This pre-proposal conference presentation outlines requirements for a construction project solicitation to build an Aircraft Support Equipment and Vehicle Maintenance facility at Bradley Air National Guard Base in East Granby, Connecticut. Offerors must submit two proposal volumes - with the first addressing price and the second covering technical merit and past performance. The technical merit volume must include experience and capability, key personnel, and a construction schedule. The past performance volume requires information on quality control, timely performance, safety compliance, management effectiveness, and compliance with federal laws and regulations from the past five years. Proposals are due by 10:00 AM EST on January 23, 2023 and the contract award will be made based on best overall value considering technical merit, past performance, and price factors equally. The period of performance is 730 days from notice to proceed.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50SC2-23-R-0001
ASE / VM COMPLEX
PRE-PROPOSAL CONFERENCE
Date: 5 JAN 2023
Location of Project: Bradley ANGB, East Granby, CT
INTRODUCTION
• Contracting Officer (KO): 2d Lt Eric Hoss
• Contracting Officer’s Representative (COR): Mr. Scott Pearsall
• Base Civil Engineer (BCE): Mr. Cory Knick
• No questions today, submit RFIs
SOLICITATION, PLANS
& SPECIFICATIONS
• On The Web – www.SAM.gov
• Solicitation
• Exhibits
• Requests for Information (RFIs) and Responses
• Amendments
• Check Regularly & Refresh Web Page
• Plans & Specifications- must be registered on SAM and have Unique Entity ID
PERIOD OF PERFORMANCE
730 days after the Notice to
Proceed is issued.
DISCLAIMER
THE FOLLOWING IS A BRIEF OVERVIEW OF THE PROPOSAL
REQUIREMENTS
Offerors Are Strongly Cautioned
To Carefully Read The
Requirements Of The Solicitation
And Comply Accordingly
IMPORTANT REMINDER
The Government Intends To
Award Without Discussion And
There May Not Be A Chance For
Discussions, Corrections, Or
Revised Proposals
WHAT YOU MUST SUBMIT
• Section 00110 Of The RFP Details The Required Information And Format For The Proposal
• 2 Volumes Are Required
• VOL 1 – Price/Cost
• Pro forma documents
• VOL 2 – Technical Merit and Past/Present Performance
VOLUME 1- PRICE/COST
• Offeror portion of SF1442
• Section 00010 – Pricing Info
• Section 00600 – Representations and Certifications (R&C)
• Complete R&Cs in SAM on the web
• Complete and Return DoD R&Cs in Section 0600
VOLUME 2 TECHNICAL MERIT – PART 1
NO PRICES/COST IN THIS VOLUME
Comprised of three (3) subfactors:
1. Experience and Capability
2. Key Personnel
3. Construction Schedule
VOLUME 2 PAST/PRESENT PERFORMANCE – PART 2
NO PRICES/COST IN THIS VOLUME
• Comprised of six (6) subfactors:
• Subfactor 1 – Quality Control
• Subfactor 2 - Timely Performance
• Subfactor 3 – Compliance with Safety Standards
• Subfactor 4 – Management Effectiveness
• Subfactor 5 – Compliance with Federal laws and regulations
• Subfactor 6 – Compliance with utilization of small business concerns requirements
• Exhibit A- Part 1- Performance Relevancy Questionnaires – Use Exhibit Format!
• Complete not more than 5 forms for Relevant Contracts Completed Or Substantially Completed (70%) In The Last Five Years
• Exhibit A-Part 2 – Complete One (1)
• Send Questionnaires For The Exhibit A Projects to references
VOLUME 2 – PART 2
PAST PERFORMANCE CONTINUED
• If You Do Not Have Relevant Past Performance And Are Using Experience Of Key Personnel, Predecessor Companies Or Subcontractors To Obtain This Ensure You Clearly State This In The Proposal
• To Be Considered, Subcontractor Must Complete A Consent Form - Exhibit B
PAST PERFORMANCE REFERENCES
EXHIBIT C
• Reference Questionnaires Are
Also Due By The Solicitation
Closing Time And Date
• Send Reference Questionnaires Out As
Soon As Possible
• Return to KO email
EXHIBITS
• Exhibit A = Relevancy Questionnaire
• PART 1 (NTE 5) PART 2 (1)
• Exhibit B = Subcontractor Consent Form- if applicable
• Exhibit C = Past Performance Letter and Questionnaire (Send out to References)
PROPOSAL DUE DATES
• Proposal Due: 10:00 AM EST on 23 January
• Proposal Must Be Signed By Officer Of Your
Company
• No Facsimile Or Electronic Offers
• Send or deliver to: (follow instructions in
Section 00100 for base access)
PROPOSAL EVALUATION
• Process Is Detailed In RFP Section 00120
• Carefully Review Section 00120 When Preparing Proposal
• Comply With Section 00100 And 00110 Requirements
• Failure To Furnish A Complete Proposal May Result In Elimination From Consideration
PROPOSAL EVALUATION
• The award will be made based on the best overall (i.e.
best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration give the to the three (3) evaluation factors: Technical Merit, Past/Present Performance and Price.
• The Technical Merit factor is approximately equal to the Past/Present Performance factor and when combined, the non-price factors are approximately equal to the Price factor.
• The firm that represents the Best Value to the Government will be selected for an award IAW FAR
15.1 Source Selection Processes and Techniques.
AWARD
The Contractor Whose Proposal Provides:
• The Best Value To The Government
(carefully read Section 00120)
• The Best Value May Not Be The Lowest
Price
RFIs and Responses
• See Section 00100 Paragraph 3
File details come from the government source that posted it. Updated .