Attachment 0013 - Impact Study Template.pdf
PDF 32 KB Posted
- Attached to
- Logistics Civil Augmentation Program (LOGCAP) V Federal contract opportunity
- Solicitation number
- W52P1J-16-R-0001
About this file
This document provides an impact study template for the Logistics Civil Augmentation Program V (LOGCAP V) federal contract opportunity. The impact study template outlines requirements for quarterly reports measuring and explaining cost variances against the task order budget. Reports should include an executive summary, major cost drivers, work breakdown structure details, and a summary. Techniques like cost element breakdowns, workload and cost fluctuations, government changes, and other condition changes must be addressed. Contributors and their relationships to variances should be identified. The 80/20 concept should determine the level of analysis for major drivers.
Impact Study template
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0009
Impact Study Template
• The Impact Study shall be submitted on a quarterly basis and should be organized in a general report structure (i.e. Introduction/Executive Summary, Major Contributors/Significant Factors, WBS/Requirement Detail, Summary) and should include any necessary supporting documentation.
• The Offeror shall utilize cost accounting techniques and metrics to measure and track cost variances across the Task Order as compared to the Task Order budgeted cost base.
• The Impact Study will address the cost variance by major contributor and be prepared to a sufficient level of detail to allow DCAA audit and Government Technical Evaluation.
The techniques should include, but not be limited to, cost element breakout, cost and workload data fluctuations, Government caused changes, or otherwise changed conditions throughout the quarter.
• The Impact Study is not intended to be an all inclusive analysis, but shall identify and explain the significant factors and their contributing relationships to the Task Order cost variances.
• In determining the level of depth for this study, the 80/20 concept should be applied to addressing the major contributors.