W52P1J17R0009-0001.pdf

PDF 40 KB Posted

Attached to
Yuma Proving Ground Logistics Readiness Center- Logistics Support Services
Solicitation number
W52P1J-17-R-0009
Issued by

About this file

Amendment 1 - Providing Revisions

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2017FEB24

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

ABIGAIL L. BALTIMORE

EMAIL: ABIGAIL.L.BALTIMORE.CIV@MAIL.MIL

W52P1J-17-R-0009

2017JAN31

X

X 2017MAR07 12:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 15

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ABIGAIL L. BALTIMORE

Buyer Office Symbol/Telephone Number: CCRC-FC/(309)782-2170

Type of Contract 1: Firm Fixed Price

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

1. The purpose of Amendment 0001 to RFP W52P1J-17-R-0009 is to:

a. Provide an updated Attachment 0005- Cost Price Matrix to lock all blue cells IAW Section L.5.2.2(d)

b. Remove paragraph Section L.5.4.2.11 as this is not applicable.

c. Provide an updated Attachment 0001 - Performance Work Statement to reflect the corrections in the following paragraphs:

1. PWS paragraph 1.5.7: Rename the CDRL from MMD-02 to SS-03 as maintenance functions are not a requirement

2. PWS paragraph 5.19.5: Add the statement that the contractor shall provide a monthly Inventory of Weapons, Locks, and Keys report.

CDRL SS-03: Inventory of Weapons, Locks, and Keys.

d. Provide an updated Exhibit A TE 1 M-S-T Minimum Functional Labor Category to reflect the correct PWS reference in the column PWS

REQUIREMENT/SHOP from PWS 5.24 to PWS 5.30 Equipment Pool Operations

e. Provide an updated Exhibit K- CRDLs Portfolio to add CDRL SS-03 Inventory of Weapons, Locks and Keys to the Exhibit with the associated TE 5M-003 Inventory of weapons locks and keys (CDRL SS-03)

f. Remove DFARS Clauses 252.234-7001 Notice of Earned Value Management System and 252.229-7001 Tax Relief as these clauses are not applicable.

g. Extend proposal due date to 07 March 2017 at 1200 Central.

2. All other terms and conditions remain unchanged.

*** END OF NARRATIVE A0002 ***

2 15

W52P1J-17-R-0009 0001

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 DELETED 252.229-7001 TAX RELIEF--BASIC SEP/2014

3 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Exhibit A TE 1 M-S-T 001 FUNCTIONAL LABOR CATEGORY 1 HOURS 15-FEB-2017 001

Exhibit K CDRLS PORTFOLIO 15-FEB-2017 033

Attachment 0001 PERFORMANCE WORK STATEMENT (PWS) 15-FEB-2017 128

Attachment 0005 COST-PRICE MATRIX (INCLUDING TEAMING MATRIX) 09-FEB-2017 001

4 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

L-1 DELETED 252.234-7001 NOTICE OF EARNED VALUE MANAGEMENT SYSTEM (DEVIATION 2015-O0017) SEP/2015

(DEV 2015-

O0017)

L.1 GENERAL INSTRUCTIONS:

L.1.1 These instructions are a guide for preparing a proposal. These instructions describe the type and extent of information required, and emphasizes the significant areas to be addressed in the proposal. Review the Performance Work Statement (PWS) contained in this Request for Proposal (RFP) for further insight into the areas that must be addressed within the proposal. Include detailed information sufficient to enable the Government evaluators to conduct a meaningful review and make a determination relative to the

Offeror's understanding of the requirements in each of the evaluated areas. It is the Government's intent to award a single Firm Fixed

Price (FFP) Requirements contract with some non-fee bearing cost elements (e.g., Other Direct Costs) which are ancillary to the services provided.

L.1.2 In accordance with FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition (Jan 2004), the Government intends to award a contract without discussions. Offerors are cautioned to examine this RFP in its entirety and to ensure that proposals contain all necessary information, provide all required documentation, and are complete in all respects. The Government is not obligated to make another request for the required information nor does the Government assume the duty to search for data to cure problems it finds in proposals. The Government reserves the right to conduct discussions in the evaluation process and to permit Offerors to revise proposals, if deemed necessary. During the evaluation process, the Government may request clarifications as needed. Clarifications do not constitute discussions and an Offeror is not allowed to change its proposal in response to a request for clarification. In accordance with FAR 15.306(c)(2),if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Any Offeror eliminated from further consideration will be notified in writing.

L.1.3 The proposal shall be valid for 180 days from the required submission date.

L.1.4 Proposals, modifications, revisions, or withdrawals of proposals received after the date established in this RFP for receipt of proposals will be handled in accordance with FAR Clause 52.215-1.

L.1.5 An Offeror is defined as the prime BOA Holder submitting a proposal under this RFP.

L.1.6 For the purposes of this Task Order RFP, a Teammate is defined as a Joint Venture partner and/or Subcontractor that is included in the Offeror's BOA Attachment 0002 - Team Arrangement by the closing date of the Task Order RFP.

L.1.7 Updates related to this Task Order RFP, to include the RFP, amendments, notices, and other information, will be made available on the FBO.gov website. Offerors are advised to continuously monitor the FBO.gov website for new information. Offerors are deemed to have knowledge of all information that is posted to the FBO.gov website.

L.2 PROPOSAL PREPARATION:

L.2.1 The proposal shall be prepared in a clear and legible manner. In addition, the Offeror shall write the proposal in English and the proposal must be specific and complete as described in these instructions. Offerors shall not specifically prepare samples or descriptive literature for submission with the proposal. Adherence to the prescribed format is required. Failure to provide proposals ______________________________ in compliance with the instructions specified as COMPLIANCE REQUIREMENTS in Section L of this RFP and in compliance with ALL_____________________________________________________________________________________________________________________________ instructions in Section M.3 of this RFP shall render the Offeror's proposal non-compliant. The proposal will not be evaluated and will________________________________________________________________________________________________________________________________________ not be further considered for award. An authorized official of the firm shall sign the Standard Form (SF) 33, all signed amendment___________________________________ coversheets (SF30) and all certifications requiring original signature. Electronic signatures are acceptable.

L.2.2 All information pertaining to a particular volume shall be confined to that volume. For example, no Cost/Price information shall be included in any volume other than the Cost/Price Proposal volume. The Government is not required to and will not search other volumes for a missing file or missing information.

L.2.3 No classified material shall appear anywhere within the proposal.

L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.

L.2.5 Digital MS Word files and MS Excel files shall be compatible with Microsoft (MS) Office 2013.

L.2.5 (a) Please Note: The Offeror shall not lock or password protect any file (e.g. *.doc, *.pps, *.xls, *.txt, *.msg).

5 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.2.6 Adobe PDF (Portable Document Format) Files. Scanned PDF documents must be legible and shall have the ability to be viewed in

Adobe Acrobat.

L.2.6.1 Text Searchable Adobe PDFs: File formats that are identified as Text Searchable Adobe PDF must be formatted to contain searchable text. All elements of the file to include tables, diagrams, charts, etc. must be able to be searched for text. The

Government will not accept scanned or image-only PDF files in lieu of this requirement and will not invoke the text recognition feature within Adobe.

L.2.7 Compressed files (e.g. *.zip) and Executable files (e.g. *bat, *.exe,*.jar, *.vb, *.wsf) will NOT be accepted. Refer to

Attachment 0010 - Blocked File Extensions for a complete list of non-acceptable file types.

L.2.8 For the purposes of proposal preparation and evaluation only, the Offeror shall use 22 JUL 2017 as the Notice to Proceed (NTP) date. Proposal information shall reflect that NTP date.

L.3 PROPOSAL SUBMITTAL INSTRUCTIONS:

L.3.1 Offeror shall submit its proposal through the FedBizOpps (FBO.gov) system. The requirements and procedures for offer submission are found in the FBO Vendor User Guide located on the FBO webpage at: https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.

L.3.2 The proposal submittal method used for this solicitation is the electronic response via document upload method.

L.3.3 Offerors should enter a description for every file uploaded. For files over 10 megabytes (MB) the "Large Upload (JAVA)" button must be utilized. The combined file size limit for upload using "Large Upload (JAVA)" is 100MB. If needed, the Offeror can break single files over 100MB into smaller files or use the upload utility multiple times if files exceed the 100MB size limit.

L.3.4 Digital file names shall use the required naming convention for each specific proposal document identified below. Filenames must be 40 characters or less and must not contain single quotes, spaces and pound or percent signs. If an Offeror's file name is too long (more than 40 characters), it is permitted to abbreviate the Name of the Company field within the file name.

L.3.5 NOT APPLICABLE

L.3.6 Once the Offeror's proposal is submitted, it can be systematically revised prior to the solicitation response deadline. Refer to Paragraph 4.3.2 of the FBO Vendor Guide titled "Reviewing / Editing an Electric Response" for detailed guidance on completing a revision to an electronic proposal submission. Note: the FBO bid response system will send an email to the email address on file for the user confirming the electronic submission.

L.3.6 (a) Note: the Offeror must be logged in to the system to be able to submit / revise electronic responses.

L.3.6 (b) For assistance and troubleshooting for the FBO electronic bid response system, contact the Federal Service Desk (FSD.gov).

Phone: 866-606-8820 or Web Form (https://gsafsd.service-now.com/fsd-gov/login.do).

L.3.7 Do not assume submission will be instantaneous. File size and number of files to be uploaded will be factors to consider.

Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e. Offerors submission and all Teammate/Subcontractor(s) independent submissions) must be received by the due date and time for the proposal to be considered.

L.3.8 To avoid rejection of an offer, the Offeror must make every effort to ensure its electronic submission is virus-free.

Proposals, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).

L.4 PROPOSAL STRUCTURE:

L.4.1 The Offeror shall submit a proposal in accordance with the guidelines below.

L.4.1.1 For all documents, each page shall include the complete Offeror's name, volume number, file name, date, and solicitation number in a header and/or footer.

L.4.1.2 Each Offeror shall submit ONLY one proposal and that proposal shall address all of the requirements of the RFP. To be considered for this requirement, the Offeror must submit a complete response to this RFP using the instructions provided in Section L. _

If the Offeror's proposal fails to meet the terms and conditions of the RFP or takes exception to any of the terms and conditions of the_________________________________________________________________________________________________________________________________________

RFP, it shall render the Offeror's proposal will be not acceptable and will not be further considered for award.__________________________________________________________________________________________________________________

L.4.1.3 The Offeror shall provide sufficient detail to substantiate the validity of all stated assertions. Proposals must not merely repeat the RFP requirements, but rather must provide convincing documentary evidence of how contract requirements will be met. Clarity

6 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

and completeness are essential. Data not submitted with the proposal, but submitted previously, or presumed to be known (i.e., previous projects performed for the United States Government (USG)) will not be considered as part of the proposal except for Past Performance

(see paragraph L.5.3.1).

L.5 INFORMATION TO BE SUBMITTED:

L.5.1 General Documents: The Offeror shall include the following:

L.5.1.1 One executed signed copy of the RFP coversheet titled "Solicitation, Offer and Award" (SF33).

L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33

L.5.1.1(b) File Format: Adobe PDF or MS Word

L.5.1.1(c) Page Limit: none

L.5.1.1(d) COMPLIANCE REQUIREMENT: Failure to provide the signed SF 33 shall render the Offeror's proposal non-compliant. The _____________________________________________________________________________________________________________________ proposal will not be evaluated and will not be further considered for award.____________________________________________________________________________

L.5.1.2 EITHER all signed amendment coversheets titled "Amendment of Solicitation/ Modification of Contract " (SF30) or one executed signed copy of the RFP coversheet with block fourteen (14) completed.

L.5.1.2(a) Naming Convention: Offeror's_Name_Vol_1_SF30(Amends)

L.5.1.2(b) File Format: Adobe PDF or MS Word

L.5.1.2(c) Page Limit: none

L.5.1.3 Section I clauses that require Offeror completion.

L.5.1.3(a) Naming Convention: Offeror's_Name_Vol_1_IClauses

L.5.1.3(b) File Format: Adobe PDF or MS Word

L.5.1.3(c) Page Limit: none

L.5.1.4 Section K clauses that require Offeror certification.

L.5.1.4(a) Naming Convention: Offeror's_Name_Vol_1_KClauses

L.5.1.4(b) File Format: Adobe PDF or MS Word

L.5.1.4(c) Page Limit: none

L.5.1.5 Offeror Points of Contact (POC): The Government does not intend to conduct discussions prior to awarding this requirement.

However, any exchanges to include clarifications between the Government and the Offeror will be conducted through the use of e-mail.

Therefore, the Offeror is required to provide at least two (2) company individuals whose responsibilities will include reading and responding to Evaluation Notices (ENs) through e-mail. For example, the Offeror's Contract Manager, as an agent of the company might be the main agent responsible, but a second agent shall be available in case of the main agent's unavailability. The agents' names, company titles, telephone numbers, facsimile numbers, and e-mail addresses should be provided. A Title Page is allowable to provide for the restriction or disclosure and use of data as specified in FAR Clause 52.215-1.

L.5.1.5(a) Naming Convention: Offeror's_Name_Vol_1_POCs

L.5.1.5(b) File Format: Adobe PDF or MS Word

L.5.1.5(c) Page Limit: none

L.5.1.6 SECRET Facility Clearance: NOT APPLICABLE

L.5.1.7 Business Systems Information:

L.5.1.7.1 The Contracting Officer will review the Offeror's accounting system status for determining contractor responsibility in accordance with FAR 16.301-3; a cost-reimbursement type contract may be used only when the contractor's accounting system is adequate for determining costs applicable to the contract. An adequate system is a system that can separately accumulate costs under a

7 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Government contract and has the ability to generate the specific cost information required under the anticipated contract. An SF 1408 has been attached to this RFP (Attachment 0006) which contains the specific procedures that are considered part of an adequate system.

Therefore, in order for an Offeror to receive an award under this RFP, the successful Offeror will be required to demonstrate that the design of its accounting system can accomplish the specific SF 1408 procedures; as a result, the Offeror is required to provide in its proposal:

- Official documentation, from either a successful Defense Contract Audit Agency (DCAA) audit of the Offeror's accounting system; or

- A letter from the Defense Contract Management Agency (DCMA) documenting its approval/adequacy of the Offeror's accounting system; or

- Rationale for why documentation cannot be presented at proposal submission and a proposed date for which required documentation will be available. Absent an adequate accounting system, an apparent awardee cannot be determined responsible under FAR 9.104-5 and will be ineligible for award. Per FAR 9.104-5(b), an apparent awardee who does not furnish the certification or such information as may be requested by the Contracting Officer shall be given an opportunity to remedy the deficiency. Therefore, if an Offeror is unable to provide the certification with its proposal as required, it will be given another opportunity to present the required certification prior to award in the event it is determined to be the apparent awardee.

L.5.1.7.1(a) Naming Convention: Offeror's_Name_Vol_1_AcctSys

L.5.1.7.1(b) File Format: Adobe PDF or MS Word

L.5.1.7.1(c) Page Limit: none

L.5.1.7.2 The Offeror shall provide its current Government approval status of the following business systems: billing (internal controls), estimating, budget and financial control, purchasing and quality assurance. The Offeror shall provide official Government approval documentation for any systems that have Government approval. The approval status and approval documentation will not be evaluated and is for Government contract administration. If approval of any of these business systems is not available, provide a statement of such and a brief rationale as to why these systems have not been approved.

L.5.1.7.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys

L.5.1.7.2(b) File Format: Adobe PDF or MS Word

L.5.1.7.2(c) Page Limit: none

L.5.1.7.3 In accordance with FAR 52.245-1(b) Property management, Offerors shall have a system of internal controls to manage

(control, use, preserve, protect, repair and maintain) Government property in its possession accountable to the contract. The system of internal controls shall be adequate to satisfy the requirements of this clause. In doing so, the successful Offeror shall initiate and maintain the processes, systems, procedures, records, and methodologies necessary for effective and efficient control of Government property accountable to the contract. The Offeror may employ customary commercial practices, voluntary consensus standards, or industry-leading practices and standards that provide effective and efficient Government property management that are necessary and appropriate for the performance of this contract (except where inconsistent with law or regulation). Offerors shall provide a written plan detailing its system of internal controls to manage Government property in its possession. Offerors' property management plan must address all elements under FAR 52.245-1(f) Contractor plans and systems. This plan shall be submitted with the Offerors' proposal. The

Contracting Officer will review Offerors' property management plan as part of a responsibility determination in accordance with FAR

9.104-1. Note: After award, the successful Offeror will be required to update its property management plan specific to the place of performance sites.

L.5.1.7.3(a) Naming Convention: Offerors_Name_Vol_1_PMP

L.5.1.7.3(b) File Format: Adobe PDF or MS Word

L.5.1.7.3( c) Page limit: none

L.5.1.8 Teaming Matrix (Attachment 0005, Tab 2): The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s) to be performed, total estimated dollar value for the total period of performance of 5 years, percent of participation, and the cost proposal submittal method. The Offeror shall populate every column using the instructed fill-ins on the

Attachment 0005, Tab 2 for itself, proposed Teammates and proposed Subcontractors.

L.5.1.8(a) COMPLIANCE REQUIREMENT: The amount in the total of Column F (Total estimated dollar value) provided on Attachment 0005, Tab ____________________________________________________________________________________________________________________________

2 shall match the amount of "Subtotal - Proposed Labor/Fee" found on Attachment 0005, Tab 1. Failure to make these two amounts match______________________________________________________________________________________________________________________________________ shall render the Offeror's proposal non-compliant. The proposal will not be evaluated and will not be further considered for award.___________________________________________________________________________________________________________________________________

L.5.1.8(b) Teammate/Subcontractor Utilization: Offerors proposing the use of Teammate(s)/Subcontractor(s) shall do so in accordance

8 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

with Section C, paragraphs C.1 (d and e) of this RFP. The Government will verify that the Offeror's proposal includes approved

Teammates by comparing the Offeror's Teaming Matrix (Attachment 0005, Tab 2) to the Offeror's BOA Attachment 0002 - Team Arrangement as of the closing date of the RFP.

L.5.1.8(c) Naming Convention: Offeror's_Name_Vol_4_Att0005

L.5.1.8(d) File Format: MS Excel

L.5.1.8(e) Page Limit: none

L.5.1.8(f) COMPLIANCE REQUIREMENT: Failure to provide a fully completed Teaming Matrix (Attachment 0005, Tab 2) containing all of the ____________________________________________________________________________________________________________________________ required information (including populating every column) shall render the Offeror's proposal non-compliant. The proposal will not be______________________________________________________________________________________________________________________________________ evaluated and will not be further considered for award._______________________________________________________

L.5.1.9 NOT APPLICABLE

L.5.1.10 NOT APPLICABLE

L.5.2 Technical Factor:

L.5.2.1 The Offeror shall demonstrate mission capability by detailing its proposed technical approach to meet the requirements specified in the PWS and this RFP by providing the following:

L.5.2.1(a) Staffing and Management Plan (SMP)

L.5.2.1(b) Mission Essential Contractor Services (MECS)

L.5.2.1(c) Organizational Diagram (OD)

L.5.2.1.1 Staffing and Management Plan (SMP):

L.5.2.1.1(a) The Offeror's SMP proposal shall adhere to the following:

L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP

L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF

L.5.2.1.1(a)(3) Page Limit: 7 Pages

L.5.2.1.1(a)(3)(i) Page limit excludes cover page, table of contents, and glossary of abbreviations and acronyms

L.5.2.1.1(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages

L.5.2.1.1(a)(3)(iii) The font size shall be no less than 10 point font and no more than 14 point font for all documents; however, for charts, tables, and diagrams, font size shall be no less than 8 point font and no more than 14 point font.

L.5.2.1.1(a)(4) COMPLIANCE REQUIREMENT: Failure to provide the Staffing and Management Plan and in compliance with L.5.2.1.1(a)(2) ___________________________________________________________________________________________________________________ through L.5.2.1.1(a)(3)(ii) shall render the Offeror's proposal non-compliant. The proposal will not be evaluated and will not be___________________________________________________________________________________________________________________________________ further considered for award._____________________________

L.5.2.1.1(b) The Offeror's Staffing and Management Plan must detail its approach to deliver services required in the RFP and PWS. The

Offerors SMP must detail the overarching methodology used to determine the proposed skill sets / skill level; the SMP must also contain any assumptions used to support staffing decisions with any explanations needed to clarify staffing decisions. As the Government is utilizing the Attachment 0008 - Collective Bargaining Agreement (CBA), Service Contract Act (SCA) Directory of Occupations (5th Edition) and TE 1-G-005 Key & Specified Non-Key Positions for technical evaluation purposes, the Offeror must include appropriate duty descriptions for all position titles proposed that are NOT in the CBA, SCA Directory of Occupations (5th Edition) or Exhibit E TE 1-G-

005 Key & Specified Non-Key Positions. The Offeror shall utilize the CBA, SCA Directory of Occupations (5th Edition) or Exhibit E TE 1-

G-005 Key & Specified Non-Key Positions when possible. The SMP MUST BE SUPPORTED BY THE OFFEROR'S ATTACHMENT 0002 STAFFING/LABOR MIX, and at a minimum, must address the following elements:

L.5.2.1.1(b)(1) Staffing and organization of the required effort by providing its approach to creating its management structure from general staff oversight by first line supervisors through its company headquarters management. This approach must detail the management and supervision structure related to executing this effort. This approach must include adequate details of how it will retain its

QUALIFIED personnel (includes all personnel, Key, Specified Non-Key) to accomplish contract requirements.

9 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.5.2.1.1(b)(2) NOT APPLICABLE

L.5.2.1.1(b)(3) Transition-in Approach: Offeror must provide its time-phased approach to transitioning-in the effort from Notice to

Proceed (NTP) to successfully reaching a fully operational capability (FOC) within the time allotted in M.1.1, by addressing:

L.5.2.1.1(b)(3)(i) Open communications approach to open communications including timely periodic meetings with the incumbent contractor and the Government documenting progress of transition (i.e., GFP/GFE inventories, hiring actions.)

L.5.2.1.1(b)(3)(ii) Hiring actions approach to proper and timely hiring actions which include: pre-employment drug screening;

qualification verification; requisition and issuance of contractor Common Access Cards (CAC) / access badges (as required); and processing of required security clearances (as required) to ensure no impact to current operations.

L.5.2.1.1(b)(3)(iii) Accountability of Government Furnished Property (GFP) / Government Furnished Equipment (GFE) approach to proper and timely assumption of accountability of GFP / GFE that includes properly conducting a joint inventory, to include reconciliation

(prior to end of transition), with incumbent contractor while ensuring no impact to current operations.

L.5.2.1.1(c) Staffing/Labor Mix (Attachment 0002 - Staffing/Labor Mix): The Offeror must provide its proposed staffing mix/labor categories (skill sets / skill level, FLC1, FLC2, number of employees) in relation to the PWS requirements and the provided workload data (see applicable Technical Exhibits) for both the base period and option periods (fully operational capable 12-month periods (365 day periods)). The Offeror's proposal must present a staffing approach which demonstrates a thorough understanding of the effort and provides the expected skill sets / skill level of each position, to include level of responsibility in order to successfully perform the specific workload requirements identified at Exhibit A TE 1 M-S-T-001 Minimum Functional Labor Category 1 Hours and meet all the PWS requirements. NOTE: For Technical evaluation purposes only, the Government will utilize the Attachment 0008 Collective Bargaining

Agreement (CBA), Service Contract Act (SCA) Directory of Occupations (5th Edition) labor category definitions and Exhibit E TE1-G-005

Key & Specified Non-Key Positions or Offeror provided definitions to determine if the proposed labor category is consistent with the task(s) proposed. Proposed position titles not identified in the CBA, SCA Directory of Occupations (5th Edition) or Exhibit E TE1-G-

005 Key & Specified Non-Key Positions must be defined by the Offeror in its SMP (see L.5.2.1.1(b)). A cross-walk between the CBA and the SCA is provided in Attachment 0017.

L.5.2.1.1(c)(1) Offeror's proposal shall adhere to the following:

L.5.2.1.1(c)(2) Naming Convention: Offeror's_Name_Vol_2_Att0002

L.5.2.1.1(c)(3) File Format: MS Excel

L.5.2.1.1(c)(3)(i) The Offeror shall not add or remove any tabs (other than the example tab) to the Attachment 0002 Staffing/Labor Mix.

L.5.2.1.1(c)(4) COMPLIANCE REQUIREMENT: Failure to provide the Staffing/Labor Mix Attachment 0002 in the Government provided format, ______________________________________________________________________________________________________________________ in compliance with L.5.2.1.1(c)(3) and L.5.2.1.1(c)(3)(i), and to provide the following required information: proposed hours per FTE for_________________________________________________________________________________________________________________________________________ both the base period and option periods 1-4; option period total proposed FLC1 Hours by Functional Area; FLC1/FLC2; identification of______________________________________________________________________________________________________________________________________

CBA/SCA/Exempt; SCA Code; Offeror Position Title; and identification of Functional Area shall render the Offeror's proposal non-________________________________________________________________________________________________________________________________ compliant. The proposal will not be evaluated and will not be further considered for award.___________________________________________________________________________________________

L.5.2.1.1(c)(5) Definitions relating to Staffing/Labor Mix:

L.5.2.1.1(c)(5)(i) Full Time Equivalents (FTEs): Compensable hours are determined by the Offeror and are the work hours available to ____________________________ perform a function in one year less holiday and vacation hours. An employee who works all available compensable hours is one Full Time

Equivalent. If an employee works less than the total compensable hours for one year, that is considered a fractional FTE. Fractional

FTEs are determined by dividing the hours scheduled for that employee by the total available compensable hours.

L.5.2.1.1(c)(5)(ii) Functional Labor Category 1 (FLC1): Contract or task order level positions that are specifically identified to __________________________________ directly accomplish the tasks/functions of the workload provided in Exhibit A TE 1-M-S-T-001 Note: Leads may be proposed as solely FLC1, if applicable.

L.5.2.1.1(c)(5)(iii) Functional Labor Category 2 (FLC2): Contract or task order level positions required for the completion of RFP __________________________________ requirements, but do not directly perform the tasks / functions of the workload provided in Exhibit A TE 1-M-S-T-001. FLC2 positions may be required by the RFP, regulation, or the Offeror's business practices, but are not directly supporting the workload (e.g. project manager, supervisory functions, and administrative assistant). Additionally, all managers must be proposed as solely FLC2; supervisors may be split FLC1 and FLC2 with the FLC2 portion proposed commensurate with the level of supervisory duties assigned.

L.5.2.1.1(c)(6) The purpose of Staffing/Labor Mix - Attachment 0002 is to provide the Government with a complete picture of each

Offeror's staffing and total proposed labor hours for each Shop or PWS requirement for this effort. For proposal purposes staffing must be constant for all periods of performance. The Government intends to use the MS Excel program to analyze the data provided.

The following instructions pertain to the Staffing/Labor Mix - Attachment 0002:

10 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.5.2.1.1(c)(6)(i) The Offeror must identify all of its proposed staffing required to support all PWS requirements and Exhibit A TE 1-

001 M-S-T Minimum Functional Labor Category 1 Hours in terms of FTEs and FLC1 or FLC2 on the Staffing/Labor Mix - Attachment 0002. The

Government required Key Position labor categories are prepopulated as identified at TE1-G-005 Key & Specified Non-Key Positions; the

Offeror must identify its associated FTEs for the pre-populated Key Positions. The Offeror's Attachment 0002 must identify the required

Specified Non-Key positions using "(Non-Key)" following the Offeror Position Title; see example tab in Attachment 0002.

L.5.2.1.1(c)(6)(ii) The Offeror must insert FLC1 or FLC2 for all proposed labor categories. Please note: The hours associated with

FLC2 positions (including managers proposed as FLC1 and supervisors proposed solely as FLC1), in whole or part, will not count toward the total minimum FLC1 hours specified in L.5.2.1.1(c)(6)(v), and positions incorrectly identified as FLC1 will not count toward the total minimum FLC1 hours specified in L.5.2.1.1(c)(6)(v).

L.5.2.1.1(c)(6)(iii) The Offeror must clearly identify all FTEs that are cross utilized FTEs, or, in other words, when a portion of an

FTE (e.g. supervisor) is applicable to an FLC1 labor category and a portion of the same FTE is also applicable to an FLC2 labor category. These positions must be listed on the Attachment 0002 - Staffing/Labor Mix in all applicable locations (e.g. part time worker

(.20 FLC1) and part time supervisor (.80 FLC2)) with the appropriate percentage of hours applicable to each labor category expressed as a decimal (not to exceed two decimal places to the right of the whole number). Additionally, supervisors must, by definition, have a portion of their proposed time proposed FLC2. (See "Example Tab" contained in Attachment 0002 - Staffing/Labor Mix.)

L.5.2.1.1(c)(6)(iv) The Offeror must provide its proposed annual labor hours by employee type in the Hours Per Year column (in both the

Base Period and Option Periods 1-4) for Exempt, CBA and SCA.

L.5.2.1.1(c)(6)(v) Proposed FLC1 FTEs, when multiplied by the associated annual hours per year by employee type proposed for the option periods, shall be equal to or greater than the total minimum hours of: Supply 19,650 and Transportation 31,200 as provided at Exhibit

A TE 1-001 M-S-T Minimum Functional Labor Category 1 Hours. The proposed FLC2 FTEs (i.e., FLC2 portion of proposed supervisors, if applicable) are not to be included in the total Proposed FLC1 Hours by Functional Area.

L.5.2.1.1(c)(6)(vi) The Offeror must insert the proposed Offeror Position Title and it must match the labor category description found in either the CBA, SCA, TE1-G-005 Key & Specified Non-Key Positions or be provided by the Offeror if Exempt (e.g., manager, supervisor)). If SCA is identified, the Offeror must also provide the corresponding SCA labor code in the Column indicated as SCA Code).

In the event the labor code and the Offeror Position Title do not match, the SCA labor code will take precedence over the Offeror

Position Title. Additionally, the Offeror may insert the "Duty Title" in order to better identify the functional nature of the position.

L.5.2.1.1(c)(6)(vii) The Offeror must insert the applicable functional area (i.e. Supply or Transportation) in the Column(s) indicated as "Fill in Functional Area." This column is intended to match or align with the Functional Areas listed in Exhibit A TE 1-001 M-S-T

Minimum Functional Labor Category 1 Hours. The Offeror may add or delete columns as needed.

L.5.2.1.1(c)(6)(viii) The Offeror must insert the corresponding shop or PWS requirement in the cells labeled "Shop or PWS Requirement."

L.5.2.1.1(c)(6)(ix) The Offeror must insert the number of FTEs (or less than full time equivalents expressed as FTEs) within the applicable FTE Count column. The Offeror's staffing must be rounded to the nearest hundredth decimal (i.e. two decimal places to the right of the whole number). Formatting the cells to display only two decimal places is not considered rounding; the values entered in each cell should only contain two decimal places. FTEs entered by the Offeror with greater than two decimal places will be rounded by the Government to the nearest hundredth decimal (two decimal places to the right of the whole number) using the Microsoft Excel formula

"=ROUND (number,num_digits)" in accordance with generally accepted rounding methods, i.e. numbers 5 through 9 are rounded up to the next whole number; numbers 1 through 4 are rounded down to the next whole number.

L.5.2.1.1(c)(6)(x) The Offeror must complete the section of the Attachment 0002 - Staffing/Labor Mix marked "Option Period Total

Proposed FLC1 Hours by Functional Area" by correctly calculating its total proposed FLC1 hours for Supply and Transportation.

Calculations must correctly multiply total proposed FLC1 FTEs by the Offeror provided Hours per Year applicable to the specific employee type. The calculated total proposed FLC1 hours must be equal to or greater than the minimum required hours as stated in Exhibit A.

L.5.2.1.1(c)(6)(xi) According to Attachment 0008, the maximum available work year for CBA employees is 1860 hours per employee. The

Offerors proposed hours per year for CBA positions shall not exceed the maximum hours established by Attachment 0008. Note: Available hours for the base year shall be adjusted to reflect the transition-in period associated with this solicitation.

L.5.2.1.1(c)(6)(xii) L.5.2.1.1(c)(6)(xii) COMPLIANCE REQUIREMENT: Proposing in excess of the maximum hours identified in _______________________________________________________

L.5.2.1.1(c)(6)(xi) shall render the Offeror's proposal non-compliant. The proposal will not be evaluated and will not be further__________________________________________________________________________________________________________________________________ considered for award._____________________

L.5.2.1.2 Mission Essential Contractor Services (MECS):

L.5.2.1.2(a) The Offeror's MECS proposal shall adhere to the following:

11 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.5.2.1.2(a)(1) Naming Convention: Offeror's_Name_Vol_2_MECS, L.5.2.1.2(a)(2) File Format: Text Searchable Adobe PDF, L.5.2.1.2(a)(3) Page Limit: 2 pages, L.5.2.1.2(a)(3)(i) Page limit excludes cover page, table of contents, and glossary of abbreviations and acronyms, L.5.2.1.2(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages, and

L.5.2.1.2(a)(3)(iii) The font size shall be no less than 10 point font and no more than 14 point font for all documents; however, for charts, tables, and diagrams, font size shall be no less than 8 point font and no more than 14 point font.

L.5.2.1.2(a)(4) COMPLIANCE REQUIREMENT: Failure to provide the Mission Essential Contractor Services and in compliance with ____________________________________________________________________________________________________________

L.5.2.1.2(a)(2) through L.5.2.1.2(a)(3)(ii) shall render the Offeror's proposal non-compliant. The proposal will not be evaluated and_______________________________________________________________________________________________________________________________________ will not be further considered for award._________________________________________

L.5.2.1.2(b) Mission Essential Contractor Services (MECS): The Offeror shall provide its MECS Plan that details its approach as to how it will continue to perform the essential contractor services listed in Attachment 0013 - Mission Essential Contractor Services by specifically addressing each part of the DFARS 252.237-7024 (b)(2)(i through v) .

L.5.2.1.3 Organizational Diagram (OD):

L.5.2.1.3(a) The Offeror's Organizational Diagram proposal shall adhere to the following:

L.5.2.1.3(a)(1) Naming Convention: Offeror's_Name_Vol_2_OD

L.5.2.1.3(a)(2) File Format: Adobe PDF

L.5.2.1.3(a)(3) Page Limit: 4 pages

L.5.2.1.3(a)(3)(i) Page limit excludes cover page, table of contents, and glossary of abbreviations and acronyms

L.5.2.1.3(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages

L.5.2.1.3(a)(3)(iii) The font size shall be no less than 10 point font and no more than 14 point font for all documents; however for charts and diagrams, font size shall be no less than 8 point font and no more than 14 point font.

L.5.2.1.3(a)(4) COMPLIANCE REQUIREMENT: Failure to provide the Organizational Diagram and in compliance with L.5.2.1.3(a)(2) through _____________________________________________________________________________________________________________________

L.5.2.1.3(a)(3)(ii) shall render the Offeror's proposal non-compliant. The proposal will not be evaluated and will not be further___________________________________________________________________________________________________________________________________ considered for award.________________________

L.5.2.1.3(b) The Offeror must provide an Organizational Diagram to depict a comprehensive organizational overview that identifies the following:

L.5.2.1.3(b)(1) Identification of the tasks to be performed by the Offeror, all proposed teammate(s) and proposed subcontractor(s) expected to perform 20% or more of the Offerors total estimated dollar value as found in column F of the Offerors Teaming Matrix

(Attachment 0005, Tab 2).

L.5.2.1.3(b)(2) Identification of the command and control relationship among the Offeror, all proposed teammate(s) and proposed subcontractor(s) expected to perform 20% or more of the Offerors total estimated dollar value as found in column F of the Offerors

Teaming Matrix (Attachment 0005, Tab 2). The command and control relationship must include identification of leadership positions

(e.g., team leads, foremen, supervisors, deputies, managers) responsible for performing successful oversight of each of the primary task areas identified in Section C-5 of the PWS. FTE Counts are not required on the Organizational Diagram. Proposed FTEs counts will only be evaluated on the Attachment 0002 and will not be evaluated as part of the Organizational Diagram.

L.5.2.1.3(b)(3) Identification of an onsite independent quality control organization reporting directly to the corporate quality office.

L.5.3 Past Performance Factor:

L.5.3.1 The Government will consider the recent past performance references that were provided with the Offeror's BOA proposal, task order proposals to date, data calls, and the BOA annual review, as well as references obtained from sources other than those identified by the Offeror. Offerors are not required or allowed to provide additional past performance contract references for itself, proposed

Teammates, and/or Subcontractors for use in this task order evaluation. The Government will not evaluate any new past performance

12 15

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

references provided by the Offeror in its proposal with the exception of the information requested in L.5.3.5.1 through L.5.3.5.4 below.

L.5.3.1.1 Definitions:

L.5.3.1.1(a) Teammate, as used in this factor, is only those Teammates (defined in L.1.6) expected to perform 20% or more of the

Offeror's total estimated dollar value as found in column F of the Offerors Teaming Matrix (Attachment 0005,Tab 2) OR Joint Venture partner that is included in the Offeror's BOA Attachment 0002 - Team Arrangement by closing date of the Task Order RFP.

L.5.3.1.1(b) Subcontractor, as used in this factor, are not considered those Teammates identified in the Offeror's BOA Attachment 0002 -

Team Arrangement, who are expected to perform 20% or more of the Offeror's total estimated dollar value as found in column F of the

Offerors Teaming Matrix (Attachment 0005,Tab 2).

L.5.3.1.2 The Offeror shall provide a Letter of Consent for each Subcontractor and Teammate, using the Letter of Consent template provided in Attachment 0004. This letter allows the release of the Subcontractors' and Teammates' present and past performance information to the Offeror. Failure to include written consent from each Subcontractor and Teammate will result in the Government's inability to contact the Offeror to communicate the findings from its Subcontractor(s) and Teammate(s) references. A Letter of Consent from the BOA Step Two process is not relevant to this Task Order RFP. A new Letter of Consent is required and shall adhere to the following:

L.5.3.1.2(a) Naming Convention: Offeror's_Name_Vol_3_Att0004, L.5.3.1.2(b) File Format: MS Word or Adobe PDF, and

L.5.3.1.2(c) Page Limit: none.

L.5.3.1.2(d) COMPLIANCE REQUIREMENT: Failure to provide a completed Letter of Consent for each Subcontractor and Teammate will render __________________________________________________________________________________________________________________________ the Offeror's proposal non-compliant. The proposal will not be evaluated and will not be further considered for award._______________________________________________________________________________________________________________________

L.5.3.2 The Government is under no obligation to search for additional information in order to identify contracts/performance references.

L.5.3.3 Additional narratives are not required in this factor and will not be evaluated if provided.

L.5.3.4 Recency and relevancy definitions can be found in M.5.2.7 and M.5.2.8, respectively

L.5.3.5 The Offeror shall complete Attachment 0003 - Performance Questionnaire. A separate questionnaire shall be provided for the

Offeror and each proposed Teammate and Subcontractor.

L.5.3.5(a) If the Offeror, and/or its proposed Teammates and Subcontractors have experienced any performance problems as described in

L.5.3.5.1 through L.5.3.5.4, it shall mark Yes for the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .