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
2. FOR PILE-TO-CAP AND
PILE-TO-SLAB CONN DETAILS
SEE S-502
3. FOR PILE TIP ELEVATIONS SEE
SCHEDULE ON S-121
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16"
SQUARE CONC FENDER PILE
PER S-536
3'-6" 3'-6"
A1
S-302
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
PILE PLAN
SCALE: 1''=10'-0"
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
1107'-6"
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
M A
T C
H
L
I N
E
S
M A
T C
H
L
I N
E
S
20'-0"
TYP
10'-0" 10'-0"
8'-0"
TYP
PILES @ 8'-0" OC ON LINES TO
PD PF
P I E
R
P
I L
E
P
L A
N
NOTES:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
2. FOR PILE-TO-CAP AND
PILE-TO-SLAB CONN DETAILS
SEE S-502
3. FOR PILE TIP ELEVATIONS SEE
SCHEDULE ON S-121
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16"
SQUARE CONC FENDER PILE
PER S-536
6" 7'-0"
7'-0"
A1
S-302
4'-6"
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
PILE PLAN
SCALE: 1''=10'-0"
B1
S-302
C
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
H V
G
M N
M
C B
S
1 2 3 4
S
C
S
C H
U L Z
E
1107'-6" TO START OF PIER
10'-0" 0'-0'' 10'-0"
20'-0"
SCALE: 1''=10'
2'-6"
6'-10
M A
T C
H
L
I N
E
S
20'-0"
TYP
10'-0" 10'-0"
8'-0"
TYP
PF.5
EAST TRESTLE
PER SR103
10'-0" 10'-0"
P I E
R
P
I L
E
P
L A
N
EXIST CONC FENDER
PILES PER SR103
EXIST TIMBER
FENDER PILES
PER SR103
20'-0"
TYP
7'-0" 4'-6"
NOTES:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS
SEE S-001 TO S-004
2. FOR PILE-TO-CAP AND
PILE-TO-SLAB CONN DETAILS
SEE S-502
3. FOR PILE TIP ELEVATIONS SEE
SCHEDULE ON S-121
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES TEST PILE
6. DENOTES SALVAGED 16"
SQUARE CONC FENDER PILE
PER S-536
7. DENOTES ADDITIONAL 16"
SQUARE CONC FENDER PILE
PER S-536
A1
S-302
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
PILE PLAN
SCALE: 1''=10'-0"
PILES @ 8'-0" OC ON LINES TO
PD PF
PILES @ 8'-0" OC ON LINE
8'-0"
A
B
C
1 2 3 4
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
PILE PLAN
SCALE: 1" = 10'
WP 1
STA 10+00
MATCH LINE STA 11+20.00 (THIS SHEET)
FOR ABUTMENT
PILE PLAN SEE
A
B
C
1 2 3 4
R E
P L
A C
E U
P G
R A
E
R
O C
T O
B E
R
W
H
I
A
D
FOR CONTINUATION
SEE MAIN PLATFORM
SHEET S-122
WP 2
STA 12+79.08
MATCH LINE STA 11+20.00 (THIS SHEET)
C TRESTLE
L
(0
1. ALL PILES ARE 24" OCTAGONAL PRECAST / PRESTRESSED
CONCRETE PILES, SEE SHEETS S-501 & S-502 FOR PILE
DETAILS.
2. THE HIGHEST ALLOWABLE PILE TIP ELEVATION SHALL BE
-70FT. THE ULTIMATE GEOTECHNICAL COMPRESSIVE PILE
CAPACITY SHALL BE 750 KIPS.
3. MLLW EL 0.00 FT = +1.11 FT NAVD 88.
4. SEE SHEET G-102 FOR WORK POINT LOCATION.
5. STATIONS SHOWN ON THIS SHEET ARE FOR THE WEST
TRESTLE ONLY.
6. PRODUCTION PILES AT ABUTMENT SHALL BE INSTALLED
AFTER SURCHARGE PERIOD IS COMPLETE, SEE SHEET C-102.
7. RELOCATION OF THE TEST PILE TO ALTERNATE LOCATION IS
ACCEPTABLE, SUBJECT TO CONTRACTING OFFICER'S REVIEW
AND APPROVAL. PROPOSED ALTERNATE TEST PILE LOCATION
SHALL NOT BE MORE THAN 35 FT AWAY FORM THE TEST PILE
LOCATION SHOWN ON THE PLAN AND SHALL BE WITHIN THE
FOOTPRINT OF THE WEST TRESTLE. CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL ASSOCIATED IMPACTS, INCLUDING
BUT NOT LIMITED TO COST, SCHEDULE AND PERMITS.
8. TEST PILE DRIVEN AT THE WEST TRESTLE ABUTMENT SHALL
BE REDRIVEN AT LEAST 6 INCHES AFTER COMPLETION OF
THE SURCHARGE PERIOD.
VERTICAL PILE
BATTERED PILE 1H:3V IN
DIRECTION OF ARROW
DENOTES TEST PILE
NOTES:
LEGEND
11'-0"
TYP
UON
5'-6"
TYP
UON
S 80°17'56" W
11'-0"
TYP
UON
5'-6"
TYP
UON
S 80°17'56" W
TYP ALL BENTS
STA 10+34.08
STA 10+69.08
STA 11+04.08
STA 11+39.08
STA 11+74.08
STA 12+09.08
STA 12+44.08
24" OCTAGONAL PILE,
TYP
8'-2" 12'-4"
4'-2"
L
10' 0 10'
20'
SCALE: 1"=10'
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
(ABUTMENT)
A B C D
A B C D
12'-4"
C TRESTLE
C1
S-405
SEE NOTES 7 & 8
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
PIER GENERAL FRAMING PLAN
SCALE: 1'' = 40'-0"
40' 0' 40' 80'
SCALE: 1''=40'
A1 S-301
NOTE:
1. FOR GENERAL NOTES, TYPICAL
DETAILS, AND ABBREVIATIONS,
SEE SHEETS S-001 TO S-004
WEST TRESTLE
SEE SHT S-151
EAST TRESTLE
SEE SR SHEETS
S-142 S-143 S-144 S-145 S-146 S-147
TYP
P
IE
R G
E N
E R
A L
FR
A
M
IN
G P
LA
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
'-0
1107'-6" TO END OF PIER
2'-6"
7' -6
'-0
'-0
'-0
'-0
'-0
2'-6"
7' -6
'-0
'-0
'-0
'-0
5' -0
WEST TRESTLE
PER S-151
5'
-0
FRAMING PLAN
SCALE: 1''=10'-0"
'-0
'-0
7' -0
155'-6"
5'-0"
NOTES:
1. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR STORM
WATER FILTER DETAILS.
2. FOR GENERAL NOTES, TYP
DETAILS, AND ABBREVIATIONS,
SEE S-001 TO S-004
3. FOR ADDITIONAL TEMPERATURE
AND SHRINKAGE REINF AT DECK
SLOPE, SEE
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES SALVAGED 16" SQ CONC
FENDER PILE PER S-536
6. DENOTES 16" SQUARE CONC
FENDER PILE PER S-536
7. CONTRACTOR SHALL COORDINATE
THE LOCATION, NUMBER AND TYPE
OF PIPE SUPPORTS WITH
MECHANICAL DRAWINGS PRIOR TO
FABRICATION.
8. CONTRACTOR SHALL COORDINATE
ALL DECK PIPE PENETRATIONS
(SIZE AND LOCATION) WITH
MECHANICAL DRAWINGS. PIPE
PENETRATIONS THROUGH BEAMS
ARE NOT ALLOWED. DECK SLEEVE
DETAIL PER
9. COORDINATE ELECTRICAL
PULLBOX AND GROUND TEST WELL
LOCATIONS WITH ELEC DWGS.
10. SEE ELECTRICAL DRAWINGS FOR
SIZE, NUMBER, AND LOCATION OF
EMBEDDED CONDUIT.
11. CONTRACTOR SHALL COORDINATE
PLACEMENT OF THE DECK
REINFORCING STEEL WITH THE
BUILDING HOLDOWNS AND COLUMN
BASE PLATE ANCHORS. THE
ANCHORS NEED TO BE SECURED IN
PLACE PRIOR TO CONCRETE
PLACEMENT.
SWFV
A2 S-003
A1 S-003
'-0
85'-0"
'-0
TRENCH
DRAIN
TYP @
BOLLARDS
'-0
A1 S-513
4'-0" D x5'-0" W CIP
CONC PILE CAP
TYP
B1 S-517
P
IE
R F
R A
M
IN
G P
LA
N
M A
TC
H
L
IN
E
S E
E S
-1
12'-0"
A1 S-401
'-0
C3 S-402
'-0
#9
" O
C T
O P
#9
" O
C B
O T
#9 @ 8" OC TOP
#9 @ 8" OC BOT
CIP CONC SLAB, TYP
THICKNESS VARIES,
2" MIN
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
8 1/4"
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
A1 S-303
B1 S-303
OPS BLDG
OUTLINE
A1 S-510
PULLBOX
PER
TYP
B1 S-515
A1 S-402
#9
" O
C T
O P
#9
" O
C B
O T
TYP @
TRENCH
DRAIN
A1 S-512
4'-0" D x 5'-0" W CIP
CONC PILE CAP
#9 @ 8" OC TOP
#9 @ 8" OC BOT
#9 @ 8" OC TOP
#9 @ 8" OC BOT
#9
" O
C T
O P
#9
" O
C B
O T
B1 S-302
PIPE SUPPORT @
14'-0" OC, SEE
A1 S-551
PIPE SUPPORT @
14'-0" OC MAX, SEE A2
S-551
A3 S-513
'-0
A1 S-514
A3 S-510
SIM-W/O
GUARDRAIL
VALVE BOX PER
MECH DWGS
GROUND TEST WELL
PER TYPA3
S-516
CRANE STOP
SEE S-520, OH
CRANE STOP
SEE S-520 OH
SAFETY BARRIER EA
SIDE (3 TOTAL ON
WEST TRESTLE) , TYP
SEE B3
S-549
7'-2 3/8"
FACE OF
CRANE STOP
BUMPER, TYP
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
'-0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
A1 S-302
A
B
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
NOTES:
1. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR STORM
WATER FILTER DETAILS.
2. FOR GENERAL NOTES, TYP
DETAILS, AND ABBREVIATIONS,
SEE S-001 TO S-004
3. FOR ADDITIONAL TEMPERATURE
AND SHRINKAGE REINF AT DECK
SLOPE, SEE
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES SALVAGED 16" SQ CONC
FENDER PILE PER S-536
6. CONTRACTOR SHALL COORDINATE
THE LOCATION, NUMBER AND TYPE
OF PIPE SUPPORTS WITH
MECHANICAL DRAWINGS PRIOR TO
FABRICATION.
7. CONTRACTOR SHALL COORDINATE
ALL DECK PIPE PENETRATIONS
(SIZE AND LOCATION) WITH
MECHANICAL DRAWINGS. PIPE
PENETRATIONS THROUGH BEAMS
ARE NOT ALLOWED. DECK SLEEVE
DETAIL PER
8. COORDINATE ELECTRICAL
PULLBOX AND GROUND TEST WELL
LOCATIONS WITH ELEC DWGS.
9. SEE ELECTRICAL DRAWINGS FOR
SIZE, NUMBER, AND LOCATION OF
EMBEDDED CONDUIT.
SWFV
A2 S-003
A1 S-003
20'-0"
TYP
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
TRENCH DRAIN
CRANE CABLE
TRENCH
4'-0" D x 5'-0" W CIP
CONC PILE CAP
TYP @
BOLLARDS
'-0
'-0
FOR UTILITY
HOODS, SEE
TYP
C1 S-548
TYP
B1 S-517
TYP
P
IE
R F
R A
M
IN
G P
LA
N
C3 S-402
#9 @ 8" OC TOP
#9 @ 8" OC BOT
#9
" O
C T
O P
#9
" O
C B
O T A1
S-512
4'-0" D x 5'-0" W CIP
CONC PILE CAP
CIP CONC SLAB, TYP
THICKNESS VARIES,
2" MIN
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
FRAMING PLAN
SCALE: 1''=10'-0"
A1 S-402
PULLBOX
PER
TYP
B1 S-515
B1 S-302
PIPE SUPPORT @
14'-0" OC, SEE
A1 S-551
PIPE SUPPORT @
16'-0" OC, SEE
A1 S-511
A1 S-510
'-0
B1 S-552
GROUND TEST WELL
PER TYPA3
S-516
PIN
SOCKET
PIN
SOCKET
16'-0"
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
'-0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
A1 S-302
A
B
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
NOTES:
1. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR STORM
WATER FILTER DETAILS.
2. FOR GENERAL NOTES, TYP
DETAILS, AND ABBREVIATIONS,
SEE S-001 TO S-004
3. FOR ADDITIONAL TEMPERATURE
AND SHRINKAGE REINF AT DECK
SLOPE, SEE
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES SALVAGED 16" SQ CONC
FENDER PILE PER S-536
6. CONTRACTOR SHALL COORDINATE
THE LOCATION, NUMBER AND TYPE
OF PIPE SUPPORTS WITH
MECHANICAL DRAWINGS PRIOR TO
FABRICATION.
7. CONTRACTOR SHALL COORDINATE
ALL DECK PIPE PENETRATIONS
(SIZE AND LOCATION) WITH
MECHANICAL DRAWINGS. PIPE
PENETRATIONS THROUGH BEAMS
ARE NOT ALLOWED. DECK SLEEVE
DETAIL PER
8. COORDINATE ELECTRICAL
PULLBOX AND GROUND TEST WELL
LOCATIONS WITH ELEC DWGS.
9. SEE ELECTRICAL DRAWINGS FOR
SIZE, NUMBER, AND LOCATION OF
EMBEDDED CONDUIT.
SWFV
A2 S-003
A1 S-003
20'-0"
TYP
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
CRANE CABLE
TRENCH
4'-0" D x 5'-0" W CIP
CONC PILE CAP
TYP @
BOLLARDS
'-0
'-0
TRENCH DRAIN
FOR UTILITY
HOODS SEE
TYP
C1 S-548
B1 S-517
TYP
TYP
P
IE
R F
R A
M
IN
G P
LA
N
C3 S-402
A1 S-512
#9 @ 8" OC TOP
#9 @ 8" OC BOT
#9
" O
C T
O P
#9
" O
C B
O T
4'-0" D x 5'-0" W CIP
CONC PILE CAP
CIP CONC SLAB, TYP
THICKNESS VARIES,
2" MIN
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
FRAMING PLAN
SCALE: 1''=10'-0"
PULLBOX
PER
TYP
B1 S-515
A1 S-402
B1 S-302
PIPE SUPPORT @
16'-0" OC, SEE
PIPE SUPPORT @
14'-0" OC, SEE
A1 S-551
A1 S-511
A1 S-510
'-0
B1 S-552
GROUND TEST
WELL PER TYPA3
S-516
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
'-0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
A1 S-302
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
20'-0"
TYP
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
CRANE CABLE
TRENCH
4'-0" D x 5'-0" W CIP
CONC PILE CAP
TYP @
BOLLARDS
'-0
'-0
TRENCH DRAIN
FOR UTILITY
HOODS SEE
TYP
C1 S-548
B1 S-517
TYP
TYP
P
IE
R F
R A
M
IN
G P
LA
N
A1 S-512
#9 @ 8" OC TOP
#9 @ 8" OC BOT
#9
" O
C T
O P
#9
" O
C B
O T
4'-0" D x 5'-0" W CIP
CONC PILE CAP
CIP CONC SLAB, TYP
THICKNESS VARIES,
2" MIN
NOTES:
1. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR STORM
WATER FILTER DETAILS.
2. FOR GENERAL NOTES, TYP
DETAILS, AND ABBREVIATIONS,
SEE S-001 TO S-004
3. FOR ADDITIONAL TEMPERATURE
AND SHRINKAGE REINF AT DECK
SLOPE, SEE
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES SALVAGED 16" SQ CONC
FENDER PILE PER S-536
6. CONTRACTOR SHALL COORDINATE
THE LOCATION, NUMBER AND TYPE
OF PIPE SUPPORTS WITH
MECHANICAL DRAWINGS PRIOR TO
FABRICATION.
7. CONTRACTOR SHALL COORDINATE
ALL DECK PIPE PENETRATIONS
(SIZE AND LOCATION) WITH
MECHANICAL DRAWINGS. PIPE
PENETRATIONS THROUGH BEAMS
ARE NOT ALLOWED. DECK SLEEVE
DETAIL PER
8. COORDINATE ELECTRICAL
PULLBOX AND GROUND TEST WELL
LOCATIONS WITH ELEC DWGS.
9. SEE ELECTRICAL DRAWINGS FOR
SIZE, NUMBER, AND LOCATION OF
EMBEDDED CONDUIT.
SWFV
A2 S-003
A1 S-003
KEY PLAN
NTS
WEST
TRESTLE
(E) EAST
TRESTLE
MAIN PLATFORM
FRAMING PLAN
SCALE: 1''=10'-0"
PULLBOX
PER
TYP
B1 S-515
A1 S-402
B1 S-302
PIPE SUPPORT @
16'-0" OC, SEE
PIPE SUPPORT @
14'-0" OC, SEE
A1 S-551
A1 S-511
A1 S-510
'-0
B1 S-552
GROUND TEST
C
R E
P
LA
C E
/U P
G R
A D
E P
IE
R
5-
-0
O C
TO
B
E R
, 2
H V
G
M N
M
C B
S
1 2 3 4
/S / C
. S C
H U
LZ
E
'-0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
2' -6
7'
-6
'-0
'-0
'-0
'-0
5' -0
'-0
1107'-6"
A1 S-302
10'-0" 0'-0'' 10'-0" 20'-0"
SCALE: 1''=10'
NOTES:
1. DENOTES STORM WATER FILTER
VAULT, SEE S-553 FOR STORM
WATER FILTER DETAILS.
2. FOR GENERAL NOTES, TYP
DETAILS, AND ABBREVIATIONS,
SEE S-001 TO S-004
3. FOR ADDITIONAL TEMPERATURE
AND SHRINKAGE REINF AT DECK
SLOPE, SEE
4. DENOTES 24" OCTAGONAL
CONC PILE PER S-501
5. DENOTES SALVAGED 16" SQ CONC
FENDER PILE PER S-536
6. CONTRACTOR SHALL COORDINATE
THE LOCATION, NUMBER AND TYPE
OF PIPE SUPPORTS WITH
MECHANICAL DRAWINGS PRIOR TO
FABRICATION.
7. CONTRACTOR SHALL COORDINATE
ALL DECK PIPE PENETRATIONS
(SIZE AND LOCATION) WITH
MECHANICAL DRAWINGS. PIPE
PENETRATIONS THROUGH BEAMS
ARE NOT ALLOWED. DECK SLEEVE
DETAIL PER
8. COORDINATE ELECTRICAL
PULLBOX AND GROUND TEST WELL
LOCATIONS WITH ELEC DWGS.
9. SEE ELECTRICAL DRAWINGS FOR
SIZE, NUMBER, AND LOCATION OF
EMBEDDED CONDUIT.
SWFV
A2 S-003
A1 S-003
20'-0"
TYP
M A
TC
H
L
IN
E
S E
E S
-1
M A
TC
H
L
IN
E
S E
E S
-1
CRANE CABLE
TRENCH
4'-0" D x 5'-0" W CIP
CONC PILE CAP
TYP @
BOLLARDS
'-0