This solicitation is for a construction project to build an Aircraft Support Equipment and Vehicle Maintenance Facility at Bradley Air National Guard Base in East Granby, Connecticut. The project magnitude is estimated between $10 million and $25 million. The work includes site clearing, demolition, and construction in accordance with technical specifications. The North American Industry Classification code is 236220 for Commercial and Institutional Building Construction, and the size standard for small businesses is average annual revenue of $39.5 million for the past three years. This will be a single-award contract, and failure to submit an offer on all items will result in rejection of the proposal. Instructions for obtaining drawings and specifications are in Section 00100 of the solicitation. Funds have not yet been appropriated for this acquisition but are anticipated to become available prior to award, as this project has been identified on the National Guard's priority list. No contract will be awarded until funds are available.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Connecticut Air National Guard 31 March 2022 Construct Composite ASE/VMXS Facility - CEKT179200 AMENDMENT 001 – JANUARY 2023 Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SITE CLEARING 311000 - 1
SECTION 311000 - SITE CLEARING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Stripping and stockpiling topsoil.
2. Removing above- and below-grade site improvements.
3. Disconnecting, capping or sealing, removing, and abandoning site utilities in place.
B. Related Requirements:
1. Section 015723 "Temporary Storm Water Pollution Control" for temporary erosion- and sedimentation-control measures.
1.3 DEFINITIONS
A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.
B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.
C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects larger than 2 inches (50 mm) in diameter; and free of weeds, roots, toxic materials, or other nonsoil materials.
D. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Not Required.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SITE CLEARING 311000 - 2
1.5 MATERIAL OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
1.6 INFORMATIONAL SUBMITTALS
A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.
1. Use sufficiently detailed photographs or video recordings.
2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain.
B. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.
1.7 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
2. Provide alternate routes around closed or obstructed trafficways if required by Owner or authorities having jurisdiction.
B. Utility Locator Service: Notify Call Before You Dig (dial 811, or 1-800-922-4455) for area where Project is located before site clearing.
C. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 312000 "Earth Moving."
1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SITE CLEARING 311000 - 3
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.
B. Protect existing site improvements to remain from damage during construction.
1. Restore damaged improvements to their original condition, as acceptable to Owner.
3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
B. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.
3.3 EXISTING UTILITIES
A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.
1. Arrange with utility companies to shut off indicated utilities.
B. Locate, identify, and disconnect utilities indicated to be abandoned in place.
C. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others, unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Owner not less than three (3) days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner's written permission.
D. Excavate for and remove underground utilities indicated to be removed.
3.4 CLEARING AND GRUBBING
A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.
1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SITE CLEARING 311000 - 4
2. Grind down stumps and remove roots larger than 2 inches (50 mm) in diameter, obstructions, and debris to a depth of 18 inches (450 mm) below exposed subgrade.
B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.
1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm), and compact each layer to a density equal to adjacent original ground.
3.5 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.
B. Strip topsoil to depth of 6 inches (150 mm) in a manner to prevent intermingling with underlying subsoil or other waste materials.
C. Stockpile topsoil away from edge of excavations without intermixing with subsoil or other materials. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.
1. Limit height of topsoil stockpiles to 144 inches (3600 mm)
2. Surplus topsoil shall not be removed from the Base. Coordinate offsite surplus topsoil stockpile location with Owner. Stockpile should be spread out low enough to be maintained and hydroseeded. Silt fence shall be installed around the base of the stockpile and shall not be removed until grass growth has stabilized the pile.
3.6 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.
B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.
1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.
2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.
3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus soil material (except topsoil), obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SITE CLEARING 311000 - 5
END OF SECTION 311000