Attachment_0006_-_SF1408.pdf

Standard Form PDF 35 KB Posted

Attached to
Yuma Proving Ground Logistics Readiness Center- Logistics Support Services
Solicitation number
W52P1J-17-R-0009
Issued by

About this file

Attachment 0006- SF1408

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preaward Survey of Prospective Contractor Accounting System Checklist

[FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract. If no information is available in the files to make this determination, a Preaward Survey of Prospective Contractor’s Accounting System (SF1408) can be requested from DCAA. Before requesting such an audit, it is a good idea to send this checklist to prospective contractor’s for completion to ensure they understand the requirements of the SF1408, and to ensure they are ready for DCAA to come in and perform an audit].

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary

Contractor Name:

Point of Contact (Name/Ph #/Email):

CAGE Code:

READY FOR AUDIT (YES) / (NO):

Yes No N/A Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost

(FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note Narrative

>PLEASE ANSWER ALL QUESTIONS BELOW:

>ARE YOU PLANNING ON BIDDING ON COST TYPE CONTRACTS? (YES/NO) ______

>ARE YOU READY FOR A DCAA AUDIT? (YES/NO) _____________

>HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO) ____________

>HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's >WEBSITE (http://www.dcaa.mil/)? (YES/NO) _____________

>PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR

COMPANY - >(Found on DCAA's website (http://www.dcaa.mil/) _____________________ >PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT (Name/ph #/ eMail)

If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report

>>[Insert name and title of individual responsible for design of the accounting system] Name: ______________________ Signature: ___________________________ Title: ______________________ Date: ______________________________ Contractor: ______________________________________________________________ http://www.dcaa.mil/ http://www.dcaa.mil/

File details come from the government source that posted it. Updated .