W50SC223R0001 RFI Log 20221228.pdf

PDF 428 KB Posted

Attached to
Construct Aircraft Support Equipment (ASE) and Vehicle Maintenance (VM) Facility, Bradley Air National Guard Base, CT
Solicitation number
W50SC2-23-R-0001
Issued by

About this file

This document contains responses to contractor questions regarding solicitation number W50SC2-23-R-0001 for the construction of an Aircraft Support Equipment and Vehicle Maintenance Facility at Bradley Air National Guard Base in East Granby, Connecticut. The project scope involves the construction of the facility in accordance with contract drawings and technical specifications, with a project magnitude between $10-25 million. The North American Industry Classification code is 236220 for commercial and institutional building construction, and the size standard for small businesses is average annual revenue of $39.5 million for the past three years. This is an unrestricted solicitation seeking a single award contract. Funding is not presently available but is anticipated to be appropriated prior to award, as this project is on the National Guard's priority list. No award will be made until funds are available.

View the file

Other files

File Type Posted
CEKT179200 Geotechnical Report - CTANG - Final.pdf PDF
W50SC2-23-R-0001 Amendment 0002 SF 30.pdf PDF
C-304 - Civil Details_Amendment 002.pdf PDF
122413 - Roller Window Shades_Amendment 002.pdf PDF
104416 FL - Fire Extinguishers_Amendment 002.pdf PDF
FS001_Amendment 002.pdf PDF
W50SC223R0001 RFI Log 20230118.pdf PDF
CTANG ASE-VMXS _ RPF Building Survey Report October 2019_Amendment 002.pdf PDF
024119 FL - Selective Demolition_Amendment 002.pdf PDF
W50SC2-23-R-0001 Amendment 0001 SF 30.pdf PDF
Small Business Participation Plan Form.pdf PDF
329300 - Plants_Amendment 001.pdf PDF
A-130 - A-137 - RCPs_ Amendment 001.pdf PDF
A-610 - Door Schedule_Amendment 001.pdf PDF
101400 - Signage_Amendment 001.pdf PDF
C-304 - Civil Details_Amendment 001.pdf PDF
329113 - Soil Preparation_Amendment 001.pdf PDF
311000 - Site Clearing_Amendment 001.pdf PDF
334200 - Stormwater Conveyance_Amendment 001.pdf PDF
093013 Ceramic Tiling_Amendment 001.pdf PDF
C-306 - Civil Details_Amendment 001.pdf PDF
W50SC223R0001 RFI Log 20230112.pdf PDF
A-601 - Finish Schedule - Amendment 001.pdf PDF
Pre-Proposal Conference Attendance Sheet 20230105.pdf PDF
CE Pre-Proposal Slides.pdf PDF
Contracting Pre-Proposal Slides.pdf PDF
W50SC223R0001 RFI Log 20221222.pdf PDF
W50SC223R0001 RFI Log 20221201.pdf PDF
Brand Name JA CEKT179200 signed.pdf PDF
W50SC2-23-R-0001.pdf PDF
Mandatory Signs 2.pdf PDF
Manadatory Door Hardware.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
EXHIBIT D - Letter of Commitment ok Key Personnel.docx DOCX document
Mandatory Signs 1.pdf PDF
EXHIBIT A - Performance Relevancy Questionnaire.docx DOCX document
Mandatory Sign Part Numbers.pdf PDF
EXHIBIT C - Reference_Questionnaire_Package.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Connecticut Air National Guard 103 AW at Bradley ANGB, East Granby, CT Solicitation: W50SC2-23-R-0001 Requests for Information (RFIs) Item RFI Response

Solicitation references Exhibit C at p.21, para 2.5.3.2. Can we submit completed CPARS evaluation in lieu of Exhibit C?

No, the Government will pull and review CPARS evaluations seperately from what is submitted as part of the proposal package.

Section 00100 of the solicitation, para 14 on page 18 references Brand Name Justification and Approval (J&A), Control No. 22-39. Where can we find this J&A.

The J&A has been posted to SAM.gov at the same time as this RFI Log.

019113 states “The Government shall hire an Independent Commissioning Authority…” Do I understand that the GC is not required to carry Commissioning in their cost?

The A-E is the Commissioning Authority and the GC will not incur the cost of the A-E for their commissioning efforts.

Please confirm that UFC 3-520-01 and UFGS Section 26 05 19.10.10 shall apply to this project. Specifically, please confirm that bidders are permitted to utilize the type(s) of material(s) described in UFC 3-520-01 and UFGS Section 26 05 19.10.10 applicable to their scope of work despite any potentially contradictory provisions in the design plans and specifications.

The building design complies with UFC requirements, however, UFGS specs are not part of the project. The contractor shall provide materials as specified in specification 260519 FL - Low-Voltage Electrical Power Conductors and Cables in the construction documents. Also, see FAR clause 52.236-5 and DFARS clause 252.236-7001.

Please provide a signage schedule. The Government will supply an initial draft of a signage schedule during construction in the preliminary submittal phase according to 101400 3.3.A. The door schedule (Sheet A-610) and room finish schedule (Sheet A-601) will be the initial basis for the first draft of the signage schedule (in accordance with 101400 3.3.C), but those schedules may not be all inclusive, and may not be accurate or adequately descriptive for signage purposes. The Contractor shall submit the final message schedule in the form of a submittal from the Manufacturer (according to 101400 2.4) for Government approval prior to fabrication (according to 101400 3.3.B).

101400 3.3.B For all sign types requiring message schedules, Contractor is required to meet with the Government prior to production and fabrication, to verify final messages…. (Continued)

Thursday, December 1, 2022

Thursday, December 22, 2022

Wednesday, December 28, 2022

As of 12/28/2022 11:52 AM Page 1 of 2

Connecticut Air National Guard 103 AW at Bradley ANGB, East Granby, CT Solicitation: W50SC2-23-R-0001 Requests for Information (RFIs) Item RFI Response

Thursday, December 1, 2022

Continued 101400 3.3.C Sign Type Schedule:

1.Type RI:

a.Rooms: All rooms with doors from circula on corridors [refer to Sheet A-601

Room Finish Schedule for list of room names, refer to Sheet A-610 Door Schedule for list of doors]

2.Type [LR, typo]:

a.Rooms: 111A and 112A

101400 2.4 Sign Types [sign specifications according to identified type]

As of 12/28/2022 11:52 AM Page 2 of 2

File details come from the government source that posted it. Updated .