Attachment 0005 - Cost/Price Matrix

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost_Price_Matrix_Tab_1

OFFEROR:CAGE CODE:
Installation Name
CLIN
TypeDescriptionCLINBase YearOY1OY2OY3OY4Grand Total

FFP Transition In 0001 $0 $0 $0 $0 $0

RESERVED Installation Maintenance Division (IMD) 0002 $0 $0 $0 $0 $0 $0

FFPInstallation Supply Division (ISD)0003$0$0$0$0$0$0
CIPBO Asset Management (302)0003AA
Retail Supply (301)0003AB
Hazardous Material (HAZMAT) Support (301)0003AC
FFPInstallation Transportation Division (ITD)0004$0$0$0$0$0$0
Transportation Support Personal Property Operations (308)0004AA
Equipment Pool (EP) Support (307)0004AB$0
Transportation Support Material Movements (3080004AC
Transportation Reimbursable Equipment Pool (307)0004AD
Subtotal - Proposed Labor / Fee$0$0$0$0$0$0
** COMPLIANCE WARNING ** If CELL I21 (Subtotal-Proposed Labor/Fee on Cost Price Matrix Tab 1) does not equal CELL F12 (Total Proposed Labor/Fee on Teaming Matrix Tab 2), then per L.5.1.8(a), the Offeror's proposal will be non-compliant.
CostOther Direct Costs (ODC)0005$139,745.00$171,490.00$176,635.00$181,934.00$187,391.00$857,195.00
CIPBO Asset Management Supply0005AB$ 9,238.00$ 12,587.00$ 12,963.00$ 13,353.00$ 13,752.00
Retail Supply0005AC$ 48,507.00$ 47,199.00$ 48,615.00$ 50,075.00$ 51,577.00
Hazmat Supply0005AD$ 4,620.00$ 6,293.00$ 6,482.00$ 6,676.00$ 6,877.00
Personal Property0005AE$ 3,465.00$ 4,720.00$ 4,862.00$ 5,007.00$ 5,158.00
Equipment Pool (EP) Trans0005AF$ 31,183.00$ 42,479.00$ 43,754.00$ 45,066.00$ 46,418.00
Material Movement Trans0005AG$ 9,239.00$ 12,586.00$ 12,964.00$ 13,353.00$ 13,753.00
Reimbursable Equipment Pool0005AH$ 33,493.00$ 45,626.00$ 46,995.00$ 48,404.00$ 49,856.00
NSPContractor Manpower Reporting Requirement0006
NSPContract Data item list (CDRLS)0007
Option to Extend Service IAW clause 52.217-8$93,695.50
Total Proposed Price$139,745.00$171,490.00$176,635.00$181,934.00$187,391.00$950,890.50

&D&T &A &F &Z&F

Teaming_Matrix_Tab_2

Company NameCage CodeRoleFunctional area(s) to performProposed Labor / FeePercentage of participationCost Information Submittal Method
1BOA HolderIND
2Teammate/Subcontractor 1
3Teammate/Subcontractor 2
4Teammate/Subcontractor 3
5Teammate/Subcontractor 4
6Teammate/Subcontractor 5
7Teammate/Subcontractor 6
8Teammate/Subcontractor 7
9Teammate/Subcontractor 8
10Teammate/Subcontractor 9
*Total:$0100%
Subtotal-Proposed Labor/Fee from Tab 1 (Cell I21)$0** COMPLIANCE WARNING ** If CELL F12 (Total Proposed Labor/Fee on Teaming Matrix Tab 2) does not equal CELL F13 (Subtotal-Proposed Labor/Fee on Cost Price Matrix Tab 1), then per L.5.1.8(a), the Offeror's proposal will be non-compliaint.
(A) Offeror may NOT add or delete rows to accommodate the total number of participants.

(B) Company Name: list the name of the Offeror, all proposed teammates, and all proposed subcontractors.

(C) CAGE Code: list the corresponding CAGE code for the Offeror, all proposed teammates, and all proposed subcontractors. The listed CAGE Code shall remain consistent throughout the Offeror’s entire proposal.

(D) Role: fill in with either: P, T, S or an O (defined below) for each participant.
P - Offeror
T - Approved Teammate (via BOA Attachment 0002 Team Arrangement)
S - Major Subcontractor (Not on BOA Attachment 0002 Team Arrangement performing 20% or more for thetotal value of the contract.)
O - Other Subcontractor (Not on BOA Attachment 0002 Team Arrangement performing less than 20% for thetotal value of the contract.)
(E) Offeror to identify which functional area(s) will be performed for each participant as follows:
M - Maintenance
S - Supply
T - Transportation
MS - Maintenance and Supply
ST - Supply and Transportation
MT - Maintenance and Transportation
MST - Maintenance, Supply and Transportation
(F) Proposed Labor / Fee for each participant for the entire Period of Performance (excluding ODCs and the option to extend.)
* Formatting is set to only allow for whole dollars (no cents (i.e. decimals) are allowed)
* The Tab 2 Total in column F is a locked cell with a SUM formula of the values entered in the column F blue cells.
(G) Percentage of participation for each participant for the entire Period of Performance. The total in this column should equal 100%.
* Formatting is set to only allow for whole percentages
(H) Offeror to identify cost information Submittal Method each Teammate/Subcontractor as follows:
I N D - Teammate/Subcontractor submitting independently, Default for BOA Holder.
W I P - Teammate/Subcontractor submitting cost information within Offeror’s submission