This document provides information on an upcoming industry day and one-on-one meetings for the Logistics Civil Augmentation Program (LOGCAP) V opportunity. The Army Sustainment Command and Army Contracting Command - Rock Island will host the industry events from October 27-29, 2015 in Davenport, Iowa. The schedule includes an Enhanced Army Global Enterprise Business Operations Alignment Holder meeting on October 27th for current holders, as well as a LOGCAP Industry Day and one-on-one meetings open to all interested parties on October 27-29th. The industry day and meetings will provide an opportunity for firms to learn more about the LOGCAP V requirement for contingency logistics support services across multiple regions.
Industry Day 24 Oct 2017 Slides
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
124 Oct 2017 Pre-Decisional
UNCLASSIFIED
Logistics Civil Augmentation Program
(LOGCAP) V
Industry Day
Oct 24, 2017
Army Contracting Command – Rock Island
Army Sustainment Command
224 Oct 2017 Pre-Decisional
• Industry Day is for information and planning purposes only. This does not constitute a formal solicitation or a Request for Proposal
(RFP). This is not to be construed as a commitment by the
Government in any way.
• The Government does not intend to award a contract on the basis of Industry Day or otherwise pay respondents for participation in this event. Should an RFP be issued, any information contained within the RFP supersedes this Industry Day.
• Milestones, numbers/quantities, and other details are for informational purposes only and may change.
• No Government personnel except for the Contracting Officer can make any commitments for the Government.
Disclaimer
324 Oct 2017 Pre-Decisional
• Facilities
• Electronic Devices
• Please place wireless devices in silent mode
• No recording or video
• Breaks
• Questions
• Conduct
Administrative Notes
424 Oct 2017 Pre-Decisional
1300 - 1330 - Opening Remarks – MG Gamble
1330 – 1345 - Acquisition Strategy Overview – Brian Knutson
1345 – 1400 - Program Update – Jerry Jastrab
1400 – 1420 - Draft RFP 2 - Brian Knutson
1420 – 1440 - Break
1440 – 1600 – Guided Discussion - Brian Knutson
1600 - 1630 – Break and allow time for industry partnering /Collect Questions
1630 – 1700 - Final Open Forum Question & Answer Session - Acquisition Team
Agenda
NOTE: Q&A allowed during each briefing
524 Oct 2017 Pre-Decisional
UNCLASSIFIED
LOGCAP V
Acquisition Strategy
Overview
624 Oct 2017 Pre-Decisional
Summary of Acquisition Strategy
Basic Contract:
• Full and open competition
• Award minimum of four and up to six multiple award indefinite delivery/indefinite quantity contracts
• No more than two GCC/ASCCs to a single Contractor
• 5 year ordering period and options for 5 additional one year ordering periods
Source Selection:
• GCC/ASCCs awards are a mix of operational considerations and business opportunity
• Best Value Tradeoff of the following Evaluation Factors:
Technical/Management, Past Performance, Small Business Participation, and Cost/Price
• Proposals evaluated and rated for each GCC/ASCC
Future Orders:
• Competed
• Urgent requirements sourced to the GCC/ASCC aligned Contractor (requires JEFO)
• Re-compete initial performance task orders no later than Year 5 among the LOGCAP V Contractors
• Government retains the ability to compete among LOGCAP V Contractors at any time, with any requirements
Initial Task Orders:
• Awarded simultaneously with basic contract
• 10 year task order for ‘Set the Theater’ (one year base + nine one year options)
• 5-year performance task orders ’ (one year base + four one year options); recompete at year 5
• Planning in support of assigned GCC/ASCC to set and mature the theater logistics requirements in anticipation of future operations, and existing requirements in GCC/ASCC
724 Oct 2017 Pre-Decisional
Post-award: Any new requirements will be competed, however there are options for exceptions for fair opportunity to be approved (i.e.; urgency of need)
TO 0005
TO 0004 – Urgent
TO 0003 – Competitive
Year 5 Year 10
TO 0001 Setting the Theater
TO 0002 Performance Task
Award
Example
Initial award: Each ASCC will have a 10 year task order (TO) for the ‘Set the Theater’ requirement and 5 year TOs for existing requirements (i.e. Iraq, Afghanistan).
Example: TO 0004 supports an urgent and unstable operational environment not conducive to upfront competition; JEFO signed by PARC to allow incumbent ‘Setting the Theater’ Contractor to receive the task order
Contractor - A Contractor – A,B, C, or D Required Competition Compete Decision
Legend:
Abbreviations:
TO: Task Order
JEFO: Justification for
Exception to Fair
Opportunity
Example: Recompete is open to all MATOC contractors.
TO 0006
824 Oct 2017 Pre-Decisional
LOGCAP V Contract Timeline
Issue RFP
Contract Award - Goal
Proposals Due
Industry Day 4
Acquisition Strategy Approval (DASA(P))
Draft RFP
Industry Day 3
Draft RFP 2
924 Oct 2017 Pre-Decisional
UNCLASSIFIED
LOGCAP V
Program Update
1024 Oct 2017 Pre-Decisional
LOGCAP V Deliverables (Non-Proprietary)
• Performance Contractor Embeds lead planner with AFSB
• One LOGCAP concept of support/ input to Annex W and support plan (SUPPLAN) to complement TSC plans (1st year of award)
• Concept of support and SUPPLAN reviewed every six months during program reviews
• Country/Region books to support LC concept of support, input to Annex W and SUPPLAN
(1st year of award)
• Participation in ASCC/TSC/Corps exercise support
LOGCAP IV and V Comparison
LOGCAP IV LOGCAP V
PWS Type Performance based - Performance based
- Adds new services
Responsiveness Warm basing (72hr Response)
- Warm Basing (72hr Response)
- Larger presence in Theaters
LOGCAP planners location
GCC ASCC or TSC/ESC*, Corps (*AFSB Commander Decision)
Planning Focus GCC - ‘Set the Theater’ is the planning priority
- Holistic operational planning PH 0-V
Decision to use LOGCAP Dictated by GCC OCS ASCC/TSC/Corps
Exercise Support Limited GCC exercise support ASCC/TSC/Corps annual exercise support
1124 Oct 2017 Pre-Decisional
PWS SECTIONS:
SECTION I - LOGISTICS CIVIL AUGMENTATION
PROGRAM CONCEPT OF
OPERATIONS
SECTION II - CONTRACTOR ENABLING
FUNCTIONS
SECTION III - ENGINEERING
SECTION IV - Base Operations Services Support
SECTION V - SUPPLY
SECTION VI - MAINTENANCE
SECTION VII - TRANSPORTATION
SECTION VIII - OTHER SUPPORT
OPERATIONS
SECTION IX - CONTRACTOR OPERATIONS
SECTION X - TECHNICAL EXHIBITS
Services Required Under LOGCAP V
PLANNING FOCUS
Section II:
• Pre-activation
• Exercise
• Project
Section III:
• Plan and Design
Reduce risk and improve responsiveness by:
• Building relationships and knowledge of theater
• Standardizing designs and base operations support equipment o Implementing modularity in construction
• Seek out and find opportunities for technology insertion
• Develop tactical power grids and point of use infrastructure
Seek to reduce the logistics tail while maintaining capabilities and resiliency
1224 Oct 2017 Pre-Decisional
LOGCAP Performance Contractor Planners
NORTHCOM
Planners Location ASC Partner
- ARNORTH (1) Fort Sam Houston, TX 404th AFSB (JBLM)
- I Corps (1) Joint Base Lewis- McChord, WA
404th AFSB
- FORSCOM (1)
- XVIII Corps (1)
- USASOC (1)
Fort Bragg, NC 406th AFSB
- III Corps (1) Fort Hood, TX 407th AFSB
SOUTHCOM
Planner Location ASC Partner
- USARSO (1) Fort Sam Houston, TX 407th AFSB (Fort Hood, TX)
1324 Oct 2017 Pre-Decisional
LOGCAP Performance Contractor Planners
EUCOM Planner Location ASC Partner
- USAREUR (1)
Kaiserslautern, Germany
405th AFSB
AFRICOM
Planner Location ASC Partner
- USARAF (1) Vicenza, Italy 405th AFSB (GE)
CENTCOM Planner Location ASC Partner
- ARCENT (Fwd) (1) Kuwait 401st AFSB
PACOM Planner Location ASC Partner
- USARPAC (1) Hawaii 402nd AFSB
- 8th Army (1) Korea 403rd AFSB
1424 Oct 2017 Pre-Decisional
Planning Support – Pre-Activation:
o LOGCAP Contractors will provide preparatory planning for the integration of LOGCAP capabilities into existing OPLANs, CONPLANs, and areas of emerging threat.
o The contractor shall develop, update, and maintain updated information for countries within the GCC including, but not limited to:
Applicable labor laws
VISA wait times
Vendor lists
Transportation infrastructures
Identify engineering support required
Other pertinent information that will impact or influence cost and ability to deliver required services when needed.
o The planning capability shall develop proposals, estimates, and technical execution plans.
Focus Area - Setting the Theater
USG will provide
Contractor:
o Prioritized list of countries/regions requiring detailed analysis o Required deliverables with timelines for country books o Access to existing
USG data when available
USG will assess semi-annually during Performance
Management Review
1524 Oct 2017 Pre-Decisional
PWS SECTIONS:
SECTION I - LOGISTICS CIVIL AUGMENTATION
PROGRAM CONCEPT OF
OPERATIONS
SECTION II - CONTRACTOR ENABLING
FUNCTIONS
SECTION III - ENGINEERING
SECTION IV - Base Operations Services Support
SECTION V - SUPPLY
SECTION VI - MAINTENANCE
SECTION VII - TRANSPORTATION
SECTION VIII - OTHER SUPPORT
OPERATIONS
SECTION IX - CONTRACTOR OPERATIONS
SECTION X - TECHNICAL EXHIBITS
Requirements by Category
Base Operations Support:
• Requirements are now contingency and non-contingency augmentation support across the operational spectrum (Phases 0-V)
• Adds medical support requirement (role 1 and 2), and family support services
• Permissive environment - focus on efficiencies
• Contingency environment and multi-domain battlefield - focus on reducing footprint and logistics tail
1624 Oct 2017 Pre-Decisional
Sustainment Operations:
• Requirements are now contingency and non-contingency augmentation support across the operational spectrum
(Phases 0-V)
• Support Theater exercises for plan validation
• Directed use of Army automated information systems in order to maintain theater logistics common operating picture
PWS SECTIONS:
SECTION I - LOGISTICS CIVIL AUGMENTATION
PROGRAM CONCEPT OF
OPERATIONS
SECTION II - CONTRACTOR ENABLING
FUNCTIONS
SECTION III - ENGINEERING SERVICES
SECTION IV - CONTINGENCY BASING
SECTION V - SUPPLY
SECTION VI - MAINTENANCE
SECTION VII - TRANSPORTATION
SECTION VIII - OTHER SUPPORT OPERATIONS
SECTION IX - PLANS IN SUPPORT OF
CONTRACTOR OPERATIONS
SECTION X - TECHNICAL EXHIBITS
Requirements by Category
• Permissive environment - focus on efficiencies
• Contingency environment and multi-domain battlefield - focus on reducing footprint and logistics tail, and point of need production operations
1724 Oct 2017 Pre-Decisional
How a LOGCAP V Task Order Will Work
Performance Work Statement
“Menu” of Services and baseline standards
Technical Exhibit A.1 Services Matrix indicates active service requirements supporting workload by location.
Technical Exhibit A.2 Site Maps, facility drawings*
Site specific requirements
Technical Exhibit C (C.1-C.4)
Government Furnished:
• Facilities (GFF)
• Equipment (GFE)
• Material (GFM)
• Services, Support and Training
Government support
Technical Exhibit H.2 PRS Supplement – exceptions and supplements to H.1
How services are to be provided
Technical Exhibit H.1 Performance
Requirements Summary (PRS) and Acceptable Quality levels (AQL)
How we build Task Order requirements
*Provided Post Award Built from a single workload
Excel data package
1824 Oct 2017 Pre-Decisional
Reporting
Type of Report Method/Medium/Format
• Routine status, management, inventory, and information reports
• Government property management
Standard Army Automated Information Management Systems
• LOGCAP Program Specific Reports Stand alone or flat file format o Microsoft Office Software o Format provided by USG
• Theater / Operation Specific Reports Specific to theater and/or local base/camp
Technical Exhibit (TE) F: Required Reports
• Government formatted reports under development
• LOGCAP V will use baseline reporting formats common to all task orders
• Baseline frequency dictated in TE F
• Exceptions/deviations will be detailed in TE H.2
Goal is to standardize reporting across all theaters and enable accurate theater logistics common operating picture
1924 Oct 2017 Pre-Decisional
LOGCAP V ENDSTATE
Endstate
• Coordinated LC support solution
– Surge-ready ahead of TPFDD to set the theater
– Agile and adaptable
– Proactive versus reactive
• Augment or assume TSC/sustainment brigade functions ISO theater opening, RSOM activities, theater distribution, theater sustainment, and other required services
• Built against Standard Requirements Codes (SRC), TPFDD gaps, and theater organic gaps
• Use of USG automated Logistic Information Systems (LIS)
• Non-proprietary LC concepts of support, SUPPLANS, Annex W inputs and country books
2024 Oct 2017 Pre-Decisional
Country/Region Books
Region book data is broken into four major categories:
• General Information
(i.e. customs/immigration, health/medical, political agreements, labor laws, labor brokers, skill set availability, existing political agreements, Status of Forces Agreements, etc.).
• Transportation/distribution infrastructure related details
(i.e. seaport/maritime, airfield/aviation, rail, pipeline/warehouse/storage facilities).
• Engineering infrastructure related details
(i.e. power, water, building codes)
• Potential vendor lists.
2124 Oct 2017 Pre-Decisional
UNCLASSIFIED
LOGCAP V
Draft RFP 2
2224 Oct 2017 Pre-Decisional #
LOGCAP V Source Selection Process
Group Two All Contractors eligible for one award only
Group One All Contractors eligible for one award only
Group Three All Contractors eligible unless awarded
CENTCOM, or did not receive a GCC/ASCC award in previous rounds
1. EUCOM
2. PACOM
1. CENTCOM
2. NORTHCOM
4. SOUTHCOM
3. AFRICOM
AFG
• Required propose on all requirements (all GCC/ASCC)
• Must be acceptable or higher technically in all GCC/ASCC
2324 Oct 2017 Pre-Decisional
Technical Proposal Instructions
Regional Capabilities
• Regional Capabilities Matrix (1 per GCC/ASCC)
• Purpose of the matrix is to depict the contractor’s existing capability within each GCC/ASCC as it directly relates the service requirements that may be required under any
LOGCAP Task Order (PWS).
• Regional Planning and Performance Capabilities (1 per
GCC/ASCC)
• Description of structure with each GCC/ASCC that demonstrates rapid responsiveness, capabilities, and/or experience.
• Approach to leverage those in delivering services.
• Supported by the Regional Capabilities Matrix.
2424 Oct 2017 Pre-Decisional
Section M – Technical Evaluation
Approach A separate adjectival rating will be assigned to support award determinations for each GCC/ASCC.
Regional Performance Capabilities:
• Offeror’s demonstrated capabilities within each GCC/ASCC that directly relate to the service requirements that may be required under LOGCAP.
• Demonstrates rapid responsiveness, capabilities, and/or experience throughout the GCC/ASCC.
• How they (regional capabilities) will be leveraged in delivering services required by the RFP and the LOGCAP Standardized
PWS
2524 Oct 2017 Pre-Decisional
Regional Capabilities Evaluation
Key LOGCAP Risk Areas
CapabilityFlexibility
• Assess the offeror’s ability to mitigate risk through its:
• Existing locations and capabilities
• Business arrangements with host nations
• Strategic partnerships, vendor networks, and supply chains
• How those will be leveraged to support “Setting the Theater” and delivering services of the PWS.
Responsiveness
2624 Oct 2017 Pre-Decisional
Technical Proposal Instructions (cont.)
Management and Staffing Approach: (1 Overarching Approach)
• Describe organization structure and plan to manage the complexity of providing services, to include, start-up operations, service adjustments (adding/removing services/workload), and termination of operations. Describe tools, reports, etc. to overcome challenges and how those will be collected, packaged, and delivered to the USG.
• Key Initiatives (Combating Trafficking in Persons (CTIP), Sexual
Harassment / Assault Response & Prevention (SHARP), Threat
Awareness and Reporting Program (TARP), and Safety.
• Labor Staffing Model
• Describe supporting rationale used as the basis for the Labor
Staffing Model.
2724 Oct 2017 Pre-Decisional
Technical Proposal Instructions (cont.)
Management and Staffing Approach: (1 Overarching Approach)
• Describe organization structure and plan to manage the complexity of providing services, to include, start-up operations, service adjustments (adding/removing services/workload), and termination of operations. Describe tools, reports, etc. to overcome challenges and how those will be collected, packaged, and delivered to the USG.
• Key Initiatives (Combating Trafficking in Persons (CTIP), Sexual
Harassment / Assault Response & Prevention (SHARP), Threat
Awareness and Reporting Program (TARP), and Safety.
• Labor Staffing Model
• Describe supporting rationale used as the basis for the Labor
Staffing Model.
2824 Oct 2017 Pre-Decisional
Section M – Technical Evaluation
Approach
Management & Staffing
• Feasibility of approach to transmit information and meet key initiatives
• Feasibility of and confidence in the Labor Staffing Model
• Based on the quality and soundness of the supporting rationale utilized to develop the labor staffing model.
• Evaluated for consistency, scalability, and adjustability across the broad range of requirements
2924 Oct 2017 Pre-Decisional
Technical Evaluation
Key LOGCAP Risk Areas
Transparency Accountability
L a b o r
H o u rs
Workload
Labor Staffing Model
• Assess confidence in the Offeror’s ability to predict and control cost through the staffing model and supporting rationale
Management
• Assess the ability to mitigate risk through the use of processes, reports, communications, or other unique approaches.
• Mitigate risk through the
Offeror’s approach to addressing key
Army initiatives.
Predictability Affordability
3024 Oct 2017 Pre-Decisional
Cost/Price
• Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP)
• Cost Realism and Price Reasonableness
• Total Evaluated Price per GCC/ASCC
• Planning (FFP)
• Current requirements (TBD based on requirements)
• Most Probable Cost (MPC) adjustment for CPFF
• Task Order Base and Options evaluated
• Material & Equipment plug numbers
• Base Rates applicable to future cost/price baselining
• No fee on material, equipment, Defense Base Act, Facilities Capital
Cost of Money, and USG directed travel
3124 Oct 2017 Pre-Decisional
Proposal Instructions & Evaluation Criteria (L&M)
• Firm fixed price portion:
• Total price only
• No breakdown required, but may be requested if needed.
• Cost Reimbursable portion:
• Offerors required to submit costs and prices using Government provided formats.
• A general format has been specified for the offeror’s detailed calculation of costs.
• Offerors may add columns as needed to accommodate their proposal structure.
• Subcontract proposals will need to provide cost or price breakdowns that show resources and their quantities.
• Applies even in the case of FFP subcontracts
• Government needs visibility into the resources being proposed.
3224 Oct 2017 Pre-Decisional
Past Performance
• The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the PWS.
• Must be recent and relevant
• Within 3 years of issuance of LOGCAP V RFP
• Performing services that are same or similar scope, complexity, magnitude of effort and meets objectives and performance requirements as outlined in PWS
• Offeror may shall submit up to 3 project/contract references based on its own performance; any proposed joint venture shall submit up to 2; may submit up to 2 references for major subcontractor(s)
• Major subcontractor – represents 25% or more of a proposed effort based on the total proposed price for any task order
• Project/contract references in support of Department of Defense or
Other Government Agencies; commercial contracts not considered
• No limit for adverse past performance
• One overall Confidence Assessment
3324 Oct 2017 Pre-Decisional
Small Business
• Proposed Small Business Participation
• Submission of Small Business Participation Plan Attachment
• Commitment to Small Business
• Established procedures for timely payments to small business IAW FAR 52.219-8
• Compliance with reporting requirements IAW FAR 52.219-9; submit 3 ISRs for contracts within the past 3 years of issuance of this RFP that included a subcontracting plan
• Goals based on Total Contract Value for CONUS and OCONUS
• Small Business - 15%
• Small Disadvantaged Business (SDB) - 4%
• Woman-Owned Small Business (WOSB) - 3%
• Historically Underutilized Business Zone (HUBZone) Small Business - 2%
• Veteran Owned Small Business (VOSB) - 2%
• Service Disabled Veteran Owned Small Business (SDVOSB) - 1%
• One overall adjectival rating
• Per Section H of the RFP:
• Small Business Participation must correlate with the Small Business Subcontracting Plan required by FAR 52.219-9
• A separate small business report will be required that includes all OCONUS & CONUS dollars
3424 Oct 2017 Pre-Decisional
UNCLASSIFIED
Guided Discussion
3524 Oct 2017 Pre-Decisional
• Performance Work Statement
• 72 Response
• USG data vs. Proprietary
• Requirements Worksheets (PWS Tech Exhibits)
• Performance locations/Inputs
• Weighting of criteria
• Task Orders
• Factor elements
• Technical/Management
• Afghanistan
• CTIPs
• Labor Staffing Model (Structure and Oral Demonstrations)
• Past Performance - Relevancy
• Pricing
• Rates List
• Instructions and template
• Small Business Participation
• Non-Competitive Contract Actions
• Transition
• EVMS
Guided Discussion
3624 Oct 2017 Pre-Decisional
Panel
Questions ?
File details come from the government source that posted it. Updated .