About this file

This document package includes a fire suppression system design specifications file and a related federal contract solicitation. The specifications file provides details for designing, installing, and testing fire suppression systems according to various codes and standards. It includes sprinkler system design criteria, notes, abbreviations, legends, and a site plan.

The federal contract solicitation seeks offers to construct an Aircraft Support Equipment and Vehicle Maintenance facility at Bradley Air National Guard Base in East Granby, Connecticut. Work will be performed according to contract drawings and technical specifications. The North American Industry Classification code is 236220 and size standard is $39.5 million average annual revenue. Project value is between $10-25 million. A single award is contemplated. Failure to submit an offer on all items will result in rejection. Instructions for drawings and specifications are in section 00100. Funds have not been appropriated and no award will be made until funds become available, which is anticipated prior to award as the project is on the National Guard priority list.

View the file

Other files

File Type Posted
CEKT179200 Geotechnical Report - CTANG - Final.pdf PDF
W50SC2-23-R-0001 Amendment 0002 SF 30.pdf PDF
C-304 - Civil Details_Amendment 002.pdf PDF
122413 - Roller Window Shades_Amendment 002.pdf PDF
104416 FL - Fire Extinguishers_Amendment 002.pdf PDF
W50SC223R0001 RFI Log 20230118.pdf PDF
CTANG ASE-VMXS _ RPF Building Survey Report October 2019_Amendment 002.pdf PDF
024119 FL - Selective Demolition_Amendment 002.pdf PDF
W50SC2-23-R-0001 Amendment 0001 SF 30.pdf PDF
Small Business Participation Plan Form.pdf PDF
329300 - Plants_Amendment 001.pdf PDF
A-130 - A-137 - RCPs_ Amendment 001.pdf PDF
A-610 - Door Schedule_Amendment 001.pdf PDF
101400 - Signage_Amendment 001.pdf PDF
C-304 - Civil Details_Amendment 001.pdf PDF
329113 - Soil Preparation_Amendment 001.pdf PDF
311000 - Site Clearing_Amendment 001.pdf PDF
334200 - Stormwater Conveyance_Amendment 001.pdf PDF
093013 Ceramic Tiling_Amendment 001.pdf PDF
C-306 - Civil Details_Amendment 001.pdf PDF
W50SC223R0001 RFI Log 20230112.pdf PDF
A-601 - Finish Schedule - Amendment 001.pdf PDF
Pre-Proposal Conference Attendance Sheet 20230105.pdf PDF
CE Pre-Proposal Slides.pdf PDF
Contracting Pre-Proposal Slides.pdf PDF
W50SC223R0001 RFI Log 20221228.pdf PDF
W50SC223R0001 RFI Log 20221222.pdf PDF
W50SC223R0001 RFI Log 20221201.pdf PDF
Brand Name JA CEKT179200 signed.pdf PDF
W50SC2-23-R-0001.pdf PDF
Mandatory Signs 2.pdf PDF
Manadatory Door Hardware.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
EXHIBIT D - Letter of Commitment ok Key Personnel.docx DOCX document
Mandatory Signs 1.pdf PDF
EXHIBIT A - Performance Relevancy Questionnaire.docx DOCX document
Mandatory Sign Part Numbers.pdf PDF
EXHIBIT C - Reference_Questionnaire_Package.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT ALL SYMBOLS ARE USED

TC

ABBREVIATIONSYMBOL DESCRIPTION

BUTTERFLY VALVE WITH TAMPER

FLOW SWITCHFS

EAB ELECTRIC ALARM BELL

FDC FIRE DEPARTMENT CONNECTION (WALL-MOUNTED)

INSPECTOR'S TEST CONNECTION

WET PIPE RISER

OUTSIDE SCREW AND YOKE GATE VALVE W/TAMPER SWITCH

POST INDICATOR VALVE

DRY PIPE VALVE

PRESSURE REDUCING VALVE

CHECK VALVE

ANGLE VALVE

GLOBE VALVE

AV

GLV

CV

DPV

PRV

PIV

OS&Y

SP

CAPPED PIPE/OUTLET

PIPE TURNING DOWN

PIPE TURNING UP

AFF

AHJ

AVG

BFP

CFM

COTR

ELEV

FDC

FHV

FP

EOL

FPC

FVC

GALS

GPH

GPM

GV

JP

JPC

JOCKEY PUMP

GATE VALVE

GALLONS PER MINUTE

GALLONS PER HOUR

GALLONS

FIRE VALVE CABINET

FIRE PUMP CONTROLLER

FIRE PUMP

FIRE HOSE VALVE

END OF LINE RESISTOR

ELEVATION

CUBIC FEET PER MINUTE

AVERAGE

AUTHORITY HAVING JURISDICTION

DOUBLE CHECK BACKFLOW PREVENTER

CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE.

FIRE DEPARTMENT CONNECTION

WEATHER PROOFWP

UH

SQFT

SLC

NIC

NC

MIN

NP

PIV

PSIG

SOV

VLV

OS&Y

NAC

JOCKEY PUMP CONTROLLER

MINIMUM

NOTIFICATION APPLIANCE CIRCUIT

NOT PERMITTED

NONCOMBUSTIBLE

POST INDICATOR VALVE

NOT IN CONTRACT

OUTSIDE SCREW AND YOKE

POUNDS PER SQUARE INCH GAUGE

SIGNALING LINE CIRCUIT

SOLENOID VALVE

SQUARE FEET

UNIT HEATER

VALVE

ABOVE FINISHED FLOOR

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

OH ORDINARY HAZARD

TYP TYPICAL

FIRE SUPPRESSION GENERAL NOTESFIRE SUPPRESSION LEGEND FIRE PROTECTION ABBREVIATIONS

1. THE BUILDINGS MUST BE FULLY SPRINKLERED. THE SYSTEMS MUST BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH

• UFC 3-600-01, 8 AUGUST 2016 WITH CHANGE 5, 24 SEPTEMBER 2020

• INTERNATIONAL BUILDING CODE, 2018 EDITION

• NFPA 1, FIRE CODE, 2018 EDITION

• NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

• NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE SERVICE MAINS AND THEIR APPURTENANCES, 2019 EDITION

• CONTRACT SPECIFICATIONS

2. THE DESIGN IS BASED ON UFC 3-600-01, AND THE REQUIREMENTS LISTED BELOW. THE MORE STRINGENT REQUIREMENTS OF UFC 3-600-01 MUST APPLY.

3. VERIFY ALL LOCATIONS AND MEASUREMENTS AS CONDITIONS MAY VARY THROUGHOUT CONSTRUCTION. ALL CHANGES FROM THE ORIGINAL DESIGN MUST BE APPROVED BY THE AHJ.

4. INSTALL TAMPER AND FLOW SWITCHES AS INDICATED ON CONTRACT DRAWINGS. CONNECTIONS TO THE FIRE ALARM SIGNALING LINE CIRCUIT MUST BE MADE UNDER SPECIFICATION DIVISION 28.

5. DESIGN THE AUTOMATIC SPRINKLER SYSTEM BY MEANS OF HYDRAULIC CALCULATIONS IN ACCORDANCE WITH UFC 3-600-01, NFPA 13, AND CONTRACT SPECIFICATIONS REQUIREMENTS. REFER TO WATER SUPPLY AND DESIGN REQUIREMENTS ON THIS SHEET FOR CLARIFICATION. THE CONTRACTOR IS RESPONSIBLE FOR THE ENTIRE DESIGN OF THE SPRINKLER SYSTEM.

6. DRAWINGS INDICATE THE DESIGN INTENT. SHOP DRAWINGS MUST BE SUBMITTED TO INDICATE SPECIFIC PRODUCTS TO BE INSTALLED, HANGER DESIGN CRITERIA, ETC. IN ACCORDANCE WITH NFPA

13, CHAPTER 27.

7. OBTAIN ALL REQUIRED PERMITS AND APPROVALS FROM THE AHJ PRIOR TO COMMENCING WORK.

8. BUILDING SEISMIC DESIGN CATEGORY C. PROVIDE SEISMIC BRACING FOR SPRINKLER SYSTEM PIPING IN ACCORDANCE WITH NFPA 13.

HH HIGH HAZARD

AAV AUTOMATIC AIR VENT

OCCUPANCY

CLASSIFICATION

DESIGN DENSITY

(GPM / SQ. FT)

DESIGN AREA

(SQ. FT)

HOSE STREAM

ALLOWANCE (GPM)

DURATION

(MIN.)

LIGHT HAZARD (LH) 0.10 1,500 250 60

ORDINARY HAZARD

WET (OH)

0.20 2,500 250 60

COVERAGE PER

SPRINKLER

(SQ. FT)

SPRINKLER SYSTEM DESIGN CRITERIA

SPRINKLER HEAD

K-FACTOR

5.6

8.0

RESPONSE

TIME INDEX

(RTI)

QR

SR

VEHICLE OPERATIONS

PARKING (REFUELER) -

CEILING HEIGHT UP TO 30'

EXTRA HAZARD (EH)

0.30 2,500 500 60 100 11.2 SR

9. PROVIDE UPRIGHT SPRINKLERS IN ALL ROOMS WITH NO CEILINGS, AND CONCEALED OR RECESSED TYPE SPRINKLERS WITH COVERS IN SUSPENDED CEILINGS, GYPSUM CEILINGS AND SOFFITS.

COORDINATE COVER PLATE COLORS WITH ARCHITECT.

10. COORDINATE ALL FIRE PROTECTION, ELECTRICAL, PLUMBING, MECHANICAL, AND STRUCTURAL WORK WITH CEILING HEIGHTS AND ARCHITECTURAL WORK. WHERE CONFLICTS OCCUR COORDINATE

FINAL LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS.

11. THE FIRE SUPPRESSION SYSTEMS MUST BE SUPPLIED BY A DEDICATED FIRE MAIN. THE EXISTING HIGH PRESSURE FIRE MAIN IS SUPPLIED BY TWO 3,000 GPM @140 PSI FIRE PUMPS. BASE HYDRAULIC CALCULATIONS ON THE MOST RECENT FIRE PUMP TEST REPORTS, STATIC PRESSURE ON THE SYSTEM IS 170 PSI.

12. SPRINKLER PIPING MUST BE LABELED IN ACCORDANCE WITH UFC 3-600-01, 9-6.8.

13. FIRE SPRINKLER SYSTEM MUST BE FULLY COORDINATED WITH ALL DISCIPLINES PRIOR TO INSTALLATION.

14. PROVIDE AUXILIARY DRAINAGE FOR ALL LOW POINT AND TRAPPED SECTIONS OF WATER.

15. SPRINKLER TEMPERATURE RATING IN ACCORDANCE WITH NFPA 13.

16. SPRINKLERS MUST BE LOCATED SYMMETRICALLY WITHIN CEILING TILES.

17. FOR ALL PIPE PASSING THROUGH EXPANSION JOINTS PROVIDE UL LISTED AND FM APPROVED FLEXIBLE COUPLING.

18. PROVIDE BLACK STEEL SCHEDULE 40 MINIMUM THICKNESS FOR ALL FIRE SUPPRESSION PIPING.

19. PROVIDE AN AIR RELIEF VENT AT THE HIGH POINT OF EACH ZONE OF THE FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13.

20. PROVIDE AN INSPECTORS TEST CONNECTION AT THE MOST HYDRAULICALLY REMOTE POINT ON THE SPRINKLER SYSTEM.

21. ALL DRAIN PIPING MUST BE PIPED TO THE BUILDING EXTERIOR TO WITHIN 6 INCHES ABOVE FINISHED GRADE. ALL DRAIN PIPING DISCHARGE LOCATIONS MUST BE PROVIDED WITH SPLASH

BLOCKS.

SIM

SP

TD TRAVEL DISTANCE

SMOKE PARTITION

SIMILAR

CIS COMMON INTELLIGIBILITY LEVEL

DOR

AFG ABOVE FINISHED GRADE

DESIGNER OF RECORD

SD SMOKE DAMPER

EX EXPLOSION PROOF

VEWSD VERY EARLY WARNING SMOKE DETECTION

LH

NS

LIGHT HAZARD

NOT SPRINKLERED

ORDINARY HAZARD

EXTRA HAZARD

OH

EH

ORDINARY HAZARD

DRY (OH)

0.20 3,500 250 60 130 8.0 SR

* DESIGN AREA MUST BE THE LESSER OF THE DESIGN AREA INDICATED OR THE ENTIRE AREA OF THE SPACE PROTECTED.

HATCHING

SYMBOL

FIRE SUPPRESSION SPRINKLER SYSTEM DESIGN CRITERIA

FIRE SUPPRESSION SITE PLAN

REFUELER MAINTENANCE -

CEILING HEIGHT GREATER

THAN 30' EXTRA HAZARD (EH)

0.30

3,600 OR

TOTAL AREA

OF ROOM

(WHICHEVER

IS LESS)

500 60 100 11.2 SR

DRY PIPE

ZONE

WET PIPE

ZONE 1

WET PIPE

ZONE 2

WET PIPE

ZONE 3

N

A

Designed:

Drawn:

Checked:

Date:

Drawing Title:

Jacobs Project No.:

Key Plan:

D3257200

B

C

D

2 3 4 5

THESE DOCUMENTS ARE FOR

INTERIM REVIEW AND NOT FOR

CONSTRUCTION, BIDDING, OR

PERMIT PURPOSES.

Phase: B-3 FINAL DESIGN

C O

N N

EC

TI

C U

T

AI

R N

AT

IO

N

AL

G U

AR

D

R D

A

IR

LI

FT

W

IN

G

BR

AD

LE

Y

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E

EA

ST

G R

AN

BY

, C O

N N

EC

TI

C U

T

C O

M P

O S

IT

E

A S

E A

N D

V M

X S

F A

C

IL

IT

Y

Drawing No.:

C D

A E

S

B

BI

M

U

S C

T_ D

0_

C

AN

G _A

SE

-V

M

XS

F ac ilit y/

D

0_ C

TA

N

G _A

SE

-V

M

XS

F

AC

IL

IT

Y_

FP

R O

.rv t

1/

/2

4:

:4

PM

M.OWENS

D.FOX

J.MCLAUGHLIN

03/31/2022

FS001

FIRE SUPPRESSION

GENERAL NOTES,

ABBREV., AND SYMBOLS

REV DESCRIPTION DATE

1 AMENDMENT 002 JAN 2023