Support.pdf

PDF 37 KB Posted

Attached to
Logistics Civil Augmentation Program (LOGCAP) V Federal contract opportunity
Solicitation number
W52P1J-16-R-0001
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This document contains required supporting documentation for an offer submitted in response to the Logistics Civil Augmentation Program (LOGCAP) V solicitation. Key details include:

Offerors must provide documentation demonstrating the realism and reasonableness of proposed costs and prices, including labor rates and supporting data, copies of indirect rate agreements, and the three most recent years of incurred indirect rates. Subcontract proposals received must be submitted along with the offeror's analyses. A list of all proposed subcontracts must include information such as the name, work to be performed, pricing structure, and basis for selection of each subcontractor. Supporting documentation should be annotated and searchable, and web pages referenced should be provided as copies rather than links. It is the offeror's responsibility to adequately support all proposed costs.

Support document

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Civil Augmentation Program (LOGCAP) V, newest first.
File Type Posted
LOGCAP_V_Industry_Day_24OCT2017.pdf PDF
Attachment 0009 - Soto Cano Tech Exhibit.xlsx XLSX spreadsheet
Attachment 0004 - Iraq Tech Exhibit.xlsx XLSX spreadsheet
Attachment 0006 - Kwajalein Tech Exhibit.xlsx XLSX spreadsheet
Attachment 0016 - Cost Reimbursable Pricing Proposal Format.xlsx XLSX spreadsheet
Attachment 0003 - AP Other Tech Exhibit.xlsx XLSX spreadsheet
Attachment 0011 - Workload Data Report Template.xlsx XLSX spreadsheet
Attachment 0013 - Impact Study Template.pdf PDF
W52P1J16R0001_LCV_draft_04OCT2017.pdf PDF
Attachment 0017 - FFP Pricing Template.xlsx XLSX spreadsheet
Attachment 0010 - Afghanistan Tech Exhibit.xlsx XLSX spreadsheet
Attachment 0014 - Cost Narrative.docx DOCX document
Attachment 0015 - Cost Price Proposal Requirements.docx DOCX document
Draft_RFP-RFI_Template.xlsx XLSX spreadsheet
Attachment 0020 - Small Business Report.xls XLS spreadsheet
Attachment 0021 - Regional Capability Matrix.xlsx XLSX spreadsheet
Attachment 0012 - Cost Variance Report Template.xlsx XLSX spreadsheet
Attachment 0019 - Small Business Participation Plan.docx DOCX document
LOGCAP_Industry_Day_Registration_Form_24Oct17.docx DOCX document
LCV_Industry_Day_Announcement_24-25Oct17.pdf PDF
LOGCAP_V_PWS_20170802_DRAFT.pdf PDF
LOGCAP_V_Notional_Tech_Exhibit.xlsx XLSX spreadsheet
LOGCAP_V_Industry_Day_23May17_FINAL.pdf PDF
LOGCAP_V_Industry_Day_Q&As_-_23May17.pdf PDF
LOGCAP_V_Attendee_List_23May17.pdf PDF
LOGCAP_V_Industry_Day_Slides_23May17.pdf PDF
Draft_RFP_Q&A_Industry_Release.pdf PDF
LOGCAP_Industry_Day_Registration_Form_23May17.docx DOCX document
Indirect_Rate_Limitation.pdf PDF
Industry_Week_Announcement_Industry_Day_23May17.ppt PPT presentation
LOGCAP_Standardized_PWS_DRAFT.pdf PDF
Source_Selection_Process_Chart.pdf PDF
Cost_Reimbursable_Pricing_Proposal_Format.xlsx XLSX spreadsheet
Past_Performance_Questionnaire.pdf PDF
Cost_Narrative.pdf PDF
Cost_Price_Proposal_Requirements.pdf PDF
Draft_RFP-RFI_Template.xlsx XLSX spreadsheet
Small_Business_Participation.pdf PDF
FFP_Pricing_Template.xlsx XLSX spreadsheet
LOGCAP_V_White_Paper_Considerations.pdf PDF
LOGCAP_V_Industry_Day_Brief_FINAL_15_Nov_16.pdf PDF
I-74_exit_closure.pdf PDF
LOGCAP_Requirements_Template_-_Workload_ _H.2.xlsx XLSX spreadsheet
LOGCAP_Industry_Day_Registration_Form.docx DOCX document
Industry_Week_Announcement.ppt PPT presentation
LCV_SB_sources_sought.pdf PDF
White_Paper_Considerations.docx DOCX document
LOGCAP_V_Industry_Day_Final.pdf PDF
ASC_Industry_Week.pptx PPTX presentation
LOGCAP_Industry_Day_Registration_Form.docx DOCX document
Show all 50

Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT XX, REQUIRED SUPPORTING DOCUMENTATION

1. The Offeror should provide all documentation necessary to support the realism and reasonableness of its proposed costs and prices for each task order. Additional guidance is as follows:

a. Labor Rates:

(1) If this solicitation contains FAR 52.237-10, Identification of Uncompensated Overtime, identify whether the proposed basic (hourly) labor rates for each direct charge Fair Labor Standards Act – exempt personnel proposed under WBS XXXX is the actual hourly rate to be proposed for all hours worked, or the “adjusted hourly rate (including uncompensated overtime)” as defined in FAR 52.237-10. Provide information showing how the “adjusted hourly rate (including uncompensated overtime)” was calculated.

(2) For labor categories performing work in the United States for the XX task order, provide a table that lists all labor categories proposed. This table should:

(a) Identify each listed labor category as being exempt or non-exempt from wage determinations or collective bargaining agreements.

(b) Briefly explain why those job titles classified as exempt are considered as such.

(c) For non-exempt labor categories, provide the following additional information:

(i) Collective bargaining agreement or wage determination and revision number used.

(ii) The collective bargaining agreement or wage determination occupation code and title, and wage rate, applicable to the proposed labor category.

(iii) Whether the identified occupation code and title are the result of an exact match to the proposed labor category or the conformance process.

(3) If labor rates are supported by labor surveys or similar types of data, the offeror should provide a clear mapping between proposed labor categories and wages versus the survey’s labor categories and wages. If the survey provides ranges or percentiles, etc., of wage rates, or different levels of labor categories with similar titles, the offeror should explain why it chose that range, percentile, or level for developing its labor rates.

b. Proposed indirect rates, fringes, and factors:

(1) Provide copies of any forward pricing rate agreements, provisional billing agreements, etc. If none, state as such in the cost narrative.

(2) Provide copies of the most recent forward pricing rate proposal submitted. If none, state as such in the cost narrative.

(3) For rates proposed, provide the most current indirect rates incurred for the three most recently completed fiscal years. This should include the pool and base amounts for each rate. If a new rate is proposed and it is based on an existing rate, the information requested above should be provided for the existing rate. If not available, explain why.

(4) For all rates proposed, provide detailed pool and base costs in a Microsoft Excel file with accompanying explanatory notes, unless provided with the forward pricing rate agreements or proposals, or billing agreements, etc.

(5) For non-exempt labor performed in the United States for the XXX task order:

(a) If the offeror’s indirect costs/rates do not separately identify “Health & Welfare”, the offeror should show using figures and narrative that the proposed indirect costs and rates comply with the Health & Welfare required by the wage determination(s). This should be supported by data from the offeror’s indirect cost/rate support.

(b) If the cost of vacations and holidays are included in indirect costs and rates, the offeror should show using facts and figures that the proposed indirect costs and rates comply with the wage determination requirements.

This should be supported by data from the offeror’s indirect cost/rate support.

c. Subcontracts:

(1) The offeror should submit copies of all subcontract proposals received in their original format and the offeror’s cost/price analyses and source selection justifications.

(2) The offeror should submit a table or list that identifies each proposed subcontract regardless of dollar value. The list should provide the following for each subcontract:

(a) Name of the proposed subcontractor.

(b) CLIN(s) and PWS(s) that will be performed by the subcontractor.

(c) Proposed subcontract type. If multiple types are proposed, identify what CLIN(s)/PWS(s) are covered by each type.

(d) Information on whether the subcontractor was selected on a competitive or non-competitive basis.

(e) Number of subcontractors submitting proposals.

(f) If price reasonableness is based on commerciality, provide a copy of the commercial item/service determination made by the offeror, and provide support for reasonableness of the commercial price.

(3) If special agreements are proposed for any subcontractor (e.g., entering into a teaming agreement, cost sharing agreement, etc.), provide a copy of all such agreements or proposed agreements.

d. Unit or Lump-Sum Costs: Provide information and supporting data on how unit or lump-sum costs included in the Offeror’s detailed pricing schedules were developed if they cannot be traced directly to underlying supporting documentation.

2. Where the Offeror’s supporting documentation is a scanned image or copy of tables, screen shots, etc. that are not readily searchable using electronic means, the documentation should be annotated to facilitate the location of the specific support.

The detailed supporting schedules should identify the supporting documentation’s file name and the page number where the Government can locate the annotated information.

3. If supporting documentation is based on internet web pages, the offeror should provide a copy of the web page(s) it obtained the information from and the web page’s address (if not printed on the copy), instead of just the address or link. Web pages may no longer be available, or their content may change, or the address or link may no longer be operable subsequent to proposal submission.

4. The above information is not necessarily all inclusive. It is the Offeror’s responsibility to adequately support its proposed costs.

File details come from the government source that posted it. Updated .