This document summarizes an industry day event related to the Logistics Civil Augmentation Program V (LOGCAP V) solicitation. The industry day will include an Enhanced Army Global Enterprise Business Operations Agreement holder meeting and a LOGCAP industry day on October 27-29, 2015 in Davenport, Iowa. The event schedule provides times for EAGLE BOA holder meetings and one-on-one meetings, as well as a LOGCAP industry day and one-on-one meetings. Further instructions for the LOGCAP portion will include an agenda, registration details, and feedback requests. The solicitation number and program name, W52P1J-16-R-0001 for LOGCAP V, are also provided.
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
123 MAY 2017 Pre-Decisional
UNCLASSIFIED
Logistics Civil Augmentation Program
(LOGCAP) V
Industry Day
May 23, 2017
Army Contracting Command – Rock Island Army Sustainment Command
223 MAY 2017 Pre-Decisional
• Industry Day is for information and planning purposes only. This does not constitute a formal solicitation or a Request for Proposal (RFP). This is not to be construed as a commitment by the Government in any way.
• The Government does not intend to award a contract on the basis of Industry Day or otherwise pay respondents for participation in this event. Should an RFP be issued, any information contained within the RFP supersedes this Industry Day.
• Milestones, numbers/quantities, and other details are for informational purposes only and may change.
• No Government personnel except for the Contracting Officer can make any commitments for the Government.
Disclaimer
323 MAY 2017 Pre-Decisional
• Facilities
• Electronic Devices
• Please place wireless devices in silent mode
• No recording or video
• Breaks
• Questions
• Conduct
Administrative Notes
423 MAY 2017 Pre-Decisional
1300 - 1320 - Opening Remarks – Mr. Hutchison
1320 – 1345 - Acquisition Strategy Overview – Brian Knutson
1345 – 1420 - PWS, Requirements, & Tech Exhibits – Jerry Jastrab
• PWS Overview
• Setting the Theater
• Reporting
1420 – 1440 Break
1440 – 1600 Draft RFP - Brian Knutson
• CLIN Structure/Requirements Breakout – Tech Exhibits
• Future Consolidation
• Clauses/Special Narratives
• Change Management, Estimating/Tracking/Accountability
• Proposal Instructions & Evaluation Criteria (L&M)
• Detailed slides by factor
1600 - 1630 – Break and allow time for industry partnering /Collect Questions
1630 – 1700 - Final Open Forum Question & Answer Session - Acquisition Team and Mr. Carr, Mr. Cartwright, and Mr. Nepper
LOGCAP V Industry Day: Afternoon 23 May 2017
NOTE: Q&A allowed during each briefing
523 MAY 2017 Pre-Decisional
UNCLASSIFIED
LOGCAP V
Acquisition Strategy
Overview
623 MAY 2017 Pre-Decisional
Acquisition Strategy Concept Compete full and open
Compete planning capability and all known requirements
• Setting the Theater task orders are the minimum guarantee
• Current requirements – All GCC/ASCC
• NOTE: Current requirements are subject to change
Multiple Award, Indefinite Delivery Indefinite Quantity (IDIQ)
• Contract type will be determined at task order level
• Based on requirements and operational considerations
Award up to six base contracts
• Task orders regionally aligned to each GCC/ASCC
• Dedicated contractor for each GCC/ASCC
• May result in less than six if not enough qualified offerors submit proposals
Base contract is a 10 year ordering period
• Service performance task orders – 5 years (base year plus four one year options)
• Setting the Theater task orders – 10 years (base year plus nine one year options)
723 MAY 2017 Pre-Decisional
Acquisition Strategy Concept (cont.)
Future ordering:
• Sourced to GCC/ASCC aligned contractor and incorporated via modification or an additional distinct task order, as appropriate
• Re-compete initial performance task orders no later than year 5 years among
LOGCAP V contractors (Operational timelines will be considered)
• Government retains the ability to compete among LOGCAP V contractors at any time, with any requirements, if determined to be in the USG’s best interest
Requires Contractors to “Set the Theater”
• Measurable outcomes to maintain capability
• Requires synchronization and integration of performance contractors into the operational planning cycle
823 MAY 2017 Pre-Decisional
Post-award: Any new requirements awarded to the Contractor with ‘Set the Theater’ TO, and will consist of mixed duration TOs
TO 0008
TO 0007
TO 0005
Year 5 Year 10
TO 0001 Setting the Theater
TO 0002 Existing Requirement
TO 0011
Award
Period of Performance Examples
Initial award: Each ASCC will have a 10 year task order (TO) for the ‘Set the Theater’ requirement and 5 year TOs for existing requirements (i.e. Iraq, Afghanistan).
Example: TO 0005 supports a permissive operational environment conducive to a recompete; open to all IDIQ Contractors
Example: TO 0007 supports an unstable operational environment not conducive to a recompete;
retained by the ‘Setting the Theater’ Contractors
TO 0004 Field Exercise TO 0006 Theater Opening EX TO 0012 Security CooperationTO 0010 STAFFEX
Contractor - A Contractor – A, B, C, or D Required Competition Compete Decision
Legend:
TO 0009TO 0003 Existing Requirement
923 MAY 2017 Pre-Decisional
LOGCAP V Contract Timeline
Issue RFP
Contract Award - Goal
Proposals Due
Industry Day 3
Acquisition Strategy Approval (DASA(P))
Draft RFP
1023 MAY 2017 Pre-Decisional
UNCLASSIFIED
LOGCAP V
Performance Work Statement
1123 MAY 2017 Pre-Decisional
Future Operational Environment The emerging operational environment indicates future operations will be significantly different than those of the recent past.
Sensor-rich militaries of peer states and proxies:
• Employing precision-guided munitions on highly lethal battlefields
• Restrict freedom of maneuver and action
• Degrade key capabilities by limiting access to space, cyberspace, and the electromagnetic spectrum (EMS)
• The Joint Force can no longer assume continuous superiority in any domain
• US Forces will create and exploit temporary windows of advantage
• As adversaries contest joint forces in one area, U.S. Forces will either:
o Fight through o Endure enemy actions; or o Bypass these effects by rapidly moving to another area where a temporary window of advantage has been created
1223 MAY 2017 Pre-Decisional
Future Logistics Operational Environment
• The U.S. Army must operate at a pace and tempo the enemy cannot sustain
• They will maneuver quickly and operate semi-independently from large formations
New logistics skill sets required:
• 3D printing/additive manufacturing
• Semi-autonomous/autonomous aerial and ground delivery o Unmanned ground and air vehicles
• Alternative energy, tactical power generation, and micro-grid technology
• Point of production water
Resulting Sustainment Environment:
• Austere environments
• Extended lines of communications
• Vulnerabilities inherent in deployment and sustainment operations
• Support will be required to smaller dispersed units far away from well established military posts
• LOGCAP contractors are needed to set and surge the theater in order to reduce the logistics burden on Army forces
1323 MAY 2017 Pre-Decisional
Setting The Theater Doctrine
1423 MAY 2017 Pre-Decisional
PWS SECTIONS:
SECTION I - LOGISTICS CIVIL AUGMENTATION
PROGRAM CONCEPT OF
OPERATIONS
SECTION II - CONTRACTOR ENABLING
FUNCTIONS
SECTION III - ENGINEERING SERVICES
SECTION IV - CONTINGENCY BASING
SECTION V - SUPPLY
SECTION VI - MAINTENANCE
SECTION VII - TRANSPORTATION
SECTION VIII - OTHER SUPPORT
OPERATIONS
SECTION IX - PLANS IN SUPPORT OF
CONTRACTOR OPERATIONS
SECTION X - TECHNICAL EXHIBITS
Requirements by Category
PLANNING FOCUS
Section II:
• Pre-activation
• Exercise
• Project
Section III:
• Plan and Design
Reduce risk and improve responsiveness by:
• Building relationships and knowledge of theater
• Standardizing designs and base operations support equipment o Implementing modularity in construction
• Seek out and find opportunities for technology insertion
• Develop tactical power grids and point of use infrastructure
Seek to reduce the logistics tail while maintaining capabilities and resiliency
1523 MAY 2017 Pre-Decisional
Operational Planning for Setting the Theater
OPLAN
CONPLAN
Emerging Requirements
Theater Planners
• Identify capability gap and countries in area of operations
Army Service Component Command
Army Field Support Brigade Contracting Support Brigade
LOGCAP Planners / ACO
• In coordination with LOGCAP Program
Management Office, ACC-RI/PCO Analyze capability gap to determine if within LOGCAP scope
• Provide support requirement to LOGCAP performance contractor
LOGCAP Performance Contractor
• Analyze support requirement
Annex W Operational Contract
Support
Theater Planners
• Conduct risk analysis and if accepted, incorporate Concept of Support into Annex W
Army Field Support Brigade Contracting Support Brigade
LOGCAP Planners / ACO
• In coordination with LOGCAP
Program Management Office, ACC- RI/PCO, analyze and negotiate on Contractor Concept of Support
LOGCAP Performance Contractor
• Develop a Concept of Support which includes: proposals, estimates, and technical execution plans
1623 MAY 2017 Pre-Decisional
• Planning Support – Pre-Activation:
o LOGCAP Contractors will provide preparatory planning for the integration of LOGCAP capabilities into existing OPLANs, CONPLANs, and areas of emerging threat.
o The contractor shall develop, update, and maintain updated information for countries within the GCC including, but not limited to:
Applicable labor laws VISA wait times Vendor lists Transportation infrastructures
Identify engineering support required Other pertinent information that will impact or influence cost and ability to deliver required services when needed.
o The planning capability shall develop proposals, estimates, and technical execution plans.
Focus Area - Section II: Pre-activation - Setting the Theater
USG will provide Contractor:
o Prioritized list of countries requiring detailed analysis o Required deliverables with timelines for country books o Access to existing USG data when available o Requirements to develop concepts of support
USG will assess semi-annually during Performance
Management Review
1723 MAY 2017 Pre-Decisional
• USG wants Contractors to be partners in driving footprint and demand reduction through:
o Technology insertion o Operational energy o Point of need production capabilities
Reducing the Logistics Tail
Incentivize through the Value Engineering Change Proposal (VECP) Process:
Government implementing DoD Value Engineering program as codified in:
- 41 U.S.C. 432 Value Engineering
- 41 U.S.C. 1711 Value Engineering
1823 MAY 2017 Pre-Decisional
PWS SECTIONS:
SECTION I - LOGISTICS CIVIL AUGMENTATION
PROGRAM CONCEPT OF
OPERATIONS
SECTION II - CONTRACTOR ENABLING
FUNCTIONS
SECTION III - ENGINEERING SERVICES
SECTION IV - CONTINGENCY BASING
SECTION V - SUPPLY
SECTION VI - MAINTENANCE
SECTION VII - TRANSPORTATION
SECTION VIII - OTHER SUPPORT OPERATIONS
SECTION IX - PLANS IN SUPPORT OF
CONTRACTOR OPERATIONS
SECTION X - TECHNICAL EXHIBITS
Requirements by Category
Base Operations Support:
• Requirements are now contingency and non-contingency augmentation support across the operational spectrum (Phases 0-V)
• Adds medical support requirement (role 1 and 2), and family support services
• Permissive environment - focus on efficiencies
• Contingency environment and multi-domain battlefield - focus on reducing footprint and logistics tail
1923 MAY 2017 Pre-Decisional
Sustainment Operations:
• Requirements are now contingency and non-contingency augmentation support across the operational spectrum (Phases 0-V)
• Support Theater exercises for plan validation
• Directed use of Army automated information systems in order to maintain theater logistics common operating picture
PWS SECTIONS:
SECTION I - LOGISTICS CIVIL AUGMENTATION
PROGRAM CONCEPT OF
OPERATIONS
SECTION II - CONTRACTOR ENABLING
FUNCTIONS
SECTION III - ENGINEERING SERVICES
SECTION IV - CONTINGENCY BASING
SECTION V - SUPPLY
SECTION VI - MAINTENANCE
SECTION VII - TRANSPORTATION
SECTION VIII - OTHER SUPPORT OPERATIONS
SECTION IX - PLANS IN SUPPORT OF
CONTRACTOR OPERATIONS
SECTION X - TECHNICAL EXHIBITS
Requirements by Category
• Permissive environment - focus on efficiencies
• Contingency environment and multi-domain battlefield - focus on reducing footprint and logistics tail, and point of need production operations
2023 MAY 2017 Pre-Decisional
How a LOGCAP V Task Order Will Work
Performance Work Statement
“Menu” of Services and baseline standards Technical Exhibit A.1
Services Matrix indicates active service requirements supporting workload by location.
Technical Exhibit A.2 Site Maps, facility drawings
Site specific requirements
Technical Exhibit C (C.1-C.4)
Government Furnished:
• Facilities (GFF)
• Equipment (GFE)
• Material (GFM)
• Services, Support and Training
Government support
Technical Exhibit H.2 PRS Supplement – exceptions and supplements to H.1
How services are to be provided
Technical Exhibit H.1 Performance
Requirements Summary (PRS) and Acceptable Quality levels (AQL)
How we build Task Order requirements
2123 MAY 2017 Pre-Decisional
Reporting
Type of Report Method/Medium/Format
• Routine status, management, inventory, and information reports
• Government property management
Standard Army Automated Information Management Systems
• LOGCAP Program Specific Reports Stand alone or flat file format o Microsoft Office Software o Format provided by USG
• Theater / Operation Specific Reports Specific to theater and/or operation o Provided in TE H.2
Technical Exhibit (TE) F: Required Reports
• Under development
• LOGCAP V will use baseline reporting formats common to all task orders
• Baseline frequency dictated in TE F
• Exceptions/deviations will be detailed in TE H.2
Goal is to standardize reporting across all theaters and enable accurate theater logistics common operating picture
2223 MAY 2017 Pre-Decisional
UNCLASSIFIED
LOGCAP V
Draft RFP
2323 MAY 2017 Pre-Decisional
Task Order/CLIN Structure
Setting the Theater – pre-activation (WBS 02.01) task order for each Army Service Component Command (ASCC)
• Guaranteed Minimum – six task orders (excludes AFG)
• Firm Fixed Price
• Potential Cost Reimbursable Travel CLINs, when USG directed
• May have a separate CLIN to support exercises
Performance Task Orders:
• Performance task order(s) in each ASCC
• ARCENT/CENTCOM Task Order Structure
• Kuwait task order
• Qatar/other AP sites task order
• Iraq Operation Inherent Resolve task order
• Afghanistan task order
• CLIN type - TBD based on requirements
• May have several CLINs to support multiple customers/funding sources
• May have separate CLINs for FOC v. Transition/IOC
2423 MAY 2017 Pre-Decisional
Consolidation
Current efforts for consolidation:
• LOGCAP IV
• Kuwait Base Operations & Security Support Services (K-BOSSS)
• Qatar Base Operations & Support Services
• Bulk Fuel (Kuwait)
• Wash Rack (Kuwait)
Strategic Sourcing Initiatives
• Preferred Sourcing may lead to additional requirements being sourced through the LOGCAP contract
2523 MAY 2017 Pre-Decisional
Clauses/Special Narratives
Clauses:
• USG will provide clause matrix
• USG still reviewing a number of clauses. All fill-ins will be input prior to release of final RFP
• EVMS applicability
Change Management for Performance Task Orders:
• Add/remove site or service
• Engineering or construction efforts
• Fluctuating Requirements – Industry Feedback
• Basis - Cost/Workload
• Level – Mission/Site/Service
• Frequency – Monthly/Quarterly
Estimating/Tracking/Accountability – Consistency of data:
• Project/Change order accounting
• All IAW standardized PWS numbering
• Use of labor staffing model
• All reporting utilizes same naming/numbering conventions
• KTR responsible to measure and track variance from baseline
2623 MAY 2017 Pre-Decisional
Clauses/Special Narratives (cont.)
Pricing:
• Labor Rate List
• Not applicable to Setting the Theater task order
• Applicable to Expats/TCN based labor
• Single master list of base labor rates by contractor fiscal year
• May use uplifts/factors to adjust for cost proposals for specific theater considerations
• For initial award and subsequent non-competitive awards (e.g., task orders, modifications)
• Not applicable to subsequent competitive awards
• Proposal cost baseline/fee setting purposes only
• Reimbursed for actual rates (incurred cost) experienced, providing they are allowable.
• Rates are for fiscal years covered by initial task order award
• Provides for negotiating rates for fiscal years subsequent to the initial task order award fiscal years
2723 MAY 2017 Pre-Decisional
Clauses/Special Narratives (cont.)
Pricing (Cont.):
• Limitation on Indirect Cost Rates
• Not applicable to Setting the Theater task orders
• Establishes ceilings on indirect rates for reimbursement purposes
• Billings at lesser of ceiling rates or current billing rates
• Unlike labor rates, may have different rates for each GCC
• Rates used in the proposal are the ceiling rates for associated fiscal years
• Most probable costs based on these ceiling rates
• Provides for negotiating ceiling rates for fiscal years subsequent to the initial task order award fiscal years.
2823 MAY 2017 Pre-Decisional
Responsiveness: Provide agile sustainment for an agile force where and when needed.
Affordability: Employ effective measures to control costs and ensure best value.
Transparency: Ensure that costs can be traceable to execution.
Predictability: High confidence in cost estimates when levels of effort are known.
Capability: When called upon, reliably provide full spectrum sustainment services across the full range of possible mission sets.
Accountability: Adherence and compliance with regulatory and contractual requirements.
Flexibility: Plan for rapid expansibility and reversibility to meet commander's objectives.
Proposal Instructions & Evaluation Criteria (L&M)
Overview
• Required propose on all requirements (all GCC/ASCC)
• USG will populate requirements template (sites, services, workload, etc.)
2923 MAY 2017 Pre-Decisional #
LOGCAP V Source Selection Process
Group Two All Contractors eligible for one award only
Group One All Contractors eligible for one award only
Group Three All Contractors eligible unless awarded CENTCOM, or did not receive a GCC/ASCC award in previous rounds
1. EUCOM
2. PACOM
1. CENTCOM
2. NORTHCOM
4. SOUTHCOM
3. AFRICOM
AFG
3023 MAY 2017 Pre-Decisional
Proposal Instructions & Evaluation Criteria (L&M)
Overview
• General Comment for both Tech/Management and Pricing:
• The labor staffing model and the costs/fees proposed in the Pricing volume shall be structured using the Government’s PWS paragraphs.
• Offerors may develop its own structure for internal use only
• Offers not structured around the Government’s PWS paragraphs will be rejected.
3123 MAY 2017 Pre-Decisional
Technical Proposal Instructions
Regional Capabilities
• Regional Capabilities Matrix (1 per GCC/ASCC)
• Purpose of the matrix is to depict the contractor’s existing capability within each GCC/ASCC as it directly relates the service requirements that may be required under any LOGCAP Task Order (PWS).
• Regional Planning and Performance Capabilities (1 per
GCC/ASCC)
• Description of structure with each GCC/ASCC that demonstrates rapid responsiveness, capabilities, and/or experience.
• Approach to leverage those in delivering services.
• Supported by the Regional Capabilities Matrix.
3223 MAY 2017 Pre-Decisional
Technical Proposal Instructions (cont.)
Management and Staffing Approach: (1 Overarching Approach)
• Describe organization structure and plan to manage the complexity of providing services, to include, start-up operations, service adjustments (adding/removing services/workload), and termination of operations. Describe tools, reports, etc. to overcome challenges and how those will be collected, packaged, and delivered to the USG.
• Key Initiatives (Combating Trafficking in Persons (CTIP), Sexual Harassment / Assault Response & Prevention (SHARP), Threat Awareness and Reporting Program (TARP), and Safety.
• Labor Staffing Model
• Describe supporting rationale used as the basis for the Labor
Staffing Model.
3323 MAY 2017 Pre-Decisional
Labor Staffing Model – Standardized approach and concepts to meet global requirements Developed to meet the actual requirements and include adjustability, etc. criteria set forth in the draft RFP based upon the standardized USG provided requirements build
Other Considerations to include: Operational environment, threat conditions, accessibility, transportation, etc.
Site/Service Specific Requirement InformationStandard Requirements Information
Proposal Instructions & Evaluation Criteria (L&M)
PWS LIST of Services
04 – Base Ops 05 – Supply 06 – Transportation 07 - Maintenance
PWS
Standards
Shall do IAW xxxx Shall meet Shall maintain
H.2 Supplement
Hours of operations Days of supply
Workload Data
Quantity of facilities Quantity produced
Non-standardized supplemental information specific to mission/requirement. Must be accounted for but does not serve intent of the model approach (i.e. I want it done this way)
3423 MAY 2017 Pre-Decisional
Tech Exhibit A.1 WBS/SITE Site A Site B Site C
04.00 Base Camp Services
04.02. Utility Operations.
04.02.01 Environmental Control X X
04.02.02 Power/Electricity X X
04.02.03 Emergency Back up Power Generation X X
04.03 Water and Ice service
04.03.01 Produce Raw Water X X
04.03.02 Produce Bulk Potable Water X X
04.03.03 Produce Bulk Non-Potable Water X X
04.03.04 Ice Services X X
04.04 Textile Services
04.04.01 Full Service Laundry X X
04.04.02 Medical Service Laundry X X
04.04.03 Self-Service Laundry X X
04.04.04 Textile Repair X X
04.05 Custodial Services
04.06 Food Service
Sample Requirements for Staffing Model
USG provided PWS list of activated services and standards
Standard PWS list of services and standards
List of sites within task order
“X” indicates service is activated for site
3523 MAY 2017 Pre-Decisional
Sample Requirements for Staffing Model
USG provided PWS Supplemental Data and Workload
WBS 04.04.01 Full Service Laundry
SITE CATEGORY DESCRIPTION INPUT
Site A
Workload Pounds Per Person Per Turn-in 18 Workload Number of Bag Turn-ins per Month 3,000 Workload Number of Pickup/Drop-off Points 1 H.2. Supplemental Turnaround Time (hrs) 72 H.2. Supplemental Hours of Operation 0700-1900
Site B
Workload Pounds Per Person Per Turn-in 18 Workload Number of Bag Turn-ins per Month 4,000 Workload Number of Pickup/Drop-off Points 1 H.2. Supplemental Turnaround Time (hrs) 48 H.2. Supplemental Hours of Operation 0700-1900
Site C
Workload Pounds Per Person Per Turn-in 18 Workload Number of Bag Turn-ins per Month 10,000 Workload Number of Pickup/Drop-off Points 2 H.2. Supplemental Turnaround Time (hrs) 72 H.2. Supplemental Hours of Operation 0700-1900
Data will be input for all sites where service is activated
Description of the data that will be input for the specific
WBS if activated
Inputs
3623 MAY 2017 Pre-Decisional
Sample Requirements for Staffing Model
KTR developed staffing model approach for WBS 04.04.01
WBS Tasks Relationship Operate Pickup/Drop-off points 1 operator per hour of operations
Clean Laundry 1 technician = 40 bags per day @ 72 hour 1 technician = 32 bags per day @ 48 hour
Site A Operator 1.75 Technician 2.5
Site B Operator 1.75 Technician 5.2
Site B Operator 1.75 Technician 8.3
Task required to complete service
Estimating relationship to successfully complete required tasks
0700-1900 = 14 hours 3,000/30 = 100 bags per day
100/40 = 2.5 per day
0700-1900 = 14 hours 4,000/30 = ~130 bags per day
100/32 = ~5.2 per day
0700-1900 = 14 hours 10,000/30 = ~330 bags per day
100/40 = ~8.3 per day
Staffing approach applied to site specific workload and supplemental standards
3723 MAY 2017 Pre-Decisional
• Utilize Government provided workload
• Consistent and scalable based across a broad range of requirements and workload fluctuations
• Fixed level of resource/requirement
• Adjustable based on variable workload inputs and scenario
• Thought processes and methodologies in estimating labor hours/mix for successful performance
• Based on Standard (Gov’t, Your Company, Product, etc.)
• Estimating relationships
• Past experience
• Explain relevance, how data was collected/analyzed
• Complexity Factors
Labor Staffing Model Development
3823 MAY 2017 Pre-Decisional
Requirements Development and Staffing Model Concept
3923 MAY 2017 Pre-Decisional
Section M – Technical Factor
• Feasibility of the technical management approach to accomplishing the requirements of the solicitation, to include the LOGCAP PWS and the identified LOGCAP objectives.
• Will consider the content of the Description of Technical/Management Approach , the Labor staffing model, and the Regional Capability Matrix in evaluating the Offeror’s approach.
4023 MAY 2017 Pre-Decisional
Section M – Technical Evaluation Approach
A separate adjectival rating will be assigned to support award determinations for each GCC/ASCC.
Regional Performance Capabilities:
• Offeror’s demonstrated capabilities within each GCC/ASCC that directly relate to the service requirements that may be required under LOGCAP.
• Demonstrates rapid responsiveness, capabilities, and/or experience throughout the GCC/ASCC.
• How they (regional capabilities) will be leveraged in delivering services required by the RFP and the LOGCAP Standardized
PWS
4123 MAY 2017 Pre-Decisional
Section M – Technical Evaluation Approach
Management & Staffing
• Feasibility of approach to transmit information and meet key initiatives
• Feasibility of and confidence in the Labor Staffing Model
• Based on the quality and soundness of the supporting rationale utilized to develop the labor staffing model.
• Evaluated for consistency, scalability, and adjustability across the broad range of requirements
4223 MAY 2017 Pre-Decisional
Cost/Price
• Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP)
• Cost Realism and Price Reasonableness
• Total Evaluated Price per GCC/ASCC
• Planning (FFP)
• Current requirements (TBD based on requirements)
• Most Probable Cost (MPC) adjustment for CPFF
• Task Order Base and Options evaluated
• Structuring of Contractor Program Management Office (PMO)
• Material & Equipment plug numbers
• Base Rates applicable to future cost/price baselining
• No fee on material, equipment, Defense Base Act, Facilities Capital
Cost of Money, and USG directed travel
4323 MAY 2017 Pre-Decisional
Proposal Instructions & Evaluation Criteria (L&M)
Pricing:
• Firm fixed price portion:
• Total price only
• No breakdown required, but may be requested if needed.
• Cost Reimbursable portion:
• Offerors required to submit costs and prices using Government provided formats.
• A general format has been specified for the offeror’s detailed calculation of costs.
• Offerors may add columns as needed to accommodate their proposal structure.
• Subcontract proposals will need to provide cost or price breakdowns that show resources and their quantities.
• Applies even in the case of FFP subcontracts
• Government needs visibility into the resources being proposed.
4423 MAY 2017 Pre-Decisional
Past Performance
• The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the PWS.
• Must be recent and relevant
• Within 3 years of issuance of LOGCAP V RFP
• Performing services that are same or similar scope, complexity, magnitude of effort and meets objectives as outlined in PWS…
• Offeror may submit up to 3 project/contract references; any proposed joint venture, partnerships, or major/critical subcontractor(s) are allowed up to 2 references each
• No limit for adverse past performance
• The Government will focus its inquiries on the offeror’s record of performance as it relates to all solicitation requirements, including cost, schedule, performance, and management
• NOTE: Includes major/critical subcontractors, Joint Venture members, partnerships, and new entities
• One overall Confidence Assessment
4523 MAY 2017 Pre-Decisional
Small Business Participation
• Proposed Small Business Participation
• Submission of Small Business Participation Plan Attachment
• Commitment to Small Business
• Established procedures for timely payments to small business
IAW FAR 52.219-8
• Compliance with reporting requirements IAW FAR 52.219-9;
submit 3 ISRs for contracts within the past 3 years that included a subcontracting plan
• Goals/objectives based on Total Contract Value for CONUS and
OCONUS
• Small Business - 15%
• Small Disadvantaged Business (SDB) - 4%
• Woman-Owned Small Business (WOSB) - 3%
• Historically Underutilized Business Zone (HUBZone) Small Business - 2%
• Veteran Owned Small Business (VOSB) - 2%
• Service Disabled Veteran Owned Small Business (SDVOSB) - 1%
• May require additional report(s) outside of eSRS’
4623 MAY 2017 Pre-Decisional
Panel
Questions ?
| Logistics Civil Augmentation Program �(LOGCAP) V �Industry Day ���May 23, 2017� |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| �LOGCAP V �Acquisition Strategy�Overview����� |
| Acquisition Strategy Concept |
| Acquisition Strategy Concept (cont.) |
| Slide Number 8 |
| LOGCAP V Contract Timeline |
| LOGCAP V �Performance Work Statement����� |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| �LOGCAP V�Draft RFP����� |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Technical Proposal Instructions |
| Technical Proposal Instructions (cont.) |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Section M – Technical Factor |
| Section M – Technical Evaluation Approach |
| Section M – Technical Evaluation Approach |
| Cost/Price� |
| Slide Number 43 |
| Past Performance |
| Small Business Participation� |
| Panel |